Loading...
HomeMy WebLinkAboutSDU 02-01; Hollabaugh Residence; Second Dwelling Unit (SDU)- City of Carlsbad March 1 1 , 2002 Donald Grover Architect 21 87 Newcastle Avenue, Suite 100 Cardiff, CA 92007 SUBJECT: SDU 02-01 - HOLLABAUGH RESIDENCE Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your request for approval of a Second Dwelling Unit with Pool Bath and Storage, application no. SDU 02-01, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, February 13, 2002, to either resubmit the application or , submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Saima Qureshy, at (760) 602-4619, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, MICHAEL J. HOLZMILLER Planning Director MJH:SO:cs C: Don Neu, Team Leader David Rick, Project Engineer File Copy Data Entry Planning Aide 1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us @ LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION SDU 02-01 - Second Dwelling Unit with Pool Bath and Storage Planning: 1. Show the location of existing garage and proposed parking for second dwelling unit on your site plan. Pursuant to section 21.10.100 of the zoning ordinance, each dwelling unit shall have a two car garage and one additional paved off-street parking space shall be provided for a second dwelling unit. a. Site acreage b. Total building coverage (existing and proposed) c. Building square footage (existing) d. Height and exterior material of existing walls and roof 2. Include following information in the summary table on your site plan: 3. On sheet 2, dimension the proposed building height on the building elevations. Engineering: 1. Plot sewer easement identified under item No. 3 of Schedule B of the preliminary title report. 2. The guesthouse as plotted will encroach over an existing 40% slope. Show how the grade and/or structure will be altered to accommodate what appears to be a 3- foot difference in elevation between the 168-foot contour line and the proposed 171-foot pad. Include grading quantities in cubic yards. All roof drainage should be discharged as farthest from the slope as possible.