HomeMy WebLinkAboutSDU 94-01; Ladwig Second Unit; Second Dwelling Unit (SDU) (3)CITY OF CARLSBAD
ENGINEERING DEPARTMENT
LAND USE REVIEW
TO: SENIOR PLANNER - CHRIS DECERBO Date: July 20, 1994
From: Assistant Engineer - Land Use Revieww 4 Project ID: SDU 94-01
Via: Assistant City Engineer
LADWIG SECOND UNIT
PROJECT REPORT AND CONDITIONS TRANSMITTAL
The Engineering Department has completed its review of the above referenced project and is
recommending:
X That the project be approved subject to the conditions as listed on the attached sheet.
- That the project be denied for the following reasons:
X The following is a final Land Use Review project report for inclusion in the staff report
for this project.
LAND USE REVIEW DIVISION
PROJECT REPORT
PROJECT ID: SDU 94-01 PREPARED BY: MIKE SHIREY
PROJECT NAME: LADWIG SECOND UNIT APPROVED BY:
LOCATION: SOUTH SIDE OF MCCAULEY LANE BETWEEN VALLEY STREET &
MONROE STREET.
BRIEF DESCRIPTION: PROPOSE SECOND DWELLING UNIT ABOVE NEW GARAGE
ENGINEERING ISSUES AND DISCUSSION:
Traffic and Circulation:
Projected Average Daily Traffic (ADT): 16
Traffic Study Performed by: N/A
No major Traffic and Circulation issues associated with this project.
SEWER
Sewer District: Carlsbad
Sewer EDU's Required: 1
No major Sewer issues associated with this project.
WATER
Water District: Carlsbad
EDU's Required: 1
GPD Required: 220
No major Water issues associated with this project.
GRADING
Quantities: Cut: 10 cy (Foundation Trenching) Export: 10 cy
Permit Required: NO
Offsite Approval required/obtained: NO
Hillside Grading Requirements met: N/A
Preliminary Geotechnical Investigation Performed by: N/A
No major Grading issues associated with this project.
DRAINAGE AND EROSION CONTROL:
Drainage Basin: A
Preliminary Hydrology Study Performed by: N/A
Erosion Potential: Low
The project is proposed on an existing virtually flat lot. Existing drainage
flows to the south and west with a low spot along the westerly property
line, located approximately midway between the front and rear property
lines. The applicant has proposed and staff has permitted the use of an
area drain with a standard curb drain outlet to convey this low spot
drainage to McCauley Lane. The remaining existing drainage patterns
will not be altered.
LAND TITLE:
Conflicts with existing easement: NO
Easements dedication required: NO
Site boundary coincides with Land Title: YES
No major Land Title issues associated with this project.
IMPROVEMENTS:
Offsite improvements: NO
Standard Variance Required: NO
No major Improvement issues associated with this project.
SDU 94-01; LADWIG SECOND UNIT
ENGINEERING CONDITIONS OF APPROVAL
Enoineerina Conditions
34.
35.
36.
45A.
47.
57.
Unless a standards variance has been issued, no variance from City Standards
is authorized by virtue of approval of this Site Plan.
The applicant shall comply with all the rules, regulations and design
requirements of the respective sewer and water agencies regarding services to
the project.
The applicant shall be responsible for coordination with S.D.G.&E., Pacific Bell
Telephone, and Cable TV authorities.
Prior to Building Permit Issuance the applicant shall pay all current fees and
deposits required.
The owner of the subject property shall execute an agreement holding the City
harmless regarding drainage across the adjacent property prior to approval of
the Building Permit or this project.
Prior to hauling dirt or construction materials to or from any proposed
construction site within this project, the applicant shall submit to and receive
approval from the City Engineer for the proposed haul route. The applicant
shall comply with all conditions and requirements the City Engineer may impose
with regards to the hauling operation.