Description of Document:
Traffic Evaluation
Comments:
~v~-----------------------
This Material Sent:
D Your Files
~ At Your Request
D Other
Original to be mailed
f I j
181
0
0
Job No.: 01-0064-01
Your Review
Please can Upon Receipt
Yes [g)
Total Number of Pages (Including this Transmittal):
No
12
Note: Please call if you did not receive the total number of pages or cannot read the pages
transmitted.
CC:
19 Spectrum Pointe Drive, Suite 609 • Lake Forest, CA 92630-2242 • Phone (949} 599-0870 • FAX (949) 599-0880
MA-0005·0110/19/1999
P:\01-0064-01 The Pavilion at La Costa\Files\Fax Transmittals\01-11-27 John Maashoff.doc
1 ·d 0880-SSS lSvSJ
~ov 27 01 as:sap Al in-Faust (71 667-7S52
•fir.IIITIN·FOUST A$$0CIATE~ INC.
TRAFFIC ~IIIJIN~~IIING AND TfiANIPORTAT/0. I'LANIIJNIJ
202tl NQRTH TUSTIN AVENUE • SANTA ANA, CALIFORNIA 92705·7827
FAX TRANSMITTAL
[DATE:(\-21--D\
CC:
CC: FAX
CC: FAX
TELEPHONE (714) 687..()498
FAX (714} 667-7S52
E-mail: maDOausllnfoust.com
Total number of pages being transmitted, :including this cover sheet: _
Hard copy being mailed, E-mailed,-or sent overnight service _yes _No
0880-669 (6..,61
p.l
~------
• l'lov 27 01 05:50p A1.. in-Foust
City of Carlsbad
PAVILION AT LA COSTA
Trame Evaluation
Prepared by:
A1,1stio-Foust Associates, Ioc.
2020 North Tustin Avenue
Santa Ana, California 92705-7827
(114) 667-0496
November27, 2001
0880-SSS (S~Sl
(71 66?-?952 p.2
.
Nov 2? 01 05:50p Au in-Foust (71· SS?-7952 p.3
City of Carlsbad
PAVILION AT LA COSTA
Traffic Evaluation
This report presents a traffic evaluation for the pmposed Pavilion at La Costa (part of Green
Valley Master Plan) in the City of Carlsbad. lt is intended to supplement and update the traffic report
prepared by Urban Systems Associates (June 28, 2000). Revised trip generation estimates are
presented along with design recommendations for the northerly access intersection.
PROJECT OVERVIEW
The proposed project comprises 265,000 square feet of commercial uses located west of El
Camino Real and south and east of Calle Barcelona immediately north of the City of Encinitas. A
portion of the project (47,413 square feet) will be second floor office uses and the remaining 217,5i'1"7::t
square feet of ground floor uses will be retail. The retail component will have a variety of tenants
(including restaurants) and hence can be classified as a shopping center.
Trip generation estimates for the proposed project were derived from the Institute of
Transportation Engineers (ITE) Trip Generation Manual, 6th Edition, and also from tbe SANDAG
Trip Generation. The ITE land use category (LU 820) specifically addresses mixed retail uses such
as this, and the trip generation is calculated using an equation which accounts for the size of the center
in the trip generation rate. As can be seen, the total daily trip generation is estimated at 11,760 trips
per day, with 324 in the AM peak hour and 1,121 in the PM peak hour. The SANDAG rates do not
vary with size of center and result in a trip generation of 16,180 ADT with 590 in the AM peak hour
and 1,646 in the PM peak hour.
Although the ITE rates may be more representative of this type of center, both sets of trip
generation estimates have been used to evaluate driveway volumes at the northerly access point. In this
manner, comparisons can be made with respect to the findings under both sets of data.
Pavilion@La Costa
Treffic Evaluation
0880-SSS lSt;rSJ
Austin-Foust Associates, Inc.
797001Rpt.wpd
tiov 2? 01 05:51p R~.o .in-Foust. (?1· 66?-?952
Table 1
1RIP GENERATION SUMMARY
AM PEAK HOUR PMPEAKHOUR
ITE Trip Rates• UNITS IN OUT TOTAL IN OUT TOTAL ADT
Shopping Center (820) Eq. TSF Office (71 o) TSF 1.37 Q_l9 L56 0.25 1.24 1.49 11.01
Trip~Gencration 1~
Shopping Ctr 217 .58'f TSF 150 100 250 500 550 1,050 11,240
Office 47.413 TSF 65 9 74 12 59 71 522
TOTAL 215 109 324 512 609 1,121 11,762
SANDAG Trip Rates••
Community Shopping Center TSF 1.26 0.84 2.10 3.50 3.50 7.00 70.00
Office TSF 2.52 0.28 2.80 0.52 2.08 2.60 20.00
Trip Generation 7<J Shopping Ctr 217.58-1 TSF 274 183 457 762 762 1,523 15,231
Office 47.413 TSF 119 13 133 25 99 123 948
TOTAL 393 196 590 787 861 1,646 16.179
* 'Trip Generation 6th Edition", ITE 1997
"* "San Diego Traffic Generators", San Diego Association of Governments, July 1998
s·d 0880-SSS (SvSl
Nov 27 01 05:5lp Al.. in-Foust t 71· 667-?952
DRIVEWAY VOLUMES
The PM peak hour project generated trips were assigned to the two driveway locations based
on the following distribution pattern:
Northern Driveway
Southern Driveway
58% East
34 %South
1% West
7 %North
It is asswned that both the northern and southern driveway will be signalized.
Volumes at the northern driveway were added to the background traffic as contained in the
previous traffic report to provide total turn movement volumes. These volumes are shown in the form
of peak hour intersection capacity utilization (ICU) calculations in the appendix to this report. Lane
configurations for the northern driveway assume single eastbound and westbound left-tum lanes and
two thru-lanes in each direction. As can be seen here for the ITE trip generation rates, the PM peak
hour ICU is .36 which represents level of service (LOS) "A" and for the SANDAG trip generation rates
the ICU is .46 which also represents WS "A."
Queue length requirements were calculated for the westbound left-tum volume in the PM peak
hour. The queue lengths were determined from Synchro version 4.0 which uses Highway Capacity
Manual2000 methodology in its calculations. The results are as follows;
VOLUME
lTE Trip Generation 290
SANDAG Trip Generation 455
QUEUE LENGTII
(95m Percentile)
116feet
197 feet
Hence the turn pocket needs to be 197 feet to accommodate traffic volume as estimated by the
SANDAG trip rates (116 feet underthe ITE trip generation.) To account for higher volumes which
can occur at shopping centers in weekends, it is recommended that the westboWld left-tum pocket be
300 feet in length. This provides for a potential 50 percent increase in left-turn volumes. The signal
Pavilion@La Costa
Traffic Evaluation
0880-66S (6~61
2 Austin-Foust Associates, Inc.
i97001Rptwpd
p.5
Nov 27 01 05:52p Al. in-Foust (?1 66?-?952
t..•d
should be timed to ensure that even if the queue should ever approach this length, it will clear the left-
turn phase (see signal sheet attached).
Pavilion@La Costa
Traffic Evaluallon
0880-SSS (Sf,Sl
3 Austin.Foust Associates, Inc.
797001Rpt.wpd
p.S
Nov 27 01 05:52p AL in-Foust (71 SS?-7852 p.7
1. Owy & Calle Barcelona CITE Rates) 2. !Ny & Cane Barcelona <SANDAG Rates)
I Sac~ground T Project Background + Project
I
I -AM PK HOUR PH PK HlUR AM PK HlUR PM PK HOUR
I LANES CA.PACITY VOL V/C VOL V/C LANES CAPACIT'I VOL VIC VOL V/C
I
I MBL 0 5 5 NBL 0 5 5
I NBi C.5 3201) 5 {. 01}* 5 [.05}* NBT 0.5 3200 5 {.01}* 5 {. 05)'*
I NBR 1.5 55 350 NBR 1.5 105 500
I
I SBL 1 1600 15 .01* 10 .01* SBL 1 1600 15 .01* 10 .01*
I SST 1 1600 5 .01 5 .01 SBT 1 1600 5 .01 5 .01
I SBR 0 0 10 5 SBR 0 0 10 5
I
I EBL 1 1600 5 .00 10 .01 EBL 1 1600 5 .00 10 .01
I EBT 2 3200 15 .01* 60 .02* EBT 2 3200 15 .01* 60 .02*
I EBR 0 0 5 5 EBR 0 0 5 5
I
I WBL 1 1600 115 .07* 290 .18* WSL 1 1600 220 .14* 455 .28*
I WilT 2 32[10 20 .01 60 .02 WBT 2 3200 20 .01 60 .02
' WBR 0 0 10 15 WBR 0 0 10 15
I
I Clearance Interval .10"' .101r Clearance lnterva i .10* .10*
TOTAL CAPACITY !ITILIZATION .20 .36 10TAL CAPACITY UTiliZATION .27 .46
9·d 0880-SSS (SirSJ
.
Nov 27 01 05:52p
La Costa
ITE Trips
AL. in-Faust £71· 667-7952 p.a
PM
11/27/2001
i----~
11/2312001 Baseline
0880-SSS (6ir61
Synchro 5 Report
Page1
Nov 27 01 05:53p
La Costa
ITE Trips
1112312001 Baseline
AUSTINSANT -$TS1
A~ ,in-Faust
0 1 • cl OBB0-669 £6~61
('71 887-'7952 p.S
PM
1112712001
Synchro 5 Report
Page2
doE:: c:n 1 o ez f\ot-J
Nov 27 01 05:53p
LaCosta
SANDAG Trips
Splits and Phases:
AL. in-Faust
3: lnt
( 71 667-7952 p.lO
PM
11/27/2001
. ---' 9
11123/2001 Baseline
AUSTINSANT-ST51
11 ·d 0880-SSS £SioSJ
Synchro 5 Report
Page 1
dot:: :c:n 10 8Z not-~
••
Nov 27 01 05:54p Al. in-Foust
21·d
LaCosta
SANDAG Trips
1112312001 Baseline
AUSTINSANT-ST51
0880-SSS £S..,Sl
(71 667-7952 p. 11
PM
11/2712001
Synchro 5 Report
Page2
,---
... :.. URBAN SYSTEMS ASSOCIATES, INC.
PLANNING & TRAFFIC ENGINEERING, MARKETING & PROJECT SUPPORT
CONSULTANTS TO INDUSTRY AND GOVERNMENT
ATTN: Mike Shirey, Assistant Engineer
COMPANY: City of Carlsbad, Engineering Department
FROM: i. fsam P. Kab, II
1 .
phone: ,..
760 602 2747
fax: ,..
760 602 8562
TOTAL PAGES .' 2 + 8 pg.
attachment
DATE: june 28, 2000 TIME: 3:37pm TRANSMITTED VIA: Planning Systems
SUBJECT: THE PAVILION AT LA COSTA (PART OF GREEN VALLEY MASTER
PLAN)
Provided attached are figures that show the project only average daily traffic and peak hour
volumes for The Pavilion at La Costa, previously approved as part of the Green Valley Master
Plan.
The project contains 260,000 square feet of commercial retail uses and was included in the
Green Valley Master Plan at a higher square footage. Since this project was previously
approved, only a site specific driveway analysis is being provided at this time.
Attachment 1 shows the project site plan and location on the south side of Calle Barcelona,
west of El Camino Real.
Attachment 2 shows the project peak hour and average daily traffic volumes. Also shown is
the traffic expected from La Costa Glen, the health and assisted living community planned to
the north of Calle Barcelona.
Attachment 3 includes the average daily traffic volumes expected on Calle Barcelona with the
project traffic, with La Costa Glen traffic, and with through traffic added. These volumes are
used in the traffic signal warrant analysis that follows.
Attachment 4 includes a traffic signal warrant analysis for the three project driveways. As
shown on these warrant worksheets, only the north driveway (Driveway A) is expected to
meet traffic signal warrants. The approach traffic volumes are expected to be higher at this
location since it is planned as the major entrance near the major stores and restaurants, and
is the driveway near El Camino Real.
3100 C:\OFFICE_2000\ Trans. fax.2000\31 00. 6.2 7.00
4540 KEARNY VIUA ROAD, SUITE 106 • SAN DIEGO, CA 92123-1573 • (858) 560-4911 • FAX (858) 560-9734
Mike Shirey
june 28, 2000
Urban Systems Associates, Inc.
Attachment 5 includes a conceptual lane configuration layout, for discussion only, not for
design purposes, at the Calle Barcelona(Driveway A intersection. The inbound PM peak hour
traffic volumes are expected to need a dual left turn into the project driveway. Since Calle
Barcelona through traffic in the westbound direction is expected to be of low volume, needing
only a single lane, the westbound approach can be designed with a single through-right lane
and dual left turn lanes within the existing 64 foot curb-to-curb dimension.
Attachment 6 shows the intersection level of service calculation at the Calle
Barcelona(Driveway A intersection which is expected to be at LOS A in both the AM and PM
peak hour, which is an acceptable level of service.
Driveway queuing areas will be provided as follows:
Driveway A
Driveway 8
Driveway C
(11,151 ADT)
(4,368 ADT)
(3,094 ADT)
(12x20 ft.= 240ft.) 2 lanes at 120ft.
(5x20 ft. = 100ft.)
( 4x20 ft. = 80 ft.)
Please review this driveway only evaluation and let me know if you have questions or need
additional information.
3100 2 C: \OFFIC£_2000\ Trans.fax.2000\31 00. 6.2 7.00
ATIACHMENT 1
Project Site Plan
-...
I
I
L
COaceplulllte Pllln • SA.1 .. "'
Resume
t8.33ao
1111,500 a.t. 81,500 o.f.
------=,:-:oiO--:I-:2111=,ooooJ.
~:
"-!'*M
112110---d -1.aoo~
t,0101pacN 247lp1CH :z.-4--------~T~~~,.~aa~~
.r:::s..~~7/IOOU Von~';;(23111)
Building S. F.
Building I: _,_
&eoondFloa<
~2:
Ekllding 3: a.-.;c:
llulldlng5:
llulldlng8:
llulldlng7:
llulldlnga:
61,11001.! 81,500a.f.
IB,OOOa.l.
60.i00s.t
28.1100 •. 1.
20.300a.f.
&.800•.f.
8.000a.l
6.1100a.f. ·-----Tolll 280,000 Ll
hhhllh 1-;:5~~~~·~~~;--~:e ,.._ .. .:;::... ... , I The· Pav11·1on at La Costa w ................. ..
... .. ..... ..._D. I I Int .... I . =!=~ I cartsbad, California ............. i ... ·-·-............. •ca arcl.i••ctu.r•
ATIACHMENT 2
Project+ Green Valley
AM I PM Peak Hour Traffic & Average Daily Traffic Volumes (ADT)
0~ vl"'l
.................... 1()0
N~
'"
ADT
550
'-t0/35
,-45/180
1---tr
00
4,315 ADT ~
oo ~l"'l
.................... 1()0
-0 ,....
'-s/25
,-35/140
Green Valley
AM
In Out In
15 25 25
PM
Out
15
~ ~ ~ .......... '-to;ts 0 ~ .-LO-Jl'. ...-20/60
,-200/530
5/1DJ 't' 15/60 ....
5/5~ ~~0 ''v ~I()V ..........
0 .-.-
The
Pavilion at
La Casta
r
0 Ol
.......... 0 c-..
I
I
I
I
I
I tr : ~o I ~~-------------------------------------J .................... oo CX)~ Pavilion at La Costa
AM PM
--Siz-e --Ra-te-~----=A-=oT;;;-lt--:-ln~o=-u-=-t+-:-ln-----r-::o:-u-:-it
260 KSF 70/KSF 18,200 330 220 910 910
LEGEND
XXXX =Average Daily Traffic {ADT)
XX% =Distribution Percentage
XX/XX =AM I PM Peak Hour Traffic
, CD-I .3100-ATI-2.dwg
3100 4 C: \OFFIC£_2000\ Trans.fax.2000\31 00. 6.2 7.00
ATTACHMENT3
Project+ Green Valley + Through Average Daily Traffic (ADT)
12,195 ADT
+ 2,000 ADT Through
14,195 ADT
2,785 ADT
+ 2,000 ADT Through 10,738 ADT@
4,765 ADT
4,315 ADT
+ 2,000 ADT Through
6,315 ADT
6,635 ADT
+ 2,000 ADT Through
8,635 ADT
CO-l J100-ATT-J.dwg
3100
1---4,368 ADT @
1----3,094 ADT @
The
Pavilion at
La Costa
--------------------------------------~
5 C: \OFFICE_2000\ Trans. fax.2000\31 00. 6.2 7.00
A'ITACHMENT 4 Page 1 of3
Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9-9
------------------------------------------------------------------------------~--2
Figure 9-4
TRAFFIC SIGNAL WARRANTS
Calle Barcelona I Driveway A
(See Volumes in Attachment 3)
<Based on Estimated Average Daily Traffic -See Note)
URBAN RURAL 40 MPH Minimum Requirements
EADT
1. Minimum Vehicular CaRe Barcelona Driveway A
X Vehicles per day on Vehicles per day on
Satisfied Not Satisfied maJor street {total of higher-volume minor
both approaches) street approach (one
direction only)
Number of lanes for moving traffic on each 9,480 ADT 5,576 ADT approach
Urban Rural Urban Rural
hAajor Street hAinor Street 8,000 5,600 2,400 1,680
1 1 9,600 6,720 2,400 1,680
2 or more 1 l6,72ol 12,2401
®or more ®or more
9,600 3,200
8,000 5,600 3,200 2,240
1 2 or more
2. lntaruptian of Continuous Traffic Vehicles per day on Vehicles per day on
maJor street (total of higher-volume minor
Satisfied Not Satisfied X both approaches) street approach (one
direction only)
Number of lanes for moving traffic on each 9,480 ADT 5,576 ADT
approach Urban Rural Urban Rural
hAajor Street hAinor Street 12,000 8,400 1,200 850
1 1 14,400 10,080 1,200 850
2 or more 1 14,400 l1o,o8ol 1,600 11,12ol
®or more ®or more 12,000 8,400 1,600 1,120
1 2 or more [@
3. Combination
Satisfied X Not Satisfied 2 Warrants 2 Warrants No one warrant satisfied, but following warrants
fulfilled BOX or more 100% 94%
1 2
.CO-l 3100-ATT-4-I.dwg
3100 6 C: \OFFIC£_2000\ Trans. fax.2000\31 00. 6.2 7.00
ATTACHMENT 4 Page2of3
Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9-9
--------------------------------------------------------------------------~.u
Figure 9-4
TRAFFIC SIGNAL WARRANTS
Calle Barcelona I Driveway B
(See Volumes in Attachment 3)
(Baaed on Estimated Average Daily Traffic -See Note)
URBAN RURAL 40 MPH Minimum Requirements
EADT
Calle Barcelona Driveway B 1. t.ilnlmum Vehicular
X Vehicles per day on Vehicles per day on
Satisfied Not Satisfied major street (total of higher-volume minor
both approaches) street approach (one
direction only)
Number of lanes for moving traffic on each 5,540 ADT 2,184 ADT approach
Urban Rural Urban Rural
Major Street t.llnor Street 8,000 5,600 2,400 1,680
1 1 9,600 6,720 2,400 1,680
2 or mora 1 9,600 l6,72ol 3,200 12.2401
®or more ®or more 8,000 5,600 3,200 2,240
1 2 or more I 82" I I 98" I
2. lnteruption of Continuous Traffic Vehicles per day on Vehicles per day on
major street (total of higher-volume minor
Satisfied Not Satisfied X both approaches) street approach (one
direction only)
Number of lanes for moving traffic on each 5,540 ADT 2,184 ADT
approach Urban Rural Urban Rural
MaJor Street t.llnor Street 12,000 8,400 1,200 850
1 1 14,400 10,080 1,200 850
2 or mora 1 14,400 l1o,o8ol 1,600 11.1201
®or more ®or more 12,000 8,400 1,600 1,120
1 2 or more ~
3. Combination
Satisfied Not Satisfied X 2 Warrants 2 Warrants No one warrant satisfied, but following warrants
fulfilled SO" or more 82% 55 !f.
1 2
.CD-I J100-ATI-+-2.dwg
3100 7 C: \OFFIC£_2000\ Trans.fax.2000\31 00. 6.2 7.00
ATIACHMENT 4 Page3 of3
Traffic Manual TRAFFIC SIGNALS AND LIGHTING 9-9
------------------------------------------------------------------------------~--
Figure 9-4
TRAFFIC SIGNAL WARRANTS
Calle Barcelona I Driveway C
(See Volumes in Attachment 3)
CBaaed on Estimated Average Daily Traffic -See Note)
URBAN __ RURAL 40 MPH Minimum Requirements EADT
1. Minimum Vehicular Calle Barcelona Driveway C
X Vehicles per day on Vehicles per day on
Satisfied Not Satisfied major street {total of higher-volume minor
both approaches) street approach (one
direction only)
Number of
approach
lanes for moving traffic on each 6,425 ADT 1,547 ADT
Urban Rural Urban Rural
Major Street t.Ainor Street 8,000 5,600 2,400 1,680
1 1 9,600 16,7201 2,400 11,6801 (6) or more CD 9,600 6,720 3,200 2,240
2 or more 2 or more 8,000 5,600 3,200 2,240
1 2 or more ~ I 92" I
2. lnteruption of Continuous Traffic Vehicles per day on Vehicles per doy on
major street (total of higher-volume minor
Satisfied Not Satisfied X both approaches) street approach (one
direction only)
Number of Iones for moving traffic on each 6,425 ADT 1,547 ADT
approach Urban Rural Urban Rural
Major Street Minor Street 12,000 8,400 1,200 850
1 1 14,400 j1o,o8ol 1,200 [lill
®or more CD 14,400 10,080 1,600 1,120
2 or more 2 or more 12,000 8,400 1,600 1,120
1 2 or more I 64" I
3. Combination
Satisfied Not Satisfied X 2 Warrants 2 Warrants
No one warrant satisfied, but following warrants
fulfilled 80" or more 96% 64%
1 2
.CO-l J10D-ATT--4-3.d"'g
3100 8 C: \OFFIC£_2000\ Trans. fax.2000\31 00. 6.2 7.00
17'~
----------
10'-+-
10' J
11' __... -------r---
16' __...
.......
CONCEPTUAL LAYOUT FOR DISCU8810N PURPOSES
ONLY. PLAN DOES NOT FEPRESENT CQWILETED
DESiaN. NOT FOR BO, DESIGN AND CONSTAUCnoN.
ALL DM:N810NS ARE APPROXIMATE.
ATTACHMENT 5
14 ~
Match Exla...., Lanoe\
J!.,.. 17' 20'
--..... ~ r 10'
12' r 10'
12' __... 11' -s-
---f-----__... 16' 20'
Calle Barcelona
I + I' I
I
13' 1 12' 12' 12'
I
I
Driveway A
0
n 0 l
~ 0 'i' ,.
~ ... c.. :E "'
ICU All A
UOVK CAPACITY ICU.
k ~ o' 5i:= ~ .o,
~ ~ l)l..
l.:tz: ~ ot
-'"-ll•_. .... ~,1.5
UOYB CAPACITY ICU
AITACHMENT 6
Vc.!1tt. 'l.v~O '
AM (lEA""~
1CU Alt. 0
UOVE ~APACITY
LO.I._· .......
JCU
LOA_ .............
"f.E.¢.1... 'l_pll>
~"" ~~tl.. \\Cu.,__
LO.I._
. ........... 0 "11
'""""---. l/RQAN SYSTEMS----~~-------.-....--.....---------