CMWD Board Memorandum
Dec. 5, 2019
To: Carlsbad Municipal Water ·
From: Vicki Quiram, General Mana
Via: Scott Chadwick, Executive M na
Re: Water Line Break on Avenida ncinas Update
Ccarlsbad
Municioal Water District
Memo ID# 2019139
This memorandum provides updated information related to the repair of the water line break on
Avenida Encinas, south of Palomar Airport Road.
Background
On Nov. 26, 2019, a memorandum (Attachment A) was sent to the Carlsbad Municipal Water
District Board of Directors (CMWD Board) with information on a water line break that was
responded to on Sunday, Nov. 24, 2019. The break was on a 10" cement mortar lined steel
(CMLC) water main that crosses under the railroad tracks and serves the Hilton Garden Inn and
the adjacent Solamar Mobile Estates neighborhood on Carlsbad Boulevard.
Discussion
As reported, CMWD staff was able to continue to serve potable water to the Hilton Garden Inn
and residents of the Solamar neighborhood temporarily with a high line. However, the
permanent repair was complicated by the depth of the pipe crossing below the railroad, and an
extremely difficult location to access without specialty contractor equipment and North County
Transit District (NCTD) permits.
Staff has continued to work closely with NCTD and on Nov. 26, 2019, deployed a leak detection
company to use closed circuit television (CCTV) to video the pipe. On Nov. 27, 2019, the leak
detection company provided the results of the video and the location of the water line break was
found. Staff determined that the permanent repair would require contracting with an
experienced construction contractor and a longer lead time than expected.
Staff was keeping Mr. Thomas Lee, Area General Manager of the Hilton Garden Inn, informed on
the progress of the permanent repair. Mr. Lee requested that the temporary high line be
relocated so that it was not visible to the hotel's visitors. Staff presented Mr. Lee with options
and then proceeded to bury and conceal the temporary lines. Attachment B contains pictures of
the temporary configuration of the high line that was agreed upon-and completed on Nov. 27,
2019.
Carlsbad Municipal Water District
5950 El Camino Real I Carlsbad, CA 92008 I 760-438-2722
Carlsbad Municipal Water District Board of Directors
Dec.5,2019
Page 2
On Dec. 3, 2019, staff met with a highly recommended contractor, Cass Arrieta General
Engineering Contractors, to determine a scope of work and cost estimate.
Next Steps
• A scope of work, time frame and cost estimate are expected by Dec. 6, 2019.
• Using the scope of work and cost estimates provided by Cass Arrieta General Engineering
Contr:actors, staff will work with the Public Works Contract Administration Division to
process an emergency contract for repair of the water line, and obtain a project schedule
with an estimated completion date.
Attachments: A. Memorandum dated Nov. 26, 2019
B. Pictures
cc: Elaine Lu key, Chief Operations Officer
Celia Brewer, General Counsel
Paz Gomez, Deputy City Manager, Public Works
Laura Rocha, Deputy City Manager, Administrative Services
Cindie McMahon, Assistant General Counsel
Amanda Guy, Deputy General Counsel
Kristina Ray, Communications and Engagement Director
Ken Knatz, District Engineer
Babaq Taj, Interim Transportation Director
Eric Sanders, Utilities Manager
To the members of the:
CllYCOUNCIL
Date'~CA _!:_CC .!:._
CM ~ COO .l::._ DCM (3) _.:t=,_
Nov.26,2019
CMWD Board Memorandum
To: . Carlsbad Municipal Water Dist · t Board of Directors
From: Vicki Quiram, General Manage
Via: Scott Chadwick, Executive Ma ag
Re: Water Line Break on Avenida
Attachment A
Ccarlsbad
Municipal Water District
Memo ID# 2019136
This memorandum provides informatioh related to the repair of a water line break on Avenida
Encinas, south of Palomar Airport Road.
Background
On Sunday, Nov; 24, 2019, at 10:30 a.m., staff responded to a report of a water line break.
Attachment A shows the approximate location of the break and the location of the 10" asbestos
cement water main that crosses under the railroad tracks and serves the Hilton Garden Inn on
Carlsbad Boulevard and the adjacent Solamar Mobile Estates neighborhood. Attachment B shows
a picture of the incident. North County Transit District (NCTD) was contacted immediately and
responded on-site to grant staff access to the site.
Discussion
Carlsbad Mu~icipal Water District's (CMWD) system is designed with redundant water lines,
allowing staff to isolate the broken portion of the water main and quickly continue to serve·
potable water to the Hilton Garden Inn and residents of the Sola mar Mobile Estates. Until the
broken main is completely repaired, a combination of permanent lines and staff-installed above-
ground temporary lines are providing domestic water and fire service to the Hilton Garden Inn
and Solamar Mobile Estates.
While staff does not anticipate any problems, the City of Carlsbad's Fire Battalion Chief and
North County Dispatch have been notified ofthe situation. Hilton Garden Inn personnel and
mobile estate residents have also been provided with emergency phone numbers to contact if
there are any concerns.
Next Steps
• Continue to work closely with NCTD
• · Deploy a leak detection company to videotape the pipe and assess the location and
extent of damage on Tuesday, Nov. 26, 20~9
• Hire a contractor with the capability and equipment to make the necessary repairs due to
the location, which is in an extremely difficult area for city staff and equipment to access.
Carlsbad Municipal Water District
5950 El Camino Real I Carlsbad, CA 92008 I 760-438-2722
Carlsbad Municipal Water District Board of Directors
Nov. 26, 2019
Page 2
Attachments: A. Location Map
B. Picture
· cc: Elaine Lu key, Chief Operations Officer
Celia Brewer, General Counsel
Paz Gomez, Deputy City Manager, Public Works
Laura Rocha, Deputy City Manager, Administrative Services
Michael Calderwood, Fire Chief
Cindie McMahon, Assi.stant General Counsel
Kristina Ray, Communications and Engagement Director
Babaq Taj, Interim Transportation Director
Amanda GLiy, Deputy General Counsel
Ken Knatz, District Engineer
Eric Sanders, Utilities Manager
0
N
A
water Leak/
Main Isolation
Potable Main
Reclaimed
. h _ 300 feet 1 me -
Attachment B