Loading...
HomeMy WebLinkAboutSP 19I; Car Country SP Amendment; Specific Plan (SP) (3)ENVIRONMENTAL IMPACT ASSESSMENT FORM-PART II CASE NO: SP 9KIVLCPA02-11 DATE: January 10.2006 BACKGROUND 1. CASE NAME: Car Country Specific Plan Amendment 2. LEAD AGENCY NAME AND ADDRESS: City of Carlsbad - 1635 Faraday Avenue. Carlsbad, CA 92008 3. CONTACT PERSON AND PHONE NUMBER: Barbara Kennedy. Associate Planner - (760) 602-4626 4. PROJECT LOCATION: Car Country Specific Plan Area located north and west of Car Country Drive, east of Interstate 5. and south of Cannon Road. Carlsbad. CA 5. PROJECT SPONSOR'S NAME AND ADDRESS: Lexus Carlsbad 5444 Paseo Del Norte Carlsbad. CA 92008 6. GENERAL PLAN DESIGNATION: R - Regional Commercial 7. ZONING: C-2 - General Commercial OTHER PUBLIC AGENCIES WHOSE APPROVAL IS REQUIRED (i.e., permits, financing approval or participation agreements): California Coastal Commission (Local Coastal Program Amendment) PROJECT DESCRIPTION/ ENVIRONMENTAL SETTING AND SURROUNDING LAND USES: The project consists of an amendment to the Car Country Specific Plan and Local Coastal Program. The Car Country Specific Plan implements the Local Coastal Program for Car Country Carlsbad. The original Car Country (SP 19) and the Car Country Expansion area (SP 19(C)) are currently covered by two separate documents. The proposed Specific Plan amendment will consolidate the two components of the specific plan into one document and will provide one set of standards for signage and parking for the entire Specific Plan area. The amendment would also allow parking structures up to 35 feet in height and allow for an increased lot coverage of 50% in conjunction with the construction of a parking structure. The amendment does not propose a comprehensive update to the Specific Plan; however, it does address major areas of concern and conflicting standards between "old" and "new" Car Country, and also corrects a number of typographical and other errors. The LCP amendment is necessary to ensure consistency between the LCP and Specific Plan. The proposed amendment will not result in any conflict with the provisions of the LCP. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED: The summary of environmental factors checked below would be potentially affected by this project, involving at least one impact that is a "Potentially Significant Impact," or "Potentially Significant Impact Unless Mitigation Incorporated" as indicated by the checklist on the following pages. Aesthetics Agricultural Resources Air Quality Biological Resources Cultural Resources Geology/Soils Hazards/Hazardous Materials Hydrology/Water Quality Land Use and Planning Mineral Resources Mandatory Findings of Significance Noise Population and Housing Public Services Recreation Transportation/Circulation Utilities & Service Systems DETERMINATION. (To be completed by the Lead Agency) I find that the proposed project COULD NOT have a significant effect on the environment, and a NEGATIVE DECLARATION will be prepared. I find that although the proposed project could have a significant effect on the environment, there will not be a significant effect in this case because the mitigation measures described on an attached sheet have been added to the project. A MITIGATED NEGATIVE DECLARATION will be prepared. I find that the proposed project MAY have a significant effect on the environment, and an ENVIRONMENTAL IMPACT REPORT is required. I find that the proposed project MAY have "potentially significant impact(s)" on the environment, but at least one potentially significant impact 1) has been adequately analyzed in an earlier document pursuant to applicable legal standards, and 2) has been addressed by mitigation measures based on the earlier analysis as described on attached sheets. A Negative Declaration is required, but it must analyze only the effects that remain to be addressed. I find that although the proposed project could have a significant effect on the environment, there WILL NOT be a significant effect in this case because all potentially significant effects (a) have been analyzed adequately in an earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier ENVIRONMENTAL IMPACT REPORT or NEGATIVE DECLARATION, including revisions or mitigation measures that are imposed upon the proposed project. Therefore, nothing further is required. I /in Date Planning Director's Signature Date / Rev. 07/03/02 ENVIRONMENTAL IMPACTS STATE CEQA GUIDELINES, Chapter 3, Article 5, Section 15063 requires that the City conduct an Environmental Impact Assessment to determine if a project may have a significant effect on the environment. The Environmental Impact Assessment appears in the following pages in the form of a checklist. This checklist identifies any physical, biological and human factors that might be impacted by the proposed project and provides the City with information to use as the basis for deciding whether to prepare an Environmental Impact Report (EIR), Negative Declaration, or to rely on a previously approved EIR or Negative Declaration. • A brief explanation is required for all answers except "No Impact" answers that are adequately supported by an information source cited in the parentheses following each question. A "No Impact" answer is adequately supported if the referenced information sources show that the impact simply does not apply to projects like the one involved. A "No Impact" answer should be explained when there is no source document to refer to, or it is based on project-specific factors as well as general standards. • "Less Than Significant Impact" applies where there is supporting evidence that the potential impact is not significantly adverse, and the impact does not exceed adopted general standards and policies. • "Potentially Significant Unless Mitigation Incorporated" applies where the incorporation of mitigation measures has reduced an effect from "Potentially Significant Impact" to a "Less Than Significant Impact." The developer must agree to the mitigation, and the City must describe the mitigation measures, and briefly explain how they reduce the effect to a less than significant level. • "Potentially Significant Impact" is appropriate if there is substantial evidence that an effect is significantly adverse. • Based on an "EIA-Part II", if a proposed project could have a potentially significant adverse effect on the environment, but all potentially significant adverse effects (a) have been analyzed adequately in an earlier EIR or Mitigated Negative Declaration pursuant to applicable standards and (b) have been avoided or mitigated pursuant to that earlier EIR or Mitigated Negative Declaration, including revisions or mitigation measures that are imposed upon the proposed project, and none of the circumstances requiring a supplement to or supplemental EIR are present and all the mitigation measures required by the prior environmental document have been incorporated into this project, then no additional environmental document is required. • When "Potentially Significant Impact" is checked the project is not necessarily required to prepare an EIR if the significant adverse effect has been analyzed adequately in an earlier EIR pursuant to applicable standards and the effect will be mitigated, or a "Statement of Overriding Considerations" has been made pursuant to that earlier EIR. • A Negative Declaration may be prepared if the City perceives no substantial evidence that the project or any of its aspects may cause a significant adverse effect on the environment. • If there are one or more potentially significant adverse effects, the City may avoid preparing an EIR if there are mitigation measures to clearly reduce adverse impacts to less than significant, and those mitigation measures are agreed to by the developer prior to public review. In this case, the appropriate "Potentially Significant Impact Unless Mitigation Incorporated" may be checked and a Mitigated Negative Declaration may be prepared. Rev. 07/03/02 • An EIR must be prepared if "Potentially Significant Impact" is checked, and including but not limited to the following circumstances: (1) the potentially significant adverse effect has not been discussed or mitigated in an earlier EIR pursuant to applicable standards, and the developer does not agree to mitigation measures that reduce the adverse impact to less than significant; (2) a "Statement of Overriding Considerations" for the significant adverse impact has not been made pursuant to an earlier EIR; (3) proposed mitigation measures do not reduce the adverse impact to less than significant; or (4) through the EIA-Part II analysis it is not possible to determine the level of significance for a potentially adverse effect, or determine the effectiveness of a mitigation measure in reducing a potentially significant effect to below a level of significance. A discussion of potential impacts and the proposed mitigation measures appears at the end of the form under DISCUSSION OF ENVIRONMENTAL EVALUATION. Particular attention should be given to discussing mitigation for impacts, which would otherwise be determined significant. Rev. 07/03/02 Issues (and Supporting Information Sources). I. AESTHETICS - Would the project: a) Have a substantial adverse effect on a scenic vista? (See Discussion of Environmental Evaluation) b) Substantially damage scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a State scenic highway? (See Discussion of Environmental Evaluation) c) Substantially degrade the existing visual character or quality of the site and its surroundings? (See Discussion of Environmental Evaluation) d) Create a new source of substantial light and glare, which would adversely affect day or nighttime views in the area? (See Discussion of Environmental Evaluation) II. AGRICULTRAL RESOURCES - (In determining whether impacts to agricultural resources are significant environmental effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model-1997 prepared by the California Department of Conservation as an optional model to use in assessing impacts on agriculture and farmland.) Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? (See Discussion of Environmental Evaluation) b) Qonflict with existing zoning for agricultural use, or a Williamson Act contract? (See Discussion of Environmental Evaluation) c) Involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland to non-agricultural use? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant Impact No Impact Rev. 07/03/02 Issues (and Supporting Information Sources). III. AIR QUALITY - (Where available, the significance criteria established by the applicable air quality management or air pollution control district may be relied upon to make the following determinations.) Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? (See Discussion of Environmental Evaluation) b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? (See Discussion of Environmental Evaluation) c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non-attainment under an applicable federal or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)? (See Discussion of Environmental Evaluation) d) Expose sensitive receptors to substantial pollutant concentrations? (See Discussion of Environmental Evaluation) e) Create objectionable odors affecting a substantial number of people? (See Discussion of Environmental Evaluation) BIOLOGICAL RESOURCES - Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or Regulations, or by California Department of Fish and Game or U.S. Fish and Wildlife Service? (See Discussion of Environmental Evaluation) b) Have a substantial adverse effect on any riparian, aquatic or wetland habitat or other sensitive natural community identified in local or regional plans, policies, or regulations or by California Department of Fish and Game or U.S. Fish and Wildlife Service? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant No Impact Impact Rev. 07/03/02 Issues (and Supporting Information Sources). c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including but not limited to marsh, vernal pool, coastal, etc.) through direct removal, filing, hydrological interruption, or other means? (See Discussion of Environmental Evaluation) d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? (See Discussion of Environmental Evaluation) e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? (See Discussion of Environmental Evaluation) f) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? (See Discussion of Environmental Evaluation) IV. CULTURAL RESOURCES - Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in §15064.5? (See Discussion of Environmental Evaluation) b) Cause a substantial adverse change in the signifi- cance of an archeological resource pursuant to §15064.5? (See Discussion of Environmental Evaluation) vy c) Directly or indirectly destroy a unique paleontologi- cal resource or site or unique geologic feature? (See Discussion of Environmental Evaluation) d) Disturb any human remains, including those interred outside of formal cemeteries? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant Impact No Impact Rev. 07/03/02 Issues (and Supporting Information Sources). V. GEOLOGY AND SOILS - Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury or death involving: i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii. Strong seismic ground shaking? iii. Seismic-related ground failure, including liquefaction? iv. Landslides? (See Discussion of Environmental Evaluation) b) Result in substantial soil erosion or the loss of topsoil? (See Discussion of Environmental Evaluation) c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse? (See Discussion of Environmental Evaluation) d) Be located on expansive soils, as defined in Table 18 - 1-B of the Uniform Building Code (1994), creating substantial risks to life or property? (See Discussion of Environmental Evaluation)* e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the "disposal of wastewater? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant No Impact Impact Rev. 07/03/02 Issues (and Supporting Information Sources). VI. HAZARDS AND HAZARDOUS MATERIALS - Would the project: a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? (See Discussion of Environmental Evaluation) b) Create a significant hazard to the public or environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant No Impact Impact (See Discussion of Environmental Evaluation) c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? (See Discussion of Environmental Evaluation) "d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or environment? (See Discussion of Environmental Evaluation) e) For a project within an airport land use plan, or where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? (See Discussion of Environmental Evaluation) f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people Residing or working in the project area? (See Discussion of Environmental Evaluation) g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? (See Discussion of Environmental Evaluation) 10 Rev. 07/03/02 Issues (and Supporting Information Sources). h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? (See Discussion of Environmental Evaluation) VIII. HYDROLOGY AND WATER QUALITY - Would the project: a) Violate any water quality standards or waste discharge requirements? (See Discussion of Environmental Evaluation) b) Substantially deplete groundwater supplies or interfere substantially with ground water recharge such that there would be a net deficit in aquifer volume or a lowering of the local ground water table level (i.e., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? (See Discussion of Environmental Evaluation) c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner, which would result in substantial erosion or siltation on- or off- site? (See Discussion of Environmental Evaluation) d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the flow rate or amount (volume) of surface runoff in a manner, which would result in flooding on- or off- site? (See Discussion of Environmental Evaluation) e) Create or contribute runoff water, which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? (See Discussion of Environmental Evaluation) f) Otherwise substantially degrade water quality? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant No Impact Impact 11 Rev. 07/03/02 Issues (and Supporting Information Sources). g) Place housing within a 100-year flood hazard area as mapped on a Federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood delineation map? (See Discussion of Environmental Evaluation) h) Place within 100-year flood hazard area structures, which would impede or redirect flood flows? (See Discussion of Environmental Evaluation) i) Expose people or structures to a significant risk of loss injury or death involving flooding, including flooding as a result of the failure of a levee or dam? (See Discussion of Environmental Evaluation) j) Inundation by seiche, tsunami, or mudflow? (See Discussion of Environmental Evaluation) IX. LANDUSE AND PLANNING - Would the project: a) Physically divide an established community? (See Discussion of Environmental Evaluation) b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? (See Discussion of Environmental Evaluation) c) Conflict with any applicable habitat conservation plan or natural community conservation plan? (See Discussion of Environmental Evaluation) X. MINERAL RESOURCES - Would the project: a) Result in the loss of availability of a known mineral resource that would be of future value to the region and the residents of the State? (See Discussion of Environmental Evaluation) b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Less Than Mitigation Significant Incorporated Impact No Impact 12 Rev. 07/03/02 Issues (and Supporting Information Sources). XI. NOISE - Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance or applicable standards of other agencies? (See Discussion of Environmental Evaluation) b) Exposure of persons to or generation of excessive groundbourne vibration or groundbourne noise levels? Potentially Significant Potentially Unless Less Than Significant Mitigation Significant No Impact Incorporated Impact Impact d) (See Discussion of Environmental Evaluation) c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? (See Discussion of Environmental Evaluation) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project?. (See Discussion of Environmental Evaluation) e) For a project located within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? • (See Discussion of Environmental Evaluation) f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? (See Discussion of Environmental Evaluation) XII. POPULATION AND HOUSING - Would the project: *V a) Induce substantial growth in an area either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? (See Discussion of Environmental Evaluation) b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? (See Discussion of Environmental Evaluation) 13 Rev. 07/03/02 Issues (and Supporting Information Sources). c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? (See Discussion of Environmental Evaluation) XIII. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered government facilities, a need for new or physically altered government facilities, the construction of which could cause significant environmental impacts, in order to maintain acceptable service ratios, response times, or other performance objectives for any of the public services: i) Fire protection? ii) Police protection? iii) Schools? iv) Parks? v) Other public facilities? (See Discussion of Environmental Evaluation) XIV. RECREATION a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? (See Discussion of Environmental Evaluation) b) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effecUm the environment? (See Discussion of Environmental Evaluation) XV. TRANSPORTATION/TRAFFIC - Would the project: a) Cause an increase in traffic, which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections)? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant Impact No Impact 14 Rev. 07/03/02 Issues (and Supporting Information Sources). b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? (See Discussion of Environmental Evaluation) c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? (See Discussion of Environmental Evaluation) d) Substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible uses (e.g., farm equipment)? (See Discussion of Environmental Evaluation) e) Result in inadequate emergency access? (See Discussion of Environmental Evaluation) f) Result in insufficient parking capacity? (See Discussion of Environmental Evaluation) g) Conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turn- outs, bicycle racks)? (See Discussion of Environmental Evaluation) XVI. UTILITIES AND SERVICES SYSTEMS - Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? (See Discussion of Environmental Evaluation) b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which would cause significant environmental effects? (See Discussion of Environmental Evaluation) c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Less Than Mitigation Significant Incorporated Impact No Impact D K 15 Rev. 07/03/02 Issues (and Supporting Information Sources). d) Have sufficient water supplies available to serve .the project from existing entitlements and resources, or are new or expanded entitlements needed? (See Discussion of Environmental Evaluation) e) Result in a determination by the wastewater treatment provider, which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? (See Discussion of Environmental Evaluation) f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? (See Discussion of Environmental Evaluation) g) Comply with federal, state, and local statutes and regulations related to solid waste? (See Discussion of Environmental Evaluation) XVII. MANDATORY FINDINGS OF SIGNIFICANCE a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? (See Discussion of Environmental Evaluation) b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumula- tively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects?) (See Discussion of Environmental Evaluation) c) Does the project have environmental effects, which will cause the substantial adverse effects on human beings, either directly or indirectly? (See Discussion of Environmental Evaluation) Potentially Significant Impact Potentially Significant Unless Mitigation Incorporated Less Than Significant Impact No Impact 16 Rev. 07/03/02 XVIII. EARLIER ANALYSES Earlier analyses may be used where, pursuant to the tiering, program EIR, or other CEQA process, one or more effects have been adequately analyzed in an earlier EIR or negative declaration. Section 15063(c)(3)(D). In this case a discussion should identify the following on attached sheets: a) Earlier analyses used. Identify earlier analyses and state where they are available for review. b) Impacts adequately addressed. Identify which effects from the above checklist were within the scope of and adequately analyzed in an earlier document pursuant to applicable legal standards, and state whether such effects were addressed by mitigation measures based on the earlier analysis. c) Mitigation measures. For effects that are "Less Than Significant with Mitigation Incorporated," describe the mitigation measures, which were incorporated or refined from the earlier document and the extent to which they address site-specific conditions for the project. 17 Rev. 07/03/02 DISCUSSION OF ENVIRONMENTAL EVALUATION AESTHETICS - Would the project: a) Have a substantial adverse effect on a scenic vista? b) Substantially damage scenic resources, including but not limited to, trees, rock outcroppings, and historic buildings within a State scenic highway? c) Substantially degrade the existing visual character or quality of the site and its surroundings? d) Create a new source of substantial light and glare, which would adversely affect day or nighttime views in the area? No Impact - The proposed text amendments do not include a proposal for physical development of any site, and do not propose or affect any policy or standard that could: a) adversely effect a scenic vista; b) substantially damage scenic resources; c) degrade the visual character of any site; or d) create substantial light or glare that would adversely affect day or nighttime views. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. AGRICULTRAL RESOURCES - Would the project: a) Convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance (Farmland), as shown on the maps prepared pursuant to the Farmland Mapping and Monitoring Program of the California Resources Agency, to non-agricultural use? b) Conflict with existing zoning for agricultural use, or a Williamson Act contract? c) Involve other changes in the existing environment, which, due to their location or nature, could result in conversion of Farmland to non-agricultural use? No Impact - The proposed text amendments do not include a proposal for physical development of any site, and do not propose or affect any policy or standard that could: a) result in the conversion of farmland to a non-agricultural use; b) conflict with any existing zoning for agricultural uses or a Williamson Act contract; or c) result in changes to the existing city environment that would cause the conversion of farmland to a non-agricultural use. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. AIR QUALITY—Would the project: a) Conflict with or obstruct implementation of the applicable air quality plan? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policy or standard that could conflict or obstruct implementation of the regional air quality plan. All properties within the city are located in the San Diego Air Basin which is a federal and state non-attainment area for ozone (O3), and a state non-attainment area for particulate matter less than or equal to 10 microns in diameter (PMio). The periodic violations of national Ambient Air Quality Standards (AAQS) in the San Diego Air Basin (SDAB), particularly for ozone in inland foothill areas, requires that a plan be developed outlining the pollution controls that will be undertaken to improve air quality. In San Diego County, this attainment planning process is embodied in the Regional Air Quality Strategies (RAQS) developed jointly by the Air Pollution Control District (APCD) and the San Diego Association of Governments (SANDAG). A plan to meet the federal standard for ozone was developed in 1994 during the process of updating the 1991 state- mandated plan. This local plan was combined with plans from all other California non-attainment areas having serious ozone problems and used to create the California State Implementation Plan (SIP). The SIP was adopted by the Air Resources Board (ARB) after public hearings on November 9th through 10th in 1994, and was forwarded to the Environmental Protection Agency (EPA) for approval. After considerable analysis and debate, particularly regarding airsheds with the worst smog problems, EPA approved the SIP in mid-1996. 18 Rev. 07/03/02 Future development projects relate to the SIP and/or RAQS through the land use and growth assumptions that are incorporated into the air quality planning document. These growth assumptions are based on each city's and the County's general plan. If a proposed project is consistent with its applicable General Plan, then the project presumably has been anticipated with the regional air quality planning process. Such consistency would ensure that the project would not have an adverse regional air quality impact. Section 15125(B) of the State of California Environment Quality Act (CEQA) Guidelines contains specific reference to the need to evaluate any inconsistencies between the proposed project and the applicable air quality management plan. Transportation Control Measures (TCMs) are part of the RAQS. The RAQS and TCM plan set forth the steps needed to accomplish attainment of state and federal ambient air quality standards. The California Air Resources Board provides criteria for determining whether a project conforms with the RAQS which include the following: • Is a regional air quality plan being implemented in the project area? • Is the project consistent with the growth assumptions in the regional air quality plan? The project area is located in the San Diego Air Basin, and as such, is located in an area where a RAQS is being implemented. The proposed amendments are consistent with the growth assumptions of the General Plan. Future development projects that are subject to the amended Car Country Specific Plan will be required to be consistent with the growth assumptions of the City's General Plan and the RAQS. Therefore, the project is consistent with the regional air quality plan and will in no way conflict or obstruct implementation of the regional plan. b) Violate any air quality standard or contribute substantially to an existing or projected air quality violation? No Impact - The closest air quality monitoring station to properties within the city is in the City of Oceanside. Data available for this monitoring site through April, 2002 indicate that the most recent air quality violations recorded were for the state one hour standard for ozone (one day in both 2000 and 2001) and one day in 2001 for the federal 8-hour average for ozone and one day for the 24-hour state standard for suspended particulates in 1996. No violations of any other air quality standards have been recorded recently. The proposed amendments do not involve the physical development of any site nor air quality planning/standard changes. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. c) Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable federal or state ambient air quality standard? No Impact - The Air Basin is currently in a non-attainment zone for ozone and suspended fine particulates. The proposed amendments do not propose or affect any policy or standard that would result in a contribution to a cumulatively considerable potential net increase in emissions throughout the air basin. Additionally, the project does not include a proposal for physical development of any site. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. d) Expose sensitive receptors to substantial pollutant concentrations? •V No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards relating to air quality or pollution. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. e) Create objectionable odors affecting a substantial number of people? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in an activity that could create objectionable odors. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. 19 Rev. 07/03/02 BIOLOGICAL RESOURCES - Would the project: a) Have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by California Department of Fish and Game or U.S. Fish and Wildlife Service? b) Have a substantial adverse effect on any riparian, aquatic or wetland habitat or other sensitive natural community identified in local or regional plans, policies, or regulations or by California Department of Fish and Game or U.S. Fish and Wildlife Service? c) Have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including but not limited to marsh, vernal pool, coastal, etc.) through direct removal, filing, hydrological interruption, or other means? d) Interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native resident or migratory wildlife corridors, or impede the use of native wildlife nursery sites? No Impact (a, b, c & d) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in an adverse effect on any sensitive habitat or species, or interference with any native or migratory wildlife corridor or native wildlife nursery site. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. e) Conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance? 1) Conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan? No Impact (e & f) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in a conflict with local policies and ordinances that protect biological resources or the provisions of any habitat conservation plan. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. CULTURAL RESOURCES - Would the project: a) Cause a substantial adverse change in the significance of a historical resource as defined in §15064.5? b) Cause a substantial adverse change in the significance of an archeological resource pursuant to §15064.5? c) Directly or indirectly destroy a unique paleontological resource or site or unique geologic feature? •* d) Disturb any human remains, including those interred outside of formal cemeteries? No Impact (a, b, c & d) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in a disturbance of any human remains or an adverse impact to any historical, archeological, or paleontological resource. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis, and will be subject to the City's Cultural Resource Guidelines. GEOLOGY AND SOILS - Would the project: a) Expose people or structures to potential substantial adverse effects, including the risk of loss, injury or death involving: 20 Rev. 07/03/02 i. Rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on other substantial evidence of a known fault? Refer to Division of Mines and Geology Special Publication 42. ii. Strong seismic ground shaking? iii. Seismic-related ground failure, including liquefaction? iv. Landslides? No Impact - There are no Alquist-Priolo Earthquake Fault zones within the City of Carlsbad and there is no other evidence of active of potentially active faults within the City. However, there are several active faults throughout Southern California, and these potential earthquakes could affect Carlsbad. Landslides are also a potential threat in parts of the City. All development proposals in Carlsbad are subject to requirements such as the Uniform Building Code earthquake construction standards and soil remediation that when necessary ensure potential adverse effects are not significant. The proposed amendments, however, do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would expose people or structures to potential adverse effects from a known earthquake fault, ground shaking, seismic-related ground failure or landslides. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. b) Result in substantial soil erosion or the loss of topsoil? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in substantial soil erosion on any site. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA and the City's Engineering standards on a site specific basis. c) Be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in on- or off-site landslide, lateral spreading, subsidence, liquefaction, or collapse? d) Be located on expansive soils, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property? e) Have soils incapable of adequately supporting the use of septic tanks or alternative wastewater disposal systems where sewers are not available for the disposal of wastewater? No Impact (c, d & e) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in impacts to unstable or expansive soil conditions. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA and the City's engineering standards on a site specific basis. HAZARDS AND HAZARDOUS MATERIALS - Would the project: •*> a) Create a significant hazard to the public or the environment through the routine transport, use, or disposal of hazardous materials? b) Create a significant hazard to the public or environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment? c) Emit hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste within one-quarter mile of an existing or proposed school? d) Be located on a site which is included on a list of hazardous materials sites compiled pursuant to Government Code Section 65962.5 and, as a result, would it create a significant hazard to the public or environment? 21 Rev. 07/03/02 No Impact (a, b, c & d) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in hazards associated with exposure to hazardous materials. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. e) For a project within an airport land use plan', or where such a plan has not been adopted, within two miles of a public airport or public use airport, would the project result in a safety hazard for people residing or working in the project area? f) For a project within the vicinity of a private airstrip, would the project result in a safety hazard for people residing or working in the project area? No Impact (e & f) — The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in exposing people to hazards associated with an airport. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. g) Impair implementation of or physically interfere with an adopted emergency response plan or emergency evacuation plan? h) Expose people or structures to a significant risk of loss, injury or death involving wildland fires, including where wildlands are adjacent to urbanized areas or where residences are intermixed with wildlands? No Impact (g & h) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would interfere with the implementation of an adopted emergency response or evacuation plan, or result in exposing people to risk from wildland fires. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. HYDROLOGY AND WATER QUALITY - Would the project: a) Violate any water quality standards or waste discharge requirements? b) Substantially deplete groundwater supplies or interfere substantially with ground water recharge such that there would be a net deficit in aquifer volume or a lowering of the local ground water table level (i.e., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted)? c) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner, which would result in substantial erosion or siltation on- or off-site? d) Substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the flow rate or amount •» (volume) of surface runoff in a manner, which would result in flooding on- or off-site? e) Create or contribute runoff water, which would exceed the capacity of existing or planned stormwater drainage systems or provide substantial additional sources of polluted runoff? f) Otherwise substantially degrade water quality? No Impact (a, b, c, d, e, & f) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would conflict with any water quality standards, alter any drainage pattern, impact the capacity of existing or planned stormwater drainage systems, or result in the degradation of water quality. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. 22 Rev. 07/03/02 g) Place housing within a 100-year flood hazard area as mapped on a Federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood delineation map? h) Place within 100-year flood hazard area structures, which would impede or redirect flood flows? i) Expose people or structures to a significant risk of loss injury or death involving flooding, including flooding as a result of the failure of a levee or dam? j) Inundation by seiche, tsunami, or mudflow? No Impact (g, h, i, & j) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in placing housing within a 100-year flood hazard area, or expose people or structures to flooding or inundation by seiche, tsunami or mudflow. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. LAND USE AND PLANNING - Would the project: a) Physically divide an established community? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in the division of an established community. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. b) Conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect? No Impact — The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would conflict with any land use plan, policy, or regulation adopted for the purpose of avoiding or mitigating environmental effects. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. c) Conflict with any applicable habitat conservation plan or natural community conservation plan? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would conflict with the any habitat conservation plan or natural community conservation plan. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. MINERAL RESOURCES - Would the project: a) Result in the loss of availability of a known mineral resource that would be of future value to the » region and the residents of the State? b) Result in the loss of availability of a locally important mineral resource recovery site delineated on a local general plan, specific plan, or other land use plan? No Impact (a & b) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in the loss of availability of a mineral resource. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. NOISE - Would the project result in: a) Exposure of persons to or generation of noise levels in excess of standards established in the local general plan or noise ordinance or applicable standards of other agencies? 23 Rev. 07/03/02 b) Exposure of persons to or generation of excessive groundbourne vibration or groundbourne noise levels? c) A substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project? d) A substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project? No Impact (a, b, c & d) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in exposing people to excessive noise levels or groundbourne vibrations, or increase noise levels. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. e) For a project located within an airport land use plan or, where such a plan has not been adopted, within 2 miles of a public airport or public use airport, would the project expose people residing or working in the project area to excessive noise levels? f) For a project within the vicinity of a private airstrip, would the project expose people residing or working in the project area to excessive noise levels? No Impact (e & f) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in exposing people to excessive noise levels associated with an airport. Also, any future development proposal that is subject to the amended Car Country Specific Plan will be subject to the Comprehensive Land Use Plan for McClellan-Palomar Airport and further environmental review pursuant to CEQA on a site specific basis. POPULATION AND HOUSING - Would the project: a) Induce substantial growth in an area either directly (for example, by proposing new homes and businesses) or indirectly (for example, through extension of roads or other infrastructure)? No Impact — The proposed amendments do not include a proposal for physical development of any site, and therefore will not directly induce any growth. In addition, the proposed amendments will not introduce any new standard or provision that would indirectly induce substantial growth beyond what is currently allowed by City policies and standards. Any future development within the city must comply with the City's Growth Management Program. Because all public facilities (roads, infrastructure, etc) have been planned to accommodate the growth anticipated in the Growth Management Program, no substantial new roads or infrastructure will be necessary. Therefore, the project will not induce substantial growth either directly or indirectly. Also, any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. b) Displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere? •^ c) Displace substantial numbers of people, necessitating the construction of replacement housing elsewhere? No Impact (b & c) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in the displacement of any existing housing or people. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. PUBLIC SERVICES a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically altered government facilities, a need for new or physically altered government facilities, the construction of which could cause significant environmental impacts, in order to 24 Rev. 07/03/02 maintain acceptable service ratios, response times, or other performance objectives for any of the public services: i. Fire protection? ii. Police protection? iii. Schools? iv. Parks? v. Other public facilities? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in adverse impacts to the maintenance of acceptable service ratios, response times or other performance objectives for any public service (fire & police protection, schools, parks and other public facilities). Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. RECREATION a) Would the project increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facility would occur or be accelerated? b) Does the project include recreational facilities or require the construction or expansion of recreational facilities, which might have an adverse physical effect on the environment? No Impact (a & b) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in an increase in use of existing neighborhood or regional parks or other recreational facilities, such that substantial physical deterioration of the facility would occur. Also, the proposed amendments do not include recreational facilities or require the construction or expansion of recreational facilities. Any future development proposal that is subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. TRANSPORTATION/TRAFFIC—Would the project: a) Cause an increase in traffic that is substantial in relation to the existing traffic load and capacity of the street system? No Impact - The project does not include a proposal for physical development of any site. A performance standard for traffic is part of the City's Growth Management Program. Future development that is subject to the amended Car Country Specific Plan will be required to comply with this performance standard, which ensures future development will not exceed the traffic load and capacity of the city's street system. In addition, future development will be subject to further environmental review pursuant to CEQA on a site specific basis. b) Exceed, either individually or cumulatively, a level of service standard established by the county congestion management agency for designated roads or highways? No Impact - SANDAG acting as the County Congestion Management Agency has designated three roads (Rancho Santa Fe Rel, El Camino Real and Palomar Airport Rd.) and two highway segments in Carlsbad as part of the regional circulation system. The Existing and Buildout average daily traffic (ADT) and Existing LOS on these designated roads and highways in Carlsbad is: Existing ADT* LOS Buildout APT* Rancho Santa Fe Road 15-32 "A-C" 28-43 El Camino Real 21-50 "A-C" 32-65 Palomar Airport Road 10-52 "A-B" 29-77 SR78 120 "F" 144 1-5 183-198 . "D" 219-249 *The numbers are in thousands of daily trips. 25 Rev. 07/03/02 The Congestion Management Program's (CMP) acceptable Level of Service (LOS) standard is "E", or LOS "F" if that was the LOS in the 1990 base year (e.g., SR 78 in Carlsbad was LOS "F" in 1990). Accordingly, all designated roads and highways are currently operating at or better than the acceptable standard LOS. Note that the buildout ADT projections are based on the full implementation of the region's general and community plans. The proposed amendments do not change the growth projections of the general plan. Achievement of the CMP acceptable Level of Service (LOS) "E" standard assumes implementation of the adopted CMP strategies. Based on the design capacity(ies) of the designated roads and highways and implementation of the CMP strategies, they will function at acceptable level(s) of service in the short-term and at buildout. This project proposes no physical development of a property. Further, it does not propose to change or add a standard that would affect levels of service as established by the CMP. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA and the CMP on a site specific basis. c) Result in a change in air traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in a change of air traffic patterns or result in substantial safety risks associated with air traffic patterns. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. d) Substantially increase hazards due to a design feature or incompatible uses? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would cause a future project to increase hazards due to a design feature or incompatible use. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. e) Result in inadequate emergency access? f) Result in inadequate parking capacity? No Impact (e & f) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would result in inadequate emergency access or parking capacity. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. g) Conflict with adopted policies, plans or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks, etc.)? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would conflict with adopted policies, plans or programs supporting alternative transportation. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. •%? UTILITIES AND SERVICES SYSTEMS - Would the project: a) Exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would cause future development to exceed any wastewater treatment requirements. Any future development subject to the amended Car Country Specific Plan will be subject to the requirements of the Regional Water Quality Control Board, and further environmental review pursuant to CEQA, on a site specific basis. 26 Rev. 07/03/02 b) Require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which would cause significant environmental effects? c) Require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant environmental effects? d) Have sufficient water supplies available to serve the project from existing entitlements and resources, or are new or expanded entitlements needed? e) Result in a determination by the wastewater treatment provider, which serves or may serve the project that it has adequate capacity to serve the project's projected demand in addition to the provider's existing commitments? No Impact (b, c, d & e) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would increase the need for, or conflict with the current growth projections for water facilities, wastewater treatment or drainage facilities. All public facilities, including water facilities, wastewater treatment facilities and drainage facilities, have been planned and designed to accommodate the growth projections for the City at build-out. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. f) Be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs? g) Comply with federal, state, and local statutes and regulations related to solid waste? No Impact (f & g) - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would conflict with any regulations related to solid waste, or impact the ability to accommodate solid waste disposal needs within the city. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. MANDATORY FINDINGS OF SIGNIFICANCE a) Does the project have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self-sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would have the potential to degrade the quality of the environment, substantially reduce the habitat of a fish or wildlife species, cause a fish or wildlife population to drop below self- sustaining levels, threaten to eliminate a plant or animal community, reduce the number or restrict the range of a rare or endangered plant or animal or eliminate important examples of the major periods of California history or prehistory. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. b) Does the project have impacts that are individually limited, but cumulatively considerable? ("Cumulatively considerable" means that the incremental effects of a project are considerable when viewed in connection with the effects of past projects, the effects of other current projects, and the effects of probable future projects?) No Impact - San Diego Association of Governments (SANDAG) projects regional growth for the greater San Diego area, and local general plan land use policies are incorporated into SANDAG projections. Based upon those projections, region-wide standards, including storm water quality control, air quality standards, habitat conservation, congestion management standards, etc, are established to reduce the cumulative impacts of development in the region. All of the City's development standards and regulations are consistent with the region-wide standards. The City's standards and regulations, including grading standards, water quality and drainage standards, traffic 27 Rev. 07/03/02 standards, habitat and cultural resource protection regulations, and public facility standards, ensure that development within the City will not result in a significant cumulatively considerable impact. The proposed amendments will not affect any policies or standards that would conflict with City or region-wide standards. Also, the proposed amendments do not include a proposal for physical development of any site; therefore, the project will not result in an individually or cumulatively considerable environmental impact. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. c) Does the project have environmental effects, which will cause substantial adverse effects on human beings, either directly or indirectly? No Impact - The proposed amendments do not include a proposal for physical development of any site, and do not propose or affect any policies or standards that would cause substantial adverse effects on human beings, either directly or indirectly. Any future development subject to the amended Car Country Specific Plan will be subject to further environmental review pursuant to CEQA on a site specific basis. 28 Rev. 07/03/02 EARLIER ANALYSIS USED AND SUPPORTING INFORMATION SOURCES The following documents were used in the analysis of this project and are on file in the City of Carlsbad Planning Department located at 1635 Faraday Avenue, Carlsbad, California, 92008. 1. Final Master Environmental Impact Report for the City of Carlsbad General Plan Update (MEIR 93-01). City of Carlsbad Planning Department. March 1994. 2. Carlsbad General Plan. September 6, 1994. 3. Carlsbad Municipal Code. Title 21. Zoning 4. Carlsbad Local Facilities Management Zones 5. City of Carlsbad Geotechnical Hazards Analysis and Mapping Study, November 1992. 29 Rev. 07/03/02