Loading...
HomeMy WebLinkAboutSDU 98-02; Gunter Residence; Second Dwelling Unit (SDU) (3)Tim and Ann Gunter 4 I60 Sunnyhill Drive Carlsbad, CA 92008 760-434- I40 I March 18, 1998 Mr. Chris DeCerbo City of Carlsbad Planning Department 2075 Las Palmas Drive Carlsbad, CA 92009-1576 RECEIVED MAR 1 9 1998 ENGINEERING DEPARTMENT RECEIVED ENGINEERING DEPARTMENT RE: CDP 98-17/SDU 98-02 - GUNTER RESIDENCE Dear Mr. DeCerbo: Enclosed is a resubmittal of our application for a Coastal Development Permit and Second Dwelling Unit, with modifications based on the staff comments. I met with Mari Sparks on March 12 to review the engineering comments, and the revised plans include the requested information, as summarized below. Planning: 1. The maximum building height of the second dwelling unit has been added to the building elevation sheet. Engineering: 1. 2. 3. 4. 5. 6. 7. Sewer and water to the property are provided by the Carlsbad Municipal Water District, and the site is within the Carlsbad Unified School District. This information has been added to the first sheet of the plan set. The bearings and distances have been added to the plans. There are no fences proposed as part of this project. The street grade adjacent to the property has been added to Sheet 3. The street section for Sunnyhill Drive has been added to Sheet 3. The easements as noted in the title report have been added to Sheet 3. The location of sewer and water services have been added to Sheet 3, including mains and laterals, and the water meter. No sewer cleanout is known to exist. Mr. Chris DeCerbo March 18, 1998 Page 2 8. 9. 10. 11 12. 13. The driveway is proposed to be concrete, and additional notations have been added to the plans for clarity. The toe of the slope relative to the driveway (which occurs opposite the main house garage) has been revised to be 2' away from the property line, per the City of Carlsbad Standard GS- 14. The edge of the driveway in front of the main house garage area has been modified based on the changes in slope location (see item 9). The flow line of the drainage swale has been moved to be 5 ' from the building. Parcels adjacent to this property are existing single family lots with public street access. There is no undeveloped land adjacent to this property, and no access is provided to adjacent parcels. Earthwork volumes have been added to Sheet 3. As indicated in the application forms, cut and fill volumes will be balanced at 530 cubic yards. Thank you for your review of the application package. Hopefully these revised plans will provide you with the information necessary to deem the application complete and schedule for public hearing. Please do not hesitate to call me at (760) 722-1924 if you have further questions. Sincerely, Enclosures: 4 sets of Revised Plans, including: Site Plan Preliminary Grading Plan Building Floor Plans and Elevations