Loading...
HomeMy WebLinkAboutSP 144C; SDG&E Wastewater Facility; Specific Plan (SP) (4)STAFF REPORT March 9, 1977 TO: PLANNING COMMISSION FROM: PLANNING DEPARTMENT CASE NO: SP-144 (C) APPLICANT: SAN DIEGO GAS AND ELECTRIC REQUEST: Approval of an amendment to the Specific Plan for the power plant site to allow the construction of water treatment facilities and a maintenance building. SECTION I; RECOMMENDATION: Staff recommends APPROVAL of SP-144 (C) for the following reasons and subject to the following conditions: FINDINGS: 1) The proposed Specific Plan Amendment is consistent with the General Plan because: a) The Land Use Map of the General Plan shows the subject property as "U" (Public Utility). The proposed project is consistent with that designation. 2) The proposed Specific Plan Amendment is consistent with the City of Carlsbad Environmental Protection Ordinance of 1972 because: a) A negative declaration has been issued for the project based on the following findings: 1) The construction of the treatment facilities is a nec- essary water pollution control measure which is required by the U.S. Environmental Protection Agency. Discharged water must be treated so that levels of copper, iron, oil, grease, and suspended solids will be reduced; 2) The construction of the treatment facilities will not increase the amount of fresh water discharged into the ocean but wi,ll simply improve the quality of that discharged water, in accordance with all State and Federal require- ments ; 3) The amount of grading associated with the project is not substantial, and does not pose any special geotech- ni cal problems; 4) The treatment ponds will not be visible from offsite. Landscaped berms will surround the ponds; -1- 5) An impervious liner will be installed to prevent see- page from the ponds. As an auxilliary measure, a subdrain system will be constructed to accommodate see- page should the liner be punctured; 6) The applicant will construct overflow pipes to prevent discharge from rising too high in the ponds; and 7) Boiler blow-down water, which accounts for approximately 37% of the water which the company could legally dis- charge into the ocean, will be reused. b) The maintenance building is exempted by Section 19.04.090. a.l 3) The proposed project conforms to applicable City policies and ordinances dealing with public facilities because: a) The project will not increase the need for any existing facilities. CONDITIONS: 1) The approval is granted for the land described in the application and any attachments thereto and as shown on the plot plan labeled Exhibit A, dated January 31, 1977. The location of all proposed facilities shall be located substantially as shown on said plot plan except or unless indicated otherwise herein. 2) The water treatment ponds shall be constructed and maintained to the following standards to minimize the likelyhood of the ponds serving as mosquito breeding sources: a) Confine standing water impoundment to as small an area as possible. b) All ponds areas shall be lined with a non-porous material acceptable to the City Engineer. c) Maintain a removal program of dense aquatic vegetation, such as cattails, bulrush, tule, pondweed, etc. d) Maintain a mosquito fish (Gambusia affinis) population, as necessary. e) Maintain routine (weekly) inspections of water impoundments to detect mosquito breeding. f) Abate any mosquito breeding, as it is detected. -2- 3) Prior to the issuance of building permits i or the maintenance building, the applicant shall submit a plot plan to the Planning Director for review and approval showing which existing shops and storage activities are to be removed and consolidated into the new structure. 4) Prior to the issuance of building permits, the applicant shall submit a revision to Exhibit A of SP-144 (B), incorporating these -new facilities on said exhibit. The revised exhibit shall be a reproducible mylar. SECTION II: BACKGROUND: - Lo-c-a-t-io-n and Description of Property: The proposed project is located on the existing site of the Encina Power Plan. The existing uses include various structures and facilities related to the power plant operation. Existing Zoning; Subject Property: P-U North: 0-S East: P-U South: R-l & 0-S West: 0-S Existing Land Use Subject Property: Encina Power Plant North: Agua Hedionda Lagoon East: Oil Tanks and 1-5 South: Terramar West: Pacific Ocean Past History and Related Cases: SP-144, - 144(A) and - 144(B) all have to do with various phases of the exist ing power plant operation. Public Facilities: Water and sewer services are provided by the City of Carlsbad. Major Planning Considerations Are these proposed facilities necessary? SECTION III: DISCUSSION: Federal environmental regulations mandate that the water treatment ponds and facilities be installed by July 1, 1977. A letter from P.M. Dudly of SDG&E, dated January 26, 1977, states that the future maintenance building will be "for consolidating certain shops and storage activities now occurring at various places around the power plant property." The conditions of approval cover this matter Attachments: Location Map, Exhibit A, Dated January 31, 1977 MZ:ar (3/4/77) -3-