HomeMy WebLinkAboutSDP 12-01; Vista La Costa Apartments; Site Development Plan (SDP) (5)DRAINAGE STUDY
Vista La Costa
JN 121004
For
Vista La Costa
SDP xx-xx
February 15, 2012
JN 12-1004
Prepared For:
SJ Assets Management, Inc.
In care of
Diversified Development, Inc
7668 El Camino Real
Carlsbad, CA 92009 Ste. 104-280
Prepared By:
O'DAY CONSULTANTS
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92010
Nichole Fine
Exp. 9/30/12
C 70035
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
Section Description Page No.
Introduction and Description
B. Hydrologic Calculations Existing Conditions
Appendix A Existing Hydrologic Conditions
C. Hydrologic Calculations Proposed Conditions
5
6-8
Appendix B Proposed Conditions (Developed) 100-year hydrology
for Vista La Costa 9-26
D. Hydraulic Calculations Developed Conditions
Appendix C Hydraulics Analysis of Grate Capacity 27-29
EXHIBITS
Exhibit A
Exhibit B
Exhibit C
Exhibit D
Exhibit E
Exhibit F
Exhibit G
Exhibit H
Exhibit I
Exhibit J
Exhibit K
Vicinity Map
Table 3-1 Runoff Coefficients For Urban Areas (Rational Method)
Soil Group Map
100-year 6-hour precipitation map
100-year 24-hour precipitation map
Figure 3-3 Urban Areas Overland Time of Flow Nomograph
Figure 3-1 Intensity Duration Design Chart
Capacity of Grate Inlet Chart from Bureau of Public Works
Table A-3 Manning's Roughness Coefficients from San Diego
County Drainage Design Manual
20-Scale Existing Conditions Hydrologic Map (Map Pocket)
10-Scale Proposed Conditions Hydrologic Map (Map Pocket)
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
Declaration of Responsible Charge
I hereby declare that I am the Engineer of Work for this project, that I have exercised responsible
charge over the design of this project as defined in section 6703 of the Business and Professions
Code, and that the design is consistent with current standards.
I understand that the check of project drawings and specifications by the City of Carlsbad is
confined to a review only and does not relieve me, as the Engineer of Work, of my
responsibilities for the project design.
O'Day Consultants, Inc.
2710 Loker Avenue West, Suite 100
Carlsbad, CA 92010
(760) 931-7700
Date:
Nichole A. Fine
C 70035 Exp. 09/30/12
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
A. Introduction and Description
This Drainage Study was prepared to support the Site Development Plan for Vista La Costa,
located 1.5 miles east of El Camino Real, north of Gibraltar Street in between Jerez Court and
Romeria Street in the City of Carlsbad (See Vicinity Map, Exhibit 'A'). The existing site is
Parcel 2 of Certificate of Compliance, recorded on August 27, 1984 as file number 84-325375.
The site lies southerly of the La Costa Resort and Spa and is 0.88 gross acres. A Preliminary
Storm Water Management Plan was prepared for Vista La Costa on February 10, 2012 by O'Day
Consultants and will be referred to hereon as Reference 1.
The existing site is mass graded per Grading Plans IM Costa South, Unit No. 5, County of San
Diego Dwg. L-5548 (Reference 2).
Existing Conditions:
Currently, the site is mass-graded per Reference 2. The upper pad is at about elevation 61.0 and
the lower pad is at elevation 55.5. On the northerly edge of the site a 1.4:1 slope daylights into
the La Costa Golf Course and Spa to the north. The site drains at 0.5% towards Gibraltar Street,
to a curb inlet located on the south side of the site. The curb inlet drains to a 48" RCP pipe, that
runs along the easterly boundary of the site. The storm drain outlets to the north, to a PCC lined
drainage swale in the La Costa Golf Course and ultimately outlets to the Batiquitos Lagoon. For
the 100-year storm event see Appendix 'A'.
Proposed Conditions:
19 Multi-Family residential units are proposed for Vista La Costa: two main buildings, and a
parking lot. A private driveway will be constructed between the two buildings and lead into
underground parking garages. The drive aisle and the parking lot will be constructed of pervious
pavement or pavers. The roof will drain to various bioretention areas located at the southwest
and north sides of the site. Each bioretention area will have an underground detention facility to
limit the outflow for hydromodification. The detention facilities will limit the outflow to the
lower flow threshold 0.1Q2. A plate will be placed over the outlet structure for the detention
pipe. A small orifice opening will be at the bottom of the plate and a 6" diameter orifice will be
at the top of the plate for overflows. The catch basin within the bioretention areas will be 10"
above the finish grade. This will act as a secondary overflow if stormwater flows exceed
capacity of detention facility. The trench drain at the bottom of Private Drive 'A' will pick-up
water from the driveway and will connect to the private storm drain system. See Reference 1 for
calculations for the treatment and hydromodification of storm water at the site. See Appendix B
for the proposed 100 year hydrologic calculations. See Exhibit K for the drainage map.
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
B. Hydrologic Calculations
The Hydrologic calculations were performed utilizing the San Diego County Rational Method as
described in the San Diego County Hydrology Manual, June 2003. Pertinent exhibits from the
San Diego County Hydrology Manual are enclosed for reference, as follows:
Exhibit B - Table 3-1 Runoff Coefficients For Urban Areas (Rational Method)
Exhibit C - Soil Group Map
Exhibit D - 100-year 6-hour precipitation map
Exhibit E - 100-year 24-hour precipitation map
Exhibit F - Figure 3-3 Urban Areas Overland Time of Flow Nomograph
Exhibit G - Figure 3-1 Intensity Duration Design Chart
Exhibit J - 20-Scale Existing Conditions Hydrologic Map (Map Pocket)
Exhibit K - 10-Scale Proposed Conditions Hydrologic Map (Map Pocket)
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
APPENDIX A
100 Year Calculations for Existing Conditions
(See Exhibit 'J')
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
San Diego County Rational Hydrology Program
CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2004 Version 7.4
Rational method hydrology program based on
San Diego County Flood Control Division 2003 hydrology manual
Rational Hydrology Study Date: 04/23/07
Existing 100-Yr Storm Hydrology
Vista La Costa JN 03-1060
Prepared By: NF 4/23/07
g:\accts\031060\03 60e.out
********* Hydrology Study Control Information **********
Program License Serial Number 5014
Rational hydrology study storm event year is 100.0
English (in-lb) input data Units used
Map data precipitation entered:
6 hour, precipitation(inches) = 2.800
24 hour precipitation(inches) = 5.000
P6/P24 = 56.0%
San Diego hydrology manual 'C values used
-H-l--)--H-H-H-l--(--l--H-H-l--H-H-l--H-H-l--H-l- + -l--H-l--f- + -l--l--H-l--t--(--(--t- + -)--H-H-(- + -H-F-l--l- +
Process from Point/Station 100.000 to Point/Station 101.000
**** INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[UNDISTURBED NATURAL TERRAIN ]
(Permanent Open Space )
Impervious value, Ai = 0.000
Sub-Area C Value = 0.3 50
Initial subarea total flow distance = 153.500(Ft.)
Highest elevation = 63.800(Ft.)
Lowest elevation = 57.600(Ft.)
Elevation difference = 6.200(Ft.) Slope = 4.039 %
Top of Initial Area Slope adjusted by User to 0.500 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 50.00 (Ft)
for the top area slope value of 0.50 %, in a development type of
Permanent Open Space
In Accordance With Figure 3-3
Initial Area Time of Concentration = 12.03 minutes
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
TC = [1. 8* (1.1-C) *distance(Ft. )-".5) / (% slope'"(l/3)]
TC = [1.8*(1.1-0.3500)*( 50.000".5)/( 0.500^(1/3)]= 12.03
Rainfall intensity (I) = 4.188(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.350
Subarea runoff = 0.381(CFS)
Total initial stream area = 0.260(Ac.)
-H-l--l--H-h-l--H-f-F-h-H-h-H-F-l--l--l--l--H-h-H-H-H-H-l--H-H-l--H-l--H-H-H-l--H + + -h-h-H-H-H-l- + -f--l-
Process from Point/Station 102.000 to Point/Station 103.000
^ **** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
tm Estimated mean flow rate at midpoint of channel = 0.799(CFS)
Depth of flow = 0.194(Ft.), Average velocity = 2.493(Ft/s)
******* Irregular Channel Data ***********
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.70
«i 2 10.00 0.50
3 10.17 0.00
« 4 11.50 0.12
5 30.00 0.49
Manning's 'N' friction factor = 0.015
^ Sub-Channel flow = 0.799(CFS)
g| ' ' flow top width = 5.086(Ft.)
velocity= 2.493(Ft/s)
^ ' ' area = 0.321(Sg.Ft)
' ' Froude number = 1.750
ii
Upstream point elevation = 56.900(Ft.)
Downstream point elevation = 53.100(Ft.)
^ Flow length = 145.000(Ft.)
Travel time = 0.97 min.
Time of concentration = 13.00 min.
" Depth of flow = 0.194(Ft.)
m Average velocity = 2.493(Ft/s)
Total irregular channel flow = 0.799(CFS)
im Irregular channel normal depth above invert elev. = 0.194(Ft.)
Average velocity of channel(s) = 2.493(Ft/s)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[UNDISTURBED NATURAL TERRAIN ]
(Permanent Open Space )
Impervious value, Ai = 0.000
Sub-Area C Value = 0.3 50
Rainfall intensity = 3.984(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.350 CA = 0.290
Subarea runoff = 0.776(CFS) for 0.570(Ac.)
Total runoff = 1.157(CFS) Total area = 0.830(Ac.)
Depth of flow = 0.213(Ft.), Average velocity = 2.696(Ft/s)
End of computations, total study area = 0.830 (Ac.)
il
G:\031060\Drainage\Hydrology\Drainage Study.doc
Vista La Costa
JN 121004
a APPENDIX B
100 Year Hydrologic Calculations for Proposed Conditions
(See Exhibit'K')
I
I
I
I
G:\031060\Drainage\Hydrology\Drainage Study.doc
I
Vista La Costa
JN 121004
TC = [1.8*(1.1-0.7100)*( 100.000-^.5) / ( 12 . 500" (1/3) ] = 3.02
Rainfall intensity (I) = 10.202(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.362(CFS)
Total initial stream area = 0.050(Ac.)
-l--l--^-l--(- + -H-(--H-K-l-H--l-4--l--l--F-H-H-H-F-l--H-f-H-^-h-l--l--H-l--f-l--H-l--l--l--H-l--H-H-l--H + -H
Process from Point/Station 200.000 to Point/Station 201.000
**** SUBAREA FLOW ADDITION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 3.02 min.
Rainfall intensity = 10.202{In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.078
Subarea runoff = 0.435(CFS) for 0.060(Ac.)
Total runoff = 0.797(CFS) Total area = 0.110(Ac.)
-l- + -l--(--^-^-^-^-^--(--h-^-^-^-l--l--^-^-l--l--^-^-l--^-l--^--^-l--^-^-^-^-^-^-^--^+-^-^-l--^--l--t--^-^-^
Process from Point/Station 201.000 to Point/Station 202.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 59.200(Ft.)
Downstream point/station elevation = 58.600(Ft.)
Pipe length = 55.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.797(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 0.797(CFS)
Normal flow depth in pipe = 4.29(In.)
Flow top width inside pipe = 8.99(In.)
Critical Depth = 4.89(In.)
Pipe flow velocity = 3.83(Ft/s)
Travel time through pipe = 0.24 min.
Time of concentration (TC) = 3.2 6 min.
Process from Point/Station 203.000 to Point/Station 204.000
**** IMPROVED CHANNEL TRAVEL TIME ****
Upstream point elevation = 57.900(Ft.)
Downstream point elevation = 57.600 (Ft.)
Channel length thru subarea = 44.000(Ft.)
Channel base width = 7.000 (Ft.)
Slope or 'Z' of left channel hank = 2.000
Slope or 'Z' of right channel bank = 2.000
Estimated mean flow rate at midpoint of channel = 0.861(CFS)
Manning's 'N' =0.03 5
G:\031060\Drainage\HydroIogy\Drainage Study.doc 11
Vista La Costa
JN 121004
0.888(Ft/s)
Maximum depth of channel = 1.000(Ft.)
Flow(q) thru subarea = 0.861(CFS)
Depth of flow = 0.133(Ft.), Average velocity =
Channel flow top width = 7.534(Ft.)
Flow Velocity = 0.89(Ft/s)
Travel time = 0.83 min.
Time of concentration = 4.09 min.
Critical depth = 0.077(Ft.)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 8.399(In/Hr)
Effective runoff coefficient used for
(Q=KCIA) is C = 0.710 CA = 0.099
Subarea runoff = 0.038(CFS) for 0.030(Ac.)
Total runoff = 0.835(CFS) Total area = 0.140(Ac.;
Depth of flow = 0.131(Ft.), Average velocity = 0.878(Ft/s)
Critical depth = 0.075(Ft.)
]
for a 100.
total area
0 year storm
-H-H-t--t--l--H-l- + -h + -h-H-h-h-H-H-l--H-l- + -H-)--h-h-H-f-h-H-l--l--l--H-f-l--h-t- + H-H--l--H-HH--H-l--l- +
Process from Point/Station 204.000 to Point/Station 205.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 48.100(Ft.)
Downstream point/station elevation = 47.400(Ft.)
Pipe length = 66.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.83 5(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 0.835(CFS)
Normal flow depth in pipe = 4.45(In.)
Flow top width inside pipe = 9.00(In.)
Critical Depth = 5.01(In.)
Pipe flow velocity = 3.84(Ft/s)
Travel time through pipe = 0.29 min.
Time of concentration (TC) = 4.38 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
Process from Point/Station 205.000 to Point/Station 205.000
**** SUBAREA FLOW ADDITION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 4.3 8 min.
G:\031060\Drainage\Hydrology\Drainage Study.doc 12
Vista La Costa
JN 121004
Rainfall intensity = 8.040(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.114
Subarea runoff = 0.078(CFS) for 0.020(Ac.)
Total runoff = 0.913(CFS) Total area = 0.160(Ac.)
-H-H-l--H-^-l- + -(--l- + + -H-H-l--l--l--t--H-f-l--l--^-h-H + -h-h-H-l--h-H-H-l--(--H-f-H-l--H-l--^-F-l--l--H +
Process from Point/Station 205.000 to Point/Station 206.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 47.400(Ft.)
Downstream point/station elevation = 47.000(Ft.)
Pipe length = 37.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.913(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 0.913(CFS)
Normal flow depth in pipe = 4.66(In.)
Flow top width inside pipe = 8.99(In.)
Critical Depth = 5.25(In.)
Pipe flow velocity = 3.95(Ft/s)
Travel time through pipe = 0.16 min.
Time of concentration (TC) = 4.53 min.
-l--h-hH--(--h-(--l--h-H-H-H-h-l--l--h-l--f--F-(--h-f-H-h-l--H-H-H-(--l--l--l--l--(--F-(--H-H-l--l--H-l--l- +
Process from Point/Station 205.000 to Point/Station 206.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 0.160(Ac.)
Runoff from this stream = 0.913(CFS)
Time of concentration = 4.53 min.
Rainfall intensity = 7.860(In/Hr)
Program is now starting with Main Stream No. 2
-f-(--f-H-(--(--F-^-H-l--H-h-H-l--H-(--f-H-H-(--F-F-(--H-H-H-f--H-H-H-(--H-l--H-l--H + -H-H-f-l--H-H-l--H-^
Process from Point/Station 207.000 to Point/Station 208.000
**** INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 51.000(Ft.)
Highest elevation = 55.000(Ft.)
Lowest elevation = 54.400(Ft.)
Elevation difference = 0.600(Ft.) Slope = 1.176 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 65.00 (Ft)
for the top area slope value of 1.18 %, in a development type of
G:\031060\Drainage\Hydrology\Drainage Study.doc 13
Vista La Costa
JN 121004
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration =
TC = [1. 8* (1.1-C) *distance(Ft. ) ^^.5) / (%
TC = [1.8*(1.1-0.7100) *( 65.000^^.5) / (
Rainfall intensity (I) = 7.052(In/Hr)
Effective runoff coefficient used for area
Subarea runoff = 0.150(CFS)
Total initial stream area = 0.030(Ac.)
5.3 6 minutes
slope'^ (1/3) ]
1.176'^ (1/3) ] =
for a 100,
(Q=KCIA) is
5.36
year storm
= 0.710
-f-t--t--h + -(--^-l--h-l--H-F-H-l--H-(--F-H-f-(--H-H-H-l--h-l--t- + + -H-H-|--l--H-H-F-l--H-h-t--H-H-f-^-h-l-
Process from Point/Station 208.000 to Point/Station 206.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 49.200(Ft.)
Downstream point/station elevation = 47.000(Ft.)
Pipe length = 11.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.150(CFS)
Nearest computed pipe diameter = 3.00(In.)
Calculated individual pipe flow = 0.150(CFS)
Normal flow depth in pipe = 1.28(In.)
Flow top width inside pipe = 2.97(In.)
Critical Depth = 2.72(In.)
Pipe flow velocity = 7.50(Ft/s)
Travel time through pipe = 0.02 min.
Time of concentration (TC) = 5.39 min.
-^-^-^-(--^-^-(--^-^-l--)--^-^+-^-^-l--^-^-^--l--l--^-^-l--l--^-l--^-^-^--(--^-^-^-^--^-t--(--^-^-^-^--^-^
Process from Point/Station 208.000 to Point/Station 206.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.03 0(Ac.)
Runoff from this stream = 0.150(CFS)
Time of concentration = 5.39 min.
Rainfall intensity = 7.031(In/Hr)
Summary of stream data:
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
1
2
Qmax(1) =
0.913
0.150
Qmax(2) =
000
000
0. 895
1.000
4.53
5.39
1.000 *
0.841 *
1.000 *
1.000 *
7.860
7.031
0.913) -I-
0.150) -1-
0.913) +
0.150) +
1.040
0.967
Total of 2 main streams to confluence:
Flow rates before confluence point:
0.913 0.150
G:\031060\Drainage\Hydrology\Drainage Study.doc 14
Vista La Costa
JN 121004
Maximum flow rates at confluence using above data:
1.040 0.967
Area of streams before confluence:
0.160 0.030
Results of confluence:
Total flow rate = 1.040(CFS)
Time of concentration = 4.532 min.
Effective stream area after confluence = 0.190(Ac.)
-^-^•^-^-^-H-^ + -l--l--l--l--^-^-(--^•-^-^-(-++-^-^-^-^-(--^-^ + -^-l--^-l--^-(--^-l--^-^-^-^-^-l--^-^-^-^-^
Process from Point/Station 206.000 to Point/Station 209.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 47.000(Ft.)
Downstream point/station elevation = 45.400(Ft.)
Pipe length = 85.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.040(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 1.040(CFS)
Normal flow depth in pipe = 4.28(In.)
Flow top width inside pipe = 8.99(In.)
Critical Depth = 5.62(In.)
Pipe flow velocity = 5.03(Ft/s)
Travel time through pipe = 0.2 8 min.
Time of concentration (TC) = 4.81 min.
-l--l--H-(- + + -h + -h-H-l--f-H-H-f-H-H-l--(--H-^-l--l--f-f-t- + -l--(--H-l--f-l--l--l--H-f-l--l--l--l--h + -H-(--h
Process from Point/Station 206.000 to Point/Station 209.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 0.190(Ac.)
Runoff from this stream = 1.040(CFS)
Time of concentration = 4.81 min.
Rainfall intensity = 7.560(In/Hr)
Program is now starting with Main Stream No. 2
+ -F-l--(--H + -l--l--t--h-h-^-l--F-H-h-H-h-H-h-H-h-H-l--H-t--f--(--f--)--H-(--t--H-l--F-t--l--l--l--(- + -l--F-^
Process from Point/Station 210.000 to Point/Station 211.000
**** INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 48.000(Ft.)
Highest elevation = 56.200(Ft.)
G:\031060\Drainage\Hydrology\Drainage Study.doc 15
Vista La Costa
JN 121004
Lowest elevation = 53.200(Ft.)
Elevation difference = 3.000(Ft.) Slope = 6.250 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 95.00 (Ft)
for the top area slope value of 6.25 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 3.71 minutes
TC = [1.8* (1.1-C) *distance(Ft.) ".5) / (% slope^^ (1/3) ]
TC = [1.8* (1.1-0.7100) * ( 95.000-^.5) / ( 6 . 250^^ (1/3 ) ] = 3.71
Rainfall intensity (I) = 8.936(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.254(CFS)
Total initial stream area = 0.040(Ac.)
-H-H-f-F-H-H-H-(--(--f-H-H-l--l--f-(--l--H-f-H-f-l--(--f-f-h + -t--H-H-H-H-H-H-l--H-^-H-H4--H-H-H-f-F-l--^
Process from Point/Station 211.000 to Point/Station 209.000
**** IRREGULAR CHANNEL FLOW TRAVEL TIME ****
Estimated mean flow rate at midpoint of channel = 0.444(CFS)
Depth of flow = 0.133(Ft.), Average velocity = 4.241(Ft/s)
******* Irregular Channel Data ***********
Information entered for subchannel number 1 :
Point number 'X' coordinate 'Y' coordinate
1 0.00 0.33
2 10.50 0.12
3 11.83 0.00
4 12.00 0.50
Manning's 'N' friction factor = 0.015
Sub-Channel flow = 0.444(CFS)
flow top width = 2.035(Ft.)
velocity= 4.241(Ft/s)
area = 0.105(Sq.Ft)
' ' Froude number = 3.2 95
Upstream point elevation = 53.200(Ft.)
Downstream point elevation = 48.400(Ft.)
Flow length = 47.000(Ft.)
Travel time = 0.18 min.
Time of concentration = 3.90 min.
Depth of flow = 0.133(Ft.)
Average velocity = 4.241(Ft/s)
Total irregular channel flow = 0.444(CFS)
Irregular channel normal depth above invert elev. = 0.133(Ft.)
Average velocity of channel(s) = 4.241(Ft/s)
Adding area flow to channel
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
G:\031060\Drainage\HydrologyVDrainage Study.doc 16
Vista La Costa
JN 121004
Rainfall intensity = 8.661(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.071
Subarea runoff = 0.361 (CFS) for 0.060(Ac.)
Total runoff = 0.615(CFS) Total area = 0.100(Ac.
Depth of flow = 0.150(Ft.), Average velocity = 4.225(Ft/s)
-l--|- + -^-^-l--l--l--l--^-^-l--l-+-l--l-++-^--l--^-(--^-^-^-^-l--^-l--^-l--^-^-^-+-^-^-|--^-|--^-^-t--^+-^
Process from Point/Station 211.000 to Point/Station 209.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.100(Ac.)
Runoff from this stream = 0.615(CFS)
Time of concentration = 3.90 min.
Rainfall intensity = 8.661(In/Hr)
Summary of stream data:
Stream Flow rate TC Rainfall Intensity
No. (CFS) (min) (In/Hr)
1 1.040 4.81 7.560
2 0.615 3.90 8.661
Qmax(1) =
1.000 * 1.000 * 1.040) +
0.873 * 1.000 * 0.615) + = 1.576
Qmax(2) =
1.000 * 0.810 * 1.040) +
1.000 * 1.000 * 0.615) + = 1.457
Total of 2 main streams to confluence:
Flow rates before confluence point:
1.040 0.615
Maximum flow rates at confluence using above data:
m 1.576 1.457
Area of streams before confluence:
mt 0.190 0.100
Results of confluence:
Total flow rate = 1.576(CFS)
Time of concentration = 4.814 min.
Effective stream area after confluence = 0.290(Ac.
Process from Point/Station 209.000 to Point/Station 212.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 45.400(Ft.)
Downstream point/station elevation = 44.700 (Ft.)
Pipe length = 70.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.576(CFS)
Nearest computed pipe diameter = 9.00(In.)
G:\031060\Drainage\Hydrology\Drainage Study.doc 17
Vista La Costa
JN 121004
Calculated individual pipe flow = 1.576(CFS)
Normal flow depth in pipe = 7.02(In.)
Flow top width inside pipe = 7.46(In.)
Critical Depth = 6.93(In.)
Pipe flow velocity = 4.26(Ft/s)
Travel time through pipe = 0.27 min.
Time of concentration (TC) = 5.09 min.
-l--l- + -H-l--l--l--H-h-f + -l--l- + -l--H-F-(--l--l--H-H-H-H-l--h-(--^-H-^-H-H-H-l- + + -l--H-l--l--l- + -H-(--H +
Process from Point/Station 209.000 to Point/Station 212.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 0.290(Ac.)
Runoff from this stream = 1.576(CFS)
Time of concentration = 5.09 min.
Rainfall intensity = 7.295(In/Hr)
Program is now starting with Main Stream No. 2
-^^--^-(--^+-^-^-l--^-^--l--(--l--^--^--l--l--^--^-4--^-^-^-^-l--l--^-l--l--l--(--^-l--^-l--l--^--^-l--^-l-++-l-+
Process from Point/Station 200.000 to Point/Station 213.000
**** INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Initial subarea total flow distance = 40.000(Ft.)
Highest elevation = 96.200(Ft.)
Lowest elevation = 91.200(Ft.)
Elevation difference = 5.000 (Ft.) Slope = 12.500 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 100.00 (Ft)
for the top area slope value of 12.50 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 3.02 minutes
TC = [1.8*(l.l-C)*distance(Ft.)".5)/(% slope'-(1/3 ) ]
TC = [1.8*(1.1-0.7100)*( 100.000-^.5) / ( 12.500^^(1/3)]= 3.02
Rainfall intensity (I) = 10.202(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.362(CFS)
Total initial stream area = 0.050(Ac.)
-H-l--H-F-l--f-^-l--(--F-(--l--F-H-F-F-H-(- + -t--H + -h-(--l--f-l- + -F-F-h-h-l--l--l--l--F-f-f-l--f-l--H-H-H-H
Process from Point/Station 214.000 to Point/Station 214.000
**** SUBAREA FLOW ADDITION ****
Decimal fraction soil group A = 0.000
G:\031060\Drainage\Hydrology\Drainage Study.doc 18
Vista La Costa
JN 121004
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 3.02 min.
Rainfall intensity = 10.202(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.078
Subarea runoff = 0.435(CFS) for 0.060(Ac.)
Total runoff = 0.797(CFS) Total area = 0.110(Ac.)
Process from Point/Station 213.000 to Point/Station 214.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 57.400(Ft.)
Downstream point/station elevation = 56.800(Ft.)
Pipe length = 57.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.797(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 0.797(CFS)
Normal flow depth in pipe = 4.34(In.)
Flow top width inside pipe = 8.99(In.)
Critical Depth = 4.89(In.)
Pipe flow velocity = 3.78(Ft/s)
Travel time through pipe = 0.25 min.
Time of concentration (TC) = 3.28 min.
-l--l--H-F-H-F-F-H-H-H-l--l--H-^-H-l--H-f-H-l--l--K-H-F-f-f-l--h-l--H-(--H-F-F-H-H-H-F-(--l--f--F-)--h-H-l- +
Process from Point/Station 215.000 to Point/Station 216.000
**** IMPROVED CHANNEL TRAVEL TIME ****
55.800(Ft.)
55.400(Ft.)
70.000(Ft.)
4.000(Ft.)
bank = 2.000
0
Upstream point elevation =
Downstream point elevation =
Channel length thru subarea
Channel base width =
Slope or 'Z' of left channel
Slope or 'Z' of right channel bank = 2.000
Estimated mean flow rate at midpoint of channel =
Manning's 'N' =0.035
Maximum depth of channel
Flow(q) thru subarea =
Depth of flow = 0.195(Ft.
Channel flow top width =
Flow Velocity = 1.01(Ft/s)
Travel time = 1.16 min.
Time of concentration = 4.43 min.
Critical depth = 0.111(Ft.)
Adding area flow to channel
Decimal fraction soil group A = 0.
Decimal fraction soil group B = 0.
Decimal fraction soil group C = 0.
1.000(Ft.)
863(CFS)
, Average velocity =
4.781(Ft.)
0.863(CFS)
1.007(Ft/s)
.000
, 000
,000
G:\031060\Drainage\Hydrology\Drainage Study.doc 19
Vista La Costa
JN 121004
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(43.0 DU/A or Less )
Impervious value, Ai = 0.800
Sub-Area C Value = 0.79 0
Rainfall intensity = 7.971(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.731 CA = 0.110
Subarea runoff = 0.078(CFS) for 0.040(Ac.)
Total runoff = 0.874(CFS) Total area =
Depth of flow = 0.197(Ft.), Average velocity = 1
Critical depth = 0.111(Ft.)
0.150(Ac.)
012(Ft/s)
Process from Point/Station 216.000 to Point/Station 212.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 46.900 (Ft.)
Downstream point/station elevation = 44.700(Ft.)
Pipe length = 39.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.874(CFS)
Nearest computed pipe diameter = 6.00(In.)
Calculated individual pipe flow = 0.874(CFS)
Normal flow depth in pipe = 3.54(In.)
Flow top width inside pipe = 5.90(In.)
Critical Depth = 5.48(In.)
Pipe flow velocity = 7.24(Ft/s)
Travel time through pipe = 0.09 min.
Time of concentration (TC) = 4.52 min.
Process from Point/Station 216.000 to Point/Station 212.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.150(Ac.)
Runoff from this stream = 0.874(CFS)
Time of concentration = 4.52 min.
Rainfall intensity = 7.869(In/Hr)
Summary of stream data:
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
1
2
Qmax(1)
1.576
0.874
1.000 *
0.927 *
Qmax(2) =
000
000
5.09
4.52
1.000 *
1.000 *
0.889 *
1.000 *
7 .295
7.869
1.576) +
0.874) -I-
1.576) +
0.874) -H
2 .387
2.276
G:\031060\Drainage\Hydrology\Drainage Study.doc 20
Vista La Costa
JN 121004
Total of 2 main streams to confluence:
Flow rates before confluence point:
1.576 0.874
Maximum flow rates at confluence using above data:
2.387 2.276
Area of streams before confluence:
0.290 0.150
Results of confluence:
Total flow rate = 2.387(CFS)
Time of concentration = 5.088 min.
Effective stream area after confluence = 0.440(Ac.)
-l--t--H-H-H-l--H-^-F-l--F-H-H-l--H-H-H-l--h-l--^-H-l--(--H-l--l--H-l--)--l- + -H-F-H-l--l--(--l--H-l--l--H-H +
Process from Point/Station 212.000 to Point/Station 217.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 44.700(Ft.)
Downstream point/station elevation = 42.100(Ft.)
Pipe length = 76.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 2.387(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 2.387(CFS)
Normal flow depth in pipe = 5.98(In.)
Flow top width inside pipe = 8.50(In.)
Critical Depth = 8.21(In.)
Pipe flow velocity = 7. 66(Ft/s)
Travel time through pipe = 0.17 min.
Time of concentration (TC) = 5.25 min.
-)--l--h-(--|--l- + -(--l--l--l--l--l--l--H + -)--t--l--(--K-|--l--l--H-H-H-l--h-l--l--H-l-H--h + -l--h + -(--l--h-^-f +
Process from Point/Station 212.000 to Point/Station 217.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 1
Stream flow area = 0.440(Ac.)
Runoff from this stream = 2.387(CFS)
Time of concentration = 5.25 min.
Rainfall intensity = 7.146(In/Hr)
Program is now starting with Main Stream No. 2
+++++++++++++++++++++++++++++++++-^++++++++++++++++++++++++++++++++++++
Process from Point/Station 218.000 to Point/Station 219.000
**** INITIAL AREA EVALUATION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
G:\031060\Drainage\Hydrology\Drainage Study.doc 21
Vista La Costa
JN 121004
Sub-Area C Value = 0.710
Initial subarea total flow distance = 60.000(Ft.)
Highest elevation = 93.500(Ft.)
Lowest elevation = 88.500(Ft.)
Elevation difference = 5.000(Ft.) Slope = 8.333 %
INITIAL AREA TIME OF CONCENTRATION CALCULATIONS:
The maximum overland flow distance is 100.00 (Ft)
for the top area slope value of 8.33 %, in a development type of
24.0 DU/A or Less
In Accordance With Figure 3-3
Initial Area Time of Concentration = 3.46 minutes
TC = [1.8*(l.l-C)*distance(Ft.)'^.5)/(% slope'^ (1/3) ]
TC = [1.8* (1.1-0.7100) * ( 100.000^^.5) / ( 8.333^(1/3)]= 3.46
Rainfall intensity (I) = 9.350(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for area (Q=KCIA) is C = 0.710
Subarea runoff = 0.332(CFS)
Total initial stream area = 0.050(Ac.)
-^+-^-^-^-l-•^-^-^-l--^-f-l--^-^-^-^-^-^-l--l--l--^-^-^-^-l--^-l--^-(--^-l--(--l--^-^-+-l--l--l--l-+-l--^-^
Process from Point/Station 219.000 to Point/Station 220.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 54.900(Ft.)
Downstream point/station elevation = 54.200(Ft.)
Pipe length = 70.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.332(CFS)
Nearest computed pipe diameter = 6.00(In.)
Calculated individual pipe flow = 0.332(CFS)
Normal flow depth in pipe = 3.32(In.)
Flow top width inside pipe = 5.97(In.)
Critical Depth = 3.50(In.)
Pipe flow velocity = 2.98(Ft/s)
Travel time through pipe = 0.39 min.
Time of concentration (TC) = 3.85 min.
-t- + -t--t--F-)--^-(--(--l-4--h-h-H-l--H-l--H-l--l--l--l--l--H-H-l--l--F-l--l--l--F-l--l--l--l--l--H-H-F-h + -(--f +
Process from Point/Station 220.000 to Point/Station 220.000
**** SUBAREA FLOW ADDITION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 3.85 min.
Rainfall intensity = 8.725(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.085
Subarea runoff = 0.411(CFS) for 0.070(Ac.)
Total runoff = 0.743(CFS) Total area = 0.120(Ac.)
G:\031060\Drainage\Hydrology\Drainage Study.doc 22
Vista La Costa
JN 121004
-H-l--H-F + -f-t--h-l--t--H-l--t--(--f-)--l--F-h-l--h-H-l--h-l--(--f-H-f-F-(- + -H-l--l--H-l--l--H-H-f-l--)--F-^
Process from Point/Station 220.000 to Point/Station 221.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 54.200(Ft.)
Downstream point/station elevation = 53.500(Ft.)
Pipe length = 125.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 0.743(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 0.743(CFS)
Normal flow depth in pipe = 5.03(In.)
Flow top width inside pipe = 8.94(In.)
Critical Depth = 4.72(In.)
Pipe flow velocity = 2.93(Ft/s)
Travel time through pipe = 0.71 min.
Time of concentration (TC) = 4.57 min.
-^-(--^-^-l--l--^-^-l--^-l--l--l--^-l--^-l--l--l--^-^-l--^-l--^-^-^-^-^-^-^-^-t--^-l--l--l--^-f--(--^-^-l- +
Process from Point/Station 221.000 to Point/Station 221.000
**** SUBAREA FLOW ADDITION ****
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 4.57 min.
Rainfall intensity = 7.822(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.135
Subarea runoff = 0.312(CFS) for 0.070(Ac.)
Total runoff = 1.055(CFS) Total area = 0.190(Ac.)
-f-H-l--F-h-h + -H-h-l--f-H-F-l--h-t--f-f-f-l--l--l--l--l--h-l--l--(--K-l-H--h-H-h-h-^-H-h-h + -h-H-h-H-)--F
Process from Point/Station 221.000 to Point/Station 222.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 53.500(Ft.)
Downstream point/station elevation = 53.300(Ft.)
Pipe length = 50.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.055(CFS)
Nearest computed pipe diameter = 12.00(In.)
Calculated individual pipe flow = 1.055(CFS)
Normal flow depth in pipe = 5.78(In.)
Flow top width inside pipe = 11.99(In.)
Critical Depth = 5.18(In.)
Pipe flow velocity = 2.82(Ft/s)
Travel time through pipe = 0.30 min.
Time of concentration (TC) = 4.86 min.
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
G:\031060\Drainage\Hydrology\Drainage Study.doc 23
Vista La Costa
JN 121004
Process from Point/Station 222.000 to Point/Station
**** SUBAREA FLOW ADDITION ****
222.000
Decimal fraction soil group A = 0.000
Decimal fraction soil group B = 0.000
Decimal fraction soil group C = 0.000
Decimal fraction soil group D = 1.000
[HIGH DENSITY RESIDENTIAL ]
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Time of concentration = 4.86 min.
Rainfall intensity = 7.513(In/Hr) for a 100.0 year storm
Effective runoff coefficient used for total area
(Q=KCIA) is C = 0.710 CA = 0.170
Subarea runoff = 0.225(CFS) for 0.050(Ac.)
Total runoff = 1.280(CFS) Total area = 0.240(Ac.)
-^-^-l--f-^-l--^-^-l-+-l--^+-^•-^ + -^-^-^-l--^-^-^-^-^--^-^-^-t-+-^--^-^-^-^ + + -^-^-^-^-^-^-^-^ + -^-(- +
Process from Point/Station 223.000 to Point/Station 224.000
**** IMPROVED CHANNEL TRAVEL TIME ****
52 .300(Ft.)
51.900(Ft.)
85.000(Ft.
6.000(Ft.)
bank = 2.000
1.000(Ft.)
.494(CFS)
Average velocity
.905(Ft.)
Upstream point elevation =
Downstream point elevation =
Channel length thru subarea
Channel base width =
Slope or 'Z' of left channel
Slope or 'Z' of right channel bank = 2.000
Estimated mean flow rate at midpoint of channel
Manning's 'N' =0.03 5
Maximum depth of channel =
Flow(q) thru subarea = 1
Depth of flow = 0.226(Ft.),
Channel flow top width = 6
Flow Velocity = 1.02 (Ft/s)
Travel time = 1.3 8 min.
Time of concentration = 6.25
Critical depth = 0.123(Ft.
Adding area flow to channel
Decimal fraction soil group A =
Decimal fraction soil group B =
Decimal fraction soil group C =
Decimal fraction soil group D =
[HIGH DENSITY RESIDENTIAL
(24.0 DU/A or Less )
Impervious value, Ai = 0.650
Sub-Area C Value = 0.710
Rainfall intensity = 6.391(In/Hr)
Effective runoff coefficient used for
(Q=KCIA) is C = 0.710 CA = 0.256
Subarea runoff = 0.353(CFS) for 0.120(Ac
Total runoff = 1.634(CFS) Total area =
Depth of flow = 0.239(Ft.), Average velocity =
Critical depth = 0.131(Ft.)
1.494(CFS)
1.023(Ft/s)
000
000
000
000
for a 100.
total area
0 year storm
)
0.360{Ac.)
1.057(Ft/s)
G:\031060\Drainage\Hydrology\Drainage Study.doc 24
Vista La Costa
JN 121004
-^-^--l--(--^-l--^-^-^-)--l--^-^-l--^-l--^-^-^--l--l--^+-^-^-^-^-^-^-l--^•^-^--^--^-l--^-^+-l--^-^-^-l--^+
Process from Point/Station 224.000 to Point/Station 217.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 42.600(Ft.)
Downstream point/station elevation = 42.100(Ft.)
Pipe length = 85.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 1.634(CFS)
Nearest computed pipe diameter = 12.00(In.)
Calculated individual pipe flow = 1.634(CFS)
Normal flow depth in pipe = 6.69(In.)
Flow top width inside pipe = 11.92(In.)
Critical Depth = 6.52(In.)
Pipe flow velocity = 3.63(Ft/s)
Travel time through pipe = 0.39 min.
Time of concentration (TC) = 6.64 min.
-f-H-H-H-H + -H-l- + -h + + -f-H-l--H-l--l--H-(--l--(--l--H-l--l--H-H-(--t--H-l--H-(--H-(--l- + H--H-H-H-h-t--H-l-
Process from Point/Station 224.000 to Point/Station 217.000
**** CONFLUENCE OF MAIN STREAMS ****
The following data inside Main Stream is listed:
In Main Stream number: 2
Stream flow area = 0.360(Ac.)
Runoff from this stream = 1.634(CFS)
Time of concentration = 6.64 min.
Rainfall intensity = 6.146(In/Hr)
Summary of stream data:
Stream
No.
Flow rate
(CFS)
TC
(min)
Rainfall Intensity
(In/Hr)
1
2
Qmax(1)
Qmax(2)
.387
.634
. 000
.000
0. 860
1. 000
5.25
6.64
1.000 *
0.792 *
1.000 *
1.000 *
7.146
6.146
2.387) +
1.634) +
2.387) +
1.634) -I-
3 . 680
3.687
Total of 2 main streams to confluence:
Flow rates before confluence point:
2.387 1.634
Maximum flow rates at confluence using above data:
3.680 3.687
Area of streams before confluence:
0.440 0.360
Results of confluence:
Total flow rate = 3.687(CFS)
Time of concentration = 6.635 min.
Effective stream area after confluence 0.800(Ac.)
G:\031060\Drainage\Hydrology\Drainage Study.doc 25
Vista La Costa
JN 121004
-F-h + -H-l--h-l--l--h-h-h-l--H-l- + -F-t--l--l--H-l- + + -l--l--l--f + + -l--l--l--h-H-H-h-h-f-(--h-t--t--(--f-l--l-
Process from Point/Station 217.000 to Point/Station 225.000
**** PIPEFLOW TRAVEL TIME (Program estimated size) ****
Upstream point/station elevation = 42.100(Ft.)
Downstream point/station elevation = 34.000(Ft.)
Pipe length = 49.00(Ft.) Manning's N = 0.013
No. of pipes = 1 Required pipe flow = 3.687(CFS)
Nearest computed pipe diameter = 9.00(In.)
Calculated individual pipe flow = 3.687(CFS)
Normal flow depth in pipe = 4.75(In.)
Flow top width inside pipe = 8.99(In.)
Critical depth could not be calculated.
Pipe flow velocity = 15.57 (Ft/s)
Travel time through pipe = 0.05 min.
Time of concentration (TC) = 6.69 min.
End of computations, total study area = 0.800 (Ac.)
100 Year Flowrate for the Parking Lot (Pervious Pavement to Gibraltar)
A= 0.05 AC
C= 0.71 (See Exhibit 'B')
1= 7.37 in/hr (See Exhibit 'G' Tc=5 min.)
0= 0.26 cfs
G:\031060\Drainage\Hydrology\Drainage Study.doc 26
Vista La Costa
JN 121004
APPENDIX C
Calculations for Grates
(See Exhibit 'K')
G:\031060\Drainage\Hydrology\Drainage Study.doc 27
Vista La Costa
JN 121004
24"x 24" Catch Basin
Qmax/P = 3.0 * H'^3/2 (Bureau of Public Roads Chart - See attached exhibiO
Q - Storm runoff
P - Perimeter of catch basin grate (24" x 24" Area Drain P=24"-i-24"-i-24"-i-24"=8.0')
H - Head (assume 6" depression, H=0.5')
Assuming grate is half clogged: (P=8.0/2=4.0')
Qmax = (3.0 * 0.5''^3/2)*4.0' = 4.24 cfs
24'
24'
24" X 24" AREA DRAIN GRATE
Capacity Calculations for 3' Diameter Round Grate
Qmax/P = 3.0 * H^3/2 (Bureau of Public Roads Chart - See attached exhibit 'H')
Q - Storm runoff
P - Perimeter of catch basin grate (2*n*(1.5') = 9.42 ft^
H - Head (assume 2" depression, H=0.17') (Freeboard in bioretention area is 2")
Assuming grate is half clogged: (P=9.42/2)= 4.71 ft^
Qmax = (3.0 * 0.17'^3/2)*4.71 = 0.99 cfs
Node 204: 0.84 cfs OK
Node 216: 0.87 cfs OK
G:\031060\Drainage\Hydrology\Drainage Study.doc 28
Vista La Costa
JN 121004
Node 224: 1.63 cfs (2~Inlets 0.99*2= 1.98 cfs) OK
G:\031060\Drainage\Hydrology\Drainage Study.doc 29
EXHIBIT 'A
cm OF OCEAHSnX
cmr or
SAN UMCOS
PACtnc
OCEAN
PROJECT SITE
aiYOF BHMTAS
VICINITY MAP
NO SCALE
i i I i I I i I I I I i I i I I i I i I I I i k 1
San Diego County Hydrology Manual
Date: June 2003
Section:
Page:
3
6 of 26
Table 3-1
RUNOFF COEFFICIENTS FOR URBAN AREAS
Land Use Runoff Coefficient "C"
Soil Type
NRCS Elements County Elements % IMPER. A B C D
Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.20 0.25 0.30 0.35
Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41
Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46
Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49
Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52
Medium Density Residential (MDR) Residendal, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57
Medium Density Residential (MDR) Residential. 10.9 DU/A or less 45 0.52 0.54 0.57 0.60
Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63
High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71.^\
High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79 (
Commercial/Industrial (N. Com) Neighborhood Conraiercial 80 0.76 0.77 0.78 0.79
Conunercial/lndustrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82
Conunercial/lndustrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85
Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85
Commercial/Industrial (General I.) General Industrial 95 0.87 0.87 0.87 0.87
*The values associated with 0% impervious may be used for direct calculation of the
coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity.
is located in Cleveland Nadonal Forest).
DU/A = dwelling units per acre
NRCS = National Resources Conservation Service
runoff coefficient as described in Section 3.1.2 (representing the pervious runoff
Justificadon must be given that the area will remain natural forever (e.g., the area
3-6
IIII I I t 1 i i i I
/^
IIII I 1 i 1 1 i I I i i t i
33?30'
County of San Diego
Hydrology Manual
Rainfall Isopluvials
100 Year Rainfall Event - 6 Hours
isopluvial (Inches)
-^GIS GIS
••XV H,!V'.,-.'^'J:I r'KY-' f .''i'Vv.T:'^-
-im MAP IS PBCMMD WHIHOUI WAnnANTY OF AMT MK). HTHf" e>P«BS OBKMIED. wauDWQ. BUI NOT IMTBD TO. TMB iMPlW W*««MmS
Of wcRcwiNTMaurT wm mNess FOR * pwiicuiAfi puwost
3 0 3 Miles
lift, I 1 I I I 1 i i I I I. I 1 I i I 1 t 1 1 1 t I
33'30'
County of San Diego
Hydrology Manual
Rainfall Isopluvials
100 Year Rainfall Event - 24 Hours
Isopluvial (inches)
DPW CIS
t*n « PBovntia wrHout MMWAKTI of MND. fTivCRKuFHEBs on MPlKD. tNClUOING. Bur NOT UMTEOTD. THi M>lCO MARIUmK9 or MERCWMTAMUTY AND Ftness Fof> A pMrncuuo PUNKtse.
3 0 3 Miles
Illlllliitliilllllll I i I 1 i I I i I i I 1 I 1 t
100
LU
LU O 2
W
O
LU
CO
cc
o
O Q: LU
I
EXAMPLE:
Given: Watercourse Distance (D) = 70 Feet
Slope (s) =1.3%
Runoff Coefficient (C) = 0.41
Overland Flow Time (T) = 9.5 Minutes
SOURCE: Aiiport Drainage, Federal Aviation Administration. 1965
j_^.6{\.i-C)\fo
Rational Formula - Overland Time of Flow Nomograph
F I G U R E -r
I I i I II II 11 II ftl I I i f 1 i I f E I I i I f I i I I i I i
7 8 9 10 20 30 40 50 1
Minutes
Duration
3 4
Hours
Diractlons for Application:
(1) From precipitation maps determine 6 hr and 24 hr amounts
fbr the selected fi-eqtjency. These maps are included in the
County Hydrology Manual (10,50, and 100 yr maps included
in the Design and Procedure Manual).
(2) Adjust 6 hr precipitation (if necessary) so that it is within
the range of 45% to 65% of tfie 24 hr precipitation (not
applicaple to Desert).
(3) Plot 6 hr precipitation on fhe right side of the chart.
(4) Draw a tine through the point parallel to the plotted lines.
(5) This line is the Intensity-duration curve fbr the location
being analyzed.
50 year
5.5 ,_6 = 54.5 %(2)
•P 24
Application Fonn:
(a) Selected frequency
(b) P6= 3 In.. Po^
(c) Adjusted Pg'^* = _J_
(d) t3j= 20 min.
(e) I = 3.2 in./hr.
Note: This chart replaces the Intenstty-Duration-Frequency
curves used since 1965.
PB 1 i.s 2 „ "* 'is ^ 5 6
iltiraaon ... 1 T ~ i' " 1 ! 1 1 1 i i
5 2.63 3.95 659 7.90:9.22 10.54; 11.86 13.17 14.49115.81
7 2.12 ai8 4>i 6.30X6.3617.42 8.48 : 9.iM 10.60 11.06 12.72
10 1.60 3.37 4.21 i5.0Sr 5.90 6.74 7.56 8.42 9^7 iail
15 1.30 1.95 ZS9 3.24 3.89] 4.54 5.19 5.84 6:40 7.13 fM 20 1XW 1.62 2.15 2.69 'i23{3.77] 4.31 4.861 5.39 6.93 B.46
35 6S3 1.40 1.87 2.3312J0l357 3.73 4.20 4.67 5.13 5.60
30 6l3 ii4 1.66 2.07 2.49r2.g0 3.SC '3.73 ~4.is 4.56 4:ge
40 0.69 'i.03j i.38 2.07; 2.41 2.76 3.10 3.45 ,3.79 4.13
SO 0.60 0.901 T19 1.4911.7912.09 l39 2.69 i98 3.28 ass 60 033 O.flO 1.06 1.33 1.59! 1.88 2.12 "2.39 2.65' 2.92 3.18
Hi o;4i o:oi 0.82 102 15311.43 1,63 1.8« 204 2i5 2.4S
120 oM 0.51 6.68 085 1.02U[.19i 1.36 ,1.53
0.8811.63ri."l8M.'32'
0.78! 6.91 i 1.04 1 1.18
1.70 , 1.87 2.04
iBO .„ ViM 0.59 073"
1.02U[.19i 1.36 ,1.53
0.8811.63ri."l8M.'32'
0.78! 6.91 i 1.04 1 1.18
1.47 1.62 i>8 " ISO OM 6.39 0.52 6.65
1.02U[.19i 1.36 ,1.53
0.8811.63ri."l8M.'32'
0.78! 6.91 i 1.04 1 1.18 i.31 1.44 isi 240 022 0.33 0.43 "0.54 0.65 0.76 0.87 0^98 i.b8 1.19 1.30
300 019 bis 0.38 6.47 6.56 i 0.661 0 75
0".50T0.5«i 6.«7
0 85 r 0.94 '1.63 i.l3
360 0.17 0.2S 0.33 a42
6.56 i 0.661 0 75
0".50T0.5«i 6.«7 0.75 i 0.84 0.92 1.00
Intenslty-Duration Design Chart - Example
FIGURE -
3-2
1
-I
•"I
Willi'
41
•Jjj
1073.02
1—0—1
P » 2 (QT b)
l=-. 1 1 1 i |< 1 •• lui ti" f"'| ' "' f"jl"'l "•>C.u^".| 1 1 I 1 1 •/• t
till!
g Mill I 1 / =
lli IIII III /\ 4
i M II m / 1 = t I/-.• — ^ • 1 11 llillll/
r 1 11 llllll./
i IMM
I-. ) . I .ni.i.|-..-||.»| 111, j.m)"i.)ii'-|—fl
IIII I I I I M ' I
111 I t I I I I
T7^\ ill .A I I I i I
t I I I /I t IIII
i I I I I I I I 111 ^jr-- i' l II 1/11 I I I 11
f Vi I
I foil l >fl
I IIII I i^t I TT
I I 1/
1/ I TT
I I.
\ Ml
MM
I llli I I i I I I I
IIII I I I I I j I I I I
I 111 I t I I I I I I
£ H-:;05 Ul? 7.0 iD.j^.baaVEHffll hn^ilES I I I | I I
Mill
io/i . is. 3 TIW^*
MIM
llli
I I I -I I I
I I I I 1 I
IIIII
I HEAPS 3j-T\V£LN 6.^£ fTrjA^bljTION |
\ £gcrOR IS Or;ia£.Tl)ON l!Sl iW iD^Tr'^JITr I | | |
I I MM llllll I I IIM
tf
i- M
Cr.f ri I I
IMM
• 3
• 11,1. ml... , III..1.1.,..1.., IL
~i till 111 1 III I.: .,!.„,Wll. ?12
3URSAU OF PUBLIC ROADS .CAPACITY Or GRATE
I g
? FLJT
i.i..t.tiiti<. ...L.. 1 1 I I VTi .>
a a 7 c c ts Y
INLET IN SUM?
DIVJSIOW TWO WASH, p.C. VVATER PONDED ON GRATE
EXHIBIT "I"
Table A-3
Table A-3 Average Manning Roughness Coefflcients for Small Open Channels
Conveying Less than 50 cfs*
Dosign Flow Depth
Lining Type 0-0.5 ft O.S-2.0fl > 2.0 It
Concrete (Poured) . 0.015 0.013 0.013
Air Blown Concrete 0.023 0.019 0.016
Grouted Riprap 0.040 0.030 0.028
Stone Maeoniy 0.042 0.032 0.030
Soli Cement 0.025 0.022 0.020
Bare Soli 0.023 0.020 0.020
RoeliCut 0.045 0.035 0.025
Rocit Riprap Based on Rodt Size (See Section 5.7.2)
Table A-4
Table A-4 Average Manning Roughness Coefficients for Larger Open Channels
Unlined Channels
Clay Loam.....' 0.023
Sand 0.020
Lined Channels
Grass Lined (Well-Maintained) 0.035
Grass Lined (Not Maintained) 0.045
Wetland-Bottom Channels (New Channel) 0.023
Wetland-Bottom Channels (Mature Channel) See Table A-5
RIprap-UneO Channels See Section 5.7.2
Concrete (Poured) 0.014
Air Blown Mortar (Gunite or Shotcrete)' 0 016
Asphaltic Concrete or Bituminous Plant Mix 0.018
For channala with ravalmaiUs or muKipIt lining types, ust composXi Manning roughntat (xefUcitnt bastd on componant
lining matwfaM.
* Based on materials and workmanship required by standard specifications.
' For air-blown concrete, use »-0.012 (if troweled) and fl=0.025 if puiposely rougiiened.
San Diego County Drainage Design Manual (May 2005)
Page A-5