HomeMy WebLinkAboutSDU 98-07; Rancho Carrillo Village H, Lot 6; Second Dwelling Unit (SDU) (3)c
Hofman Planning
Associates
0 0 0
Memorandum
Planning Project Management Fiscal Analysis
DATE: December 2 1,1998
TO: Van Lynch
cc: Craig Ruiz
FROM: Niko Carrigan
SUBJECT: SECOND UNITS IN VILLAGE H - SUBSTANTIAL CONFORMANCE
APPLICATION st^ -99-07 -? / /
Enclosed are the proposed revisions to the floor plans and architecture for the five second units in
Village H of Rancho Carrillo. Five second units have been previously approved to be located on
Lots 6, 12,22,58, & 69. We believe the proposed revisions can be approved under the Planning
Department’s Policy No. 35, Guidelines for Substantial Conformance Determinations (enclosed),
since the proposed revisions meet all of the criteria therein.
The revisions are proposed solely to enhance the exterior architecture of the unit. The revisions
do not propose any changes to the locations of the second units, building height, density, land
use, nor will they create any additional environmental impacts. The proposed revisions do
represent upgrade to the previously approved design of the exterior architecture. The revision are
described below:
0 The ‘pop-out’ closest to the street on the fiont elevation has been shifted fiom being flush
with the right side of the structure to the middle of the fiont wall. This allows the second
building plane to be divided by the ‘pop-out’.
0 The entryway to the stairway for the second unit has been enhanced slightly by extending
the entryway by 3’-4” so that it is flush with the building plane on the opposite side of the
garage door.
0 A deck has been added to the unit which will be accessible only to the tenant of the
second unit. A small storage closet has been added and is accessible from the deck. As
you can see fiom the new plans, the second unit has been ‘flipped’ over the garage. This
was done to accommodate access to the deck. The windows at the deck area have been
changed to fit in with the deck and provide an improvement to the architecture to what
was previously approved. The deck itself was added to enhance the exterior architecture,
but we also feel it provides a better floor plan for the second unit as well.
5900 Pasteur Court Ste 150 Carlsbad CA 92008 760-438-1465 Fax 760-438-2443
0 The garage doors have been changed to put the single car garage door closest to the
second unit. This was not done on the Model unit since this foundation has already been
poured. Other than the Model however, the single car garage door will be located near
the second unit.
0 The overall square footage for the second unit has been changed from 587 SF to 607 SF.
This represents an increase in square footage of 20 SF, or 3.4%.
If you have any questions regarding this request, or would like any additional information
regarding the proposed revisions, please do not hesitate to give me a call.
5900 Pasteur Court Ste 150 Carlsbad CA 92008 760-438-1465 Fax 760-438-2443