HomeMy WebLinkAboutRP 86-22; THREE STORY PROFESSIONAL BLDG; Redevelopment Permits (RP) (2)KELSO CONSTRUCTION, INC.
April 1^, 1987
r-, •
7c7
'' 4 *
To Whom It May Con cam:
I'd like to request the withdrawal of RP-86-22 from consideration
for an application of a Redevelopment Permit.
Thank-you for your time and effort.
Sincerely,
Kevin D. Kelso
Kelso Gonstruction, Inc.
KDK/amk
3350 Ridgecrest Dr. • Carlsbad, CA 92008 • (619) 729-1897
PLANNING DEPARTMENT
2075 LAS PALMAS DRIVE
CARLSBAD, CALIFORNIA 92009-4859
(619) 438-1161
Citp of Cad^^bati
March 11, 1987
Kevin D. and Anna Marie Kelso
3350 Ridgecrest Drive
Carlsbad, CA 92008
SUBJECT: RP 86-22 - KELSO Preliminary Staff Report
The preliminary staff report for the above referenced project
will be available for you to pick up on Friday, March 13, 1987,
after 8 a.m. This preliminary report will be discussed by staff
at the Development Coordinating Committee (D.C.C.) meeting which
will be held on March 16, 1987 at the Community Development
facility, 2075 Las Palmas Drive. A twenty (20) minute
appointment has been set aside for you at 9:00 a.m. If you have
any questions concerning your project, you should attend the
D.C.C. meeting.
It is necessary that you bring your required colored exhiblt(s)
with you to this meeting in order for your project to go forward
to Planning Coanission. If you do not plan to attend this
•eeting, please make arrangements to have your colored exhibit(s)
here by the scheduled time above.
If you need additional information concerning this matter, please
contact the Planning Department at A^38-1161.
CITY OF CARLSBAD
MICHAEL J. HOLZMILLER
Planning Director
By: ^
Planning Department
MJHrbn
February 2, 1987
Ms. Dee Landers
Land Use Planning Office
City of Carlsbad
2075 Las Palmas
Carlsbad, CA 92008
Dear Ms. Landers:
Thank you for submitting RP86-22 KEISO for comments. This project
is located on an existing route with a bus stop on the southwest
corner of Roosevelt Street at Grand Avenue. The stop does not
appear to be in the plans of the driveway for the parking facility
and therefore appears that the accessibility to public transit
will not be impeded.
Sincerely,
Steve Doyle
Planner
SD: ie
FEB - -
'anside- Califcr
PLANNING DEPARTMENT
2075 LAS PALMAS DRIVE
CARLSBAD, CALIFORNIA 92009-4859
(619) 438-1161
Citp of Carlgbab
January 13, 1987
Kevin St Anna Marie Kelso
3350 Ridgecrest Drive
Carlsbad, California 92008
RE: RP 86-22 - KELSO
The Community Development Director, the City Engineer and the
Planning Director have reviewed the application you submitted for
the above-referenced project. Based upon this review, it has
been determined that there are major problems associated with
your application which must be addressed before this application
can be scheduled for a hearing. The problems or issues are
listed below. Also, the name of the project planner and project
engineer is provided. You should setup a meeting to discuss the
issues with the appropriate staff member. Once the
problems/issues have been addressed, your application will then
be scheduled for a hearing.
PROJECT PLANNER
Adrienne Landers
PROJECT ENGINEER
Steve Jantz
PROBLEMS/ISSUES
Incompatibility with Village
Design Manual.
Driveway width requires standards
variance.
Building is massive and boxy.
Building will block light and
ventilation for adjacent buildingsT
Minimal landscaping.
Roof style is incompatible with
building architectureT
Plans do not have complete
information.
Compact parking may not be located
on alieyT
In addition to the above-listed issues, your application cannot
be considered complete until an application for a standards
variance has been made. This may be done by picking up the
proper form at the Development Processing Counter and turning the
paperwork into the Engineering Department to the attention of
Steve Jantz.