HomeMy WebLinkAboutRP 06-11; Carlsbad Christian Assembly; Redevelopment Permits (RP) (2)Citv of Carlsbad
Housing & Redevelopment Department
April 18. 2008
CARLSBAD CHRISTIAN ASSEMBLY
ATTN: DON METCALF
825 CARLSBAD VILLAGE DR.
CARLSBAD, CA 92008
SUBJECT: Carlsbad Christian Assembly Storage Building (RP 06-11)
On November 13, 2006 the Housing and Redevelopment Director conditionally
approved Administrative Redevelopment Permit No. RP 06-11 for property located at
3035 Harding Street. I understand that your buHding permit for the storage building has
been finalized. The Redevelopment Department was supposed sign off on the final
building permit In order to verify that the conditions placed on the permit were satisfied.
Unfortunately, this did not happen.
The Redevelopment Department Is asking you to satisfy condition No. 4 of the permit
which requires you to install a landscape planter with decorative block containing six (6)
bougainvillea plants with a minimum initial height of 4 feet and two (2) queen palms with
a minimum initial height of 6 feet consistent with the approved landscape plans.
Attached, Is a copy of the approved permit with conditions for your reference. Piease
review all conditions carefully. Violation of the conditions could result In revocation of
this permit.
If you have any questions and/or comments regarding this correspondence, please
contact me at (760) 434-2813.
Sincerely,
Austin Silva
Assistant Planner
Debbie Fountain, Housing and Redevelopment Director
Attachments: RP 06-11 w/conditlons of approval
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2335 • (760) 434-2810/2811 • FAX (760) 720-2037 @
<5itv of Carlsbad
Housing & Redevelopment Department
November 22, 2006
CARLSBAD CHRISTIAN ASSEMBLY
ATTN: DON METCALF
825 CARLSBAD VILLAGE DR.
CARLSBAD, CA 92008
SUBJECT: Carlsbad Christian Assembly Storage Building (RP 06-11)
On November 13, 2006 the Housing and Redevelopment Director conditionally
approved Administrative Redevelopment Permit No. RP 06-11 for property located at
3035 Harding Street. The decision of the Housing and Redevelopment Director is
subject to a ten (10) day appeal period. The appeal period has elapsed and no appeals
were filed.
Attached, is a copy of the approved permit authorizing the construction of a 600 square
foot storage building. Please review all conditions carefully. Violation of the conditions
could result in revocation of this permit. Having completed the land use review process,
your building permit may now be issued.
If you have any questions and/or comments regarding this correspondence, please
contact my office at (760) 434-2812.
Sincerely,
Austin
Planning Technician
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037
Citv of Carlsbad
Housing & Redevelopment Department
October 2, 2006
CARLSBAD CHRISTIAN ASSEMBLY
ATTN: DON METCALF
825 CARLSBAD VILLAGE DR.
CARLSBAD.CA 92008
Subject: Storage Building. Administrative Redevelopment Permit
RP 06-11/CDP 06-26
Dear Don:
Thank you for applying for a Redevelopment Permit In the City of Carlsbad. The
Housing and Redevelopment Department, together with other appropriate City
departments, has reviewed your Redevelopment Permit, application No. RP 06-11. as to
its completeness for processing.
The application is incomplete, as submitted. The attached list includes information that
must be submitted to complete your application. This list of items must be submitted
directly to the Housing & Redevelopment Office. All list items must be submitted
simultaneously and a copy of this list must be included with your submittal. No
processing of your application can occur until the application is determined to be
complete. When all required materials are submitted to the Redevelopment Office, the
City has an additional thirty (30) days to make a determination of completeness. If the
application is determined to be complete, processing for a decision on the application
will be initiated. In addition, please note that you have six months from the date the
application was initially filed. September 21, 2006, to either resubmit the application or
submit the required information. Failure to resubmit the application or to submit the
materials necessary to determine your application complete shall be deemed to
constitute withdrawal of the application. If an application is withdrawn or deemed
withdrawn, a new application must be submitted.
Please contact my office at (760) 434-2812, If you have any questions or wish to set up
a meeting to discuss the application.
Sincerely.
Austin Silva
Planning Technician
c: Clyde Wickham, Engineering
Pat Kelly, Building
File
Enclosures
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2389 • (760) 434-2810/2811 • FAX (760) 720-2037 @
Carlsbad Christian Assemtl^^
Storage Building
10/02/2006
Page 2 of3
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
No. RP 06-11. CDP 06-26
Staff has completed a review of the subject project for application completeness. The
applications and plans submitted for this project are Incomplete at this time. Please
resubmit 4 sets of plans addressing the following Incomplete items:
Housing & Redevelopment:
1. On the site plan, pleas Include the following information:
• Name and address of owner whose property is to be developed.
• Vicinity map showing major cross streets.
• Date of preparation/revisions.
• A summary table which includes the street address and assessor's parcel
number, site acreage, the existing zone and land use designation, and total
building coverage.
• Approximate location of existing and proposed building and permanent
structures onsite and within 100 feet of site.
• Setback dimensions for the required front, rear and side yard setbacks for all
structures.
2. Please complete the attached application for a Coastal Development Permit.
Engineering:
1. Show cross section of public streets and alleys. This applies to 2 sides of the
project. Include full width In the cross section and dimensions.
2. Show names, widths and improvements for Harding Street and the Alley
identified along the east and west sides of this project. Include existing and
proposed improvements (new driveways, planters, curb & gutter) information.
3. On the preliminary grading plan, provide additional spot elevations or topography
at least 25-feet outside the property line. This information should clearly
demonstrate existing drainage patterns.
4. The City is committed to regional and State requirements to filter and maintain
clean storm water from every development. The proposed project should
incorporate Storm Water Pollution Control Devices such as vegetated or grass
lined swales or manufactured filter devices. The designers of the proposed
project should consider Best Management Products that will serve the proposed
development to the Maximum Extent Practicable (MEP).
5. The legal description for this project should included on the site plan. If existing
lots are to be consolidated by Lot Line Adjustment, please note It.
Carlsbad Christian Assemb|
Storage Building
10/02/2006
Page 3 of 3
6. Revise the site plan to list the correct ADT (traffic). EDU (sewer), and GPD/MGD
(water) GPM (Fire) and grading quantities - cut, fill, import or export, required or
generated by this project. Existing demands can be separated from proposed
demands.
7. Proposed parking dimensions should be provided on all spaces.
8. Identify the location of the nearest fire hydrant. Also, if fire sprinklers are
required, add a separate water line and double detector check valve for the
sprinkler system. Locate the DDC Valve on private property but in a location
accessible to the Fire Department. Check with the City's Fire Marshal for
additional information.
For questions regarding engineering comments, please contact Clyde Wickham at (760)
602-2742.
Building:
1. If the storage building is less then 10 feet from the property line, the structure will
need a parapet.
Fire:
The Fire Department has completed its review of this project and does not have
any comments.
Austin,
Here are all of the items requested. We filled it out as we understood it as we are a
non-profit corporation and do not have owners or agents.
I have included the structural plans as well as the construction plans as I was not
sure if you needed both.
Regarding the 300' and loo' radius map, we used the south west comer of the
property as a starting point. If we had used the middle of the property, less people
would have needed to be notified.
You requested a landscape plan, which I brought to you earlier and you kept, so I
assume you still have it.
Hopefully this meets all of the requirements and we can proceed, please call me
ASAP if we are still lacking anything.
Thank you in advance for our assistance.
Don
June 30, 2006
Austin,
Our landscape person put this together last night. He said that the best way
to get full coverage on the side of the building is with lattice and a fast
growing, attractive, vine. This would give us virtually 100% coverage on
the street side of the building. Hopefully this will meet your needs. If not, I
would appreciate a response in writing, detailing exactly what it is that we
need to do to meet your needs. As I mentioned to you on the phone, we are
more than happy to landscape the building to meet your needs, but it is
extremely difficult when there is no standard to go by. I will look forward to
hearing fi*om you this aftemoon. Thank you in advance for your time and
consideration.
Don Metcalf
685-0291
LU
o m
ii? I
O
hcvo o rn>aAo^w fU-t^ ^ ^^^^
WgaWXo^ ^ ^
Memorandum
TO: Austin Silva - Housing and Redevelopment
FROM: Clyde Wickham - Engineering Department
DATE: September 26, 2006
RP 06-11 / CDP 06-26 CARLSBAD CHRISTIAN ASSEMBLY
COMPLETNESS AND ISSUES REVIEW
The Engineering Department has completed a review of the above subject. We have
reviewed the application for completeness and have determined that the application and
plans submitted for the project are incomplete and unsuitable for continued review due
to the following incomplete items:
Incomplete Items
1. Please submit a Site Plan in conformance with submittal requirements outlined in the RP
or CDP application package. I have attached an application checklist of items necessary
to be included on the site plan.
2. Submit a Preliminary Title Report current within the last six months.
3. Show cross section of public streets and alleys. This applies to 2 sides of the project.
Include full width in the cross section and dimensions.
4. Show names, widths and improvements for Harding Street and the Alley Identified
along the east and west sides of this project. Include existing and proposed
improvements (new driveways, planters, curb & gutter) information.
5. On the preliminary grading plan, provide additional spot elevations or topography at
least 25-feet outside the property line. This Information should clearly demonstrate
existing drainage patterns.
6. The City is committed to regional and State requirements to filter and maintain clean
storm water from every development. The proposed project should incorporate
Storm Water Pollution Control Devices such as vegetated or grass lined swales or
manufactured filter devices. The designers of the proposed project should consider
Best Management Products that will serve the proposed development to the
Maximum Extent Practicable (MEP).
7. The legal description for this project should included on the site plan. If existing lots
are to be consolidated by Lot Line Adjustment, please note it..
8. Revise the site plan to list the correct ADT (traffic). EDU (sewer), and GPD/MGD
(water) GPM (Fire) and grading quantities - cut, fill, import or export, required or
generated by this project. Existing demands can be separated from proposed
demands.
9. Proposed parking dimensions should be provided on all spaces.
10. Identify the location of the nearest fire hydrant. Also, if fire sprinklers are
required, add a separate water line and double detector check valve for the
sprinkler system. Locate the DDC Valve on private property but in a location
accessible to the Fire Department. Check with the City's Fire Marshal for
additional information.
If you have any questions, please call me at 602-2742.
Clyde Wickham
Associate Engineer
Development Services Division
Memorandum
TO: Austin Silva - Housing and Redevelopment
FROM: Clyde Wickham - Engineering Department
DATE: October 10, 2006
RP 06-11 / CDP 06-26 CARLSBAD CHRISTIAN ASSEMBLY
COMPLETNESS AND ISSUES REVIEW
The Engineering Department has completed another review of the above subject. We have
reviewed the application for completeness and have determined that the application and
plans submitted for the project are complete. We have no comments or concerns.
If you have any qi/estions, plj^seV:all me at 602-2742.
Clyde Wickham
Associate Engineer
Development Services Division
REDEVELOPMENT PERMIT
REVIEW AND COMMENT REOUEST
Date: September 13, 2006
Planning Department -Water District
Engineering Department - D. HAUSER Police Department
Building Department - P. KELLEY School District
V Fire Department - G. RYAN North County Transit District
Landscape Plancheck Consultant City Attorney
To Departments: Subject: RP 06-11/CDP 06-26
The attached plans for an Administrative Redevelopment Permit and Coastal Development
Permit have been submitted for property located at 3035 Harding St. Please forward your
comments to my office as soon as possible. Thank you for your assistance. Please contact me at
ext. 2812 if you have any questions.
Project Title:
Permit No.:
Applicant:
Carlsbad Christian Assembly
RP 06-11/CDP 06-26
Don Metcalf
Brief Description of Proposal: Request to construct a pre-fabricated 600 square foot storage
building on the property located at 3035 Harding St.
Assigned staff member: Austin Silva
Comments: {Please e-mail/send comments to Austin Silva in the Housing & Redevelopment
Department.)
CARLSBAD FIRE DEPARTMENT
Fire Prevention Division
PROJECT NAME:
Date:
Project number:
Staff Planner:
Land Use Review Report
Carlsbad Christian Assembly
04/01/06
RP06-11/CDP06-26
A. Silva Engineer:
Proiect conditions: (Note: The following identifies specific conditions necessary to achieve
Fire Department approval.)
Fire Department has completed their review of this application and has no comments or
conditions to submit
GR
Austin Silva - Fwd: Carlsbad Christian As^jibly Storage BIdg Page 1
From:
To:
Date:
Subject:
Austin-
Cliff Jones
Austin Silva
09/18/2006 7:49:56 AM
Fwd: Carlsbad Christian Assembly Storage BIdg
Here are Pat's comments.
Thanks,
Cliff
»> Pat Kelley 09/15/2006 2:07 PM »>
Hi Cliff - lost the cover sheet to this one, but looking at the plans I can't tell how far the building is to the
P/L. If it is less than 10', the structure will need a parapet. More detail will be required at the building permit
stage.
Incidently, has the church counted that parking in their space calc? This will eliminate some parking.
Have a nice weekend
Pat