HomeMy WebLinkAboutSDP 14-01; Burke Carlsbad Business Center; Site Development Plan (SDP) (5)Preliminary Hydrology Study FOR L0T17 CARLSBAD RACEWAY BUSINESS PARK PLANNED INDUSTRIAL PERMIT September 7, 2013 RECEIVED JAN 0 6 2014 CITY OF CARLSBAD PLANNING DIVISION Prepared By: O'DAY CONSULTANTS 2710 Loker Avenue, Suite 100 Carlsbad, CA 92010 (760) 931-7700 J.N. 12-1001 Timothy 0. Carroll Exp. 12/31/14 RCE 55381 Table of Contents Section Description Page No. A. Introduction and Project Description 3 B. Existing Hydrology Basin Areas And Hydrology Calculations 4 C. Proposed Hydrology Basin Areas And Hydrology Calculations 4 Exhibits Exhibit A Exhibit B Exhibit C Appendices Appendix A Appendix B Appendix C Vicinity IVIap 20-Scale Existing Project Conditions Hydrologic IVIap (iVlap Pocket) 20-Scale Proposed Project Conditions Hydrologic Map (Map Pocket) Hydrologic Calculations - Existing Project Conditions for 100-year Storm Hydrologic Calculations - Proposed Project Conditions for 100-year Storm County of San Diego Hydrology Manual References A. Introduction and Proiect Description Lot 17 of Carlsbad Raceway Business Park project is located north of Lionshead Avenue and east of Melrose Drive in the City of Carlsbad, California (see Vicinity Map below). The entire site is approximately 4.8 acres. Lot 17 is an existing mass graded lot per approved grading plan Drawing 409-lA. The purpose of this Preliminary Drainage Study is to support a Planned Industrial Permit "PIP" which proposes the development of the site for industrial use. The site will include approximately 76,326 s.f. of building permit area (includes truck docks and trash enclosures) and approximately 177 parking spaces. The remainder ofthe site will be landscaping. Under existing conditions, there is a single location where runoff from the lot discharges to as indicated on City of Carlsbad Grading Plans Drawing No. 409-lA, sheet 14 and Drawing No. 409-1, sheet 23. Runoff from the site drains to an existing desilting basin that is connected to a 54-inch storm drain that traverses the site and then discharges into an existing downstream detention basin west of Lot 17. The 54-inch storm drain is part of the existing drainage infrastructure serving the surrounding Carlsbad Raceway Business Park. The controlled discharge from the downstream detention basin eventually discharges to Agua Hedionda Creek. Since the lot is part ofthe mass grading plans for the Carlsbad Raceway Business Park, a runoff coefficient of 0.9 (Office Professional) is used in the existing hydrology calculations. Under proposed conditions, the majority ofthe site will drain into separate bioretention basins located along the southerly property line/right-of-way of Lionshead Avenue and the northeasterly corner ofthe property. The remaining area in the vicinity ofthe southwest corner ofthe property will be intercepted by a Urban Green biofiltration catch basin, and two other areas will drain into truck loading docks that are 4.5 feet below the finished floor of the proposed building. All proposed drainage facilities will connect to the existing drainage infrastructure located on-site. A runoff coefficient of 0.9 (Office Professional) is used in the proposed hydrology calculations. B. Hydrologic Calculations Hydrologic calculations were performed utilizing the San Diego County Rational Method as described in the San Diego County Hydrology Manual, June 2003. Pertinent references from the San Diego County Hydrology Manual are enclosed in Appendix "C" as follows: Table 3-1 Runoff Coefficients for Urban Areas (Rational Method) Soil Group Map 100-year 6-hour precipitation map 100-year 24-hour precipitation map Figure 3-1 Intensity Duration Design Chart In the Rational Method, Q= Flowrate = CIA, and C = Runoff coefficient, soil type 'C 1= 7.44P6tc •^*^ Exhibit H Pe = Precipitation for the 6 hour, 100-year storm, Exhibit 'F' tc = 5 minutes minimum and calculated using methodology described in hydrology manual A = Drainage area in acres, Exhibit 'B' Existing hydrology basin areas and hydrology calculations are shown on Exhibit"B" and in Appendix "A". A summary ofthe existing hydrology is shown in the table below. Table 1. Qioo flow rates for Existing Project Condition Existing Project Hydrology Results Basin Area (acres) Q (cfs) A 4.50 29.9 Total* 4.5 29.9 Proposed hydrology basin areas and hydrology calculations are sh own on Exhibit "C" and in Appendix "B". A summary ofthe proposed hydrology is shown in the table below. Table 2. Qioo flow rates for Proposed Conditions Proposed Project Hydrology Results Basin Area (acres) Q (cfs) A 2.06 12.3 B 1.97 10.0 C 0.14 0.9 D 0.12 0.8 Total 4.29 24.0 Comparison of existing hydrology and proposed hydrology is shown in the table below. Table 3. Qioo flow rates for Existing and Proposed Conditions Comparison of Existing Hydrology and Proposed Hydrology Basin Existing Project Hydrology (cfs) Proposed Project Hydrology (cfs) Total 29.9 24.0 There is an decrease in the storm water runoff from the proposed project conditions compared to the existing project conditions with a similar runoff coefficient. The decrease can be attributed to the longer time of concentration associated with the proposed site plan and reduced drainage area. Lot 17 - Carlsbad Raceway Business Park Preliminary Hydrology Study EXHIBITS CITY OF . OCEAMSIDE HIGHWAY, PACIFIC OCEAN SITE BUSINESS PARK DF?. CITY OF SAN MARCOS CITY OF ENCINITAS VICINITY MAP NO SCALE Lot 17 - Carlsbad Raceway Business Park Preliminary Hydrology Study APPENDIX A Hydrologic Calculations - Existing Project Conditions for 100-year storm San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2006 Version 7.7 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 09/04/13 LOT 17 CARLSBAD RACEWAY 131020EF1 EXISTING HYDROLOGY ********* Hydrology Study Control Information ********** Program License Serial Number 6218 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 3.000 24 hour precipitation(inches) = 5.500 P6/P24 = 54.5% San Diego hydrology manual 'C values used Process from Point/Station 100.000 to Point/Station 110.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 404.000(Ft.) Lowest elevation = 403.000(Ft.) Elevation difference = 1.000(Ft.) Slope = 2.000 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 70.00 (Ft) for the top area slope value of 2.00 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 3.10 minutes (for slope value of 2.00 %) Calculated TC of 3.100 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.356(CFS) Total initial stream area = 0.053(Ac.) Process from Point/Station 110.000 to Point/Station 120.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 403.000(Ft.) Downstream point elevation = 389.000(Ft.) Channel length thru subarea = 490.000(Ft.) Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank = 50.000 Slope or 'Z' of right channel bank = 50.000 Estimated mean flow rate at midpoint of channel = 15.305(CFS) Manning's 'N' = 0.015 Maximum depth of channel = 1.000(Ft.) Flow(q) thru subarea = 15.305(CFS) Depth of flow = 0.265(Ft.), Average velocity = 4.353(Ft/s) Channel flow top width = 26.517(Ft.) Flow Velocity = 4.35(Ft/s) Travel time = 1.88 min. Time of concentration = 4.98 min. Critical depth = 0.357(Ft.) Adding area flow to channel Calculated TC of 4.976 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.8 50 Rainfall intensity = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.850 CA = 3.828 Subarea runoff = 29. 898(CFS) for 4.450(Ac.) Total runoff = 30.254(CFS) Total area = 4.503(Ac.) Depth of flow = 0.342(Ft.), Average velocity = 5.162(Ft/s) Critical depth = 0.469(Ft.) End of computations, total study area = 4.503 (Ac.) Lot 17 - Carlsbad Raceway Business Park Preliminary Hydrology Study APPENDIX B Hydrologic Calculations - Proposed Project Conditions for 100-year storm San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software, (c)1991-2006 Version 7.7 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 08/30/13 LOT 17 CARLSBAD RACEWAY 131020SF1 PROPOSED HYDROLOGY - BASIN A ********* Hydrology Study Control Information ********** Program License Serial Number 6218 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 3.000 24 hour precipitation(inches) = 5.500 P6/P24 = 54.5% San Diego hydrology manual 'C values used Process from Point/Station 10.000 to Point/Station 20.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 397.800(Ft.) Lowest elevation = 397.540(Ft.) Elevation difference = 0.260(Ft.) Slope = 0.520 % Top of Initial Area Slope adjusted by User to 0.500 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 50.00 (Ft) for the top area slope value of 0.50 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 4.20 minutes (for slope value of 0.50 %) Calculated TC of 4.200 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.457(CFS) Total initial stream area = 0.068(Ac.) Process from Point/Station 20.000 to Point/Station 30.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 397.540(Ft.) Downstream point elevation = 396.320(Ft.) Channel length thru subarea = 188.000(Ft.) Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank = 33.000 Slope or 'Z' of right channel bank = 33.000 Estimated mean flow rate at midpoint of channel = 1.596(CFS) Manning's 'N' = 0.015 Maximum depth of channel = 0.500 (Ft.) Flow(q) thru subarea = 1.596(CFS) Depth of flow = 0.175(Ft.), Average velocity = 1.574(Ft/s) Channel flow top width = 11.569(Ft.) Flow Velocity = 1.57(Ft/s) Travel time = 1.99 min. Time of concentration = 6.19 min. Critical depth = 0.171(Ft.) Adding area flow to channel Rainfall intensity (I) = 6.887(In/Hr) for a 100.0 year storm Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Rainfall intensity = 6.887(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.850 CA = 0.389 Subarea runoff = 2.224(CFS) for 0.390(Ac.) Total runoff = 2.681(CFS) Total area = 0.458(Ac.) Depth of flow = 0.213(Ft.), Average velocity = 1.792(Ft/s) Critical depth = 0.211(Ft.) Process from Point/Station 30.000 to Point/Station 30.000 **** SUBAREA FLOW ADDITION **** Rainfall intensity (I) = 6.887(In/Hr) for a 100.0 year storm Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Time of concentration = 6.19 min. Rainfall intensity = 6.887(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.850 CA = 0.517 Subarea runoff = 0.878(CFS) for 0.150(Ac.) Total runoff = 3.559(CFS) Total area = 0.608(Ac.) Process from Point/Station 30.100 to Point/Station **** piPEFLOW TRAVEL TIME (User specified size) **** 60.100 Upstream point/station elevation = Downstream point/station elevation = Pipe length = 238.00(Ft.) Slope = No. of pipes = 1 Required pipe flow Given pipe size = 18.00(In.) Calculated individual pipe flow = Normal flow depth in pipe = 7.05(In.) Flow top width inside pipe = 17.57(In.) Critical Depth = 8.64(In.) Pipe flow velocity = 5.55(Ft/s) Travel time through pipe = 0.72 min. Time of concentration (TC) = 6.91 min. 389.700(Ft.) 387.100(Ft.) 0.0109 Manning's N = 0.013 3.559(CFS) 3.559(CFS) Process from Point/Station 30.100 to Point/Station **** CONFLUENCE OF MINOR STREAMS **** 60.100 Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.608(Ac.) Runoff from this stream = 3.559(CFS) Time of concentration = 6.91 min. Rainfall intensity = 6.418(In/Hr) Process from Point/Station 40.000 to Point/Station **** INITIAL AREA EVALUATION **** 50.000 0.000 0.000 0.000 000 1 Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance Highest elevation = 397.800(Ft.) 100.000(Ft, Lowest elevation = 397.200(Ft.) Elevation difference = 0.600(Ft.) Slope = 0.600 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 50.00 (Ft) for the top area slope value of 0.60 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 4.20 minutes (for slope value of 0.50 %) Calculated TC of 4.200 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 5.308(CFS) Total initial stream area = 0.790(Ac.) Process from Point/Station 50.000 to Point/Station 60.000 **** IMPROVED CHANNEL TRAVEL TIME **** Upstream point elevation = 397.200(Ft.) Downstream point elevation = 396.240(Ft.) Channel length thru subarea = 110.000(Ft.) Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank = 50.000 Slope or 'Z' of right channel bank = 50.000 Estimated mean flow rate at midpoint of channel = 6.752(CFS) Manning's 'N' = 0.015 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 6.752(CFS) Depth of flow = 0.244(Ft.), Average velocity = 2.274(Ft/s) Channel flow top width = 24.368(Ft.) Flow Velocity = 2.27(Ft/s) Travel time = 0.81 min. Time of concentration = 5.01 min. Critical depth = 0.258(Ft.) Adding area flow to channel Rainfall intensity (I) = 7.898(In/Hr) for a 100.0 year storm Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Rainfall intensity = 7.898(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.850 CA = 1.037 Subarea runoff = 2.883(CFS) for 0.430(Ac.) Total runoff = 8.190(CFS) Total area = 1.220(Ac.) Depth of flow = 0.262(Ft.), Average velocity = 2.387(Ft/s) Critical depth = 0.277(Ft.) Process from Point/Station **** SUBAREA FLOW ADDITION 60.000 to Point/Station 60.000 Rainfall intensity (I) = Decimal fraction soil group A Decimal fraction soil group B 7.898(In/Hr) for a 100.0 year storm 0.000 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Time of concentration = 5.01 min. Rainfall intensity = 7.898(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.850 CA = 1.232 Subarea runoff = 1.544(CFS) for 0.230(Ac.) Total runoff = 9.734(CFS) Total area = 1.450(Ac.) Process from Point/Station 60.000 to Point/Station **** CONFLUENCE OF MINOR STREAMS **** 60.000 Along Main Stream number: 1 in normal stream number 2 Stream flow area = 1.450(Ac.) Runoff from this stream = 9.734(CFS) Time of concentration = 5.01 min. Rainfall intensity = 7.898(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 2 Qmax(1) Qmax(2) 559 734 1.000 0.813 000 000 6. 91 5.01 1.000 * 1.000 * 0.725 * 1.000 * 6.418 7.898 3.559) + 9.734) + 3.559) + 9.734) + 11.469 12.314 Total of 2 streams to confluence: Flow rates before confluence point: 3.559 9.734 Maximum flow rates at confluence using above data: 11.469 12.314 Area of streams before confluence: 0.608 1.450 Results of confluence: Total flow rate = 12.314(CFS) Time of concentration = 5.006 min. Effective stream area after confluence = 2.058(Ac. Process from Point/Station 60.100 to Point/Station 60.200 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 387.100(Ft.) Downstream point/station elevation = 376.400(Ft.) Pipe length = 149.00(Ft.) Slope = 0.0718 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 12.314(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 12.314(CFS) Normal flow depth in pipe = 8.33(In.) Flow top width inside pipe = 17.95(In.) Critical Depth = 15.92(In.) Pipe flow velocity = 15.40(Ft/s) Travel time through pipe = 0.16 min. Time of concentration (TC) = 5.17 min. End of computations, total study area = 2.058 (Ac.) San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2006 Version 7.7 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 08/30/13 LOT 17 CARLSBAD RACEWAY 131020SF2 PROPOSED HYDROLOGY - BASIN B ********* Hydrology Study Control Information ********** Program License Serial Number 6218 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 3.000 24 hour precipitation(inches) = 5.500 P6/P24 = 54.5% San Diego hydrology manual 'C values used Process from Point/Station 90.000 to Point/Station 100.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 395.700(Ft.) Lowest elevation = 395.500(Ft.) Elevation difference = 0.200(Ft.) Slope = 0.400 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 50.00 (Ft) for the top area slope value of 0.40 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 4.20 minutes (for slope value of 0.50 %) Calculated TC of 4.200 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.672(CFS) Total initial stream area = 0.100(Ac.) Process from Point/Station **** STREET FLOW TRAVEL TIME 100.000 to Point/Station SUBAREA FLOW ADDITION **** 110.000 0.0140 0.0330 2.195(CFS) 1.288(Ft/s) Top of street segment elevation = 395.500(Ft.) End of street segment elevation = 394.300(Ft.) Length of street segment = 150.000(Ft.) Height of curb above gutter flowline = 6.0(In.) Width of half street (curb to crown) = 30.000(Ft.) Distance from crown to crossfall grade break = 28.490(Ft.) Slope from gutter to grade break (v/hz) = 0.033 Slope from grade break to crown (v/hz) = 0.033 Street flow is on [1] side(s) of the street Distance from curb to property line = 10.000(Ft.) Slope from curb to property line (v/hz) = 0.020 Gutter width = 1.500(Ft.) Gutter hike from flowline = 0.125 (In.) Manning's N in gutter = 0.0140 Manning's N from gutter to grade break = Manning's N from grade break to crown = Estimated mean flow rate at midpoint of street = Depth of flow = 0.299(Ft.), Average velocity = Streetflow hydraulics at midpoint of street travel Halfstreet flow width = 10.249(Ft.) Flow velocity = 1.29(Ft/s) Travel time = 1.94 min. Adding area flow to street Rainfall intensity (I) = Decimal fraction soil group A Decimal fraction soil group B Decimal fraction soil group C Decimal fraction soil group D [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Rainfall intensity = 6.923(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.850 CA = 0.527 Subarea runoff = 2.977(CFS) for 0.520(Ac.) Total runoff = 3.648(CFS) Total area = Street flow at end of street = 3.648(CFS) Half street flow at end of street = 3.648(CFS) Depth of flow = 0.371(Ft.), Average velocity = 1 Flow width (from curb towards crown)= 12.414(Ft.) TC = 6.14 min. ,923(In/Hr) for a 0.000 0.000 0. 000 1. 000 100.0 year storm 0.620(Ac.) 452(Ft/s) Process from Point/Station 110.000 to Point/Station **** CONFLUENCE OF MINOR STREAMS **** 110.000 Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.620(Ac.) Runoff from this stream = 3.648(CFS) Time of concentration = 6.14 min. Rainfall intensity = 6.923(In/Hr) Process from Point/Station 120. **** INITIAL AREA EVALUATION **** 000 to Point/Station 130.000 Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 397.800(Ft.) Lowest elevation = 397.550(Ft.) Elevation difference = 0.250(Ft.) Slope = 0.500 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 50.00 (Ft) for the top area slope value of 0.50 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 4.20 minutes (for slope value of 0.50 %) Calculated TC of 4.200 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.537(CFS) Total initial stream area = 0.080(Ac.) Process from Point/Station 130.000 to Point/Station **** IMPROVED CHANNEL TRAVEL TIME **** 140.000 Upstream point elevation = 397.550(Ft.) Downstream point elevation = 393.600(Ft.) Channel length thru subarea = 430.000(Ft.) Channel base width = 0.000(Ft.) Slope or 'Z' of left channel bank = 50.000 Slope or 'Z' of right channel bank = 50.000 Estimated mean flow rate at midpoint of channel Manning's 'N' = 0.015 Maximum depth of channel = 0.500(Ft.) Flow(q) thru subarea = 4.106(CFS) Depth of flow = 0.200(Ft.), Average velocity = Channel flow top width = 20.028(Ft.) Flow Velocity = 2.05(Ft/s) Travel time = 3.50 min. Time of concentration = 7.70 min. 4.106(CFS) 2.047(Ft/s) 100.0 year storm Critical depth = 0.211(Ft.) Adding area flow to channel Rainfall intensity (I) = 5.982(In/Hr) for a Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.8 50 Rainfall intensity = 5.982(In/Hr) for a 100.0 year storm Effective runoff coefficient used for total area (Q=KCIA) is C = 0.850 CA = 1.148 Subarea runoff = 6.458(CFS) for 1.270(Ac.) Total runoff = 6.864 (CFS) Total area = 1.350(Ac.) Depth of flow = 0.252(Ft.), Average velocity = 2.386(Ft/s) Critical depth = 0.270(Ft.) Process from Point/Station 140.000 to Point/Station **** CONFLUENCE OF MINOR STREAMS **** 140.000 Along Main Stream number: 1 in normal stream number 2 Stream flow area = 1.490(Ac.) Runoff from this stream = 7.577(CFS) Time of concentration = 7.70 min. Rainfall intensity = 5.982(In/Hr) Summary of stream data: Stream No. Flow rate (CFS) TC (min) Rainfall Intensity (In/Hr) 1 2 Qmax(1) Qmax(2) 3. 648 7 . 577 1.000 * 1.000 * 0.864 * 1.000 * 6.14 7 . 70 1.000 * 0.797 * 1.000 * 1.000 * 6. 923 5. 982 3.648) + 6.864) + 3.648) + 6.864) + 9.120 10.020 Total of 2 streams to confluence: Flow rates before confluence point: 3.648 8.864 Maximum flow rates at confluence using above data: 9.120 10.020 Area of streams before confluence: 0.620 1.350 Results of confluence: Total flow rate = 10.020(CFS) Time of concentration = 7.701 min. Effective stream area after confluence = 2.97(Ac. Process from Point/Station 140.000 to Point/Station 180.200 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 387.800(Ft.) Downstream point/station elevation = 385.000(Ft.) Pipe length = 66.00(Ft.) Slope = 0.0424 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 10.730(CFS) Given pipe size = 18.00(In.) Calculated individual pipe flow = 10.020 CFS) Normal flow depth in pipe = 8.95(In.) Flow top width inside pipe = 18.00(In.) Critical Depth = 15.09(In.) Pipe flow velocity = 12.22(Ft/s) Travel time through pipe = 0.09 min. Time of concentration (TC) = 7.79 min. End of computations, total study area = 1.97 (Ac.) San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2006 Version 7.7 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 08/30/13 LOT 17 CARLSBAD RACEWAY 131020SF3 PROPOSED HYDROLOGY - BASIN C ********* Hydrology Study Control Information ********** Program License Serial Number 6218 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 3.000 24 hour precipitation(inches) = 5.500 P6/P24 = 54.5% San Diego hydrology manual 'C values used Process from Point/Station 150.000 to Point/Station 160.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 398.000(Ft.) Lowest elevation = 393.800(Ft.) Elevation difference = 4.200(Ft.) Slope = 8.400 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 100.00 (Ft) for the top area slope value of 8.40 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 2.20 minutes (for slope value of 10.00 %) Calculated TC of 2.200 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.464(CFS) Total initial stream area = 0.069(Ac.) Process from Point/Station 160.000 to Point/Station **** PIPEFLOW TRAVEL TIME (User specified size) **** 160.100 Upstream point/station elevation = 391.900(Ft.) Downstream point/station elevation = 8.000(Ft.) Pipe length = 8.00(Ft.) Slope = 47.9875 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.464(CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.4 64(CFS) Normal flow depth in pipe = 0.46(In.) Flow top width inside pipe = 3.19(In.) Critical Depth = 4.17(In.) Pipe flow velocity = 67.06(Ft/s) Travel time through pipe = 0.00 min. Time of concentration (TC) = 2.20 min. Process from Point/Station 160.100 to Point/Station **** PIPEFLOW TRAVEL TIME (User specified size) **** 160.200 Upstream point/station elevation = Downstream point/station elevation = Pipe length = 237.00(Ft.) Slope = No. of pipes = 1 Required pipe flow Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.464(CFS) Normal flow depth in pipe = 4.14 (In.) Flow top width inside pipe = 5.55(In.) Critical Depth = 4.17(In.) Pipe flow velocity = 3.21(Ft/s) Travel time through pipe = 1.23 min. Time of concentration (TC) = 3.43 min. 391.800(Ft.) 389.400(Ft.) 0.0101 Manning's N = 0.013 0.464(CFS) Process from Point/Station 160.200 to Point/Station **** PIPEFLOW TRAVEL TIME (User specified size) **** 180.100 Upstream point/station elevation = Downstream point/station elevation = Pipe length = 60.00(Ft.) Slope = No. of pipes = 1 Required pipe flow Given pipe size = 6.00(In.) Calculated individual pipe flow = 389.400(Ft.) 388.800(Ft.) 0.0100 Manning's N = 0.013 0.464(CFS) 0.464(CFS) Normal flow depth in pipe = 4.16(In.) Flow top width inside pipe = 5.53(In.) Critical Depth = 4.17(In.) Pipe flow velocity = 3.19(Ft/s) Travel time through pipe = 0.31 min. Time of concentration (TC) = 3.75 min. Process from Point/Station 180.100 to Point/Station 180.100 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 1 Stream flow area = 0.069(Ac.) Runoff from this stream = 0.464(CFS) Time of concentration = 3.75 min. Rainfall intensity = 7.904(In/Hr) Process from Point/Station 170.000 to Point/Station 180.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance = 50.000(Ft.) Highest elevation = 397.500(Ft.) Lowest elevation = 393.800(Ft.) Elevation difference = 3.700(Ft.) Slope = 7.400 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 7.40 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 2.60 minutes (for slope value of 5.00 %) Calculated TC of 2.600 minutes is less than 5 minutes, resetting. TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.464(CFS) Total initial stream area = 0.069(Ac.) Process from Point/Station 180.000 to Point/Station 180.100 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 392.300(Ft.) Downstream point/station elevation = 388.800(Ft.) Pipe length = 73.00(Ft.) Slope = 0.0479 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0 . 464 (CFS) Given pipe size = 6.00(In.) Calculated individual pipe flow = 0.464(CFS) Normal flow depth in pipe = 2.55(In.) Flow top width inside pipe = 5.93(In.) Critical Depth = 4.17(In.) Pipe flow velocity = 5.82(Ft/s) Travel time through pipe = 0.21 min. Time of concentration (TC) = 2.81 min. Process from Point/Station 180.100 to Point/Station 180.100 **** CONFLUENCE OF MINOR STREAMS **** Along Main Stream number: 1 in normal stream number 2 Stream flow area = 0.069(Ac.) Runoff from this stream = 0.464(CFS) Time of concentration = 2.81 min. Rainfall intensity = 7.904(In/Hr) Summary of stream data: Stream Flow rate TC Rainfall Intensity No. (CFS) (min) (In/Hr) 0.464 3.75 7.904 0.464 2.81 7.904 1.000 * 1.000 * 0.464) + 1.000 * 1.000 * 0.464) + = 0.927 1.000 * 0.750 * 0.464) + 1.000 * 1.000 * 0.464) + = 0.811 Qmax(1) = Qmax(2) = Total of 2 streams to confluence: Flow rates before confluence point: 0.464 0.464 Maximum flow rates at confluence using above data: 0.927 0.811 Area of streams before confluence: 0.069 0.069 Results of confluence: Total flow rate = 0.927(CFS) Time of concentration = 3.746 min. Effective stream area after confluence = 0.138(Ac.) Process from Point/Station 180.100 to Point/Station 180.200 **** PIPEFLOW TRAVEL TIME (User specified size) **** Upstream point/station elevation = 388.800(Ft.) Downstream point/station elevation = 385.000(Ft.) Pipe length = 59.00(Ft.) Slope = 0.0644 Manning's N = 0.013 No. of pipes = 1 Required pipe flow = 0.927(CFS) Given pipe size = 12.00(In.) Calculated individual pipe flow = 0.927(CFS) Normal flow depth in pipe = 2.59(In.) Flow top width inside pipe = 9.88(In.) Critical Depth = 4.85(In.) Pipe flow velocity = 7.41(Ft/s) Travel time through pipe = 0.13 min. Time of concentration (TC) = 3.88 min. End of computations, total study area = 0.138 (Ac. San Diego County Rational Hydrology Program CIVILCADD/CIVILDESIGN Engineering Software,(c)1991-2006 Version 7.7 Rational method hydrology program based on San Diego County Flood Control Division 2003 hydrology manual Rational Hydrology Study Date: 08/30/13 LOT 17 CARLSBAD RACEWAY 131020SF4 PROPOSED HYDROLOGY - BASIN D ********* Hydrology Study Control Information ********** Program License Serial Number 6218 Rational hydrology study storm event year is 100.0 English (in-lb) input data Units used Map data precipitation entered: 6 hour, precipitation(inches) = 3.000 24 hour precipitation(inches) = 5.500 P6/P24 = 54.5% San Diego hydrology manual 'C values used ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Process from Point/Station 70.000 to Point/Station 80.000 **** INITIAL AREA EVALUATION **** Decimal fraction soil group A = 0.000 Decimal fraction soil group B = 0.000 Decimal fraction soil group C = 0.000 Decimal fraction soil group D = 1.000 [COMMERCIAL area type ] (Office Professional ) Impervious value, Ai = 0.900 Sub-Area C Value = 0.850 Initial subarea total flow distance = 80.000(Ft.) Highest elevation = 397.300(Ft.) Lowest elevation = 393.700(Ft.) Elevation difference = 3.600(Ft.) Slope = 4.500 % INITIAL AREA TIME OF CONCENTRATION CALCULATIONS: The maximum overland flow distance is 90.00 (Ft) for the top area slope value of 4.50 %, in a development type of Office Professional In Accordance With Table 3-2 Initial Area Time of Concentration = 2.60 minutes (for slope value of 5.00 %) Calculated TC of 2.600 minutes is less than 5 minutes, resetting TC to 5.0 minutes for rainfall intensity calculations Rainfall intensity (I) = 7.904(In/Hr) for a 100.0 year storm Effective runoff coefficient used for area (Q=KCIA) is C = 0.850 Subarea runoff = 0.806(CFS) Total initial stream area = 0.120(Ac.) End of computations, total study area = 0.120 (Ac.) Lot 17 - Carlsbad Raceway Business Park Preliminary Hydrology Study APPENDIX C County of San Diego Hydrology Manual References 7 8 9 10 20 30 40 50 1 Minutes Duration Directions for Application: (1) Fmm precipitation maps determine 6 hr and 24 hr amounts forthe selected frequency. These maps are included in the County Hydrotogy Manual {10,50, and 100 yr maps included in the Design and Procedure Manual). (2) Adjust 6 hr precipitation (if necessary) so that it is within the range of 45% to 65% of the 24 hr precipitation (not applicaple to Desert). (3) Plot 6 hr precipitation on the right side of Ihe chart. (4) Draw a line through the point parallel to the plotted lines. (5) This line is the intensity-duration curve for the location being analyzed. Application Form: (a) Selected frequency year P24 {b)P6 = (c) Adjusted PQ(2) = in. (d) tj( = min. (e) l= in./hr. Note; This chart replaces the Intensity-Duration-Frequency curves used since 1965. P6 Duration 7 10 IS "20 25 40 50 60 z*? 120 ISO 180 240 300 ~360 2.63 }.68 Tso 1.08 0.93 0.83 0.69 060 0.53 0.41 0.34 0.26 019 0.17 3.95; 5.27 3.18^4.24 ' 2jS3'a37 j1.62!2Tl5 1l.40't.87 1124'fee 1ro3FT38 0.90! 119 0.80:1.06 "iO.61 i a82 "• 0.51 i 6.68 O^lp.59 70J9T0,52 ~0ji3T6r43" 0^810.38 '0.25[0.33 2-5 1 3.5 1 4.S_ I 5.5 I 16.59! 7.90,9.22 [^.SOj 6.36! 7.42' 14^21 is^ossao' '3:24] 3.89! 4.54 • "2.69 = 3.23 53.77' i Z33^2!80l3J27^ ^.07""2.49t2.90; • 1.72 •2.07 •2:41" 1.49 •1.79" 2.09' 1.33 1.59; 1.86: ljB2ri;23]T43' 0.85' 1.02 J.19^ q^sjasa: 1.03" 0.65^78 rag-T 054^0.65; ares 6.47'6.56^0.66' 0.42'b.50'0.58' 10.54 11.86 8.48 • 9.54 • 6J4j^7.58' 5.19 j 5.84 ^ 4.3Tt4JB5j 3.73I 4.20 ' '3.32"r3:73 ' 2^76' 3 10 ' 2.39I2.69 2.12t 2.39^ 1.63 I 1.84 • 1.36 ri^53 • 1J8Tl.32 1.04Tiri8~j Ojj? • a98J 0.75 "i 0.85 • 0.67 70.75" 1317 14.49 15.81 10.60'11.66 J2.72 8^42 i 9^7"l6.11 '6.49T7.I3 ] 7.78 5:39X5.93TM6" 4.67j'5.13T5.60" 4115 ! 4.56- 4.98 3.45 ' 3>9 • 4; i3 2.98 ; 3.28 ' 3.58 2.65X 2.92 3.18 2.04"'i 2 25-2.45 1.70 i 1.87" 2. W I.47T1J62J 1 76^ 1.31 1.(M 0.94 ! 1.03 ! 1.13 6.84 '0.92 '~1.00 1.44 I 1.57 Tl9 1 liW FIGURE Intensity-Duration Design Chart« Template San Diego County Hydrology Manual Date: June 2003 Section: Page: 3 6 of 26 Table 3-1 RUNOFF COEFFICIENTS FOR URBAN AREAS Land Use Runoff Coefficient "C" Soil Type NRCS Elements County Elements % IMPER. A B C D Undisturbed Natural Terrain (Natural) Permanent Open Space 0* 0.20 0.25 0.30 0.35 Low Density Residential (LDR) Residential, 1.0 DU/A or less 10 0.27 0.32 0.36 0.41 Low Density Residential (LDR) Residential, 2.0 DU/A or less 20 0.34 0.38 0.42 0.46 Low Density Residential (LDR) Residential, 2.9 DU/A or less 25 0.38 0.41 0.45 0.49 Medium Density Residential (MDR) Residential, 4.3 DU/A or less 30 0.41 0.45 0.48 0.52 Medium Density Residential (MDR) Residential, 7.3 DU/A or less 40 0.48 0.51 0.54 0.57 Medium Density Residential (MDR) Residential, 10.9 DU/A or less 45 0.52 0.54 0.57 0.60 Medium Density Residential (MDR) Residential, 14.5 DU/A or less 50 0.55 0.58 0.60 0.63 High Density Residential (HDR) Residential, 24.0 DU/A or less 65 0.66 0.67 0.69 0.71 High Density Residential (HDR) Residential, 43.0 DU/A or less 80 0.76 0.77 0.78 0.79 Commercial/Industrial (N. Com) Neighborhood Commercial 80 0.76 0.77 0.78 0.79 Commercial/Industrial (G. Com) General Commercial 85 0.80 0.80 0.81 0.82 Commercial/Industrial (O.P. Com) Office Professional/Commercial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (Limited I.) Limited Industrial 90 0.83 0.84 0.84 0.85 Commercial/Industrial (General L) General Industrial 95 0.87 0.87 0.87 0.87 *The values associated with 0% impervious may be used for direct calculation of the runoff coefficient as described in Section 3.1.2 (representing the pervious runoff coefficient, Cp, for the soil type), or for areas that will remain undisturbed in perpetuity. Justification must be given that the area will remain natural forever (e.g., the area is located in Cleveland National Forest). DU/A = dwelling units per acre NRCS = National Resources Conservation Service 3-6 San Diego County Hydrology Manual Date: June 2003 Section: Page: 3 12 of 26 Note that the Initial Time of Concentration should be reflective of the general land-use at the upstream end of a drainage basin. A single lot with an area of two or less acres does not have a significant effect where the drainage basin area is 20 to 600 acres. Table 3-2 provides limits of the length (Maximum Length (LM)) of sheet flow to be used in hydrology studies. Initial Ti values based on average C values for the Land Use Element are also included. These values can be used in planning and design applications as described below. Exceptions may be approved by the "Regulating Agency" when submitted with a detailed study. Table 3-2 MAXIMUM OVERLAND FLOW LENGTH (LM) Element* DU/ Acre .5% 1% 2% 3% 5% 10% Element* DU/ Acre LM Ti LM Ti LM Ti LM Ti LM Ti LM Ti Natural 50 13.2 70 12.5 85 10.9 100 10.3 100 8.7 100 6.9 LDR 1 50 12.2 70 11.5 85 10.0 100 9.5 100 8.0 100 6.4 LDR 2 50 11.3 70 10.5 85 9.2 100 8.8 100 7.4 100 5.8 LDR 2.9 50 10.7 70 10.0 85 8.8 95 8.1 100 7.0 100 5.6 MDR 4.3 50 10.2 70 9.6 80 8.1 95 7.8 100 6.7 100 5.3 MDR 7.3 50 9.2 65 8.4 80 7.4 95 7.0 100 6.0 100 4.8 MDR 10.9 50 8.7 65 7.9 80 6.9 90 6.4 100 5.7 100 4.5 MDR 14.5 50 8.2 65 7.4 80 6.5 90 6.0 100 5.4 100 4.3 HDR 24 50 6.7 65 6.1 75 5.1 90 4.9 95 4.3 100 3.5 HDR 43 50 5.3 65 4.7 75 4.0 85 3.8 95 3.4 100 2.7 N. Com 50 5.3 60 4.5 75 4.0 85 3.8 95 3.4 100 2.7 G. Com 50 4.7 60 4.1 75 3.6 85 3.4 90 2.9 100 2.4 O.P./Com 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2 Limited I. 50 4.2 60 3.7 70 3.1 80 2.9 90 2.6 100 2.2 General I. 50 3.7 60 3.2 70 2.7 80 2.6 90 2.3 100 1.9 *See Table 3-1 for more detailed description 3-12 AE Feet • 5000 .4000 .3000 • 2000 — 1000 900 aoo TWO — 500 Tc = /lt.9Ln' V AE ^ EQUATION 0.385 Tc = Time of concentration (ho ure) L = Watercourse Distance (miles) AE = Change in elevation along effective slope line (See Figure 3-5) (feet) Tc Hours S 400 • 300 •200 • 100 I—too 90 80 70 \ \ \ Miles Feet \ . 4000 \ — 3000 50 — 40 •30 .20 10 0.5- .2000 1800 1600 — 1400 — 1200 • 1000 900 1—800 •700 • 600 -500 • 400 -300 • 200 AE SOURCE: California Division of Higliways (1941) and Kirplch (1940) Minutes • 240 180 120 -60 -50 • 40 1—30 •20 — 18 — 16 ~14 12 •10 — 9 8 7 6 — 4 —3 Tc Nomograph for Determination of Time of Concentration (Tc) or Travel Time (Tt) for Natural Vyfcitersheds FIGURE Watershed Divide, Watershed Divide Stream Profile Area "A" = Area "B" SOURCE: Califomia Division of Highways (1941) and Kirplch (1940) Design Point (Watershed Outlet) FIGURE Computation of Effective Slope for Natural Watersheds 5 6 7 8 9 10 Discharge (C.F.S.) 20 30 40 50 EXAMPLE: Given: Q = 10 8 = 2.5% Chart gives; Depth " 0.4, Velocity = 4.4 f.p.s. SOURCE: San Diego County Department of Special District Services Design Manual FIGURE Gutter and Roadway Discharge - Velocity Chart LU 0. O _l w .0.3 ,0.2 0.15 0.10 0.09 0.08 0.07 0.06 ^•0.05 0.04 S.0.03 - 0.02 0.01 0.009 0.008 0.007 0.006 0.005 EQUATION: V = 149. s''2 n •-0.2 .0.3 .0.4 0.5 ^0.6 CC 0.00-^^ 0.003 0.002 -0.001 0.0009 0.0008 - 0.0007 0,0006 0.0005 0.0004 t 0.0003 0.8 0.9 1.0 \ \ -2 r 5 6 7 8 9 10 50 r40 -30 20 r10 > •a 9 ••8 -7 6 i- 20 GENERAL SOLUTION SOURCE: USDOT, FHWA, HDS-3 (1961) 1.0 0.9 •0.8 '0.7 0.6 •0.5 -0.01 .0.02 •0.03 c 'O ' £ (U o O w UJ r0.05 r0.04 0.06 i.0.07 i.0.08 io.09 ^0.10 0.2 •0.3 ^-0.4 FIGURE Manning's Equation Nomograph County of San Diego Hydrology Manual Rainfall Isopluvials 100 Year Rainfall Event - 6 Hours Isopluvial (inches) DPW MV 6 ntowED wn>«n wwRAHrr OF MiY KM. Em» e)a>i^ OR avIJB), MCUVMa MiT NOT UUn» TO. M>l^ WMWWriES OF MnCHAMTMUTV AND FITNESS FOR A PMniCULAR PUV03E. 3 0 3 Miles Coimty of San Diego Hydrology Manual Rainfall Isoplmials 100 Year RainfaU Event - 24 Hours tsopluvial (inches) Hiiv San Dics) Lltivcrcd? MAP IS WfT>«X/T W<WRAMTV Of AKf PO—. , ™ OF MBtcHANTAaiJTY AMI FTTNESS FOR APMtncuuR punoat CoeW SwGIS. M llgM> RMMWML 117°30'0'W 117°15'0'W 117°0'0"W 116°45'0'W 116°30'0'W 116°15'0'W I I I I ' I I z - Orange County I I I ! I > I ' I ' ' I I 1 I I I I I 1 I I I 'J 1 L.LJ- ! j, LI Li I ! ! ' j ! I ! I I ' ' • ' ' ' 1 • I I I f I I I l-l I I I I I I I I I I 117°30'0'W I I I i I I I I I I I I I 117°15'0'W 117°0'0"W 116°45'0'W I I I I I 116°30'0'W r i r i T r i T i i i i i i CO L. CO I I I I I I I I T I I I I County of San Diego Hydrology Manual Soil Hydrologic Group - z - . z b . in Legend " Major Roads ^ Incorporated City Bdy HYDROLOGIC SOIL GROUP Hydrologic Group Undefined • Hydrologic Group A - Hydrologic Group B Hydrologic Group C •Hydrologic Group D No Soil Data Note: Soil Data Source USDA/NRCS SSURGO Soils 2007 N A 31.50 3 Miles THIS MAP IS PROVIDED WITHOUT WARRANTY OF ANY KIND, EHTIER EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMfTED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. Copyright SanGIS. All Rights Reserved. This product may contain Information from the SANDAG Regional Information System which cannot be reproduced without the written permission of SANDAG. This product tray contain information which has been reproduced with permission granted by Thomas Brothers Maps. 116°15'0"W