Loading...
HomeMy WebLinkAboutSP 211; Carlsbad Oaks North Phase 2; Specific Plan (SP)Center for Natural Lands Management A non-profit organization for eJ'fyteOfl!nd management of natural resources arfsb~s Via Industria, Suite B Temecula, CA 92590-3751 July 20, 2015 Mr. Ted Tchang, President TECHBIL T CONSTRUCTON CORP. P.O. Box 80036 San Diego, CA 92138 Mr. Van Lynch, Senior Planner City of Carlsbad, Planning Department 1635 Faraday Ave Carlsbad, CA 92008 JUL 2 2 2015 Planning Division Phone: 760.731.7790 Fax: 760.731.7791 www .cnlm.org RE: CENTER FOR NATURAL LAND MANAGEMENT ACCEPTANCE OF LANDSCAPING AND IRRIGATION WITHIN CARLSBAD OAKS NORTH MANUFACTURED SLOPES ADJACENT TO LOTS 22, 23 AND 24 WITHIN OPEN SPACE LOT 12 ("MANUFACTURED SLOPES"). Dear Messrs. Tchang and Lynch: This letter is to inform you that the Center for Natural Lands Management ("Center"), owner of the open space lots within Carlsbad Oaks North, accepts the City of Carlsbad final acceptance and release of the landscaping and irrigation of the MANUFACTURED SLOPES. The Center understands that the MANUFACTURED SLOPE landscaping within Carlsbad Oaks North open space lots 10 and 12 is part of the landscaping as shown on the City of Carlsbad approved landscape plans labeled: CARLSBAD OAKS NORTH PHASE 2, LOTS 13-27 LANDSCAPE CONSTRUCTION DRAWINGS, DATED 11/26/07, DRAWING NO. 415-9N, RW #2512 SHEETS 1-36. The Center understands that final approval of the landscaping on the manufactured slopes by the City of Carlsbad will be part of the overall approval process for the landscaping on the above-mentioned plans. Should you have any questions or need additional information please feel free to call me. Sincerely, David R. Brunner President