HomeMy WebLinkAboutRP 86-20; Jefferson House II Construction; Redevelopment Permits (RP) (3)FEE $100.00
•x.^ QgWIRg^NTAL IMPACT ASSESSMENT FCTO - Part I 3 /Oog
^^v^^^ Be Completed By APPLICANT) 0^/^^,^^
CASE NO.
DATE: October 14, 1936
Applicant: ^i^^ Engineering Companv
Address of Applicant: ^^^Q briars Road, San Diego, CA 92110
Phone Niunber: (6L9) 296-5050
Name, address and phone nunber of person to be contacted (if other than
Applicantj: Bill Dumka • _______
GENEPvPJL IRFORWION
Pi'oject location/address: Southeast corner of intersection of
Jefferson-Str-eet~and^Home Street
Assessor Parcel Number: 203 202 - 4, 5, &6
Zo]3e of subject property: R-P/ VR (Village Redevelopment)
Proposed use of site: Professional office building (Principal tenant
expected to be Rick Engineering Company)
List all other applicalile applications related to this project: Redevelopment
P^^^^-L-^Oij-Sh-jthg Redevelonia£D±L.I}f.€lc£^_Ci±:^r of Carlsbad
.DG SCI ibe tbe r? cti vity area, including distinguishing
natural and mcaViMiciQ characte.riGtics; also provide precise
slope analysis V7hen appropriate.
Three houses present on the property are, at the time
of this writing, being demolished.
3. Describe energy conservation measures incorporated into
the dssign and/or operation of the project. (For a more
specific discussion of' energy conservation requirements
see • of the City's EIR Guidelines)."
All required energy conservation measures will,be
incorporated into the project design.
If residential, include the number of units,* schedule of
imit sizes, range of sale prices or rents, and type cf
household size expected,
N/A
5. If cciniTiercial, indicate the type, vjhLitlier neic,\)?borhor.d,
city cr regionally oriented, square footage of s^.les area,
. c..id loading facilities. • .
The proposed project is a two story professional office
building with a total of 18,600 square feet.
If industrial, indicate type, estimated einplo^Tient per
shi ft, nd loa ding faci 1 ities ,
N/A
If institutional, indicate the major function, esti-mated
employiv.cnt per shift, estimated occupancy, loading
facilities, and conprauriity benefits to be derived from the
iproject, ' .
N/A
^- KNVIROHM.CNTAL IMPACT ANALYSIS
Answer the follov/ing questions by placing a check in the
appropriate space. (Discuss all items chocked yes. Attach
additional sheets as necessary)..
* YES NO
1) Could the project significantly change present
'land uses in the vicinity of the activity? X
10) Does the activity area serve as a habitat,
food source nesting place, source'of water,
etc. for rare or endangered wildlife on fish
species?
11) Could the activity significantly affect fish,
wildlife or'plant life?
13) Could the activity change existing features
of any of the city's lagoons, bays, or
tidelands?
2) Could the activity affect the use of a rec-
reational area, or area of important • " *
aesthetic value? • ^
3) Could the activity affect the functioning of
an estciblished community or neighborhood? X
4) Could the activity result in the displacement
• of community residents? . _x_
5) Could the activity increase the nuniber of low
•and moderate cost housing units in the city? X
6) Could the activity decrease the number of low
and modest cost housing units in the city? X
7) Are any of the natural or man-made features
in the activity area unique, that is, not'
found in other parts of the County, Stater
or Nation? X
8) Could the activity significantly affect a
historical or archaeological site or its
settings? ' * x.
9) Could the activity significantly affect thc
potential use, extraction, or conservation
of a scarce natural resource? X
X
12) Are there any rare or endanqered plant
species in the activity area? X
14) Could the activity change existing features of
any of the city's beaches? x
15) Could the activity result in the erosion or
elimination of agricultural lands? x
16) Could the activity serve to encourage develop-
ment of pre^sently undeveloped areas or intesify
development of already developed areas? x
17). Will the activity require a variance from
estfiblished environmental standards (air, water, ' X
noise, etc)7 '
IQ) Will the activity require certification, • •
authorization or issuance of a permit by any
-local, state or federal environmental control
agency? - x
19) Will the activity require issuance of a
variance or conditional use permit by the city? x
20) Will the activity involve the application, use,
or disposal cf potentially hazardous materials? X
21) . Will the activity involve construction of
facilities in a flood plain? • _X
22) VJill tho activity involve construction of .
facilities on a slope of 25 percent or greater? _^
23) V7ill the activity involve construction of
facilities in the area of an active fault? . X
24) ' Could the activity result in the generation
. of significant amounts of noise? ' _______ _X
25) Could the activity result in the generation
of significant amounts of dust? ' ' . " x
26) Will the activity involve the burning of brush,
trees, or other materials? ' X
27} Could thc activity result in a significant
change in the q da lity of any por-tion of the
regioii's air or v.'ater rc.\'oarccs? (Should note,
surface, ground water , of f--shore) . " • • y .
28) Will thc projoct substanliially increase fuel
consumption (electr:i city, oil, natural gas,
etc.)? • X
29) Vvill there be a • signiXicaut change to exi.st.i.ng
land forr.i? -X
(a) indicate estimated grading to be done in
cubic yards 500 ^
(b) percentage of alteration to the present
land form 0 ._
(c) maximum heiqht of cut or fill slopes
N/A • .
30) Will the activity result in substantial increases
in the use of utilities, sewers, drains, or
streets?
31) Is the activity carried out as part of a larger
project or series of projects? ' x
^5-
11. STATOTOT OF NON-SIGMIFICA>rr FiWIROriMENT.U EFFECTS
If you have answered yes to one or more of tlie questions
in Section I but you thj.nk the activity will have no
significant environmental effects, indicate your reasons
below:
N/A
III. COMIvlFNTS OR ELABORATIONS TO .ANY OF H-ffi QUESTIONS IN SECTION I
(If additional space is needed for ansv/ering any questions
attach additional sheets as niay be needed).
Signature
(Ferson ccni;.leting reportj
Date Signed /^/>5^/^
•6-