Loading...
HomeMy WebLinkAboutSDU 01-35; Danna Second Dwelling Unit; Second Dwelling Unit (SDU) (6)CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND USE REVIEW December 27,2001 TO: Greg Fisher - Assistant Planner FROM: David Rick - Assistant Engineer COMPLETENESS REVIEW PROJECT ID: SDU 01-35 DANNA SECOND DWELLING UNIT The Engineering Department has completed its review of the above referenced project. Engineering staff does not have any comments to add to the project. Please add the following conditions of approval to the approving resolution: NOTE: Unless specifically stated in the condition, all of the following conditions, upon the approval of this proposed tentative map, must be met prior to approval of a building permit. 1. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, Developer shall apply for and obtain approval from, the City Engineer for the proposed haul route. 2. Prior to issuance of any building permit, Developer shall comply with the requirements of the City’s anti-graffiti program for wall treatments if and when such a program is formally established by the City. 3. Prior to the issuance of a building permit, the developer shall submit an erosion control plan with the building plans for City approval. Said erosion control shall be in place prior to beginning any construction or earthwork. 4. Developer shall cause property owner to enter into a lien contract with the City for the future public improvement of Oak Ave along the subdivision frontage for a half street width of 30 feet. Public improvements shall include but are not limited to paving, base, sidewalk, curb and gutter, and streetlights. 5. Prior to approval of any grading or building permits for this project, Developer shall cause Owner to give written consent to the City Engineer to the annexation of the area shown within the boundaries of the subdivision into the existing City of Carlsbad Street Lighting and Landscaping District No. 1, on a form provided by the City Engineer. Wa- .. .. H:\LIBRARY\ENG\WPDATA\MISCCOMPREV c. 6. Prior to issuance of building permits, Developer shall pay all fees, deposits, and charges for connection to public facilities. Developer shall pay the San Diego County Water Authority capacity charge(s) prior to issuance of Building Permits. The Developer shall install potable water services and meters at a location approved by the District Engineer. The Developer shall install sewer laterals and clean-outs at a location approved by the District Engineer. This project is approved upon the express condition that building permits will not be issued for the development of the subject property, unless the District Engineer has determined that adequate water and sewer facilities are available at the time of occupancy. 7. 8. 9. If you or the applicant has any questions regarding the above, please either see or call me at extension 2781. David Rick Assistant Engineer - Development Services Division H:LIBRARY\ENG\WPDATAWlSC\COMPREV