Loading...
HomeMy WebLinkAboutSDP 2017-0002; PACIFIC VISTA COMMERCE CENTER; Sign Permits/Programs (PS)Ccityof Carlsbad -LAND USE REVIEW APPLICATION P-1 Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov APPLICATIONS APPLIED FOR: (CHECK BOXES) Development Permits (FOR DEPT. USE ONLY) Legislative Permits (FOR DEPT. USE ONLY) D Coastal Development Permit D Conditional Use Permit D Minor D Extension D Day Care (Large) 0 Minor 0 Environmental Impact Assessment D Habitat Management Permit D Hillside Development Permit D Minor D Minor D Nonconforming Construction Permit 0 Planned Development Permit O Minor D Residential D Non-Residential D Planning Commission Determination D Reasonable Accommodation D Site Development Plan D Special Use Permit 0 Minor 0 Tentative Parcel Map (Minor Subdivision) 0 Tentative Tract Map (Major Subdivision) D Variance D Minor '~;t{li-, -- 0 General Plan Amendment D Local Coastal Program Amendment D Master Plan D Specific Plan D Zone Change □Amendment □Amendment D Zone Code Amendment South Carlsbad Coastal Review Area Permits 0 Review Permit D Administrative D Minor D Major Village Review Area Permits -0 Review Permit D Administrative D Minor D Major DEV 2-0llo-OO2-3 B NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS MUST BE SUBMITTED PRIOR TO 3:30 P.M. A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION MUST BE SUBMITTED PRIOR TO 4:00 P.M. ASSESSOR PARCEL NO(S).: 209-120-18-00 ---------------------------------PROJECT NAME: Pacific Vista Commerce Center BRIEF DESCRIPTION OF PROJECT: New 3 Building Light Industrial project (411,000sf) on a previously graded lot. PROJECT VALUE (SITE IMPROVEMENTS) $8 Million (incl. utilities) ESTIMATED COMPLETION DATE July 2018 ------------- LOCATION oF PROJECT: Lot 23 of Carlsbad Oaks North Phase 3 (Whiptail Loop West) STREET ADDRESS ON THE: BETWEEN P-1 West (NORTH, SOUTH, EAST, WEST) Caribou Court (NAME OF STREET) SIDE OF AND Paoe 1 of 6 Whiptail Loop West (NAME OF STREET) Gazelle Court (NAME OF STREET) Revised 09/16 OWNER NAME (Print): Techbilt Construction Corp. APPLICANT NAME (Print): Ryan Companies US Inc. (Chris Wood) MAILING ADDRESS: P.O. Box 80036 MAILING ADDRESS: 4275 Executive Square Suite 370 CITY, STATE, ZIP: San Diego, CA 92138 CITY, STATE, ZIP: La Jolla, CA 92037 TELEPHONE: 619-223-1663 TELEPHONE: 858-812-7910 EMAIL ADDRESS: ted@techbilt.com EMAIL ADDRESS: chris.wood@ryancompanies.com I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO KNOWLEDGE. I CERTIFY AS LEGAL OWNER THAT THE APPLICANT AS T/2S'~•: MZQGE SET FORTH HEREIN IS MY AUTHORIZED REPRESENTATIVE FOR ;Jdn_ PURPOSES OF THIS APPLICATION. -e--z: :::::3 3/16/17 SIGNATURE Theodore Tchang, Presideli'd:TE SIGNATURE • APPLICANT'S REPRESENTATIVE (Print): Hofman Planning and Engineering (Eric Munoz) MAILING ADDRESS: 3152 Lionshead Avenue CITY, STATE, ZIP: Carlsbad, CA 92010 TELEPHONE: 760-692-4011 EMAIL ADDRESS: emunoz@hofmanplanning.com I CERTIFY THAT I AM THE REPRESENTATIVE OF THE APPLICANT FOR PURPOSES OF THIS APPLICATION AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNe:: /vi~~ 2-> 1'1 ~ I, ZDI.: SIGNATURE DATE IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF, PLANNING COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. Ir-NE CONSENT TO ENTRY FOR THIS PURPOSE. NOTICE OF RESTRICTION: PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE APPLICANT. NOTICE OF RESTRICTIONS RUN WITH THE LAND AND BIND ANY SUCCESSORS IN INTEREST. • 2 --e.}-e --=~ PROPERTY OWNER SIGNATURE Theodore Tchang, President FOR CITY USE ONLY P-1 Page 2 of 6 MAR 2 0 2017 CITY OF CARLSBAD PLANNING DIVISION DATE STAMP APPLICATION RECEIVED RECEIVED BY: Revised 09/16 WWW.RYANCOMPANIES.COM March 15, 2017 RYAN COMPANIES US, INC. 50 South Tenth Street, Suite 300 Minneapolis. MN 55403-2012 612-492-4000 tel 612-492-30~ fax IYAN~ RE: CHRISTOPHER WOOD-PRESIDENT OF WEST REGION and CORPORATE VICE PRESIDENT -RYAN COMPANIES US, INC. To Whom It May Concern: This letter shall serve as notice that Christopher Wood is the Corporat<. Vico President of Ryan Companies US, Inc. as well as the President of the West Region. Christopher Wood is authorized to sign on behalf of the company. If you have any questions or require additional information, please call me at 612.492.4791 with any questions. Best regµds,. -ftit1tz-J Jill Blair, MnCP Corporate Paralegal/Records Manager l,;J. ~ICEHSE R0C19~&13 COMM, ROCl12330 RES; CAUCIMs:E 842487; CHICAGO, IL UCINSE GC04531A; FL UCetS! CGC151'397, CGCl506553, ID UCEHStRCD5119; OR UC!NS! 206560; WA UCENS!O:: RYilHCOJ8&611P !QUA.L 0PPORTUtUrY EM.PLOVER TECHBILT CONSTRUCTION CORP. Fax No. (619) 223-2865 Telephone No. (619) 223-1663 City of Carlsbad 1635 Faraday Ave. Carlsbad, CA 92008 3575 Kenyon Street Suite 200 San Diego, CA. 92110 March 15, 2017 RE: CARLSBAD OAKS NORTH PHASE 3 -LOT 23 To Whom It May Concern: Mailing Address P. 0. Box 80036 San Diego, CA 92138 This letter shall serve as notice that the below officers, acting alone, are authorized to sign on behalf of TECHBIL T CONSTRUCTION CORP. Theodore Tchang, President Genevieve Tchang Frost, Vice President Raul Guzman, Vice President If you should you have any questions, please don't hesitate to contact me at (619) 223-1663. Sincerely, TECHBIL T CONSTRUCTION CORP. ------Pee 53 Theodore Tchang, President RG:nl {city of Carlsbad DISCLOSURE STATEMENT P-1(A) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov Applicant's statement or disclosure of certain ownership interests on all applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Committee. The following information MUST be disclosed at the time of application submittal. Your project cannot be reviewed until this information is completed. Please print. Note: Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal organization, corporation, estate, tnust, receiver, syndicate, in this and any other county, city and county, city municipality, district or other political subdivision or any other group or combination acting as a unit." Agents may sign this document; however, the legal name and entity of the applicant and property owner must be provided below. 1. 2. P-1(A) APPLICANT (Not the applicant's agent) Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Chris Wood Corp/Part._N_IA __________ _ Title President -West Region Title NIA ------------- Address 4275 Executive Square Suite 370 Address NIA ------------- La Jolla, CA 92037 OWNE o e owners agent Provide the COMPLETE, LEGAL names and addresses of ALL persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a corporation or partnership, include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Person Theodore Tchang Title · Pr.,_siden t Address P.O. Box 80036 San Diego, CA 92138 Corp/Part._N_IA __________ _ Title NIA Address NIA ------------- NI A Page 1 of-2 Revised 07/10 3. NON-PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the names and addresses of ANY person serving as an officer or director of the non- profit organization or as trustee or beneficiary of the. Non Profit/Trust NIA Non Profit/Trust NIA ---------- Ti tie Ni A Title Ni A -------------- Address,_N_i_A ________ _ Address NIA ·------------- N/A NIA 4. Have you had more than $500 worth of business transacted with any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? D Yes ~No If yes, please indicate person(s): ___________ _ NOTE: Attach additional sheets if necessary. I certify that all the above information is true and correct to the TECHBILT CONSTRUCTION CORP. .. 2.. e-&--!J;}/16/17 Signature of owner/date Si Theodore Tchang, President Chris Wood Print or type name of owner Print or type name of applicant Signature of owner/applicant's agent if Print or type name of owner/applicant's agent P-1(A) Page 2 of 2 Revised 07/10 Ctityof Carlsbad C PROJECT DESCRIPTION P-1(B) PROJECT NAME: Pacific Vista Commerce Center Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov APPLICANT NAME: Ryan Companies US, Inc. (Chris Wood) Please describe fully the proposed project by application type. Include any details necessary to adequately explain the scope and/or operation of the proposed project. You may also include any background information and supporting statements regarding the reasons for, or appropriateness of, the application. Use an addendum sheet if necessary. Description/Explanation: Ryan Companies is proposing the development of Lot 23 within the Carlsbad Oaks North Specific Plan, which is an existing pre-graded pad. The project requires the administrative approval of a Minor Site Development Plan (SDP). As a pre-graded pad within the specific plan, all infrastructure, facilities, utilities and services are available for the proposed development which is consistent with the specific plan. In addition, the project is within the scope of the environmental analysis completed by the Carlsbad Oaks North Specific Plan Final Program EIR. The project elements include: -three buildings (Buildings A, B and C) for a total maximum of 411,000 square feet -each building has a ground floor with mezzanine office space available -the project is a warehouse distribution facility with supporting manufacturing and office uses -the Minor SOP is designed to provide maximum flexibility for future tenant use regarding warehouse, manufacturing and office uses implemented via future tenant improvement permits -the 411,000 total square footage consists of 61,650 SF (office), 82,200 SF (manufacturing), and 267,150 SF (warehouse) -Building A: 75,191 SF of which up to 6,870 SF can be office mezzanine space -Building B: 121,093 SF which up to 9,200 SF can be office mezzanine space -Building C: 214,716 SF which up to 13,000 SF can be office mezzanine space -the office mezzanine space shown with the Minor SDP is depicted in concept regarding location; actual Shell Building or Tenant Improvement plans will locate this space per tenant specifications not to exceed the square footage shown on the Minor SDP -the project requires 720 parking space and provides 727 spaces -the project complies with all applicable development standards including employee eating areas; building height is proposed at 41 feet and as allowed by the specific plan, exceeds 35 feet by providing an additional six feet for all setbacks -the project complies with the city's Climate Action Plan via various project elements and programs as outlined in the applicafon's Climate Action Plan Consistency Checklist -Compliance with the Specific Plan Architectural Guidelines is summarized on the attachment dated 20 March 2017 P-1(B) Page 1 of 1 Revised 07/10 C Architectural Guidelines-Carlsbad Oaks North Specific Plan Lot 23: Minor Site Development Plan 20 March 2017 PVCC Lot 23 All structures which are proposed on lots within this Specific Plan shall comply with the following Architectural Guidelines: I. Square, box-like buildings without facade fenestration and large, unbroken expanses of wall are prohibited. No more than 35 linear feet of unarticulated exterior walls shall be allowed in areas visible from parking lots, public streets, adjacent residential homes, or open spaces. Articulation includes additive elements (columns, projections, towers, etc.) and subtractive elements (windows, doors, carved openings, niches, etc.). a. Each building has articulation within the required 35' linear. The articulation is demonstrated by a combination of enhanced glazing locations, door locations, recessed concrete panel sections,form liner textured accent panel sections, offset lay-up panels, parapet breaks, and clerestory windows. 2. All building elevations are required to have facade variations in a minimum of three (3) separate materials, textures, and colors. a. Each building will use the following materials; 1. Concrete 2. Glass 3. Metal 4. Composite wood veneer 3. The rear and sides of buildings are required to have architectural detail similar to the front elevation. a. The side and rear of the buildings have articulation treatment with similar features as the fronts with a combination off-set parapets, clerestory windows, doors, lay-up panels, recessed panel sections and reveals, and material breaks within the required 35' linear. 4. Light, neutral colors shall be used on buildings to help reduce their perceived size. Contrasting trim and horizontal color bands are permitted to break up the vertical monotony of tall flat walls. a. Warm neutral colors has been selected to simulate the coastal palette.Accent colors will help define the building articulation within varying panel reveals. (See Color Material Board) 5. All mechanical equipment, on the roof or on-grade, is required to be screened from view from all pedestrian, vehicular, and open space vantage points. C a. Future mechanical equipment will be screened by the parapets of each building from the public right-of-way, public open spaces, and pedestrian sidewalks. There may be areas where the roof equipment may be exposed to the adjacent site from lot 22 on the north side of building 'B' due to the severe grade difference between the two lots. In order to completely screen any future equipment on the roof would require the parapets to exceed the allowable building height of 45' or future roof screens if applicable. (See line of sight exhibit sheet A5.0) 6. Roof lines are required to be articulated with shorter elements to reduce building mass. Occasional sloped roof forms shall be introduced over special areas and special functions to create visual interest. a. These buildings are larger industrial buildings with roofs that slope a min. ¼"/foot to required roof drains. Actual roof forms will not be visible. 7. Front door and entrances to building shall be clearly defied and easily recognizable from the structure's parking lot area. a. Each entrance has been enhanced to denote way finding by enhanced glazing areas, metal canopies, off-set panels and parapet breaks. 8. Buildings shall be well articulated by changes in height and vertical planes to reduce the appearance of bulk and create interesting building silhouettes. Special emphasis shall be placed on building form to ensure that structures have changes in height and vertical planes to avoid monotonous and boxy architecture. Sloping roof, varying roof heights and forms are encouraged to provide interesting building silhouettes. For large buildings, flat roofs with appropriate parapet treatment to provide relief will be acceptable. a. The buildings have been designed to provide the following: 1. Enhanced entrance corner towers at each front corner for each of the buildings with various plane breaks, off-sets and heights. 2. Parapet breaks along each side of the building for additional visual interest. 3. Off-set panels at enhanced central entrance elements with taller parapet breaks. 4. Material breaks at strategic panel sections. 5. Clerestories. 9. Buildings that are adjacent to Faraday Avenue and the residential land uses to the east shall incorporate roof equipment into the architecture. No roof equipment requiring separate roof screens will be permitted on these lots after buildings are constructed. a.N/A C 10. A combination of building materials, including accent materials that are consistent with the surrounding natural environment such as tile or natural stone shall be required. Exterior walls shall be low intensity colors and shall be accented with low intensity color compatible natural materials in order to blend with thesurrounding natural open space. Cube like highly reflective building designs are not considered appropriate architectural styles. However, the minimal use of glass curtain walls are acceptable when incorporated into other natural building materials and architectural features. a. The building materials are consistent with all other developments within the specific plan area. The use of material breaks using textured wall panels, composite wood veneers, and recessed panel sections have been provided in strategic areas of the building to provide variation along the elevations. b. The colors and texturesare selected is to simulate warm neutral coastal palette. 11. Special emphasis shall be placed on building entries. Entries shall be defined with special enhanced architectural treatment, enhanced paving on walkways, and enhanced landscaping. a. Each entrance has been enhanced with additionalglazed areas, metal canopies, off-set panels and taller parapet breaks. The landscaping has also been strategically placed to highlight the entries. 12. Special emphasis shall be placed on side elevation architecture on lots abutting Faraday Avenue. a. N/A 13. Windows shall be designed and placed to enhance the exterior appearance of the structure and shall be consistent in design, size and scale with the building. a. The windows for each building are strategically placed to comply with the requirements of the articulation requirements of the specific plan. There are also clerestory windows to help accent tertiary areas of the building to provide the additional articulation and visual interest to each of the buildings which also help complement the building scale. 14. The north-facing facade of buildings on lots 17 through 21 will not need special details or architectural treatment. a. N/A 15. Light colored roof materials shall be used to reflect heat. a. Light colored reflective cool roofing will be used on the project. Ccityor Carlsbad HAZARDOUS WASTE AND SUBSTANCES STATEMENT P-1(C) Development Services Planning Division 1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov Consultation of Lists of Sites Related to Hazardous Wastes (Certification of Compliance with Government Code Section 65962.5) Pursuant to State of California Government Code Section 65962.5, 1 have consulted the Hazardous Waste and Substances Sites List compiled by the California Environmental Protection Agency and hereby certify that (check one): Ii] The development project and any alternatives proposed in this application are not contained on the lists compiled pursuant to Section 65962.5 of the State Government Code. D The development project and any alternatives proposed in this application fill! contained on the lists compiled pursuant to Section 65962.5 of the State Government Code. APPLICANT Name: Ryan Companies US, Inc (Chris Wood) Address: 4275 Executive Square, Suite 370 San Diego, CA 92037 Phone Number: 858-812-7910 PROPERTY OWNER Name: Techbilt Construction Corp. Address: P.O. Box 80036 San Diego, CA 92138 Phone Number: 619-223-1663 Address of Site: Lot 23 of Carlsbad Oaks North Phase 3 (Whiptail Loop West) Local Agency (City and County): Carlsbad, San Diego County Assessor's book, page, and parcel number:_2_0_9_-_1_2_0_-1_8_-0_0 ___________ _ Specify list(s):_N_I_A __________________________ _ Regulatory Identification Number:_N_I_A ____________________ _ Date of List:_N_I_A_---:,.---------------------,---------TECHBILT CONSTRUCTION CORP • .... Property Owner Signature/Dal Theodore Tchang, President /16/17 The Hazardous Waste and Substances Sites List (Cortese List) is used by the State, local agencies and developers to comply with the California Environmental Quality Act requirements in providing information about the location of hazardous materials release sites. P-1(C) Page 1 of 2 Revised 02/13 C ENVIRONMENTAL INFORMATION FORM (To be Completed by Applicant) Date Filed: :3 -W · l7 (To be completed by City) Application Number(s): '6Df -ZO 11-ODQ:Z. (-P6V ZC>) la -DO 23) General Information 1. Name of project: Pacific Vista Commerce Center 2. Name of developer or project sponsor: Ryan Companies US, Inc. 3. Address 4275 Executive Square, Suite 370 City, State, Zip Code: La Jolla, CA 92037 Phone Number: 858.812. 7912 Eric Munoz Name of person to be contacted concerning this project: ___________ _ Address: 3152 Lionshead Avenue City, State, Zip Code: Carlsbad, CA 92010 Phone Number: 760.692.4011 4. Address of Project: Lot 23 of Carlsbad Oaks North Specific Plan Assessor's Parcel Number: 209-120-18-00 -------------------- 5. List and describe any other related permits and other public approvals required for this project, including those required by city, regional, state and federal agencies: Minor Site Development Plan, grading permit, building permit 6. Existing General Plan Land Use Designation: _P_I _____________ _ 7. Existing zoning district: _P_-_M ___________________ _ 8. Existing land use(s): Vacant, pre-graded lot in Specific Plan 211 9. Proposed use of site (Project for which this form is filed): Industrial office, manufacturing and warehouse uses consistent with Specific Plan 211 Project Description 10_ Site size: 26.1 acres; one pre-graded pad (Lot 23) 11. 12: 13. 14. P-1(0) Proposed Building square footage: _4_1_1_,_0_0_0 ______________ _ Number of floors of construction: Three buildings: one floor + mezzanines Amount of off-street parking provided: _7_2_7_s..:..p_a_c_e_s ___________ _ Associated projects: _N_/_A ____________________ _ Page 2 of 4 Revised 0711 O C -·-....,.1 15. If residential, include the number of units and schedule of unit sizes: ..:N....:.:..:/ A-=-------- 16. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage of sales area, and loading facilities: ___________________ _ N/A 17. If industrial, indicate type, estimated employment per shift, and loading facilities: _____ _ These are spec buildings with assumed office, manufacturing and warehouse uses consistent with Specific Plan 211; all buildings will have loading facilities; see attached project info and analysis. 18. If institutional, indicate the major function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project: _______ _ N/A 19. If the project involves a variance, conditional use or rezoning applications, state this and indicate clearly why the application is required: __________________ _ N/A P·1(D) Page 3 of 4 Revised 07/10 C Are the following items applicable to the project or its effects? Discuss all items checked yes (attach additional sheets as necessary). Yes No 20. Change in existing features of any bays, tidelands, beaches, or hills, or substantial D 0 alteration of ground contours. 21. Change in scenic views or vistas from existing residential areas or public lands or D 0 roads. 22. Change in pattern, scale or character of general area of project. D 0 23. Significant amounts of solid waste or litter. D 0 24. Change in dust, ash, smoke, fumes or odors in vicinity. D 0 25. Change in ocean, bay, lake, stream or ground water quality or quantity, or □ 0 alteration of existing drainage patterns. 26. Substantial change in existing noise or vibration levels in the vicinity. D 0 27. Site on filled land or on slope of 1 0 percent or more. □ 0 28. Use of disposal of potentially hazardous materials, such as toxic substances, □ 0 flammables or explosives. 29. Substantial change in demand for municipal services (police, fire, water, sewage, D 0 etc.). 30. Substantially increase fossil fuel consumption (electricity, oil, natural gas, etc.). D 0 31. Relationship to a larger project or series of projects. □ 0 Environmental Setting Attach sheets that include a response to the following questions: 32. Describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing structures on the site, and the use of the structures. Attach photographs of the site. Snapshots or Polaroid photos will be accepted. 33. Describe the surrounding properties, including information on plants and animals and any cultural, historical or scenic aspects. Indicate the type of land use {residential, commercial, etc.), intensity of land use {one-family, apartment houses, shops, department stores, etc.), and scale of development {height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity. Snapshots or polaroid photos will be accepted. Certification I hereby certify that the statements furnished above and in the attached exhibits present the data and information required for this initial evaluation to the best of my ability, and that the facts, statements, and information presented are true and correct to the best of my knowledge and belief. Date: March 20, 2017 Signature: ~ Mu.-i::;~ For: Ryan Companies -Lot 3 P-1(0) Page 4 of 4 Revised 07/10 C EIA Form: Supplemental Project Information: Pacific Vista Commerce Center, Lot 23 Describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing structures on the site, and the use of the structures. Attach photographs of the site. The subject property, Lot 23 of the Carlsbad Oaks North Specific Plan (SP 211), is a pre-graded lot that is positioned for final grading and development via the proposed Minor Site Development Plan (SOP). The grading, development and proposed warehouse distribution uses with supporting office and manufacturing activities are consistent with the uses contemplated by SP 211. An EIR was also certified for SP 211 that assessed environmental impacts from the specific plan and therefore provides prior environmental review for conforming projects that receive Minor SOP approvals consistent with both the EIR and SP 211. As pre-graded pad, there are no structures onsite, nor any sensitive plant, animal, biological, historical, scenic, or cultural resources. Describe the surrounding properties, including information on plants and animals and any cultural, historical or scenic aspects. Indicate the type of land use (residential, commercial, etc.), intensity of land use (one-family, apartment houses, shops, department stores, etc.), and scale of development (height, frontage, set-back, rear yard, etc.). Attach photographs of the vicinity. The property is surrounded by other Specific Plan pre-graded lots, the Whiptail Loop West street system and adjacent open space to the west. The open space has habitat associated with it, and is not affected by the proposed development of the Specific Plan lots including Lot 23 and as assessed by the prior EIR. The proposed project involved three single story buildings with office/mezzanine options: Building A (75,191 SF}, Building B (121,093 SF), and Building C (214,716 SF) for a project total of 411,000 SF. The primary use is a warehouse distribution project with 267,150 SF and supporting office (61,650 SF) and manufacturing uses (82,200 SF). The project will comply with applicable development standards regarding height, setbacks, log coverage, and employee eating areas. The Specific Plan has contemplated the full range of necessary utilities and infrastructure for the development, including Lot 23. These include water, sewer, drainage facilities and street system capacity. Thus Lot 23 is consistent not only with the SP 211 and corresponding EIR, but also the city's Growth Management ordinance to ensure adequacy of necessary services and facilities. The project is depicted on the application package exhibits including Architecture, Civil and Landscape. An overview of other environmental elements is provided below to demonstrate consistency with SP 211 and the certified EIR to reaffirm prior environmental compliance for the development of Lot 23 without the need to conduct another CEQA (California Environmental Quality Act) process, document, or public review. Traffic The EIR contemplated 17,350 Average Daily Trips (ADT) across the Specific Plan for Planned Industrial (Pl) land uses, which applies to the proposed development of Lot 23. While the EIR assumed a total acreage for Pl uses of 216.9 acres that acreage was subsequently revised during the approval and mass grading of SP 211 to be 150.6 acres. Attached to this EIA is Table 5.2-3 of the Carlsbad Oaks North Specific Plan Final Program EIR, and a revised Lot Summary Table by 0-Day Consultants as part of the approved mass grading permit. Therefore, allowed ADT per acre of Pl uses would be: 17,350 / 150.6 = 115.2 Lot 23 has a gross size of 26.1 acres; when multiplied by 115.2 ADT for Pl uses yields an allowance for Lot 23 of 3,011 ADT. With a project square footage total of 411,000, the ADT per 1,000 of gross square footage is 7.3 (3,011/411 ). The attached Traffic summary for Pacific Vista Commerce Center dated 3/17/17 applies the applicable trip generation rates to the portions of the 411,000 project square footage for office, manufacturing and warehouse uses. It shows that Lot 23 uses a total of 2,898 ADT (3,011 ADT allowed) for Pl uses; and has a total of 7.05 ADT per 1,000 square feet (7.3 ADT per 1,000 square feet allowed). Thus Lot 23 as proposed is consistent with the traffic assessment of SP 211 and the certified El R. C Climate Action Plan / GHG Emissions To assess Greenhouse Gas (GHG) emissions from project impacts, the city has adopted Climate Action Plan (September 2015) to review projects subject to CEQA. The Climate Action Plan (CAP) is in accordance with applicable CEQA Guidelines and relies on a CAP Consistency Checklist to review projects. The Checklist is used to ensure compliance with emission targets outlined in the CAP based on specific project elements, building design, and operational programs. Based on the Checklist and a project-by-project assessment, a determination is made regarding overall consistency with the city's CAP, and the lack of a requirement to perform more detailed GHG studies. Attached to this EIA is the CAP Checklist completed by Rincon Consultants on behalf of Ryan Companies. Based on the assessment and evaluation of project parameters contained therein, the project is deemed Consistent with Carlsbad's CAP as reflected on page 10, Table 4. In this manner, the GHG emissions associated with Lot 23 do not create a significant environmental impact. The Checklist provides another element of project review to assist with cumulative determination that Lot 23 is consistent with SP 211, the certified EIR and is in prior environmental compliance. Hazardous Waste The development of Lot 23 and corresponding application materials including the standard Hazardous Waste disclosures, which are again reviewed with future tenant building permit applications consistent with the Minor SDP entitlement. Therefore, no significant impacts will result from hazardous waste or material use on Lot 23 consistent with SP 211 and the certified EIR. Grading / Soils As a pre-graded lot that underwent previous mass grading per city-approved permits and related soils assessments, there are no unique conditions onsite, nor issues with non-compliance from city engineering standards regarding site preparation for the proposed development on Lot 23. Land Use Planning The Minor SDP for Lot 23 does involve any changes to the land use designations of the governing SP 211, or the city's zoning or general plan designations. The proposed uses and intensity of development are consistent with the assessment of SP 211 and the certified EIR for Carlsbad Oaks North. Aesthetics / Visual Compliance with the SP 211 and corresponding development standards will ensure that building placement, height and architectural design do not create environmental issues regarding aesthetics or visual impact. This includes screening of rooftop equipment and truck-loading bays from designated offsite public viewpoints. Project exhibits include line-of-sight sections and related details to review and confirm applicable compliance. Environmental Resources As noted earlier, as a pre-graded pad within an existing, approved specific plan there are no onsite environmental constraints with regards to biological, cultural, historic, or scenic resources in the vicinity or city. 5.2 Transportatlonfl'raf]lc TABLE 5.2-3 TRIP GENERATION ASSUMPTIONS Carlsbad Oaks North Project INTBRIM PROJECT (YEAR. ZOOS): ♦ Plaal'Md Induatrial 119.6 Ac:rea 9,550 945 105 ♦ Light Jnduatrlal 4.4 Acres 900 BS 20 ♦ Low IUse Office 2.5 Acres 750 95 10 ♦ Other Commerclal 4.4.Acres 1,750 30 20 JNTEIUM SUBTOTALS 12,950 · 1,155 155 PROPDSBD JtROJBCT(l11cbltlu die lnlfflM hofef:t): ♦ Plauned lndllltrlal 2 6.9 Ac;re.~ 1,715 190 ♦ Llgbt ladllltrlal B.7Aucs 1,150 16S 40 ♦ Low Rift omce 4.9As::sea 1,450 185 20 ♦ Other Commerdal S.2Acrcs 2,100 35 2S "WORST CASE• PROJECT TOTALS "22,650 2,100 275 Source: Willdan. 2002. 230 920 20 85 20 80 80 80 351 1,165 415 1,665 40 16S 40 ISS 9S 95 598 2,080 Actual acreage for the project Planned Industrial area is 150.60 Acres per attached O'Day plan. Therefore, ADT's per Acre= 17,350 ADTS / 150.6 Acres= 115.2 ADT's per Acre Carlsbad Oaks North Spectftc Plan Final Program /IIR S.2-53 City of Oulsbad AugwtZ001 LOT SUMMARY TABLE lOT PAI) =) IET~J No. 'ltC.) V IIIJIJSTRW. LOTS , 6.4 5.J 0.7 6.0 2 7.5 6.4 ,. 1 7.5 J 5.2 4.2 0.4 4.6 4 6.0 J.1 1.2 4.J 5 5.2 J.1 ,. 1 4.2 6 11.6 1.7 1.6 9.J , 7.6 5.5 0.5 6.0 8 IJ.2 9.0 2.J SIJ1ER PlMP STATION g 0.6 OPENSPM:E 10 18.5 ! 11 101.2 Ill.I RJtlS1RML. LOTS '" IJ.I #.I Pacific Vista Commerce Center 3/17/17 City of Carlsbad Traffic/Trip Generation and Parking Calculations TRAFFIC Allowed ADT's er Acre er a roved CON EIR Traffic Re ort Table 5.2-3 Planned Industrial (Total Acreage per updated O'Day acreage summary rec'd from Landowner on 12/17/17). ADT's based upon approved EIR ADT's for the Planned Industrial portion of project where Lot 23 resides. Acres ADT's ------ 150.6 17,350 ADT/Acre 115.2 DESCRIPTION Acres ADT / Acre AUowed ADT's ADT per Bldg. GSF 1,000 GSF Max. Allowable CON23 Trip Generation based upon allowable ADT's per Acre per EIR: 26.14 115.2 RYAN CO. PROPOSED 3 BUILDING SPEC. PROJECT ADT CALC's 411,000 GSF • Trip Generation Rates per SAN DAG Chart dated April 2002 (downloaded on 2/15/17) ADT per PROPOSED BUILDING USES ~ GSF 1,000 GSF Office 15% 61,650 20.0 Manufacturing 20% 82,200 4.0 Warehouse 65% 267,150 5.0 TOTAL 100% 411,000 PARKING Code PROPOSED BUILDING USES ~ Area (GSF) Stalls[ksf Office 15% 61,650 4.0 Manufacturing 20% 82,200 2.5 Warehouse 65% 267,150 1.0 100% 411,000 1.75 3,011.5 411,000 Allowed ADT's ADT's less Pro11osed 1,233 329 1,336 2,898 114 OK WM03[16[17 Cherne 10.3 Pronosed Reg'd Stalls Pro11osed less Reg'd 246.60 205.50 267.15 719.2S 727 7.75 OK Printed: 3/17/2017 9:46 AM Ccicyof Carlsbad STORM WATER STANDARDS QUESTIONNAIRE Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www .carlsbadca.gov E-34 I INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be applied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the proposed project conditions and impacts. City staff has responsibility for making the final assessment after submission of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you , this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: PACIFIC VISTA COMMERCE CENTER PROJECT ID: ADDRESS: Lot 23 of Carlsbad Oaks North Phase 3 (Whiptail Loop West) APN: 209-120-18-00 The project is (check one): 0 New Development D Redevelopment The total proposed disturbed area is: 1.136M ft2 ( 26.1 ) acres The total proposed newly created and/or replaced impervious area is: ft2 ( 23.7 ) acres If your project is covered by an approved SWQMP as part of a larger development project, provide the project ID and the SWQMP # of the larger development project: Project ID SWQMP#: I Then, go to Step 1 and follow the instructions. When cohipleted, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 02/16 STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? □ ~ If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. Justification/discussion: (e.g. the project includes only interior remodels within an existing bu ilding): If you answered "no" to the above question, the project is a 'development project', go to Step 2. STEP2 TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; □ 0 b) Designed and constructed to be hydrau lically disconnected from paved streets or roads; c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets Quidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that are designed and constructed in □ [?] accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ 0 If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP ... " and complete applicant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): I If you answered "no" to the above questions, vour project is not exempt from PDP, go to Step 3. E-34 Page 2 of 4 REV 02/16 To determine if your project is a PDP, please answer the following questions (MS4 Permit Provision E.3.b.(1 )): 1. Is your project a new development that creates 10,000 square feet or more of impervious surfaces collectively over the entire project site? This includes commercial, industrial, residential, mixed-use, and ublic develo ment ro·ects on ublic or rivate land. 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public develo ment ro ·ects on ublic or rivate land. 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification SIC code 5812 . 4. Is your project a new or redevelopment project that creates 5,000 square feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside develo ment ro·ect includes develo ment on an natural slo e that is twent -five ercent or reater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a street, road, highway freeway or driveway? A street, road, highway, freeway or driveway is any paved impervious surface used for the trans ortation of automobiles, trucks, motorc c/es, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or replaces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the ro ·ect to the ESA i.e. not commin led with flows from ad·acent lands . * 8. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair shop? An automotive repair shop is a facility that is categorized in any one of the following Standard Industrial Classification (SIC) codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (RGO)? This category includes RGO's that meet the following criteria: (a) 5,000 square feet or more or (b) a project Average Daily Traffic ADT of 100 or more vehicles er da . 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11 . Is your project located within 200 feet of the Pacific Ocean and (1) creates 2,500 square feet or more of impervious surface or (2) increases impervious surface on the property by more than 10%? (CMC 21 .203.040 YES NO □ □ □ □ □ □ □ □ □ □ □ If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. l ' If you answered "no" to all of the above questions, your project is a 'STANDARD PROJECT.' Go to step 5, check the second box statin "M ro·ect is a 'STANDARD PROJECT' ... " and com lete a licant information. E-34 Page 3 of 4 REV 02/16 STEP4 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PRIORITY DEVELOPMENT PROJECTS (PDP) ONLY Complete the questions below regarding your redevelopment project (MS4 Permit Provision E.3.b.(2)): Does the redevelopment project result in the creation or replacement of impervious surface in an amount of less than 50% of the surface area of the previously existing development? Complete the percent impervious calculation below: Existing impervious area (A) = ____________ sq. ft. Total proposed newly created or replaced impervious area (B) = ____________ sq.ft. Percent impervious area created or replaced (B/A)*100 = _____ % YES NO □ □ If you answered "yes", the structural BMPs required for PDP apply only to the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. If you answered "no," the structural BM P's required for PDP apply to the entire development. Go to step 5, check the check the first box statinq "My project is a PDP ... " and complete applicant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANT INFORMATION 0 My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and must only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP .threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the requirements of the BMP Manual. Applicant Information and Signature Box Ryan Companies Applicant Title: President of West Region Applicant Name Chris w,::;l 2-~ Applicant Signature: __ ~,-..au-_..,~..,._ ....... /ILJ!t..._."-"4,,Lii1---------Date: _ _::;,.J ...... i..,;_/....r....r;-4-/,....__, ,~? ______ _ • Environmentally Sensitive Areas include but are not hm1ted to all Clean Water Act Section 303(d) 1mpa1red water bodies; areas designated as Areas of Special Biological Significance by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated with the RARE beneficial use by the State Water Resources Control Board (Water Quality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preserves or their equivalent under the Multi Species Conservation Program within the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for Citv Use Onlv YES NO City Concurrence: □ □ By: Date: Project ID: E-34 Page 4 of 4 REV 02/16 C cicyof Carlsbad TIME LIMITS ON DISCRETIONARY PROJECTS P-1(E) PLEASE NOTE: Development Services Planning Division 1635 Faraday Avenue {760) 602-4610 www.carlsbadca.gov Time limits on the processing of discretionary projects established by state law do not start until a project application is deemed complete by the City. The City has 30 calendar days from the date of application submittal to determine whether an application is complete or incomplete. Within 30 days of submittal of this application you will receive a letter stating whether this application is complete or incomplete. If it is incomplete, the letter will state what is needed to make this application complete. When the application is complete, the processing period will start upon the date of the completion letter. If you have any questions regarding application submittal requirements (i.e., clarification regarding a specific requirement or hether all quirements are necessary for your particular application) please call (760) 602-4 0. Applicant Signature: Staff Signature: Date: To be stapled with receipt to the application P-1 (E) Page 1 of 1 Revised 07/1 O ( Cicyof Carlsbad INTRODUCTION CLIMATE ACTION PLAN CONSISTENCY CHECKLIST P-30 Development Services Planning Division 1635 Faraday Avenue (760} 602-4610 www.carlsbadca.gov In September 2015, the City of Carlsbad adopted a Climate Action Plan (CAP) that outlines actions that the city will undertake to achieve its proportional share of state greenhouse gas (GHG) emissions reductions. The purpose of the CAP Consistency Checklist (Checklist) is to, in conjunction with the CAP, provide a streamlined review process for proposed new development projects that are subject to discretionary review and trigger environmental review pursuant to the California Environmental Quality Act (CEQA). Analysis of GHG emissions and potential climate change impacts from new development is required under CEQA. The CAP is a plan for the reduction of GHG emissions in accordance with CEQA Guidelines Section 15183.5. Pursuant to CEQA Guidelines Sections 15064(h)(3), 15130(d), and 15183(b), a project's incremental contribution to a cumulative GHG emissions effect may be determined not to be cumulatively considerable if it complies with the requirements of the CAP. This Checklist contains measures that are required to be implemented on a project-by-project basis to ensure that the specified emissions targets identified in the CAP are achieved. Implementation of these measures would ensure that new development is consistent with the CAP's assumption for relevant CAP strategies toward achieving the identified GHG reduction targets. Projects that are consistent with the CAP as determined through the use of this Checklist may rely on the CAP for the cumulative impacts analysis of GHG emissions. Projects that are not consistent with the CAP must prepare a comprehensive project-specific analysis of GHG emissions, including quantification of existing and projected GHG emissions and incorporation of the measures in this Checklist to the extent feasible. Cumulative GHG impacts would be significant for any project that is not consistent with the CAP. The Checklist may be updated from time to time to incorporate new GHG reduction techniques or to comply with later amendments to the CAP or local, state, or federal law. P-30 Page 1 of 13 Revised 02/17 City of Carlsbad Climate Action Plan Consistency Checklist . ' . . . . . . . . . ' . _. ' . i Contact Information Project No./Name: Property Address/ APN: Applicant Name/Co.: 1 Pacific Vista Commerce Center Whiptail Loop Way (Lot 23), Carlsbad, California Chris Wood/ Ryan Companies US , Inc. Contact Phone: 858-812-7912 contact Email: chris. wood@RyanCompanies.com Was a consultant retained to complete this checklist? 0 Yes O No If Yes, complete the following Consultant Name: Ryan Gardner Contact Phone: 510-834-4455 Company Name: Rincon Consultants C .1RGardner@rinconconsul tan ts. com ontact Ema, : Project Information 1. What is the size of the project (acres)? 26 .1 2. Identify all applicable proposed land uses: □Residential (indicate#of one-and two-familyunits): 61,650 sq . ft . of office D Residential (indicate# of multi-family units): 267 ,150 sq.ft. of warehouse distribution D Commercial (indicate total square footage): D Hotel (indicate # of rooms): 82 ,200 sq. ft. of manufacturing RI Industrial (indicate total square footage): 411 ,000 GSF Total D Other (describe): 3. Provide a brief description of the project proposed: The project consists of primarily manufacturing and distribution warehouse space with some ancillary offices . The proJect will i n clude 727 parking spaces . P-30 Page 3 of 13 Revised 02/17 City of Carlsbad Climate Action Plan Consistency Checklist CAP CONSISTENCY CHECKLIST QUESTIONS STEP 1: LAND USE CONSISTENCY The first step in this section evaluates a project's GHG emissions consistent with guidance provided by the California Air Pollution Control Officers Association (CAPCOA). New non-exempt (i.e., subject to CEQA review) discretionary development projects that emit fewer than 900 metric tons of carbon dioxide equivalent (MTC02e) would not contribute considerably to cumulative climate change impacts as stated in the CAP, and therefore, do not need to demonstrate consistency with the CAP. For projects that are subject to the CAP consistency evaluation, the first step in determining CAP consistency for discretionary development is to assess the project's consistency with the growth projections used in the development of the CAP. This section allows the city to determine a project's consistency with the land use assumptions used in the CAP. Checklist Item (Check the appropriate box and provide explanation and supporting documentation for your answer) 1. The size and type of projects listed below would emit fewer than 900 MTC02€ per year. Based on this threshold, does the proposed project equal or exceed these characteristics? • Single-Family Housing: 50 dwelling units • Multi-Family Housing: 70 dwelling units • Office: 35,000 square feet • Retail Store: 11,000 square feet • Grocery Store: 6,300 square feet • Other: For project types not listed in this section, induding changes in use of, or enlargement of an existing building that results in a net increase in GHG emissions, the need for GHG analysis and mitigation will be made on a project-specific basis, considering the 900 MTC02!l screening threshold. If ''Yes", proceed to Question 2. Yes No □ If "No", in accordance with the City's CAP screening criteria, the project's GHG impact is less than significant and not subject to the measures of the CAP. 2. Is the proposed project consistent with the existing General Plan land use and zoning designations? OR, If the proposed project is not consistent with the existing land use plan and zoning designations, does the project include a land use plan and/or zoning designation amendment that would result in an equivalent or less GHG- intensive project when compared to the existing designations? □ If "Yes", proceed to Step 2 of the Checklist. For the second option under question 2 above, provide estimated project emissions under both existing and proposed designation(s) for comparison. Emissions must be estimated in accordance with the City's Guidance to Demonstrating Consistency with the Climate Action Plan. If "No", the project's GHG impact is potentially significant and must be analyzed in accordance with CEQA. The project must prepare a GHG analysis in accordance with the City of Carlsbad's Guidance to Demonstrating Consistency with the Climate Action Plan to demonstrate how it would offset the increase in emissions over the existing designations. The project must incorporate each of the measures identified in Step 2 to mitigate cumulative GHG emissions impacts unless the decision maker finds that a measure is infeasible in accordance with CEQA Guidelines Section 15091. Proceed and complete a project-specific GHG analysis and Step 2 of the Checklist. P-30 Page 4 of 13 Revised 02/17 City of Carlsbad Climate Action Plan Consistency Checklist STEP 2: CAP MEASURES CONSISTENCY The second step of the CAP consistency review is to review and evaluate a project's consistency with the applicable measures and actions of the CAP. Step 2 only applies to development projects that involve permits that may require a certificate of occupancy from the Building Official. 1 All other development projects that would not require a certificate of occupancy from the Building Official shall implement all emissions-related mitigation measures from the General Plan Update EIR. Checklist Item Yes No (Check the appropriate box and provide explanation for your answer) Residential, Commercial and Industrial Photovoltaic Systems 1. Residential Photovoltaic Systems Does the project include photovoltaic systems with a minimum average system □ □ ~ size of 1.6 kilowatts2 for each residential unit? Check "NIA" only if the project does not contain any residential buildings. 2. Commercial and Industrial Photovoltaic Systems For new nonresidential projects with more than 50 cars surface parked or on roofs of parking structures, would the project include photovoltaic panels over at least half of the surface/roof-parked cars to achieve a minimum system size equivalent to 2.5 kilowatts2 per covered parking space (up to 45 percent of project's expected annual electricity use)? 129 □ □ OR Would the project provide equivalent energy generation onsite through rooftop photovoltaic panels or other means? Check "NIA" only if the project does not contain any non-residential buildings or provides 50 or fewer parking spaces. Efficient Lighting Standards 3. LED Lighting and Other Energy Efficient Lamps Would at least 75 percent of the luminaires provided by the project be 129 □ □ comprised of LED or other similarty efficient lighting? Solar Water Heater/Heat Pump Installation 4. Solar Water Heating Residential Units: Does the project include a solar water heating system capable of producing 2,300 kWh/year or 112 therms/year of total energy required for water heating? • Commercial Proiects: Does the project include a solar water heating lfil □ □ system capable of producing at least 50 percent of total energy required for water heating? Restaurants of 8,000 sguare feet or greater with a service water heater rated 75,000 Btu/h or greater: Does the project include installation of a 1 Actions that are not subject to Step 2 would include, for example: 1) discretionary map actions that do not propose specific development; 2) permits allowing wireless communication facilities; 3) special events permits; 4) conditional use permits that do not result in the use intensification or expansion of an existing building: and 5) non-building infrastructure projects such as roads and pipelines. Because such actions would not result in new occupancy buildings from which GHG emissions reductions could be achieved, the items contained in Step 2 would not be applicable. 2 System size rated as Direct Current (DC) under Standard Test Conditions (STC). P-30 Page 5 of 13 Revised 02/17 City of Carlsbad Climate Action Plan Consistency Checklist j ' l 1 (Check the appropriate box and provide explanation for your answer) Yes No N/A I Checklist Item solar water-heating system with a minimum solar saving fraction of 0.15 consistent with non-residential voluntary standards of the California Green Building Standards Code?3 Exceptions to this measure indude: 1. Buildings with a natural gas service water heater with a minimum of 95 percent thermal efficiency. 2. Buildings where greater than 75 percent of the total roof area has annual solar access that is less than 70 percent. Solar access is the ratio of solar insolation induding shade to the solar insolation without shade. Shading from obstructions located on the roof or any other part of the building shall not be induded in the determination of annual solar access. In lieu of solar water heaters, the project may propose to indude heat pump water heaters to reduce the water heating load by 50 percent. Check "NIA" if the project does not contain any residential or non-residential buildings. [ Transportation Demand Management I 5. Transportation Demand Management For non-residential projects with more than 50 employees, would the project indude a transportation demand management (TOM) plan reviewed and approved by the City of Carlsbad Transportation Division (see Attachment A, ED □ □ Transportation Demand Management Plan template)? Check "NIA" if the project is a residential project or if it would not accommodate more than 50 employees. ! Increased Zero-Emissions Vehicle (ZEV) Travel I 6. Zero-Emission Vehide Infrastructure • One-and two-family dwellings and townhouses with attached ()rivate garages: Would the required parking serving each new dwelling be "EV Ready"4 to allow for the future installation of electric vehicle supply equipment to provide an electric vehide charging station for use by the resident? • Multi-Family Projects of fewer than 17 dwelling units: Would a minimum of one parking space be "EV Ready" to allow for the future installation of 18] □ □ electric vehicle supply equipment to provide electric vehide charging stations at such time as it is needed for use by residents? • Multi-Family Projects of 17 or more dwelling units: Would five percent of the total parking spaces required, or a minimum of two spaces, whichever is greater, be "EV Capable"5 to allow for the future installation of electric vehide supply equipment to provide electric vehicle charging stations at such time as it is needed for use by residents? Of the total "EV Capable" spaces provided, would 50 percent of them, or a minimum of one, 3 Btu/h=British thermal unit per hour; solar saving fraction defined as the amount of energy provided by solar technology divided by the total energy required. • "EV Ready" means a parking space that is pre-wired with a dedicated 208/240 branch circuit installed in conduit that originates at the electrical service panel or sub-panel and 40 ampere minimum overcurrent protection device, and terminates into a cabinet, box or enclosure, in a manner approved by the building official. 5 "EV Capable" means a parking space that has a cabinet, box or enclosure connected to a conduit linking the parking space to the electrical service panel in a manner approved by the building official. The electrical service panel shall provide sufficient capacity to simultaneously charge all electric vehicles with or without a load management system. P-30 Page 6 of 13 Revised 02117 City of Carlsbad Climate Action Plan Consistency Checklist l , ' i •,J ec 1st em Yes No NIA I 1 (Check the appropriate box and provide explanation for your answer) Ch kl" It whichever is greater, have the necessary electric vehide supply equipment to provide active charging stations ready for use by residents and guests? • Non-residential proiects: Would six percent of the total parking spaces required, or a minimum of one space, whichever is greater, be 'EV Capable" to allow for the future installation of electric vehide supply equipment to provide electric vehide charging stations at such time as it is needed for use by future occupants? Of the total "EV Capable" spaces provided, would 50 percent of them, or a minimum of one, whichever is greater, have the necessary electric vehide supply equipment to provide active charging stations ready for use by customers and employees? I Water Utilities System Improvements I 7. For one-and two-family residential projects, does the project indude: • Waste piping to permit the discharge of greywater to be used for outdoor irrigation in compliance with Section 1502 of the Calrromia Plumbing □ □ ~ Code?6 Check "NIA" rr the project does not indude residential buildings. 6 Pursuant to Health and Safety Code Section 17922.12. greywater means untreated wastewater that has not been contaminated by any toilet discharge, has not been affected by infectious, contaminated, or unhealthy bodily wastes, and does not present a threat from contamination by unhealthful processing, manufacturing, or operating wastes. Greywater includes, but is not limited to, wastewater from bathtubs, showers, bathroom washbasins, clothes washing machines, and laundry tubs, but does not include wastewater from kitchen sinks or dishwashers. P-30 Page 7 of 13 Revised 02/17 Carlsbad Oaks Greenhouse Gas Study Table 4 Carlsbad CAP Consistencv Checklist Stratec:iies # CAP Checklist Reauirement Proiect Strategy Consistent? Residential, Commercial, and Industrial The proposed project would include a 1 PV Systems: Commercial projects with rooftop solar PV system which would over 50 parking spaces must cover at least provide a system size equivalent to half of these spaces with 2.5kW per space covering half of the parking spaces with ~ on average, or, provide up to 45% of the 2.5 kilowatts (kW) per covered parking Yes projects expected annual electricity use. space. The project proposes 727 2 parking spaces and therefore, will install a solar PV system of at least 910 kW. Efficient Lighting Standards The proposed project would utilize at 3 least 75% LED lighting throughout. Yes Solar Water Heater/Heat Pump The proposed project will conform to the solar water heater/heat pump requirements of the checklist. The proposed project will either utilize a solar water heating system which provides at least 50% of total energy required for water heating, or a natural 4 gas water heater with a minimum Yes efficiency of 95%, or a heat pump water heater to reduce the heating/cooling load by 50%. If only a small amount of water heating is required, the project may utilize high efficiency tankless water heaters and would discuss with the Citv before installation. Transportation Demand Management A Transportation Demand Management plan has been developed. The TOM plan meets the requirements of the Carlsbad CAP Checklist. The completed 5 Checklist with details on the TOM plan Yes can be found in Appendix A. Zero Emission Vehicle Travel The proposed project will provide an empty raceway for future wiring to 6% (44 spaces) of parking spaces to be "EV Capable" to allow for the future 6 installation of EV charging stations. Yes Additionally, 22 spaces will have installed and operational charging stations by the end of construction activities. Water Utilities System Improvements The proposed project in not residential. 7 N/A r City of Carlsbad 10 Attachment "A" to Climate Action Plan Consistency Checklist Transportation Demand Management (TOM} Plan Commercial Buildings V 1.2 {cityof Carlsbad Effective Date of Architect/DeveloperTDM Plan: 5/11/2017 PHASE I: ARCHITECT/DEVELOPER SECTION I: GENERAL INFORMATION Developer: Ryan Companies us Inc. Architect/Developer: Primary Contact: Chris Wood Mailing Address: 4275 Executive Sauare-Ste. La Jolla, CA 92037 Phone: 858-812-7910 Email: chris.wood@ryar ~ompanies.com SECTION II: PROJECT INFORMATION Project Address: Pacific Vista Commerce Center Carlsbad Oaks North-Lot 23; SECTION Ill: CAP ALIGNMENT 370 Carlsbad, Climate Action Plan Measure K : Promote Transportation Demand Management SECTION IV: FACILITIES CA Describe how you have incorporated the following Facility Standards into the design of your project plans. Include the number of amenities within each category as well as a site map. Please list at least one item from each of the six categories. 1) Bike Parking Requirements ~ Secure Bicycle Parking 0 Bikes available for employees D End-of-trip facilities such as showers and changing rooms with lockers Updated 10/6/2016 1 Attachment "A" to Climate Action Plan Consistency Checklist Transportation Demand Management (TDM) Plan Commercial Buildings V 1.2 {cityof Carlsbad Provide 37 ea. short term bicycle parking (5% of 727 auto stalls). Provide 37 ea . long term bicycle storage (5% of 727 auto stalls). These are shown on Site Plan and satisfy 2016 CalGreen requirements. 2) Pedestrian Facilities IX] Pedestrian Access to the Public Sidewalk D Direct Routes from Public Sidewalk to Each Building in the Project Provide pedestrian access from each building to the public sidewalk as shown on Site Plan. 3) Transit Facilities IX] Convenient Access to Transit · Provide a ridesharing and transit information board or kiosk in a prominent location as shown on Site Plan. Also provide pedestrian access to public sidewalk and bicvcle storage. 4) Vehicle Facilities ~ Preferential Parking for Carpools and Vanpools □convenient Drop-off for Carpools and Vanpools Onsite Provide 59 ea. preferred par king stalls (8% of 727 auto parking stalls) for Clean Air Vehicles including carpools and vanpools . This is shown on Site Plan and complies with the 2016 CalGreen Code . 5) Facilities: On-Site Amenities 0 Cafe or Full Service Cafe Updated 10/6/2016 2 Attachment "A" to Climate Action Plan Consistency Checklist Transportation Demand Management (TOM) Plan Commercial Buildings V 1.2 {city of Carlsbad D Kitchen capable of providing catering D Conference Center/ Meeting Rooms D Conference Communication Equipment Athletic Facllltles . ~ Wellness Center/ Gym · Delivery Services/ Employee Service Venue; dry cleaning and/or other convenient services Provide location to aooommodat• delivery 1ervioe1 (e ,q, food t~uok1, mobile dry cleaning, ,,,,), 6} Addltlonal (Optional) Programs and Services: ' ~ Moblllty Hub Services (transportation options, shuttle, bus service, etc,) EV Infrastructure Parkins Management Plan P~ovid• operational IV ohar9in9 1tation1 for 31 of auto 1tall1 in aocordanot with the Carl1bad CAP, Jrovidt empty raceway for additional 31 ot auto 1tall1 per CalQreen, SECTION V: AUTHORIZATION Chri• Wood Printed Name d I fCI fC lbdR Name ah Signature o tvo ars a epresentat ve: Printed Name Signature Date Updated 10/6/2016 3 Attachment "A" to Climate Action Plan Consistency Checklist Transportation Demand Management (TOM) Plan Commercial Buildings V 1.2 {city of Carlsbad Effective Date of TOM Plan: ______ _ PHASE II: COMPANY TOM PROGRAM 'SECTION I: GENERAL INFORMATION· Company: TBD BY FUTURE TENANT(S) Property Manager/ TBD BY FUTURE TENANT(S) Human Resources Manager: Primary Contact: TBD BY FUTURE TENANT($) Mailing Address: TBD BY FUTURE ~ENANT(S) Phone: TBD BY FUTURE TENANT(S) Email: TBD BY FUTURE TENANT(S) SECTION II: PROJECT INFORMATION I Project Address: ITBD BY FUTURE TENANT(S) SECTION Ill: CAP ALIGNMENT Climate Action Plan Measure K : Promote Transportation Demand Management Updated 10/6/2016 4 Attachment "A" to Climate Action Plan Consistency Checklist Transportation Demand Management (TOM) Plan Commercial Buildings V 1.2 SECTION IV: PROGRAMS {cityof Carlsbad The following Programs 1-7 must be implemented within one year of project completion. Please list at least one item from each of the six categories. 1) Completion of Annual Survey: TBD BY FUTURE TENANT(S) D Agree to conduct a TDM survey or an iCommute survey annually. 2) Designated On-site Transportation Coordinator: TBD BY FUTURE TENANT(S) D Agree to designate an on-site transportation coordinator to be the point of contact with the City, regarding transportation demand management facilities and programs. This person shall serve as the on-site coordinator. 3) Information Board or Kiosk: Ix] Information Board or Kiosk in Prominent Location for Residents, with resources on all modes of transportation. Project will p r ovide a ridesharing and transit information board or kiosk in a prominent location. 4) On-Site Transit Pass Sales or Pre-Tax Transit Pass Program: TBD BY FUTURE TENANT(S) D On-Site Transit Pass Sales D Pre-Tax Transit Pass Program (if applicable) or similar program IX] Information about transit services to your location Updated 10/6/2016 5 Attachment "A" to Climate Action Plan Consistency Checklist Transportation Demand Management (TOM) Plan Commercial Buildings V 1.2 {cityof Carlsbad Provide a ridesharing and transit information board or -kiosk in a prominent location. 5) Participation in Guaranteed Ride Home or similar program TBD BY FUTURE TENANT(S) D Agree to participate in a Guaranteed Ride Home Program when a personal emergency situation arises for tenant who uses an alternative commute mode to get to work (or from work to home). 6) Rideshare Services TBD BY FUTURE TENANT(S) D Rideshare matching services, subsidies or pre-tax donation D Vanpool Services D Car Sharing Services D Assistance in Finding Commute Alternatives 7) Additional (Optional) Programs and Services: TBD BY FUTURE TENANT(S) D Telecommute Program D Flexible work hours or compressed work week D Parking Management Plan i] Other On-Site Amenities Project will provide a ·location to accommodate delivery services (e.g. food t _rucks, mobile dry cleaning, .... ) as shown on site olan. Pro;ect will also orovide ooerational EV charaina stations for 3% of auto stalls and empty conduits for add'l 3% EV Stalls in acc~rdance with the Carlsbad CAP. Updated 10/6/2016 6 Attachment "A" to Climate Action Plan Consistency Checklist Transportation Demand Management (TOM) Plan Commercial Buildings V 1.2 · SECTION V: AUTHORIZATION TBD BY FUTURE TENANT($) {city of Carlsbad Name and Signature of Designated Property Management or Human Resources Manager Contact: I Printed Name I Signature I Date Name and Signature of on-site transportation coordinator: (preferred) I Printed Name I Signature I Date Name and Signature of City of Carlsbad Representative: I Printed Name I Signature I Date Updated 10/6/2016 7 1 <900MTCO~per)'tlar? 1 ResrdentJat Pl/ S~tems N/A 3 LEO and Other Eff icerit lighting 5 TOM Plan Template 7 Res1dentutl Waste P1pmg fo, Outdoor Irrigation N/A CAP CHECKLIST ffEM 1 1 < 900 MlCO:e per )'tlar'1 ,, Cons1stenc.ywrthGP arid Zooine 1 Rasldantiel PV Systems 2 ommeroal arid lndusmet PY S""tems 3 LEO end OtJ1e1 Eftucant lJghtJng 4 Solar Watef' Htatirui 5 TOM Plen Template • Zero,Emis.,JO(I Vth+dt lnfresuucture 1 Resldenllaf Waste P1p1ng for Outdoor lmgatJon Pj 5 of the GHG Study states that p<oJect would generate operatlOflal em1ss1ons lhat exefl'ds 900 MT 00,,e/year CIIIEEMod Model output states operauonal errns.s1ons to be 2 523 MT co2e;year Pg. 9 otthe G~Study stat.a, that the PfOject 1s cons~tem. with ~,11 Plan 1and ~• al'ld ton1ns, ~~UOns wt ~snot Jpeqfy wllat Ula illnd ~ or umiWJ designatlOl'ls ar, For certamtythat the p,01ect 1s consistent w1tn U'I• General Plan pleau revile the GHG st.I.la'/ to mci\Jde ltlis ,ntormatlon N/A. t>e<:au,e the pro,ect does not mc!ude res1der1tial bl.l1ldmgs Pg. 10 o(tt,e GHG Study atates that the project ""'°"Id m<:luda a ,oonop s.ola, PV 11)'$t.em which would p,CM!Je a &yStam $Ile equrvatont to covering t1e!t Of tM pa,1,;mg tpaees wi(l'I .! ~ kW per cover$CI pat1onasp~ Tne 1)1'0/'ect proposu 727 parklflgspaces and wiQ wt.It a solar PV system or at !east 910 kW Pg 10 of th9 GHG ShKfy states that tne PfOJe<;t WOl.old utIII11 &\ least 75% LEO I 11,hting t.hfougt,out Pg. 10 or the GHG Sl:Udy states that tne p,01ect win COiiform to tl'le solar water Mater/neat PUmP requrremerits ot t,1\4' checkh$t The propo,ed project will either utilize a solar water heatina S¢em wnid\ l)l'OV?d6' •t leett 50% of totateoerr, reQuued fOf waw Miaung Of a n&tlJ(al gas wat&I' healtr w1tn a ll'MfWmum etl'iciencyof95"-ot a heal pumpwM:e, t..atar U) reduce Ul• neatil\&l'eoollt\8 loed by 50% ff only a small amount of wat(Jr heau.ng is rt,Qt»red. the proiec;t mev utwie tuah efrlettneytttlk19s, lll'ato, t,eatera and woukf d•saJss wJth the Qty befOta ~al18Uon A.pPhcant filled out the TOM Plan Iri ttie CAP Cnti¢kl1st bUt some items reference CAL Green 2016 requirements and .Mcent needs c1Srif1cat,on from t,he City on mandator)' ~ voluntary measures Also not a!I portions of Phase II nave been filled out 1r'ld1catIng that cert.a~ i:seta IS will l>e detam1med by tl\e lutura tenant These items ,nclude Phase I SeetJon IV #1 Bike Parking Requtrements(Applicant states t.M prOJe(:t will comply w,tn CAL Green 2016 This ,s a mand11tory requ1,etrerit Is that eriougn to Htlsfy U11s 1equ11ement?) •Phau I Sllct/On lV lf4 vehicle Fa¢jlt1es(Applieant states mat the PfOJect w,11 comp!i w11h CALG1een 2016 This 1s a ~oluntary requ,rement) Pha$8 II SeCbon I Gerieral tntormallori (TBO by Future Tenant) Phe,e II Sec1ton II Pr0jt¢t lnlo1met1on (T8D oY Full/re Tenant) -Phase II Sectlon IV Progams 1 2 5 6 an<l 7 (TBD by Future Tenant) Phase II SeCIIOnV "vtnorizet,on (TBO byfutu<e TenantJ City staff win arso 1eY1ew the TOM apphcauon to confirm ttl)' s,ta ctes1gri ¢()fflm1tments are constStent w1\h wnat 1s slated rn the lDM app!1cat10o Crty statf will supplement •ny note.!,/C<>mmtnts 11$ need&e For other rtems that cannot be answe1ed at this moment the prOJect .shoutd to tM eiaent reas1bta be corn:l1tJOned to include these poruons of the TOM plan PB 10 of the GHG Study states that 6 percorit(or 44 spacet) or the total .,arkmA spaees wilt bf ·ry C&peblt • Add1tionaffy 22 ap~ will htve ~sui•fod and ~rat1om1! ctiarjln& steUOl'ls t,y ~ end of oonlll\,Gt!OO actJVtbeS N/A. because the p,o,.ect does not in<:luOe re$1d&ntJtl buildings APl'UCANT IESPOHU AIALffllllllf/flll- CommtmllrOm~nt ---- APnlCANT RESPONSES AIIAl.fflCOIIIIIIITI/IIUUTIOII , .... ACllllll'IFIOII -- I I Commtnllfrom~rtt ---------CAP CHECKLIST ffEM l < 900 r•.n~e per yea<? 2 Consislency with GP an~ Zoning I I ReSldenbal PV Systems 2 Commercial and lndU:$Vi•1 f¥V Systems 3 lED and Other Eff~cent lighting 4 Solar Water Heauna • TOM Plan Template 6 ze,o.Em1,-,1on Vehiele Infrastructure 7 Res,dentlal Wa:ste P1pll'\g IO! Outdoor 1mga1.Jon January 4, 2017 Chris Wood ,,. .. Order Nll"'ber: NCS-816241-SO Page N"' . ....er: 1 UPDATED AND AMENDED JANUARY 4, 2017 First American Title Insurance Company National Commercial Services 4380 La Jolla Village Drive, Suite 110 San Diego, CA 92122 Ryan Companies US, Inc. 4275 Executive Square, Suite 370, La Jolla, CA 92037 Phone: (858)812-7925 Fax: (858)812-7935 Customer Reference: Title Officer: Phone: Fax No.: E-Mail: Buyer: Owner: Property: Vacant Land Vince Tocco/ Linda Slavik (858)410-3886 (877)461-2094 vtocco@firstam.com Ryan Companies US., Inc. Techbilt Construction Corp. Vacant, Carlsbad, CA PRELIMINARY REPORT In response to the above referenced application for a policy of title insurance, this company hereby reports that it is prepared to issue, or cause to be issued, as of the date hereof, a Policy or Policies of Title Insurance describing the land and the estate or interest therein hereinafter set forth, insuring against loss which may be sustained by reason of any defect, lien or encumbrance not shown or referred to as an Exception below or not excluded from coverage pursuant to the printed Schedules, Conditions and Stipulations of said Policy forms. The printed Exceptions and Exclusions from the coverage and Limitations an Covered Risks of said policy or policies are set forth in Exhibit A attached. The policy to be issued may contain an arbitration dause. When the Amount of Insurance is less than that set forth in the arbitration c/au~ all arbitrable matters shall be arbitrated at the option of either the Company or the Insured as the exclusive remedy of the parties. Limitations on Covered Risks applicable to the CLTA and ALTA Homeowner's Policies of Title Insurance which establish a Deductible Amount and a Maximum Dollar Limit of Liability for certain coverages are also set forth in Exhibit A. Copies of the policy forms should be read. They are available from the office which issued this report. First American Title Insurance Company Order N)-'"'Qer: NCS-816241-50 Page I',,. ,..r:2 Please read the exceptions shown or referred to below and the exceptions and exclusions set forth in Exhibit A of this report carefully. The exceptions and exclusions are meant to provide you with notice of matters which are not covered under the terms of the title insurance policy and should be carefully considered. It is important to note that this preliminary report is not a written representation as to the condition of title and may not list all liens, defects, and encumbrances affecting title to the land. This report (and any supplements or amendments hereto) is issued solely for the purpose of facilitating the issuance of a policy of title insurance and no liability is assumed hereby. If it is desired that liability be assumed prior to the issuance of a policy of title insurance, a Binder or Commitment should be requested. First American Title Insurance Company Dated as of December 28m, 2016 at 7:30 A.M. The form of Policy of title insurance contemplated by this report is: EXTENDED OWNERS/LENDERS Order NJ.Will;>er: NCS-816241-SD Page J',,,_..kr: 3 A specific request should be made if another form or additional coverage is desired. Title to said estate or interest at the date hereof is vested in: Techbilt Construction Corp., a California corporation The estate or interest in the land hereinafter described or referred to covered by this Report is: Fee The Land referred to herein is described as follows: (See attached Legal Description) At the date hereof exceptions to coverage in addition to the printed Exceptions and Exclusions in said policy form would be as follows: 1. General and special taxes and assessments for the fiscal year 2016-2017. First Installment: $20,514.00, PAID Penalty: $0.00 Second Installment: $20,514.00, PAID Penalty: $0.00 Tax Rate Area: 09013 A. P. No.: 209-120-18-00 Affects: The land and other property. 2. Supplemental taxes for the year 2016-2017 assessed pursuant to Chapter 3.5 commencing with Section 75 of the California Revenue and Taxation Code. First Installment: $49,999.99, PAID Penalty: $ 0.00 Second Installment: $ 49,999.99, PAID Penalty: $ 0.00 Tax Rate Area: 09013 A. P. No.: 900-001-09-00 Affects: The land and other property. 3. Supplemental taxes for the year 2016-2017 assessed pursuant to Chapter 3.5 commencing with Section 75 of the California Revenue and Taxation Code. First American Title Insurance Company First Installment: Penalty: Second Installment: Penalty: Tax Rate Area: A. P. No.: $ 49,999.99, PAID $ 0.00 $ 49,999.99, PAID $ 0.00 09013 900-001-08-00 Order ~r: NCS-816241-5D Pagel'I.. .oer:4 Affects: The land and other property. 4. Supplemental taxes for the year 2016-2017 assessed pursuant to Chapter 3.5 commencing with Section 75 of the California Revenue and Taxation Code. First Installment: $ 34,231.88, PAID Penalty: $ 0.00 Second Installment: $ 34,231.88, PAID Penalty: $ 0.00 Tax Rate Area: 09013 A. P. No.: 900-001-07-00 Affects: The land and other property. 5. The lien of special tax for the following community facilities district, which tax is collected with the county taxes. District: Carlsbad CFD #3 IMP 2. 6. The lien of special tax assessed pursuant to Chapter 2.5 commencing with Section 53311 of the California Government Code for Community Facilities District No. 1, as disclosed by Notice of Special Tax Lien recorded May 20, 1991 as Instrument No. 1991-0236959 of Official Records. Document(s) declaring modifications thereof recorded June 29, 2004 as Instrument No. 2004- 0606773 of Official Records. 7. The lien of supplemental taxes, if any, assessed pursuant to Chapter 3.5 commencing with Section 75 of the California Revenue and Taxation Code. 8. The terms and provisions contained in the document entitled "Payment of a Public Facilities Fee" recorded December 3, 1981 as Instrument No. 81-380028 of Official Records. 9. The terms and provisions contained in the document entitled "Payment of a Public Facilities Fee" recorded December 11, 1985 as Instrument No. 85-466658 of Official Records. 10. This item has been intentionally deleted. 11. The terms and provisions contained in the document entitled "Notice of Restriction on Real Property" recorded November 9, 2004 as Instrument No. 2004-1066056 of Official Records. 12. The terms and provisions contained in the document entitled "Notice and Waiver Concerning Proximity of the Planned or Existing Palomar Airport Road and Melrose Drive Transportation Corridors Case No: CT 97-13" recorded November 9, 2004 as Instrument No. 2004-1066058 of Official Records. First American Title Insurance Company Order ~r: NCS-816241-SD Pager... -<ler:5 13. The terms and provisions contained in the document entitled "Hold Harmless Agreement Drainage" recorded December 15, 2004 as Instrument No. 2004-1180067 of Official Records. 14. The terms and provisions contained in the document entitled "Hold Harmless Agreement Geological Failure" recorded December 15, 2004 as Instrument No. 2004-1180068 of Official Records. 15. The terms and provisions contained in the document entitled "Agreement Between Developer/Owner and the City of Carlsbad for the Payment of a Local Drainage Area Fee" recorded December 21, 2004 as Instrument No. 2004-1201221 of Official Records. 16. An easement for public street and public utility and incidental purposes, recorded January 23, 2007 as Instrument No. 2007-0047586 of Official Records. In Favor of: Affects: City of Carlsbad, a municipal corporation as described therein 17. Abutter's rights of ingress and egress to or from Whiptail Loop and Gazelle Court have been dedicated or relinquished on the map no. 16145 of Tract Maps recorded October 13, 2016. 18. Covenants, conditions, restrictions and easements in the document recorded February 5, 2007 as Instrument No. 2007-0081082 of Official Records, which provide that a violation thereof shall not defeat or render invalid the lien of any first mortgage or deed of trust made in good faith and for value, but deleting any covenant, condition or restriction indicating a preference, limitation or discrimination based on race, color, religion, sex, handicap, familial status, national origin, sexual orientation, marital status, ancestry, source of income or disability, to the extent such covenants, conditions or restrictions violate Title 42, Section 3604(c), of the United States Codes or Section 12955 of the California Government Code. Lawful restrictions under state and federal law on the age of occupants in senior housing or housing for older persons shall not be construed as restrictions based on familial status. Document(s) declaring modifications thereof recorded March 20, 2013 as Instrument No. 2013- 0175873 of Official Records. A declaration of annexation recorded October 25, 2016 as Instrument No. 2016-0576403 of Official Records. 19. A Deed of Trust to secure an original indebtedness of $11,655,000.00 recorded November 1, 2016 as Instrument No.; 2016-0591601 of Official Records. Dated: Trustor: Trustee: Beneficiary: October 31, 2016 Techbilt Construction Corp., a California corporation Genevieve Tchang Frost Carlsbad Oaks North Partners, LP., a California limited partnersip 20. Water rights, claims or title to water, whether or not shown by the public records. 21. Rights of parties in possession. First American Title Insurance Company INFORMATIONAL NOTES 1. The property covered by this report is vacant land. Order ~er: NCS-816241-SD Page r....-oer:6 2. According to the public records, there has been no conveyance of the land within a period of twenty-four months prior to the date of this report, except as follows: None 3. This preliminary report/commitment was prepared based upon an application for a policy of title insurance that identified land by street address or assessor's parcel number only. It is the responsibility of the applicant to determine whether the land referred to herein is in fact the land that is to be described in the policy or policies to be issued. 4. Should this report be used to facilitate your transaction, we must be provided with the following prior to the issuance of the policy: A. WITH RESPECT TO A CORPORATION: 1. A certificate of good standing of recent date issued by the Secretary of State of the corporation's state of domicile. 2. A certificate copy of a resolution of the Board of Directors authorizing the contemplated transaction and designating which corporate officers shall have the power to execute on behalf of the corporation. 3. A certificate of revivor and a certificate of relief from contract voidability issued by the Franchise Tax Board of the State of California. 4. Requirements which the Company may impose following its review of the above material and other information which the Company may require. B. WITH RESPECT TO A CALIFORNIA LIMITED PARTNERSHIP: 1. A certified copy of the certificate of limited partnership (form LP-1) and any amendments thereto (form LP-2) to be recorded in the public records; 2. A full copy of the partnership agreement and any amendments; 3. Satisfactory evidence of the consent of a majority in interest of the limited partners to the contemplated transaction; 4. A certificate of revivor and a certificate of relief from contract voidability issued by the Franchise Tax Board of the State of California. 5. Requirements which the Company may impose following its review of the above material and other information which the Company may require. C. WITH RESPECT TO A FOREIGN LIMITED PARTNERSHIP: 1. A certified copy of the application for registration, foreign limited partnership (form LP-5) and any amendments thereto (form LP-6) to be recorded in the public records; 2. A full copy of the partnership agreement and any amendment; 3. Satisfactory evidence of the consent of a majority in interest of the limited partners to the contemplated transaction; 4. A certificate of revivor and a certificate of relief from contract voidability issued by the Franchise Tax Board of the State of California. 5. Requirements which the Company may impose following its review of the above material and First American Title Insurance Company other information which the Company may require. D. WITH RESPECT TO A GENERAL PARTNERSHIP: Order ~er: NCS-816241-5D Page r.. ...oer: 7 1. A certified copy of a statement of partnership authority pursuant to Section 16303 of the California Corporation Code (form GP-I), executed by at least two partners, and a certified copy of any amendments to such statement (form GP-7), to be recorded in the public records; 2. A full copy of the partnership agreement and any amendments; 3. Requirements which the Company may impose following its review of the above material required herein and other information which the Company may require. E. WITH RESPECT TO A LIMITED LIABILITY COMPANY: 1. A copy of its operating agreement and any amendments thereto; 2. If it is a California limited liability company, a certified copy of its articles of organization (LLC-1) and any certificate of correction (LLC-11), certificate of amendment (LLC-2), or restatement of articles of organization (LLC-10) to be recorded in the public records; 3. If it is a foreign limited liability company, a certified copy of its application for registration (LLC-5) to be recorded in the public records; 4. With respect to any deed, deed of trust, lease, subordination agreement or other document or instrument executed by such limited liability company and presented for recordation by the Company or upon which the Company is asked to rely, such document or instrument must be executed in accordance with one of the following, as appropriate: (i) If the limited liability company properly operates through officers appointed or elected pursuant to the terms of a written operating agreement, such documents must be executed by at least two duly elected or appointed officers, as follows: the chairman of the board, the president or any vice president, and any secretary, assistant secretary, the chief financial officer or any assistant treasurer; (ii) If the limited liability company properly operates through a manager or managers identified in the articles of organization and/or duly elected pursuant to the terms of a written operating agreement, such document must be executed by at least two such managers or by one manager if the limited liability company properly operates with the existence of only one manager. 5. A certificate of reviver and a certificate of relief from contract voidability issued by the Franchise Tax Board of the State of California. 6. Requirements which the Company may impose following its review of the above material and other information which the Company may require. F. WITH RESPECT TO A TRUST: 1. A certification pursuant to Section 18100.5 of the California Probate Code in a form satisfactory to the Company. 2. Copies of those excerpts from the original trust documents and amendments thereto which designate the trustee and confer upon the trustee the power to act in the pending transaction. 3. other requirements which the Company may impose following its review of the material require herein and other information which the Company may require. G. WITH RESPECT TO INDIVIDUALS: 1. A statement of information. The map attached, if any, may or may not be a survey of the land depicted hereon. First American Title Insurance Company expressly disclaims any liability for loss or damage which may result from reliance on this map except to the extent coverage for such loss or damage is expressly provided by the terms and provisions of the title insurance policy, if any, to which this map is attached. *****To obtain wire instructions for deposit of funds to your escrow file please contact your Escrow Officer.***** First American Title Insurance Company C LEGAL DESCRIPTION Order ~r: NCS-816241-5D Page r,.....6er: 8 Real property in the City of Carlsbad, County of San Diego, State of California, described as follows: LOT 23 OF CARLSBAD OAKS NORTH PHASE 3, IN THE CITY CARLSBAD, COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO MAP THEREOF NO. 16145, FILED IN THE OFFICE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY, OCTOBER 15, 2016. APN: 209-120-18-00 First American Title Insurance Company