HomeMy WebLinkAboutSDP 84-01; Buena Vista Park Plaza; Site Development Plan (SDP) (2)FEE: $100
RECEIPT NO:
ENVIRONMENTAL IMPACT ASSESSMENT FORM - Part I
(To Be Completed by APPLICANT)
CASE NO:
DATE-: 1/20/84
Applicant: G & G Development
Address of Applicant: 2204 Garnet Avenue. San m'fln ra q? ing
Phone Number: ( 619 ) 483-6252 _
Name, address and phone number of person to be contacted (if other than
Applicant): Development Consultants Cons. - J. Henthorn ~ 434-.T1 15 _
GENERAL INFORMATION;
Description of Project: Request of aproval of ^n^r-ai pia
zone change, snenifir plan ten-ha-t-i tro -map on 96.8 ^cres
development plan for construction of 300 apartment units _
Project Location/Address: Southside of .State Highway 78. 0.5 mile east
of El Camino Real _
Assessor Parcel Number: 167 ~ 040 " 24 _
Zone of Subject Property: CT.R-P. O-S __ _
Proposed Use of Site: Combination of residential condominium and
aoartment units with. Phase I to consist of 300 anartment units.
List all other applicable applications related to this project:
None other than cited above
Describe the activity area, including distiguishing natural and man-
made characteristics; also provide precise slope analysis when
appropriate.
96.8 acre vacant site covered with native vegetation. The topographv
is varied; with flat flood plan areas and coastal hills. (See Page 9
of EIR 82-5).
3. Describe energy conservation measures incorporated into the design
and/or operation of the project.
Energy conservation as required by uniform building code will be
designed in construction drawings.
4. If residential, include the number of units/ schedule of unit sizes,
range of sale prices or rents, and type of household size expected.
UNIT • SIZE QUANTITY
Studio 400 • 30
1 Bed/1 BA 555 75
1 Bed/1.5 BA 650 45
2 BED/2 BA 850 150
5. If commercial, indicate the type, whether neighborhood, city or
regionally oriented, square footage of sales area, and loading
facilities.
• N/A
6. If industrial, indicate type, estimated employment per shift, and
loading facilities.
N/A ' .
7. If institutional, indicate the major function, estimated employment per
shift, estimated occupancy, loading facilities, and community benefits
to be derived from the project.
. N/A
-2-
I.ENVIRONMENTAL IMPACT ANALYSIS
Answer the following questions by placing a check in the appropriate
space. (Discuss all items checked "yes". Attach additional sheets as
necessary.)
1) Could the project significantly change present
land uses in the vicinity of the activity?
2) Could the activity affect the use of a recreational
area, or area of important aesthetic value?
3) Could the activity affect the functioning of an
established community or neighborhood?
4) Could the activity result in the displacement of
community residents?
•5) Could the activity increase the number of low and
modest cost housing units in the city?.
6) Could the activity decrease the number of low and
modest cost housing units in the city?
7) Are any of the natural or" man-made features in the
activity area unique, that is, not found in other
parts of the county, state or nation?
8) Could the activity significantly affect an
historical or archaeological site or its settings?
9) Could the activity significantly affect the
potential use, extraction, or conservation of a
scarce natural resource?
10) Does the activity significantly affect the
potential use, extraction, or conservation of a
scarce natural resource?
11) Could the activity significantly affect fish,
wildlife or plant life?
12) Are there any rare or endangered plant species
in the activity area?
13) Could the activity change existing features of
any of the city's lagoons, bays, or tidelands?
14) Could the activity change existing features of
any of the city's beaches?
15) Could the activity result in the erosion or
elimination of agricultural lands?
16) Could the activity serve to encourage development-
of presently undeveloped areas or intensify develop-
ment of already developed areas?
YES
x
NO
x
X
X
X
X
X
-3-
YES NO
17) Will the activity require a variance from
established environmental standards (air, water,
noise, etc.)?
18) Will the activity require certification, authoriza-
tion or issuance of a permit by any local, state or
federal environmental control agency?
19) Will the activity require issuance of a variance
or conditional use permit by the City?
20) Will the activity involve the application, use, or
disposal of potentially hazardous materials?
21) Will the activity involve construction of
facilities in a flood plain?
22) Will the activity involve construction of
facilities in the area of an active fault?
23) Will the activity involve construction of
facilities on a slope of 25 percent or greater?
24) Could the activity result in the generation of
significant amounts of noise?
25) Could the activity result in the generation of
significant amounts of dust?
26) Will the activity involve the burning of brush,
trees, or other materials?
27) Could the activity result in a significant change
in the quality of any portion of the region's air
or water resources? (Should note surface, ground
water, off-shore.)
28) Will the project substantially increase fuel
consumption (electricity, oil, natural gas, etc.)?
29) Will there be a significant change to existing
land form?
(a) Indicate estimated grading to be done in
cubic yards: .
(b) Percentage of alteration to the present
land form:
(c) Maximum height of cut or fill slopes:
x
x-
x
x
x
30) Will the activity result in substantial Increases
in the use of utilities, sewers, drains or streets?
31) Is the activity carried out as part of a larger
project or series of projects?
-4-
"II. STATEMENT OF NON-SIGNIFICANT ENVIRONMENTAL EFFECTS
If you have answered yes to one or more of the questions in Section
I but you think the activity will have no significant environmental
effects, indicate your reasons below:
Please see EIR-82-5 Impacts cited therein are anticipated to
represent those associated with residential development since basic
site configurations will not change.
III. COMMENTS OR ELABORATIONS TO ANY OF THE QUESTIONS IN SECTION I
(If additional space is needed for answering any questions, attach
additional sheets as needed.)
Signature Jc
(Persorf Completing Report)
Date Signed tlt'lfr