HomeMy WebLinkAboutRP 10-05; Clearwire Wireless; Redevelopment Permits (RP) (2)Citv of Carlsbad
Housing & Redevelopment Department
March 30. 2010
MIKE MORGANSON
7578 GIBRALTAR ST. #3
CARLSBAD, CA 92009
Re: RP lO-OS/CDP 10-03
Dear Mr Morganson:
On March 29, 2010 the Housing and Redevelopment DiFectoF conditionally approved
AdministFatlve Redevelopment Pennit No. RP 10-05 and Coastal Development Pennit
No. CDP 10-03 foF propeFty located at 560 Carisbad Village Drive. The decision of the
Housing and Redevelopment DlFectoF is subject to a ten (10) day appeal period. The
appeal period has elapsed and no appeals weFe filed. Attached is a copy of the
approved pennit authorizing the addition of six panel antennas, three DAP head units
and thFee diFectionai units inside faux chimneys. Please Feview all conditions caFefully.
Violation of the conditions could Fesult in Fevocation of this pennit.
BefoFO initiating constFuction of the subject pFoject you must complete the process to
obtain the appFopriate building pennits.
If you have any questions and/oF comments Fegarding this con-espondence, please
contact my office at (760) 434-2813.
SincoFely,
AUSTIN SILVA
Assistant Planner
2965 Roosevelt St., Ste. B • Carlsbad, CA 92008-2397 • (760) 434-2810/2811 • FAX (760) 720-2037 ^
City of Carlsbad
Land Development Engineering
February 24, 2010
To: Austin Silva, Project Planner
From: Clyde Wickham, Project Engineer
SUBJECT: CLEARWIRE - ROOSEVELT CENTER, RP 10-05 / CDP 10-03
The Engineering Department has completed its review of the project. The Engineering
Department is recommending that the project be approved, subject to the following conditions:
Eneineerine Conditions
NOTE: Unless specifically stated in the condition, all of the following conditions, upon
the approval of this proposed development, must be met prior to approval of a building permit.
1. Prior to hauling dirt or construction materials to or from any proposed construction site
within this project, Developer shall apply for and obtain approval from, the City Engineer
for the proposed haul route.
2. Developer shall comply with the City's Stormwater Regulations, latest version, and shall
implement best management practices at all times. Best management practices include
but are not limited to pollution treatment practices or devices, erosion control to prevent
silt runoff during construction, general housekeeping practices, pollution prevention and
educational practices, maintenance procedures, and other management practices or
devices to prevent or reduce the discharge of pollutants to stormwater, receiving water or
stormwater conveyance system to the maximum extent practicable. Developer shall
notify prospective owners and tenants of the above requirements.
3. Concurrent with the building permit submittal, Developer shall complete and submit a
Project Threat Assessment Form (PTAF) pursuant to City Engineering Standards.
Concurrent with the PTAF, Developer shall also submit the appropriate Tier level Storm
Water Compliance form and Tier level Storm Water Pollution Prevention Plan (SWPPP)
as determined by the completed PTAF all to the satisfaction of the City Engineer.
Engineering Conditions RP 10-05.docx Page 1 of 1