Loading...
HomeMy WebLinkAboutSDP 84-01; Buena Vista Park Plaza; Site Development Plan (SDP) (2)FEE: $100 RECEIPT NO: ENVIRONMENTAL IMPACT ASSESSMENT FORM - Part I (To Be Completed by APPLICANT) CASE NO: DATE-: 1/20/84 Applicant: G & G Development Address of Applicant: 2204 Garnet Avenue. San m'fln ra q? ing Phone Number: ( 619 ) 483-6252 _ Name, address and phone number of person to be contacted (if other than Applicant): Development Consultants Cons. - J. Henthorn ~ 434-.T1 15 _ GENERAL INFORMATION; Description of Project: Request of aproval of ^n^r-ai pia zone change, snenifir plan ten-ha-t-i tro -map on 96.8 ^cres development plan for construction of 300 apartment units _ Project Location/Address: Southside of .State Highway 78. 0.5 mile east of El Camino Real _ Assessor Parcel Number: 167 ~ 040 " 24 _ Zone of Subject Property: CT.R-P. O-S __ _ Proposed Use of Site: Combination of residential condominium and aoartment units with. Phase I to consist of 300 anartment units. List all other applicable applications related to this project: None other than cited above Describe the activity area, including distiguishing natural and man- made characteristics; also provide precise slope analysis when appropriate. 96.8 acre vacant site covered with native vegetation. The topographv is varied; with flat flood plan areas and coastal hills. (See Page 9 of EIR 82-5). 3. Describe energy conservation measures incorporated into the design and/or operation of the project. Energy conservation as required by uniform building code will be designed in construction drawings. 4. If residential, include the number of units/ schedule of unit sizes, range of sale prices or rents, and type of household size expected. UNIT • SIZE QUANTITY Studio 400 • 30 1 Bed/1 BA 555 75 1 Bed/1.5 BA 650 45 2 BED/2 BA 850 150 5. If commercial, indicate the type, whether neighborhood, city or regionally oriented, square footage of sales area, and loading facilities. • N/A 6. If industrial, indicate type, estimated employment per shift, and loading facilities. N/A ' . 7. If institutional, indicate the major function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project. . N/A -2- I.ENVIRONMENTAL IMPACT ANALYSIS Answer the following questions by placing a check in the appropriate space. (Discuss all items checked "yes". Attach additional sheets as necessary.) 1) Could the project significantly change present land uses in the vicinity of the activity? 2) Could the activity affect the use of a recreational area, or area of important aesthetic value? 3) Could the activity affect the functioning of an established community or neighborhood? 4) Could the activity result in the displacement of community residents? •5) Could the activity increase the number of low and modest cost housing units in the city?. 6) Could the activity decrease the number of low and modest cost housing units in the city? 7) Are any of the natural or" man-made features in the activity area unique, that is, not found in other parts of the county, state or nation? 8) Could the activity significantly affect an historical or archaeological site or its settings? 9) Could the activity significantly affect the potential use, extraction, or conservation of a scarce natural resource? 10) Does the activity significantly affect the potential use, extraction, or conservation of a scarce natural resource? 11) Could the activity significantly affect fish, wildlife or plant life? 12) Are there any rare or endangered plant species in the activity area? 13) Could the activity change existing features of any of the city's lagoons, bays, or tidelands? 14) Could the activity change existing features of any of the city's beaches? 15) Could the activity result in the erosion or elimination of agricultural lands? 16) Could the activity serve to encourage development- of presently undeveloped areas or intensify develop- ment of already developed areas? YES x NO x X X X X X -3- YES NO 17) Will the activity require a variance from established environmental standards (air, water, noise, etc.)? 18) Will the activity require certification, authoriza- tion or issuance of a permit by any local, state or federal environmental control agency? 19) Will the activity require issuance of a variance or conditional use permit by the City? 20) Will the activity involve the application, use, or disposal of potentially hazardous materials? 21) Will the activity involve construction of facilities in a flood plain? 22) Will the activity involve construction of facilities in the area of an active fault? 23) Will the activity involve construction of facilities on a slope of 25 percent or greater? 24) Could the activity result in the generation of significant amounts of noise? 25) Could the activity result in the generation of significant amounts of dust? 26) Will the activity involve the burning of brush, trees, or other materials? 27) Could the activity result in a significant change in the quality of any portion of the region's air or water resources? (Should note surface, ground water, off-shore.) 28) Will the project substantially increase fuel consumption (electricity, oil, natural gas, etc.)? 29) Will there be a significant change to existing land form? (a) Indicate estimated grading to be done in cubic yards: . (b) Percentage of alteration to the present land form: (c) Maximum height of cut or fill slopes: x x- x x x 30) Will the activity result in substantial Increases in the use of utilities, sewers, drains or streets? 31) Is the activity carried out as part of a larger project or series of projects? -4- "II. STATEMENT OF NON-SIGNIFICANT ENVIRONMENTAL EFFECTS If you have answered yes to one or more of the questions in Section I but you think the activity will have no significant environmental effects, indicate your reasons below: Please see EIR-82-5 Impacts cited therein are anticipated to represent those associated with residential development since basic site configurations will not change. III. COMMENTS OR ELABORATIONS TO ANY OF THE QUESTIONS IN SECTION I (If additional space is needed for answering any questions, attach additional sheets as needed.) Signature Jc (Persorf Completing Report) Date Signed tlt'lfr