Loading...
HomeMy WebLinkAboutSDU 01-08; Magnolia Subdivision Lot 1; Second Dwelling Unit (SDU) (7)TO: Paul Godwin - Planning Technician FROM: David Rick -Assistant Engineer DATE: March 15, 2001 SDU 01-08 MAGNOLIA SUBDIVISION COMPLETNESS AND ISSUES REVIEW Engineering Department staff has completed a review of the above-referenced project for completeness and engineering issues of concern. All items needed for engineering review are provided for determining the application as complete. Engineering issues which need to be resolved or adequately addressed prior to staff making a determination on the proposed project are as follows: 1. On the site plan: a. Show the sewer lateral off the main. Avoid placing the driveways over this lateral. b. Show the driveway within the sewer easement. Does this driveway exist or is it proposed? Please clarify. c. Recheck the location of the water line. According to the improvement plans on file with the City (DWG 380-3), the water line is not to be aligned as shown. d. Is the concrete swale located in the easement existing or proposed? e. Provide grading quantities. If no grading is proposed, then indicate so with a note. 2. Show lot drainage patterns. Indicate percent slope of drainage. If you or the applicant has any questions, please either see or contact me at 602-2781. DAVID RICK Assistant Engineer Engineering Development Services Division