Loading...
HomeMy WebLinkAboutSDP 00-10; Pavilion The Forum The; Site Development Plan (SDP) (4)•• Facsimile Transmittal & ASSOCIATES Pl.A~IIo1NO • ENGIII-1':ElUS"G• Sl'RVEYI~G • To: City of carlsbad Fax No.: (760) 602.~ ~ s sc::r Attn: John Maashoff ./ C#~t STi:~ vJ"'St"~<.ct ""'-Date: November 27, 2001 From: Dru Mayers Project: The Pavilion at La Costa Phone No.: (760) 602-2747 Description of Document: Traffic Evaluation Comments: ~v~----------------------- This Material Sent: D Your Files ~ At Your Request D Other Original to be mailed f I j 181 0 0 Job No.: 01-0064-01 Your Review Please can Upon Receipt Yes [g) Total Number of Pages (Including this Transmittal): No 12 Note: Please call if you did not receive the total number of pages or cannot read the pages transmitted. CC: 19 Spectrum Pointe Drive, Suite 609 • Lake Forest, CA 92630-2242 • Phone (949} 599-0870 • FAX (949) 599-0880 MA-0005·0110/19/1999 P:\01-0064-01 The Pavilion at La Costa\Files\Fax Transmittals\01-11-27 John Maashoff.doc 1 ·d 0880-SSS lSvSJ ~ov 27 01 as:sap Al in-Faust (71 667-7S52 •fir.IIITIN·FOUST A$$0CIATE~ INC. TRAFFIC ~IIIJIN~~IIING AND TfiANIPORTAT/0. I'LANIIJNIJ 202tl NQRTH TUSTIN AVENUE • SANTA ANA, CALIFORNIA 92705·7827 FAX TRANSMITTAL [DATE:(\-21--D\ CC: CC: FAX CC: FAX TELEPHONE (714) 687..()498 FAX (714} 667-7S52 E-mail: maDOausllnfoust.com Total number of pages being transmitted, :including this cover sheet: _ Hard copy being mailed, E-mailed,-or sent overnight service _yes _No 0880-669 (6..,61 p.l ~------ • l'lov 27 01 05:50p A1.. in-Foust City of Carlsbad PAVILION AT LA COSTA Trame Evaluation Prepared by: A1,1stio-Foust Associates, Ioc. 2020 North Tustin Avenue Santa Ana, California 92705-7827 (114) 667-0496 November27, 2001 0880-SSS (S~Sl (71 66?-?952 p.2 . Nov 2? 01 05:50p Au in-Foust (71· SS?-7952 p.3 City of Carlsbad PAVILION AT LA COSTA Traffic Evaluation This report presents a traffic evaluation for the pmposed Pavilion at La Costa (part of Green Valley Master Plan) in the City of Carlsbad. lt is intended to supplement and update the traffic report prepared by Urban Systems Associates (June 28, 2000). Revised trip generation estimates are presented along with design recommendations for the northerly access intersection. PROJECT OVERVIEW The proposed project comprises 265,000 square feet of commercial uses located west of El Camino Real and south and east of Calle Barcelona immediately north of the City of Encinitas. A portion of the project (47,413 square feet) will be second floor office uses and the remaining 217,5i'1"7::t square feet of ground floor uses will be retail. The retail component will have a variety of tenants (including restaurants) and hence can be classified as a shopping center. Trip generation estimates for the proposed project were derived from the Institute of Transportation Engineers (ITE) Trip Generation Manual, 6th Edition, and also from tbe SANDAG Trip Generation. The ITE land use category (LU 820) specifically addresses mixed retail uses such as this, and the trip generation is calculated using an equation which accounts for the size of the center in the trip generation rate. As can be seen, the total daily trip generation is estimated at 11,760 trips per day, with 324 in the AM peak hour and 1,121 in the PM peak hour. The SANDAG rates do not vary with size of center and result in a trip generation of 16,180 ADT with 590 in the AM peak hour and 1,646 in the PM peak hour. Although the ITE rates may be more representative of this type of center, both sets of trip generation estimates have been used to evaluate driveway volumes at the northerly access point. In this manner, comparisons can be made with respect to the findings under both sets of data. Pavilion@La Costa Treffic Evaluation 0880-SSS lSt;rSJ Austin-Foust Associates, Inc. 797001Rpt.wpd tiov 2? 01 05:51p R~.o .in-Foust. (?1· 66?-?952 Table 1 1RIP GENERATION SUMMARY AM PEAK HOUR PMPEAKHOUR ITE Trip Rates• UNITS IN OUT TOTAL IN OUT TOTAL ADT Shopping Center (820) Eq. TSF Office (71 o) TSF 1.37 Q_l9 L56 0.25 1.24 1.49 11.01 Trip~Gencration 1~ Shopping Ctr 217 .58'f TSF 150 100 250 500 550 1,050 11,240 Office 47.413 TSF 65 9 74 12 59 71 522 TOTAL 215 109 324 512 609 1,121 11,762 SANDAG Trip Rates•• Community Shopping Center TSF 1.26 0.84 2.10 3.50 3.50 7.00 70.00 Office TSF 2.52 0.28 2.80 0.52 2.08 2.60 20.00 Trip Generation 7<J Shopping Ctr 217.58-1 TSF 274 183 457 762 762 1,523 15,231 Office 47.413 TSF 119 13 133 25 99 123 948 TOTAL 393 196 590 787 861 1,646 16.179 * 'Trip Generation 6th Edition", ITE 1997 "* "San Diego Traffic Generators", San Diego Association of Governments, July 1998 s·d 0880-SSS (SvSl Nov 27 01 05:5lp Al.. in-Foust t 71· 667-?952 DRIVEWAY VOLUMES The PM peak hour project generated trips were assigned to the two driveway locations based on the following distribution pattern: Northern Driveway Southern Driveway 58% East 34 %South 1% West 7 %North It is asswned that both the northern and southern driveway will be signalized. Volumes at the northern driveway were added to the background traffic as contained in the previous traffic report to provide total turn movement volumes. These volumes are shown in the form of peak hour intersection capacity utilization (ICU) calculations in the appendix to this report. Lane configurations for the northern driveway assume single eastbound and westbound left-tum lanes and two thru-lanes in each direction. As can be seen here for the ITE trip generation rates, the PM peak hour ICU is .36 which represents level of service (LOS) "A" and for the SANDAG trip generation rates the ICU is .46 which also represents WS "A." Queue length requirements were calculated for the westbound left-tum volume in the PM peak hour. The queue lengths were determined from Synchro version 4.0 which uses Highway Capacity Manual2000 methodology in its calculations. The results are as follows; VOLUME lTE Trip Generation 290 SANDAG Trip Generation 455 QUEUE LENGTII (95m Percentile) 116feet 197 feet Hence the turn pocket needs to be 197 feet to accommodate traffic volume as estimated by the SANDAG trip rates (116 feet underthe ITE trip generation.) To account for higher volumes which can occur at shopping centers in weekends, it is recommended that the westboWld left-tum pocket be 300 feet in length. This provides for a potential 50 percent increase in left-turn volumes. The signal Pavilion@La Costa Traffic Evaluation 0880-66S (6~61 2 Austin-Foust Associates, Inc. i97001Rptwpd p.5 Nov 27 01 05:52p Al. in-Foust (?1 66?-?952 t..•d should be timed to ensure that even if the queue should ever approach this length, it will clear the left- turn phase (see signal sheet attached). Pavilion@La Costa Traffic Evaluallon 0880-SSS (Sf,Sl 3 Austin.Foust Associates, Inc. 797001Rpt.wpd p.S Nov 27 01 05:52p AL in-Foust (71 SS?-7852 p.7 1. Owy & Calle Barcelona CITE Rates) 2. !Ny & Cane Barcelona <SANDAG Rates) I Sac~ground T Project Background + Project I I -AM PK HOUR PH PK HlUR AM PK HlUR PM PK HOUR I LANES CA.PACITY VOL V/C VOL V/C LANES CAPACIT'I VOL VIC VOL V/C I I MBL 0 5 5 NBL 0 5 5 I NBi C.5 3201) 5 {. 01}* 5 [.05}* NBT 0.5 3200 5 {.01}* 5 {. 05)'* I NBR 1.5 55 350 NBR 1.5 105 500 I I SBL 1 1600 15 .01* 10 .01* SBL 1 1600 15 .01* 10 .01* I SST 1 1600 5 .01 5 .01 SBT 1 1600 5 .01 5 .01 I SBR 0 0 10 5 SBR 0 0 10 5 I I EBL 1 1600 5 .00 10 .01 EBL 1 1600 5 .00 10 .01 I EBT 2 3200 15 .01* 60 .02* EBT 2 3200 15 .01* 60 .02* I EBR 0 0 5 5 EBR 0 0 5 5 I I WBL 1 1600 115 .07* 290 .18* WSL 1 1600 220 .14* 455 .28* I WilT 2 32[10 20 .01 60 .02 WBT 2 3200 20 .01 60 .02 ' WBR 0 0 10 15 WBR 0 0 10 15 I I Clearance Interval .10"' .101r Clearance lnterva i .10* .10* TOTAL CAPACITY !ITILIZATION .20 .36 10TAL CAPACITY UTiliZATION .27 .46 9·d 0880-SSS (SirSJ . Nov 27 01 05:52p La Costa ITE Trips AL. in-Faust £71· 667-7952 p.a PM 11/27/2001 i----~ 11/2312001 Baseline 0880-SSS (6ir61 Synchro 5 Report Page1 Nov 27 01 05:53p La Costa ITE Trips 1112312001 Baseline AUSTINSANT -$TS1 A~ ,in-Faust 0 1 • cl OBB0-669 £6~61 ('71 887-'7952 p.S PM 1112712001 Synchro 5 Report Page2 doE:: c:n 1 o ez f\ot-J Nov 27 01 05:53p LaCosta SANDAG Trips Splits and Phases: AL. in-Faust 3: lnt ( 71 667-7952 p.lO PM 11/27/2001 . ---' 9 11123/2001 Baseline AUSTINSANT-ST51 11 ·d 0880-SSS £SioSJ Synchro 5 Report Page 1 dot:: :c:n 10 8Z not-~ •• Nov 27 01 05:54p Al. in-Foust 21·d LaCosta SANDAG Trips 1112312001 Baseline AUSTINSANT-ST51 0880-SSS £S..,Sl (71 667-7952 p. 11 PM 11/2712001 Synchro 5 Report Page2 ,--- ... :.. URBAN SYSTEMS ASSOCIATES, INC. PLANNING & TRAFFIC ENGINEERING, MARKETING & PROJECT SUPPORT CONSULTANTS TO INDUSTRY AND GOVERNMENT ATTN: Mike Shirey, Assistant Engineer COMPANY: City of Carlsbad, Engineering Department FROM: i. fsam P. Kab, II 1 . phone: ,.. 760 602 2747 fax: ,.. 760 602 8562 TOTAL PAGES .' 2 + 8 pg. attachment DATE: june 28, 2000 TIME: 3:37pm TRANSMITTED VIA: Planning Systems SUBJECT: THE PAVILION AT LA COSTA (PART OF GREEN VALLEY MASTER PLAN) Provided attached are figures that show the project only average daily traffic and peak hour volumes for The Pavilion at La Costa, previously approved as part of the Green Valley Master Plan. The project contains 260,000 square feet of commercial retail uses and was included in the Green Valley Master Plan at a higher square footage. Since this project was previously approved, only a site specific driveway analysis is being provided at this time. Attachment 1 shows the project site plan and location on the south side of Calle Barcelona, west of El Camino Real. Attachment 2 shows the project peak hour and average daily traffic volumes. Also shown is the traffic expected from La Costa Glen, the health and assisted living community planned to the north of Calle Barcelona. Attachment 3 includes the average daily traffic volumes expected on Calle Barcelona with the project traffic, with La Costa Glen traffic, and with through traffic added. These volumes are used in the traffic signal warrant analysis that follows. Attachment 4 includes a traffic signal warrant analysis for the three project driveways. As shown on these warrant worksheets, only the north driveway (Driveway A) is expected to meet traffic signal warrants. The approach traffic volumes are expected to be higher at this location since it is planned as the major entrance near the major stores and restaurants, and is the driveway near El Camino Real. 3100 C:\OFFICE_2000\ Trans. fax.2000\31 00. 6.2 7.00 4540 KEARNY VIUA ROAD, SUITE 106 • SAN DIEGO, CA 92123-1573 • (858) 560-4911 • FAX (858) 560-9734 Mike Shirey june 28, 2000 Urban Systems Associates, Inc. Attachment 5 includes a conceptual lane configuration layout, for discussion only, not for design purposes, at the Calle Barcelona(Driveway A intersection. The inbound PM peak hour traffic volumes are expected to need a dual left turn into the project driveway. Since Calle Barcelona through traffic in the westbound direction is expected to be of low volume, needing only a single lane, the westbound approach can be designed with a single through-right lane and dual left turn lanes within the existing 64 foot curb-to-curb dimension. Attachment 6 shows the intersection level of service calculation at the Calle Barcelona(Driveway A intersection which is expected to be at LOS A in both the AM and PM peak hour, which is an acceptable level of service. Driveway queuing areas will be provided as follows: Driveway A Driveway 8 Driveway C (11,151 ADT) (4,368 ADT) (3,094 ADT) (12x20 ft.= 240ft.) 2 lanes at 120ft. (5x20 ft. = 100ft.) ( 4x20 ft. = 80 ft.) Please review this driveway only evaluation and let me know if you have questions or need additional information. 3100 2 C: \OFFIC£_2000\ Trans.fax.2000\31 00. 6.2 7.00 ATIACHMENT 1 Project Site Plan -... I I L COaceplulllte Pllln • SA.1 .. "' Resume t8.33ao 1111,500 a.t. 81,500 o.f. ------=,:-:oiO--:I-:2111=,ooooJ. ~: "-!'*M 112110---d -1.aoo~ t,0101pacN 247lp1CH :z.-4--------~T~~~,.~aa~~ .r:::s..~~7/IOOU Von~';;(23111) Building S. F. Building I: _,_ &eoondFloa< ~2: Ekllding 3: a.-.;c: llulldlng5: llulldlng8: llulldlng7: llulldlnga: 61,11001.! 81,500a.f. IB,OOOa.l. 60.i00s.t 28.1100 •. 1. 20.300a.f. &.800•.f. 8.000a.l 6.1100a.f. ·-----Tolll 280,000 Ll hhhllh 1-;:5~~~~·~~~;--~:e ,.._ .. .:;::... ... , I The· Pav11·1on at La Costa w ................. .. ... .. ..... ..._D. I I Int .... I . =!=~ I cartsbad, California ............. i ... ·-·-............. •ca arcl.i••ctu.r• ATIACHMENT 2 Project+ Green Valley AM I PM Peak Hour Traffic & Average Daily Traffic Volumes (ADT) 0~ vl"'l .................... 1()0 N~ '" ADT 550 '-t0/35 ,-45/180 1---tr 00 4,315 ADT ~ oo ~l"'l .................... 1()0 -0 ,.... '-s/25 ,-35/140 Green Valley AM In Out In 15 25 25 PM Out 15 ~ ~ ~ .......... '-to;ts 0 ~ .-LO-Jl'. ...-20/60 ,-200/530 5/1DJ 't' 15/60 .... 5/5~ ~~0 ''v ~I()V .......... 0 .-.- The Pavilion at La Casta r 0 Ol .......... 0 c-.. I I I I I I tr : ~o I ~~-------------------------------------J .................... oo CX)~ Pavilion at La Costa AM PM --Siz-e --Ra-te-~----=A-=oT;;;-lt--:-ln~o=-u-=-t+-:-ln-----r-::o:-u-:-it 260 KSF 70/KSF 18,200 330 220 910 910 LEGEND XXXX =Average Daily Traffic {ADT) XX% =Distribution Percentage XX/XX =AM I PM Peak Hour Traffic , CD-I .3100-ATI-2.dwg 3100 4 C: \OFFIC£_2000\ Trans.fax.2000\31 00. 6.2 7.00 ATTACHMENT3 Project+ Green Valley + Through Average Daily Traffic (ADT) 12,195 ADT + 2,000 ADT Through 14,195 ADT 2,785 ADT + 2,000 ADT Through 10,738 ADT@ 4,765 ADT 4,315 ADT + 2,000 ADT Through 6,315 ADT 6,635 ADT + 2,000 ADT Through 8,635 ADT CO-l J100-ATT-J.dwg 3100 1---4,368 ADT @ 1----3,094 ADT @ The Pavilion at La Costa --------------------------------------~ 5 C: \OFFICE_2000\ Trans. fax.2000\31 00. 6.2 7.00 A'ITACHMENT 4 Page 1 of3 Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9-9 ------------------------------------------------------------------------------~--2 Figure 9-4 TRAFFIC SIGNAL WARRANTS Calle Barcelona I Driveway A (See Volumes in Attachment 3) <Based on Estimated Average Daily Traffic -See Note) URBAN RURAL 40 MPH Minimum Requirements EADT 1. Minimum Vehicular CaRe Barcelona Driveway A X Vehicles per day on Vehicles per day on Satisfied Not Satisfied maJor street {total of higher-volume minor both approaches) street approach (one direction only) Number of lanes for moving traffic on each 9,480 ADT 5,576 ADT approach Urban Rural Urban Rural hAajor Street hAinor Street 8,000 5,600 2,400 1,680 1 1 9,600 6,720 2,400 1,680 2 or more 1 l6,72ol 12,2401 ®or more ®or more 9,600 3,200 8,000 5,600 3,200 2,240 1 2 or more 2. lntaruptian of Continuous Traffic Vehicles per day on Vehicles per day on maJor street (total of higher-volume minor Satisfied Not Satisfied X both approaches) street approach (one direction only) Number of lanes for moving traffic on each 9,480 ADT 5,576 ADT approach Urban Rural Urban Rural hAajor Street hAinor Street 12,000 8,400 1,200 850 1 1 14,400 10,080 1,200 850 2 or more 1 14,400 l1o,o8ol 1,600 11,12ol ®or more ®or more 12,000 8,400 1,600 1,120 1 2 or more [@ 3. Combination Satisfied X Not Satisfied 2 Warrants 2 Warrants No one warrant satisfied, but following warrants fulfilled BOX or more 100% 94% 1 2 .CO-l 3100-ATT-4-I.dwg 3100 6 C: \OFFIC£_2000\ Trans. fax.2000\31 00. 6.2 7.00 ATTACHMENT 4 Page2of3 Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9-9 --------------------------------------------------------------------------~.u Figure 9-4 TRAFFIC SIGNAL WARRANTS Calle Barcelona I Driveway B (See Volumes in Attachment 3) (Baaed on Estimated Average Daily Traffic -See Note) URBAN RURAL 40 MPH Minimum Requirements EADT Calle Barcelona Driveway B 1. t.ilnlmum Vehicular X Vehicles per day on Vehicles per day on Satisfied Not Satisfied major street (total of higher-volume minor both approaches) street approach (one direction only) Number of lanes for moving traffic on each 5,540 ADT 2,184 ADT approach Urban Rural Urban Rural Major Street t.llnor Street 8,000 5,600 2,400 1,680 1 1 9,600 6,720 2,400 1,680 2 or mora 1 9,600 l6,72ol 3,200 12.2401 ®or more ®or more 8,000 5,600 3,200 2,240 1 2 or more I 82" I I 98" I 2. lnteruption of Continuous Traffic Vehicles per day on Vehicles per day on major street (total of higher-volume minor Satisfied Not Satisfied X both approaches) street approach (one direction only) Number of lanes for moving traffic on each 5,540 ADT 2,184 ADT approach Urban Rural Urban Rural MaJor Street t.llnor Street 12,000 8,400 1,200 850 1 1 14,400 10,080 1,200 850 2 or mora 1 14,400 l1o,o8ol 1,600 11.1201 ®or more ®or more 12,000 8,400 1,600 1,120 1 2 or more ~ 3. Combination Satisfied Not Satisfied X 2 Warrants 2 Warrants No one warrant satisfied, but following warrants fulfilled SO" or more 82% 55 !f. 1 2 .CD-I J100-ATI-+-2.dwg 3100 7 C: \OFFIC£_2000\ Trans.fax.2000\31 00. 6.2 7.00 ATIACHMENT 4 Page3 of3 Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9-9 ------------------------------------------------------------------------------~-- Figure 9-4 TRAFFIC SIGNAL WARRANTS Calle Barcelona I Driveway C (See Volumes in Attachment 3) CBaaed on Estimated Average Daily Traffic -See Note) URBAN __ RURAL 40 MPH Minimum Requirements EADT 1. Minimum Vehicular Calle Barcelona Driveway C X Vehicles per day on Vehicles per day on Satisfied Not Satisfied major street {total of higher-volume minor both approaches) street approach (one direction only) Number of approach lanes for moving traffic on each 6,425 ADT 1,547 ADT Urban Rural Urban Rural Major Street t.Ainor Street 8,000 5,600 2,400 1,680 1 1 9,600 16,7201 2,400 11,6801 (6) or more CD 9,600 6,720 3,200 2,240 2 or more 2 or more 8,000 5,600 3,200 2,240 1 2 or more ~ I 92" I 2. lnteruption of Continuous Traffic Vehicles per day on Vehicles per doy on major street (total of higher-volume minor Satisfied Not Satisfied X both approaches) street approach (one direction only) Number of Iones for moving traffic on each 6,425 ADT 1,547 ADT approach Urban Rural Urban Rural Major Street Minor Street 12,000 8,400 1,200 850 1 1 14,400 j1o,o8ol 1,200 [lill ®or more CD 14,400 10,080 1,600 1,120 2 or more 2 or more 12,000 8,400 1,600 1,120 1 2 or more I 64" I 3. Combination Satisfied Not Satisfied X 2 Warrants 2 Warrants No one warrant satisfied, but following warrants fulfilled 80" or more 96% 64% 1 2 .CO-l J10D-ATT--4-3.d"'g 3100 8 C: \OFFIC£_2000\ Trans. fax.2000\31 00. 6.2 7.00 17'~ ---------- 10'-+- 10' J 11' __... -------r--- 16' __... ....... CONCEPTUAL LAYOUT FOR DISCU8810N PURPOSES ONLY. PLAN DOES NOT FEPRESENT CQWILETED DESiaN. NOT FOR BO, DESIGN AND CONSTAUCnoN. ALL DM:N810NS ARE APPROXIMATE. ATTACHMENT 5 14 ~ Match Exla...., Lanoe\ J!.,.. 17' 20' --..... ~ r 10' 12' r 10' 12' __... 11' -s- ---f-----__... 16' 20' Calle Barcelona I + I' I I 13' 1 12' 12' 12' I I Driveway A 0 n 0 l ~ 0 'i' ,. ~ ... c.. :E "' ICU All A UOVK CAPACITY ICU. k ~ o' 5i:= ~ .o, ~ ~ l)l.. l.:tz: ~ ot -'"-ll•_. .... ~,1.5 UOYB CAPACITY ICU AITACHMENT 6 Vc.!1tt. 'l.v~O ' AM (lEA""~ 1CU Alt. 0 UOVE ~APACITY LO.I._· ....... JCU LOA_ ............. "f.E.¢.1... 'l_pll> ~"" ~~tl.. \\Cu.,__ LO.I._ . ........... 0 "11 '""""---. l/RQAN SYSTEMS----~~-------.-....--.....---------