October 20, 1994
h
TO: SENIOR PLANNER - CHRIS DECERBO
From: Assistant Engineer - Land Use Review
Via: Principal Civil Engineer - Land Use Review
SDU 94-02; CASLER SECOND UNIT
COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT
Engineering Department staff have completed a review of the above referenced project for
application completeness and have determined that the application and plans submitted for the
project are complete and suitable for continued review. Engineering Issues which must be
resolved prior to staff making a determination on this project are as follows:
1. Please submit a Preliminary Title Report (PTR) which has been
issued within the past six months.
2. Please identify any easements, as referenced in the PTR, on the
Site Plan, and indicate the future disposition of the easements.
Traffic and Circulatioa
1. Please provide project Average Daily Traffic (ADT) on the Site
Plan. ADT for this project is 16.
2. Provide for a "P" vehicle turning radius (R = 24ft.) in the
driveway at the garage. Please indicate the radius on the Site
Plan. Additionally, does this entire parking area/driveway
currently exist? Please indicate if this area exists, on the Site
Plan.
3. Please identify pedestrian access to the proposed unit. What kind of ground cover currently exists in this area?
SDU 94-02; CASLER SECOND UNIT PAGE: 2
OCTOBER 20,1994; C. DECERBO
COMPLETENESS REVIEW AND INITIAL ISSUES STATEMENT
Gradinn and Drainage
1. Please indicate existing/proposed topography on the Site Plan.
2. Please indicate existing vegetation and any removal/relocation of
any vegetation on the Site Plan.
3. Identify any potential grading quantities (i.e., cut/fill, import/export). If no grading is proposed, please indicate this on
the Site Plan.
Saver
1. Please indicate the location of the proposed sewer line (tying
into the "point of connection") and cleanouts, as indicated on the
Site Plan.
Attached for the applicant's use for making plan revisions is a redljned check print of the
project. This check print must be returned with the revised plans to facilitate continued
staf€ review.
questions, please either see or call me at extension 4388.