HomeMy WebLinkAbout; ; Records Management Program AUDIT-Public Works; 2009-03-19CITY OF CARLSBAD
Records Audit
Department: PW - ENGINERING ADMINISTRATION Calendar Year: 2008
Records Manager Review: Cx^S //^"^"l^Lx Date: (£> - }) ~ 0
Department Review: ^JixjtN^T • bdb*.i*A A* - Date:
AUDIT PURPOSE
This audit has been conducted by Records Management staff. The purpose of the audit is to
determine whether the records in your department are created, received, maintained and disposed of
in accordance with the requirements of the Records Management Program. This audit also provides
an opportunity for staff to evaluate the need for additional training and materials, and determine
whether revisions to the current retention schedule are necessary.
The audit elements listed below summarize the audit findings and identify whether each are in
compliance with Program guidelines. Items requiring follow-up are identified in the "Action Itettf'
section in the Audit Summary. Records Management staff will make every effort to ensure these
action items are completed within the designated time period.
We appreciate the time your staff took to participate in this audit You may contact Ronna Stickrod
at 434-2919, if you have any questions or concerns regarding the results of the audit
Records Audit conducted on 03/19/2009 by the following staff members:
Records Staff: TANYA
Department Staff: JAYMR FOSTF.R
Report Reviewed by: Ronna Stickrod'
Records Management Page 1 of 4
Annual Audit Report - PW Engineering Administration Revised 1/09
AUDIT ELEMENT
Records Management Program
(RMP) Training
Records Retention Schedule
(RRS)
Records Destruction
FINDINGS
All staff trained.
Addition requested for Engineering Master
Plans
None
ACTION
None
Action Item 1
None
AUDIT SUMMARY
Findings:
*«• Records staff verified that the Records Management Program has been implemented and is continuing to be
applied to those records for which this department is designated as the "Office of Record" in the Records
Retention Schedule.
*«* SmeadSoft is utilized in this division, and the database has been reviewed for accuracy. A copy of the records
that were randomly selected for review is attached for reference.
V There is no designated staff member who is responsible for maintaining the department's electronic records
stored on the shared community drive. Administrative staff and project engineers manage their own files. A
snapshot of the root directory is attached for reference.
*«* In May 2007, the department participated in a "Free the Files" event, with the goal of cleaning up central
files, teaching department personnel about the value of records versus non-records, and encouraging an
environment where obsolete and duplicate documents are not maintained and stored. A checklist of which
documents to retain and which documents to purge when project files are finaled and being prepared for
storage was provided to staff as part of Engineering's 2007 Records Management Goal. As of the date of this
audit, a large volume of obsolete and duplicate documents continue to be added to project files and are
submitted for long-term offsite storage. File folders created in SmeadSoft at the beginning of a project
frequently remain empty at the close of the project, but are not being pulled from boxes submitted for
storage. The clean-up of project file records for offsite storage is being done at each individual project
engineer's discretion. The purging matrix that was created in 2007 by Engineering staff is not being utilized.
Project files are stored both in central files and in individual offices. Corresponding project files from the
three engineering divisions are not being merged into a single project file prior to being sent offsite, as was
recommended in 2007. See Action Item 2.
*»* The number of records being sent offsite to storage by Engineering has increased dramatically over the past
five years. 757 boxes of records have been added to the inventory since March of 2004, and the number of
boxes sent annually increases every year. A breakdown of the number of boxes reported at Iron Mountain in
previous Records Audit Reports follows:
o March 2004 - 909 boxes
o January 2005 - 1,019 boxes
o February 2006 -1,158 boxes
o March 2008 - 1,440 boxes
o March 2009 -1,666 boxes
Records Management Page 2 of 4
Annual Audit Report - PW Engineering Administration Revised 1/09
If this trend continues, the volume of records being stored offsite will soon become a significant financial and
administrative burden on the city as it rektes to storage costs, retrieval, and staff time spent searching for
requested records. See Action Item 2.
*** Engineering Administration is responsible for storing records offsite at Iron Mountain for
Administration/Capital Projects, Development Services, Traffic, and Construction Management &
Inspections (CM&I). Last year they received approximately 120 record boxes from CM&I for offsite storage.
Another 32 boxes are due to be transferred, all for a single project CM&I is responsible for providing an
inventory describing the records being transferred for offsite storage. There is a department concern about
the volume of records being sent for offsite storage, and the vagueness of the records inventory being
provided. See Action Item 3.
*»* Boxes of records that have been removed from Iron Mountain and destroyed have not been removed from
the Master Iron Mountain inventory. The current retention for records inventories is superceeded plus two
years, therefore they should be updated at least on an annual basis. Also, many boxes are checked out from
Iron Mountain and are being stored onsite indefinitely. Currently 86 boxes show as being checked out or
permanently removed from the Iron Mountain inventory. See Action Item 4.
*»* Soils Reports continue to be scanned when submitted; older reports are scanned as staff time allows.
Engineering Administration staff has expressed an interest in disposing of the hardcopy of Soils and
Hydrology Reports and maintaining only the document in the DMS. See Action Item 5.
*»* Issues regarding boxes of records identified in last year's audit have been resolved. Six Iron Mountain boxes
stored in the Engineering Administration office cabinets were returned to storage. Two boxes of CMWD
records were forwarded to Records Management for review and scanning of relevant documents. Five boxes
of a previous employee's files stored in the supply room were reviewed and purged. Right boxes of Beach
Erosion/Preservation Committee records were reviewed and scanned by Records Management, and
consolidated down to three boxes of permanent records which were returned to storage at Iron Mountain.
*•* Engineering microfiche is currently being stored in offsite storage with Records Management. A working
copy of this microfiche is kept for viewing at Faraday. As staff time and resources allow, Engineering
Administration should review the microfiche and determine the disposition of the records contained in them.
The records may be a duplicate of existing project file records stored offsite.
Action Items:
1. Currently the Master Plan document type designated in the Records Retention Schedule for Engineering has
a significantly shorter retention period than Master Plans identified for other departments. The Engineering
Administration department maintains a number of Master Plans (ex: Pedestrian Master Plan). This retention
period should be evaluated to determine if 0640-30 CU+2 is the correct code for this document type, and if
the retention should be changed to be consistent with other Master Plan retention periods (SU+2 and PE).
2. Records Management recommends that Engineering implement an internal process for reviewing, scanning,
purging and merging project file records prior to sending to offsite storage. This process should include
input from the project engineers and the staff who merge and send the records offsite. Having a standardized
process in pkce would ensure that only relevant record material is maintained in the project files in
compliance with the Records Management Program. This clean-up should also include all corresponding
electronic records stored on community drives, discs, and other media. This is an action item continued from
the 2005 Records Audit Report.
Records Management Page 3 of 4
Annual Audit Report - PW Engineering Administration Revised 1/09
3. Records Management will work with CM&I to ensure only permanent record material with an accurate,
descriptive inventory is being sent to offsite storage.
4. Engineering Administration staff will ensure that boxes of records that have been destroyed are removed
from the Iron Mountain inventory; both with Iron Mountain and in the departmental Excel inventory
spreadsheet An internal check-out log shall also be utilized to follow up on boxes that have been retrieved
from offsite storage. If they will be retained onsite long-term, the department may consider removing them
permanently from the offsite vendor storage inventory. This will ensure that the city is only billed for records
that are archived for long-term offsite storage, and will keep the records inventory current
5. Before paper Soils Reports can be purged as non-records, an effective and consistent quality control process
must be implemented to ensure that the document retained in the DMS is a high quality reproduction of the
original. Records Management will train Engineering staff on the scanning and quality control process for
putting documents in the DMS. When a consistently high level of quality is observed for records being
scanned to the DMS by Engineering, it is recommended that Records Management discuss the options
regarding maintaining the documents in the DMS only.
Records Management Page 4 of 4
Annual Audit Report - PW Engineering Administration Revised 1/09
City of Carlsbad
All Engineering Admin
Barcode First Name Second Name Third Name
EA000010
EA000063
EA000199
EA000253
EA000291
EA000337
EA000398
EA000521
EA000535
EA000578
EA000654
EA000798
EA000942
EA0011C8
EA001176
EA001230
EA001360
EA001621
EA001674
EA001728
EA001905
EA002182
EA002248
EA002421
EA002S44
EA002S88
EA002654
EA002861
3851 CHESTNUT AV
3182 VISTA/CARLSBAD INTERCEPTOR SEWER
3190 RANCHO SANTA FE RD BRIDGE
3190 RANCHO SANTA FE RD BRIDGE
3190 RANCHO SANTA FE RD BRIDGE
3190 RANCHO SANTA FE RD BRIDGE
3455 COASTAL RAIL TRAIL
3480 FACILITY MASTER PLAN - RECLAIMED
3528 S CARLSBAD VILLAGE STORM DRAIN
3549-C MISSION BASIN GROUNDWATER
3583 SAHI PHASE II CANNON LIFT STATION
3667-5 PAVEMENT OVERLAY
3821 LAKE CALAVERA IMPROVEMENTS
3184 CANNON ROAD WEST
3903 WELL ABANDONMENTS/SAN LUIS REY
3675 ENCINA BASIN WATER RECLAMATION II
3889 CALAVERA/D-TANK/BRESSI BOOSTER
3607 ECR & FARADAY IMPROVEMENTS
3814 CANNON RD REACH 4B
3901 FIRE STATION NO. 6
3887G - Rancho Santa Fe Rd North - Phase II
5501 BUENA INTERCEPTOR IMPROVEMENTS
66051 CALLE GAVANZO FRENCH DRAINS
4002 CARLSBAD PEDESTRIAN MASTER PLAN
3858 RANCHO CARRILLO OVERSIZING/EXTENT
5508 BUENA VISTA LIFT STATION FORCE MAIN
5009 MAERKLE FACILITY IMPROVEMENTS
5509 HOME PLANT LIFT STATION REPLACEMENT
Bids
Water Files
Administrative Documents -
Design
Environmental
Reports & Studies #2
Mitigated Negative Declaration
Carollo Eng Agendas
Administrative Documents
Correspondence - State Water
Well Permits
Correspondence
Old City Files
Photos
Correspondence
Planning & Financing
Conference Reports
Utility Companies
News Articles/Photos
Right of Way-1984 Grant
Construction
Capacities/Alternatives Study
Administrative Documents
Environmental
Design
Proposals
Bids
Construction
Agenda Bills - Malcolm Pimie
Fourth Name
Filel of 2
File 3 of 7
Leucadia Wtr - Environmental
File Code
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
106010
Color Location
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Purple
Iron Mountain
Wednesday, February 18,200911:53:16 AH - SmeadSoH Grid Print tbjor Page:1
Q SoW Wart Pmgnm
TER PROOUH
21KB
123KB
66KB
32KB
21KB
49KB
1KB
1KB
Ffc Folder
He Folder
FfcFolder
rternhfer
FfcFokter
Ffc Folder
He Folder
Ffc Fokfcr
ffc Folder
Ffc Folder
Ffc Fatter
FfeFotdrr
FteFOUv
FteFotter
Ffc Fatter
Ffc Fatter
Fie Folder
Ffc Folder
Ffe Fatter
FfcFolder
FfcFolder
Ffc Fatter
FfcFolder
FfcFdder
Ffc Fatter
Wcroaoft Office Ext...
MgOBoft Office Wo...
Mkronft Office Wo. . .
SOI Ffc
TextDoamnt
MkJToaoft Office Exc...
Shortcut
Shortcut
3/3/2009 S: 13PM
2/20/20092: 33PM
12/S/20063:«KPM
12/16/2008 *SOPH
3/10/2009 1:34PM
U/9/200610:«AM
6/liy2D06S:16PM
6/11/2006 5: 16PM
3/3/2009 3: 13PM
3/16/2009 12: 24PM
11/19/2008 ll! 22 AM
1/2/200910:36 AM
3/16/20091: »PM
7/17/2008 2: 39PM
11/19/2006 7:03 PM
6/1 1/20065: 17PM
6/1 1/2006 5: 17PM
2/9/2009 •* 39PM
2/9/2009 4; 42PM
11/3/2008 9: 49 AM
1/23/2009 L-OSPM
3/11/2009 K03PM
8/14/2008 9; 55 AM
3/17/2009 5: 12PM
2/20/2009 4:43 PM
2/27/2009 10:34 AM
3/12/2009 1:24 PM
9/11/200811: 17 AM
3/12/2006 1:43 AM
1/27/2009 5:24 PM
10/2/20086: 58 AM
10/9/20086: 18 AM
11/12/2008 3: 59PM
^Shortcut K Devdopmertt Servicxs
g39vrtcut» BC Ujndieon 2007