HomeMy WebLinkAboutRP 91-06; PRESIDENTIAL CENTRE; Redevelopment Permits (RP) (3)CASE NO
DATE:
Applicant:
ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART I
(To be Completed by APPLICANT)
Robert F. Mance
Address of Applicant: 4540 Kearny Villa Road, Suite 213
San Diego, CA 92123
Phone Number: ( 619 ) 560-0800
Name, address and phone number of person to be contacted (if other than
Applicant):
GENERAL INFORMATION: (Please be specific)
Project Description: Two story office building, 8800 square feet with
underground parking. Located in Subarea 1 of the Village Redevelopment
Area.
Project Location/Address: 2815 Jefferson. Carlsbad, CA.
Assessor Parcel Number: 203 - HQ - 29
General Plan/Zone of Subject Property: RMH/O / v-R
Local Facilities Management Zone: #i
Is the site within Carlsbad's Coastal Zone? No
Please describe the area surrounding the site to the
North: Arbuckle Street East: Jefferson Street
South: Grand West: Apartment Bidg.
List all other applicable permits & approvals related to this project
Major Use Permit Application. Building Permit
(Please be Specifier^ Attach Additional Pages or ExfrnTits, if necessary)
1. Please describe the project site, including distinguishing natural and
manmade characteristics. Also provide precise slope analysis when a slope
of 15' or higher and 15% grade or greater is present on the site.
The site is flat. No improvements exist. All trees and bushes
are gone.
2. Please describe energy conservation measures incorporated into the design
and/or operation of the project. The building will be insulated.
Each suite's meter will serve its own heat pump. Windows will be
operable. Water usuage will be combined in two lavatories.
3. PLEASE ATTACH A PROJECT SUMMARY SHEET WHICH SHOWS THE FOLLOWING:
a. If a residential project identify the number of units, type of units,
schedule of unit sizes, range of sale prices or rents, and type of
household size expected, average daily traffic generation (latest SANDAG
rates).
b. If a commercial project, indicate the exact type, activity(ies),
square footage of sales area, average daily traffic generation
(latest SANDAG rates), parking provided, and loading facilities.
Office building, two-story, wood exterior siding in Village nature,
ADT's = 176 (8800 divided by 1000 x 20), 31 parking stalls
underground, building size 8800 S.F., Office Professional Use.
c. If an industrial project, indicate the exact type or industry(ies),
average daily traffic generation (latest SANDAG rates), estimated
employment per shift, time of shifts, and loading facilities.
d. If an institutional project, indicate the major project/site
function, estimated employment per shift, estimated occupancy,
loading facilities, and community benefits to be derived from the
project.
I. ENVIRONMENTAL IMPACT ANALYSIS
Please Answer each of the following questions by placing a check in the
appropriate space. Then, fully discuss and explain why each item was
checked yes or no. Provide supporting data if applicable. Attach
additional sheets as necessary.
1) Could the project significantly impact or change
present or future land uses in the vicinity of the
activity?
EXPLANATION: Compatible with adiacent usuage.
YES NO
X
2) Could the activity affect the use of a recreational
area, or area of aesthetic value? ^
EXPLANATION: Commercial use only.
3) Could the activity affect the functioning of an
established community or neighborhood? ^
EXPLANATION: is compatible with surrounding use.
4) Could the activity result in the displacement of
community residents? x.
EXPLANATION: Site is vacant.
5) Could the activity increase the number of low and
moderate cost housing units in the city?
EXPLANATION: Office use only.
YES NO
X
6) Could the activity significantly affect existing
housing or create a demand for additional housing?
EXPLANATION: Pp,op1p, ns-ing the building are expected
to drive to the building.
7) Are any of the natural or man-made features in the
activity area unique, that is, not found in other
parts of the county, state or nation?
EXPLANATION: Not applicable
8) Could the activity significantly affect an
historical or archaeological site or its settings? £
EXPLANATION: Site is vacant. House previously
existed on site.
9) Could the activity significantly affect the
potential use, extraction, or conservation of a
scarce natural resource? L
EXPLANATION: Not applicable
YES NO
10) Could the activity significantly affect fish, x
wildlife or plant resources?
EXPLANATION: Plants and trees are gone from
site.
11) Are there any rare or endangered plant or animal
species in the activity area?
EXPLANATION: applicable
12) Could the activity change existing features of any
of the city's stream, lagoons, bays, tidelands x
or beaches?
Not applicable
EXPLANATION:
13) Could the activity result in the erosion or elimin-
ation of agricultural lands? ^
Previously residential home.
EXPLANATION:
14) Could the activity serve to encourage development
of presently undeveloped areas or intensify develop-
ment of already developed areas? ^
EXPLANATION: Site is infill area. This
development represents a maturation of the
areas site usage,
YES NO
15) Will the activity require a variance from estab-
lished environmental standards (air, water, noise,
etc.)? ^
EXPLANATION: No significant impacts
16) Is the activity carried out as part of a larger
project or series of projects? ^
EXPLANATION: On. .if. nnly
17) Will the activity require certification, authoriza-
tion or issuance of a permit by any local, state
or federal environmental control agency? ^
EXPLANATION: Not applicable
18) Will the activity require issuance of a variance or
conditional use permit by the City? x_
EXPLANATION: Required a Major Use Permit.
Zoning is compatible.
19) Will the activity involve the application, use, or ^
disposal of potentially hazardous materials?
EXPLANATION: Not applicable
(P
YES NO
20) Will the activity involve construction of facilities
in a flood plain? ^
EXPLANATION: Site grading for parking not within
flood plain.
21) Will the activity involve construction of facilities ^
in the area of an active fault?
EXPLANATION:
None exists
22) Could the activity result in the generation of
significant amounts of dust?
EXPLANATION: Normal grading and pyrflvatinn.
X
23) Will the activity involve the burning of brush,
trees, or other materials? £
EXPLANATION: Site is vacant.
24) Could the activity result in a significant change
in the quality of any portion of the region's air
or water resources? (Should note surface, ground
water, off-shore.) _JL
EXPLANATION: Service use only in building
YES NO
25) Will the project substantially increase fuel x
consumption (electricity, oil, natural gas, etc.)?
EXPLANATION: Office Professional Use
26) Will the activity involve construction of facilities
on a slope of 25 percent or greater?
EXPLANATION: Not applicable
X
27) Will there be a significant change to existing
land form?
(a) Indicate estimated grading to be done in
cubic yards: 2000 .
(b) Percentage of alteration to the present
land form: none .
(c) Maximum height of cut or fill slopes:
cut; IQfeet •
EXPLANATION:
X
28) Will the activity result in substantial increases x
in the use of utilities, sewers, drains or streets?
EXPLANATION: Var a11nT>Tah1f^ .m-anHa-rHg
YES NO
29) Will the project significantly increase wind or x
water erosion of soils?
EXPLANATION: Not applicable
30) Could the project significantly affect existing
fish or wildlife habitat? 1
EXPLANATION: nnt pppiir^bip
31) Will the project significantly produce new light
or glare? ^
EXPLANATION: Not applicable
10
(3)
II. STATEMENT OF NON-SIGNIFICANT ENVIRONMENTAL EFFECTS
If you have answered yes to any of the questions in Section I but think
the activity will have no significant environmental effects, indicate your
reasons below:
III. COMMENTS OR ELABORATIONS TO ANY OF THE QUESTIONS IN SECTION I
(If additional space is needed for answering any questions, attach
additional sheets as needed.)
Signature
Date Signed
(Person Completing Report)
11
I. GENERAL INFORMATION
F. The names of sewer, water and school districts
providing service to the project are as follows;
1. Sewer District: Carlsbad Sewer District
1200 Elm Avenue
Carlsbad, CA 92008
619 438-5541
2. Water District: Carlsbad Municipal Water District
5960 El Camino Real
Carlsbad, CA 92008
619 438-2722
619 438-3367
3. School District: Carlsbad School District
801 Pine Avenue
Carlsbad, CA 92008
619 729-9291
Presidential Centre
Positive Economic Impacts
Revenue, Jobs, New businesses
Redevelopment Agency receives 1 % of the increase in total assessed value
of property within the Redevelopment area in the form of tax increment
revenues.
This project will result in about $8,668 in new revenues annually to the
Agency.
The total assessed value would be about $923,165 including the land and
the improvements to the site (the building).
The assessed value would increase about $866,835.
Another benefit relates to employment. About 45 new jobs will be created
as a result of this project. And 8-10 new professional businesses will be
located and operating in the Redevelopment Area.
Based on the information about the proposed project that indicates that the
proposed project is consistent with the General Plan as well as the Village
Design Manual and that there is potential for significant positive economic
impacts, staff is recommending approval of RP 91 -6.
Do you have any questions?