Loading...
HomeMy WebLinkAboutSDU 01-35; Danna Second Dwelling Unit; Second Dwelling Unit (SDU) (5)I- -. TO: Greg Fisher, Assistant Planner FROM: David Rick, Assistant Engineer DATE: October 23, 2001 SDU 01-35 DANNA SECOND DWELLING UNIT COMPLETENESS 4% ISSUES REVIEW Engineering Department staff has completed a review of the above-referenced project for application completeness. The application and plans submitted for this proposed project are currently incomplete and unsuitable for further review due to the following incomplete items: <--&I. Preliminary title report dated within the last 6 months. The following issues need to be resolved prior to resubmittal: On the site plan, show: a. Street centerline and edge of pavement. b. Correct the driveway width to 12 feet at the front property linehight-of-way boundary. Also, locate the driveway 6 feet from the side property line. c. According to City records, the right-of-width on Oak St. is 80 feet, not 60. Please correct or provide evidence to the contrary. 2. You indicate on the plans that there are no trees on site. However, observations during a field visit confirm that a Eucalyptus tree does exist within either the public right-of-way or front property. Show this tree on the plan and indicate if it will be removed. If located within the public right-of-way and you plan to remove it, then separate permission must be granted from the General Services Division of the Public Works Department. 3. Obtain a letter from a soils engineer authorizing a narrow distance of 3 feet from building foundation to drainage swale within the side yard of the house and garages. Any recommendations, such as deepened footings, must be included in the letter. If you or the applicant has any questions, please either see or contact me at extension 2781. W DAVID RICK Assistant Engineer Development Services Division C: Senior Engineer - Development Services Division