Loading...
HomeMy WebLinkAbout2019-11-26; Water Line Break on Avenida Encinas; Quiram, VickiTo the members of the: CITY COUNCIL Date1~CA .!:__CC _!:_ CM ~ COO L DCM (3) _:!;:_ Nov. 26, 2019 CMWD Board Memorandum To: Carlsbad Municipal Water Dist · t Board of Directors From: Vicki Quiram, General Manage Via: Scott Chadwick, Ex~cutive Ma ag Re: Water Line Break on Avenida Ccarlsbad Municipal Water District Memo ID# 2019136 This memorandum provides information related to the repair of a water line break on Avenida Encinas, south of Palomar Airport Road. · Background On Sunday, Nov; 24, 2019, at 10:30 a.m., staff responded to a report of a water line break. Attachment A shows the approximate location of the break and the location of the 10" asbestos cement water main that crosses under the railroad tracks and serves the Hilton Garden Inn on Carlsbad Boulevard and the adjacent Solamar Mobile Estates neighborhood. Attachment B shows a picture ofthe incident. North County Transit District (NCTD) was contacted immediately and responded on-site to grant staff access to the site. Discussion Carlsbad Municipal Water District's (CMWD) system· is designed with redundant water lines, allowing staff to isolate the broken portion of the water main and quickly continue to serve· potable water to the Hilton Garden Inn and residents of the Sola mar Mobile Estates. Until the broken main is completely repaired~ a combination of permanent lines and staff-installed above- ground temporary lines are providing domestic water and fire service to the Hilton Garden Inn and Solamar Mobile Estates. While staff does not anticipate any problems, the City of Carlsbad's Fire Battalion Chief and North County Dispatch have been notified of the situation. Hilton Garden Inn personnel and mobile estate residents have also been provided with emergency phone numbers to contact if there are any concerns. Next Steps • Continue to work closely with NCTD • Deploy a leak detection company to videotape the pipe and assess the location and extent of damage on Tuesday, Nov. 26, 2019 • Hire a contractor with the capability and equipment to make the necessary repairs due to the location, which is in an extremely difficult area for city staff and equipment to access. Carlsbad Municipal Water District 5950 El Camino Real I Carlsbad, CA 92008 I 760-438-2722 Carlsbad Municipal Water District Board of Directors Nov.26,2019 Page 2 Attachments: A. Location Map B. Picture · cc: Elaine Lu key, Chief Operations Officer Celia Brewer, General Counsel Paz Gomez, Deputy City Manager, Public Works Laura Rocha, Deputy City Manager, Administrative Services Michael Calderwood, FirE: Chief Cindie McMahon, Assistant General Counsel Kristina Ray, Communications and Engagement Director Babaq Taj, Interim Transportation Director Amanda Guy, Deputy General Counsel Ken Knatz, District Engineer Eric Sanders, Utilities Manager 0 Water Leak I Main Isolation --Potable Main Reclaimed N A 1 inch = 300 feet