Loading...
HomeMy WebLinkAbout; Apartment Complex Poinsettia Lane; Soils Report; 1984-05-16,,,- .,.: SOILS INVESTIGATION APARTMENT COMPLEX Between Camino de las Ondas and Poinsettia Lane Carlsbad, California PREPARED FOR: Lincoln Properties 701 rrB" Street, Suite 1300 San Diego, California PREPARED BY: Ketchum Engineering 9508 Markwood Drive Santee, California 92071 .,- Lincoln Properties May 16, 198& 701 "B" Street, Suite 1300 San Diego, California 8430 Report #l SUBJECT: Preliminary Geotechnical Investigation For Proposed 22 Acre Apartment Complex Between Camino de las Ondas and Poinsettia Lane, Carlsbad, California. Gentlemen: In accordance with your request we have performed an investi- gation of the soil conditions at the subject site. We are transmitting herewith a report of this investigation. .- _- The analysis of our findings is intended to provide the required information to design the foundation and prepare the grading plans for the proposed development. In general, we found the site to be suitable for the proposed development provided the recommendations contained in the body of this report are followed. On site conditions which will require special design considerations will include alluvial removal and recompaction from the swales and moderately ex- pansive soils. If you have any questions after reviewing our report, please do not hesitate to contact this office. This opportunity to be of service is sincerely appreciated. Respectfully Submitted, E.N.Ketchum, R.C.E. 26267 5)Submitted 2)Eugene Roach & Associates KETCHUu ENGINEERING 9508 MARKwoOn DR., SANTEE, CA., 92071. OIS-440-3929 TABLE OF CONTENTS Page Introduction and Project Description .......... 1 Project Scope ..................... 2 Field Explorations ................... 3 Laboratory Testing ................... 3 Findings ........................ . Site Description. ................. 5 Soil Conditions .................. 6 Groundwater .................... 7 Conclusions. ...................... 8 Recommendations. .................... 9 Site Preparation. ................. 9 Demolitions, Clearing and Grubbing ...... 9 General. ................... 9 Selective Grading For Potentially Expansive Soils .............. 9 Transition Lots. .............. '.lO Areas To Be Paved. ............. .lO Moisture Content For Fill Soils. ...... .ll Subdrains. ................. .11 Select Imported Fill Material. ........ .ll Earthwork. ................. .ll Slope Stability ................. .12 General. .................. .12 Temporary Slope Stability. ......... .12 Foundations ................... .13 General. .................. .13 Alternative I ............. .13 Alternative II. ............ .13 Alternative III ............ .15 Settlement Characteristics. ...... .16 Earth Retaining Structures. ........... .16 General. .................. .16 ,- ,/- ,- ,~-- Pa e Backfill .................. 1E Allowable Soil Bearing Pressure. ...... .16 Ultimate Passive Pressure. ......... .16 Ultimate Active Pressure ........... .17 Factor Of Safety .............. .17 Limitations. ..................... .18 ,‘- ,/- ATTACHMENTS PLATES Plate 1 Site Plan Plate 2 Subsurface Exploration Legend Plates 3-13 Subsurface Exploration Logs Plate 14 Direct Shear Test Results Plate 15 Grain Size Distribution Plate 16 Typical Canyon Subdrain Plate 17 Detail-Weakened Plane Joint APPENDIX Recommended Grading Specifications - General Provisions and Special Provisions ,- GEOTECHNICAL INVESTIGATION ,Y- 22 ACRE APARTMENT COMPLEX BETWEEN CAMINO DE LAS ONDAS AND POINSETTIA LANE CARLSBAD. CALIFORNIA INTRODUCTION AND PROJECT DESCRIPTION This report presents the results of our geotechnical in- vestigation for the proposed 22 acre site located between Camino de las Ondas and Poinsettia Lane. The site location is shown on the Vicinity Map provided as Figure 1. It is our understanding that the site is to be developed by the construction of one and two story. wood frame stucco exterior structures with slab-on-grade construction. It is further understood that because of the rolling hills type site, a moderate amount of grading is anticipated. To assist in the preparation of this report, we were pro- vided with a topography map. Site plans have not been developed as of this writing. The site configuration and locations of our subsurface explorations are shown on the site plan on Plate Number 1 of this report. ,- KETCHUM ENGINEERING 9508 MARKWOno DR., SANTEE. CA., 92071, S19-44D-3929 FIGURE 1 ,‘- I -------;-.---- I I I I I som Cm‘Ss, m,m~ .-------+------~ ‘..*.++-l-.-.-. -.-.I _ UGOON 1 1 0 --w \. Yt -+.e.+., I KETCHUM ENGINEERING 9508 MAAKWOlIo OR,, SANTEE, CA., 92071, 019-440-3929 Page 2 PROJECT SCOPE This investigation consisted of: surface reconnaissance; subsurface explorations: obtaining representative dis- turbed and undisturbed samples; laboratory testing; analysis of the field and laboratory data: research of available geological literature pertaining to the site; and preparation of this report. Specifically, the intent of this study is to: a) Explore the subsurface conditions to the depths influenced by the proposed construction. b) Evaluate, by laboratory tests, the pertinent engineering properties of the various strata which will influence the development, including their bearing capacities, expansive characteristics and settlement potential. cl Define the general geology at the site including possible geologic hazards which could have an effect on the site development. d) Develop soil engineering criteria for site grad- ing and provide design information regarding the stability of cut and fill slopes. e) Determine potential construction difficulties and provide recommendations concerning these problems. f) Recommend an appropriate foundation system for the type of structures anticipated and develop soil engineering design criteria for the rec- ommended foundation design. KETCHUrn ENGINEERING 9508 MARKWOCI~ DR,, SAQNTEE, CA., 92071, fils-440-3929 Page 3 FIELD EXPLORATIONS ..- Eleven subsurface explorations were made at the locations indicated on the attached Plate Number 1 on April 27, 1984. These explorations consisted of backhoe trenches. The field work was conducted under the observation of our engineering personnel. The explorations were carefully logged when made. These logs are presented on the following Plate Numbers 3 through 13. The soils are described in accordance with the Uni- fied Soils Classification System as illustrated on the attached simplified chart. In addition, a verbal textural description, the wet color, the apparent moisture and the density or consistency are given as either very loose, loose, medium dense, dense or very dense. The consis- tency of silts or clays are given as either very soft, soft, medium stiff, stiff, very stiff, or hard. Disturbed and undisturbed samples of typical and rep- resentative soils were obtained and returned to the laboratory for testing. LABORATORY TESTING Laboratory tests were performed in accordance with the generally accepted American Society for Testing and Materials (S.S.T.M.) test methods or suggested pro- cedures. A brief description of the tests performed is presented below: a) Moisture-Density: Field moisture content and dry density were determined for representative samples obtained. This information was an aid ,- KETCHUM ENGINEERING 9508 MARKWO00 DR., SANTEE, CA., 92071, ~19-443-3929 Page 4 to classification and permitted recognition of variations in material consistency with depth. The dry unit weight is determined in pounds per cubic foot, and the field moisture content is determined as a percentage of the soil's dry weight. The results are summarized in the trench logs. b) Classification: Field classifications were ver- ified in the laboratory by visual examination. The final soil classifications are in accordance with the Unified Soil Classification System. cl Direct Shear Tests: Direct shear tests were per- formed to determine the failure envelope based on yield shear strength. The shear box was de- signed to accomodate a sample having diameters of 2.375 inches or 2.50 inches and a height of 1.0 inch. Samples were tested at different vertical loads and at saturated moisture content. The shear stress was applied at a constant rate of strain of approximately 0.05 inches per min- ute. The results of these tests are presented on attached Plate Number 14. d) Compaction Test: The maximum dry density and optimum moisture content of typical soils were determined in the laboratory in accordance with A.S.T.M. Standard Test D-1557-70, Method A. The results of these tests are presented on the at- tached Plate Number 14. KETCHUM ENGINEERING 9508 MARKWCCC CR., SANTEE. CA.. 92071~ 019-440-3929 Page 5 e) Expansion Index: The expansion index of clayey soils was determined in accordance with U.B.C. Standard Number 29-2. The typical clayey silty sandstones were determined to have an expansion index of 13 which would be classified as having a low potential for expansion. The clayey soils found in Trench T-l+ @ 7' would be classified as having a medium expansive potential with an E.I. of 80. These clayey materials would, however, have a high expansive potential in their present un- disturbed state. f) Grain Size Distribution: The grain size dis- tribution was determined for representative sam- ples of the native soils in accordance with A.S.T.M. Standard Test D-422. The results of these tests are presented on Plate Number 15. ,‘- FINDINGS SITE DESCRIPTION: The 22 acre, undeveloped site, is an irregular parcel of land that is bounded on the north by Camino de las Ondas, on the east and west by graded residential property, and on the south by Poinsettia Lane. Buttercup Road traverses the southern portions of the property. This newly constructed road has a box culvert running north to south that will drain the entire site. The rest of the property is drained by sheet flow to the natural and man-made swale that traverses the parcel along the western side from the north to the south. A de- silting basin exists on the north side of Buttercup Road. There is a 2:l engineered fill slope on this parcel that has been constructed all along the western property line by the adjacent development. On-site vegetation consists of the natural grasses and shrubs. ,- KETCHUM ENGINEERING 9508 MARKWCCo CR., SANTEE. CA., 92071 n1s-44o-3s2s Page 6 I- I SOIL CONDITIONS: In general, this site is underlain by Pleistocene sed- iments or moderately cemented sandstones which consist of brown to reddish brown, medium dense to dense silty and clayey sands. The topsoils consisted of a loose to med- ium dense, tan to reddish brown silty sand, that ranged in thickness from about 2.5, 0.5 and 2 feet in trenches T-l, T-4, and T-7. The more recent alluvial deposits in the drainage swales consist of loose to medium dense silty sands and dark brown soft to medium stiff sandy silts. These alluvial soils were found to be about 6, 1.5, and 2 feet in thickness for trenches T-2, T-3, and T-11 re- spectively for the northerly east-west swale. For the southerly northeast to southwest swale, the alluvial mater- ials were determined to be about 10 feet in thickness for trench T-6. In trench T-5, our backhoe trench was ex- tended to its maximum limit of 16 feet below the surface but we did not encounter natural materials. It is an- ticipated that competent natural soils would .be encoun- tered at depths on the order of 18 to 20 feet as indicated by the very wet soils found at a depth of about 15 feet. It is common for water to be perched or present in an alluvial swale just above dense natural materials. Although no backhoe trenches were extended to the small parcel between Buttercup and Poinsettia Lane, the soils are anticipated to be comprised of the natural, reddish brown, moderately indurated sandstones, that were found on the majority of the remainder of the site. The desilting basin just north of Buttercup Road appears to have had all the alluvial soils removed from the drainage swale and replaced by a compacted engineered KKTCHUM ENGINEERING 9508 MARKWQOCI OR., SANTEE, CA., 92071, RIS-440-392s Page 7 ./- , ,-- ,r-. fill. This procedure was probably done at the time Buttercup Road was constructed. There is a highly expansive clay layer that is about 3 feet in thickness that was found in trench T-l, at a depth of about 6.5 feet. GROUNDWATER: Although no standing groundwater table was encountered during our subsurface exploration, we did find very wet soils at the bottom of the trench T-5. It is anticipated that groundwater conditions will be encountered during the removal of the alluvial materials in this swale. No other groundwater conditions were encountered in any of our other subsurface explorations and we do not anticipate any major groundwater related problems, either during or after con- struction. However, it should be recognised that minor groundwater seepage problems may occur after development of a site, even where none were present before development. These are usually minor phenomena and are often the result of an alteration of the permeability characteristics of the soil, an alteration in drainage patterns and an in- crease in irrigation water. Based on the permeability characteristics of the soil and the anticipated usage of the development, it is our opinion that any seepage prob- lems which may occur will be minor in extent. It is further our opinion that these problems can be most effectively corrected on an individual basis if and when they develop. KETCHUM ENGINEERlNG 9508 MARKWCCC OR., SANTEE, CA., 92071. RIS-440-3929 Page 8 CONCLUSIONS Based on the findings of this study, we conclude that, with respect to geotechnical aspects, the subject site is suitable for the proposed project provided the recommenda- tions contained in this report are fully complied with. The topsoils and alluvial soils in the on-site drainage swales should be removed and replaced as an engineered fill prior to receiving any fill and/or structural loads. This procedure is recommended because these materials were determined to be loose in consistency, porous in nature and subject to excessive consolidation if loaded and al- lowed to come in contact with appreciable amounts of water. Because some of the soils within this formation were determined to have a medium expansive potential, some special earthwork procedures and foundation design re- quirements will be recommended. We further suggest that any highly expansive, clayey soils encountered during earthwork procedures be placed at least 2.5 feet below proposed finish grade. If buildings or structural loads are to be placed over the existing desilting basin, then the compaction report (if it exists) should be located and checked by this office for proper natural ground preparation and test results prior to earthwork procedure. If no compaction report is available for this area, then the soils beneath these proposed structures should be removed and replaced as an engineered fill. KETCHUM ENGINEERING 9508 MARKWCX!Zl~ DR., SAN~TES, CA., 92071~ SlS-440-3929 ,- Page 9 RECOMMENDATIONS SITE PREPARATION r- DEMOLITIONS, CLEARING AND GRUBBING: During site prepara- tion all debris and deleterious materials derived from demolition clearing and grubbing operations should be legally disposed of off-site. Any existing utilities that will not be utilized should be removed and properly capped off at the property line. The removal of trees should in- clude the removal of their rootballs. The depressions resulting from the above operation should be backfilled with soil that has been compacted to at least 90% relative compaction. GENERAL: Beneath all areas to receive structural building loads, fill soils, or asphalt pavements, we recommend that the loose top soils and alluvial materials be removed to firm natural ground and stockpiled for future use. Firm natural ground is defined as soil which possesses an in- place density equal to or greater than 85% of its maximum dry density. The soils at the bottom of the excavation should be scarified to a minimum depth of 6 inches, watered if necessary, and compacted to at least 90% relative com- paction. The stockpiled soils may then be replaced and compacted in 6 to 8 inch lifts to at least 90% relative compaction. The above recommendations should include the area within 5 feet beyond the building perimeters. SELECTIVE GRADING FOR POTENTIALLY EXPANSIVE SOILS: Al- though the typical clayey silty sandstones underlying most of this site were determined to have a low potential for expansion, there,are some moderately to highly expansive soils within this sedimentary formation. Therefore, it KETCHUM ENGINEERING 9508 MARKWWQlI DR., SANTEE, CA., 92071, GIS-44Q-3923 Page 10 is recommended that wherever expansive soil is used in fill, it be placed a minimum of 2.5 feet below finish grade and wherever it occurs within 2.5 feet of finished cut grade, it be removed and be replaced with nonexpansive soils. The lateral extent of this recommendation shall apply to the area within a perimeter of ten feet outside of the proposed structure. Conventional footing designs may then be used for the proposed structure. If it is found infeasible to cap all of the building pads with nonexpansive soils as recommended above, then the degree of expans.iveness of the soils on each lot contain- ing expansive soils in the upper 2.5 feet will have to be determined at the completion of grading in order that special foundation recommendations can be developed to minimize potential damage resulting from expansive soils. Please refer to the 'foundation recommendations' section of this report for design suggestions. TRANSITION LOTS: Foundations supported partially on cut and partially on fill are not recommended. The tendency of cut and fill soils to compress differently will prob- ably result in unequal structural support and consequen- tial cracking. Therefore, in transition areas, we recommend that the entire area be undercut and be replaced with soils compacted to a minimum of 90%. The undercutting should be carried to a depth of 1 foot below the base of the deepest footing. AREAS TO BE PAVED: The subgrade soils beneath all areas to be paved should be densified to at least 90% to a depth of at least 12 inches. ,- KETCHUM ENQINEKRING 9508 MARKWOCIC CR., SANTEE, CA., 92071~ SIS-440-392s Page 11 MOISTURE CONTENT FOR FILL SOILS: All fill soils should be placed with moisture contents of at least 3% over op- timum moisture content. SUBDRAINS: We recommend that a 4 inch perforated drain line,surrounded with at least 3 cubic feet of crushed rock per lineal foot of line, be placed in the bottom of channels to attempt to alleviate any subsurface seepage that could collect in these areas from seeps and/or irri- gation after development. Please refer to Plate Number 16. This recommendation is subject to review once the grading plans have been completed and reviewed by this office. SELECT IMPORTED FILL MATERIAL: Imported fill material should consist of granular, nonexpansive soil that con- tains no organic or deleterious materials. It shall have sufficient cohesion to hold a vertical or near vertical cut for footing excavations. It shall have at least 85% of the material passing the Number 4 sieve with no rocks or chunks larger than 14 inches. The import fill should be approved by our office prior to it being delivered to the site. EARTHWORK: All earthwork and grading contemplated for site preparation should be accomplished in accordance with the attached Recommended Grading Specifications and Special Provisions. All special site preparation recom- mendations presented in the sections above will supercede those in the Standard Recommended Grading Specifications. All embankments, structural fill and fill should be com- pacted to a minimum of 90%. Utility trench backfill with- in 5 feet of the proposed structures and beneath asphalt pavements should be compacted to a minimum of 90% of its ‘- KETCHUM ENGINEERING 9508 MARKWOClo OR.. SANTEE, CA., 92071. SIS-440-3929 Page 12 maximum dry density. The maximum dry density of each soil type should be determined in accordance with A.S.T.M. Test Method 1557-702, Method A or C. SLOPE STABILITY: GENERAL: The cut and fill slopes constructed from the native on-site materials will be stable with relation to deep-seated failures if constructed at, or flatter than, the following recommended slope ratios expressed in hor- izontal to vertical units for the indicated heights: Cut Slopes to 50 Feet in Height: 2:l Fill Slopes to 40 Feet in Height: 2:l The above. maximum heights were determined by using a fac- tor of safety of 1.5. It is also recommended that footings not be founded nearer than five feet measured horizontally inward from the face of the slopes. Slopes should be planted with erosion resisting plants and natural drainage should be directed away from the top of all slopes. TEMPORARY SLOPE STABILITY: The following table presents recommendations relative to temporary construction ex- cavations. These slopes should be relatively stable against deep-seated slope failures but nay experience localized sloughing. Slope Ratio Maximum Height of Temporary (Horizontal to Vertical) Excavation (Feet) 0.75 : 1 15 Vertical 5 KETCHUrn ENGINEERING 9508 MARKWOCJII OR., SANNTE, CA., 92071~ QIS-aon- Page 13 .- ,-- It should be the contractor's responsibility to provide safe support for the excavation. No heavy equipment should be allowed adjacent to the top of the temporary cuts. FOUNDATIONS GENERAL: In consideration that both nonexpansive soils and expansive soils exist on-site and since it is not known at this time if all building pads will be capped with non- expansive soils, the following three alternative recommen- dations are submitted: Alternative I: Construction on Nonexpansive Soils: (E.I. less than 20). Structures founded on lots containing nonexpansive soils within 2.5 feet of finished grade may be constructed using conventional spread footings. Spread footings should have a minimum width of 12 inches and should be founded at least 12 inches below adjacent finished grade for one and two story structures. Footings on nonexpansive soils may be designed for an allowable soil bearing pres- sure of 2500 psf. These footings should be reinforced with one No. & bar top and bottom. Alternative II: Construction On Moderately Expansive Soils: (E.I. less than 90%). The following recommenda- tions are provided for construction on the expansive soils. a) Conventional spread footings should be founded a minimum of 12 and 18 inches below the lowest adjacent finish grade for one and two story structures, and have a minimum width of 12 and 15 inches respectively. KETCHUM ENGINEERING 9508 MARK’JJOCl0 CR., SAN~TEE. CA., 92071. Fjis-440-3929 Page 14 b) All footings may be designed for an allowable soil bearing pressure of 2000 psf. c) Both exterior and interior continuous footings should be reinforced with one #4 bar positioned near the bottom of the footings and one #4 bar positioned near the top of the footing. d) Interior slabs for living areas should be a minimum of 3h inches thick, underlain by a 4 inch blanket of clean sand or crushed rock, reinforced with 6~tx6n-10/10 welded wire mesh and completely surrounded with a continuous footing. Interior slabs not used for living areas such as garages need not be underlain by sand or rock. e) Exterior slabs should be a minimum of 34 inches thick. Walks or slabs five feet in width need not be reinforced. Those exceeding. five feet in width should be reinforced with 6"x6"-lo/10 welded wire mesh. f) Surface drainage should be directed away from the proposed foundation. Over-irrigation of areas adjacent to foundations and slabs should be avoided. g) Adjacent footings founded at different bearing levels should be so located that the slope from bearing level to bearing level is flatter than one horizontal to one vertical. KETCHUM ENGINEERING 9508 MARKWOCID OR,, SANTSE, CA,, S207q. Q19-440-3929 Page 15 h) Prior to pouring concrete, the foundation ex- cavations should be inspected by a representative of this office to determine if the recommenda- tions in this report have been followed. Alternative III: Construction On Highly Expansive Soils: (E.I. greater than 90%) The following recommendations are provided for construction on the expansive soils. a) All footings should be founded a minimum of 24 inches below adjacent finish grade and may be designed for an allowable soil bearing pressure of 1800 psf. Footings should have a minimum width or diameter of 12 inches. b) Both exterior and interior continuous footings should be reinforced with two Number 4 bars positioned 3 inches above the bottom of the footings and two Number 4 bars positioned 4 inches below finish floor. cl Weakened plane joints for exterior slabs should be provided for any slab greater than ten feet in width. Any slabs between 5 and 10 feet should be provided with a longitudinal weakened plane joint at its center line. Slabs exceeding 10 feet in width should be provided with a weak- ened plane joint located 3 feet inside the ex- terior perimeter. Both transverse and long- itudinal weakened plane joints should be con- structed. Please refer to Plate Number 17. Items "d" through "h" of Alternative II are also applicable. ,- KETCHUM ENGINEERlNG 9508 MARKWCICC CR., SANTEE. CA., 92071. GIS-440-392s Page 16 Settlement Characteristics: The anticipated total and/or differential settlements for the proposed structure may be considered to be within tolerable limits provided the recommendations presented in this report are followed. EARTH RETAINING STRUCTURES: GENERAL: Retaining structures may be planned for this project. The following criteria may be used for design purposes. BACKFILL: All backfill soils should be compacted to at least 90% relative compaction. Expansive or clayey soils should not be used for backfill material within a distance of 5 feet from the back of the wall. The retaining struc- ture should not be backfilled until the materials in the wall have reached an adequate strength. -. ALLOWABLE SOIL BEARING PRESSURE: The foundation for the proposed retaining structures should consist of spread footings founded in the firm native soils or compacted fill. Firm natural ground is defined as soil having an in-situ density of at least 85% of its maximum dry density. Footings may be designed for an allowable bearing pressure of 2000 psf. ULTIMATE PASSIVE PRESSURE: The passive pressure for pre- vailing soil conditions may be considered to be 290 pounds per square foot per foot of depth. This pressure may be increased one-third for seismic loading. The coefficient of friction for concrete to soil nay be assumed to be .31 for the resistance to lateral movement. When combining frictional and passive resistance, the latter should be reduced by one-third. KETCHUM ENGINEERING 9508 MARKWOCJD OR.. SANTEE, CA., 32071. Rls-440-392s Page 17 ULTIMATE ACTIVE PRESSURE: The ultimate soil pressure for the design of earth retaining structures with level back- fills may be assumed to be equivalent to the pressure of a fluid weighing 41 pounds per cubic foot for walls free to yield at the top (unrestrained walls). For walls with a 2:l backfill slope we recommend an equivalent fluid pressure equal to 47 pcf. For earth retaining structures that are fixed at the top (restrained walls), an ultimate equivalent fluid pressure of 65 pounds per cubic foot may be used for a design parameter. These pressures do not consider any surcharge loading (other than the sloping backfill). If any surcharge loadings are anticipated, this office should be contacted for the necessary increase in soil pressure. All earth retaining structures should have adequate weep holes or a subdrain system to prevent the buildup of hydrostatic pressure behind the wall. FACTOR OF SAFETY: The above values, with the exception of the allowable soil bearing pressure, do not include a factor of safety. Appropriate factors of safety should be incorporated into the design of all earth retaining structures to reduce the possibility of over turning and sliding. <.. K.E T C H U M ENGINEERING 9508 MARKWCOC CR.. SANNTEE, CA.. 92071. SIS-440-3323 Page ia LIMITATIONS REVIEW, OBSERVATION AND TESTING The recommendations presented in this report are con- tingent upon our review of final plans and specifica- tions. The soil engineer and engineering geologist should review and verify the compliance of the final grading plan with this report. It is recommended that a qualified soils engineering firm be retained to provide continuous soil engineering services during the earthwork operations. This is to observe compliance with the design concepts, specifi- cations or recommendations and to allow design changes in the event that subsurface conditions differ from those anticipated prior to start of construction. UNIFORMITY OF CONDITIONS The recommendations and opinions expressed in this re- port reflect our best estimate of the project require- ments based on an evaluation of the subsurface soil conditions encountered at the subsurface exploration locations and the assumption that the soil conditions do not deviate appreciably from those encountered. It should be recognised that the performance of the found- ations and/or cut and fill slopes may be influenced by undisclosed or unforeseen variations in the soil conditions that may occur in the intermediate and un- explored areas. Any unusual conditions not covered in this report that may be encountered during site development should be brought to the attention of the soils engineer so that he may make modifications if necessary. KETCHUM ENGINEERING 9503 MARKWOOO OR., SANTEE, CA., 92071 613-aaa-392s CHANGE IN SCOPE Page 19 This office should be advised of any changes in the pro- ject scope or proposed site grading so that it may be determined if the recommendations contained herein are appropriate. This should be verified in writing or modified by a written addendum. TIME LIMITATIONS The findings of this report are valid as of this date. Changes in the condition of a property can, however, occur with the passage of time, whether they be due to natural processes or the work of man on this or adjacent properties. In addition, changes in the State-of-the-Art and/or Government Codes may occur. Due to such changes, the findings of this report may be invalidated wholly or in part by changes beyond our control. Therefore, this report should not be relied upon after a period of two years without a review by us verifying the suitabil- ity, the conclusions, and recommendations. PROFESSIONAL STANDARD In the performance of our professional services, we comply with that level of care and skill ordinarily exercised by members of our profession currently prac- ticing under similar conditions and in the same local- ity. The client recognizes that subsurface conditions may vary from those encountered at the locations where our borings, surveys, and explorations are made, and that our data, interpretations. and recommendations are based solely on the information obtained by us. We will be responsible for those data, interpretations, KETCHUM ENGINEERING 9500 MAAKWOOD OR., SAiNTEE, CA., 92071 61S-aaa-3929 Page 20 and recommendations, but shall not be responsible for the interpretations by others of the information devel- oped. Our services consist of professional consultation and observation only, and no warranty of any kind what- soever, express or implied, is made or intended in con- nection with the work performed or to be performed by us1 or by our proposal for consulting or other services, or by our furnishing of oral or written reports or find- ings. .- CLIENT'S RESPONSIBILITY It is the responsibility of the owners, or their rep- resentative to ensure that the information and recom- mendations contained herein are brought to the attention of the engineer and architect for the project and incor- porated into the project's plans and specifications. It is further their responsibility to take the necessary measures to e.nsure that the contractor and his subcon- tractors carry out such recommendations during con- struction. _- KETCHUM ENGINEERING 9508 MARKWCCD CR,, SANTEE, CA,, 92071 61S-aaa-3923 SUBSURFACE EXPLORATION LEGENO uws.co MP.# wsIr*cmI~ aAm 50u. oescsrPrr~ !ac- Sy?cBQC TyPLmL WACS 1. coAns* aAIMD. aNa=. than h*lr ot mt*ria1 ir m than LTo. 100 riwe rlr*. - CLEAN GIZIMLS GT ~.I1 gnd.d grav*1r. gravel- MOZ. than halt of SalId q ixtur.,, litth *Iz ILO eolna tacticn is teas. 1*rg.r than LTO. 4 OP PImay graded grav*1r. gnv*l r1.v. sic?. hue #and slxar*r. 1iet1a o+ no rm.11.r than 3'. iiNS. Mvu.S WITn rIm.9 GM Silty grav.1,. p.xrly gradad (Apprasi*l* aowunt gr~“.l-,and-*ilt mixeur.,. or rima .u: c1ay.y grw.1,. pQor1y przKl.d grrv*1-*and. clay mlxrurea . wehan halt ot- SAN0S SW we11 glad.d rand. pra".lly s*nds, tiCtl* or no finer. c0a.n. trueion is SP Poorly *zad.d rh-as.grav*llY rma11.r than NO. 4 sands. lit+l* or no tin*,. Sl.". *iz.. SWDS WPm FINES SM Silty sand,. poc~ly g+ad.d (Appr~eiabh mount sand and rile mixtures. ot !Zinerl SC Clayey randr. poorly graded ran* a"* clay mixtures. Il. PRCS GWNCD. nor. ehrn h.1L af m.t.rial is u than HO. 200 slwe liza. SILTS Am CLAYS .* Inorganic rilcr and v*ry tin. sands, Cock t1our. sandy silt ok- clay.y-*ile-smd mix+ur~l with rlipht plasc- icity Liquid Limit a Incrqanic clays ot led to 1.r. than 50 m.dium pl*srisiey.~ra”.lly c1*ys. randy elays.siky clay‘, 1.m clay,. Q‘ Orqanic riLcr and organic silty clays ot 10.1 plarticicy sn.?s m CLAYS m Inorganic silts. micaceous as dtatomac.ous tine sandy or riley soils, l larric silt,. Liquid Limit CH Inorqanic clays ot high gr.a+.r ehln 50 plasticity, tat clays. OH orqmic clays ot medium co high plarcicity. irI0ta.Y QRGiLYIC SOTIS PT p.*c and 0el.r hiqhly organic rolls. $ - Water level at time of excavation or as indicated us - Undisturbed, driven ring sample or tube sample CK - Undisturbed ci~nk sample as - Bulk sample KETCHUM ENGINEERING LINCOLN APARTMENTS 1 By ENK m7z 5/15/a& Jo8 *. 8430 Plate #2 --. . ._~~. ~. .-.-.-.. .-. -. .-... -.- .~ - _. .-A ___,-._.- z ii 2 ; TRENCH NUMBER T-l ; ; g 4 : ; ,z z f z = < uf 0 Au- := ww;; a:2 : z+ 2 E Y sy ELEVATION :!f? Ul= I- 2 : c 0 0 *nv, 2;; z 0 IJ -P i?; : :I” :z r= O,=a i’ : :, E” z :z ; 0 DESCRIPTION 0 0 SM Tan silty sand Dry Loose (top soil) _ Bk Med; Dense , - Ck I - SM Tan to brown silty Humid Dense sandstone , - , - SI$ Dark greenish gray Moist Med. brown clayey and - Dense- silty sandstone Dense BOTTOM - - SUBSURFACE EXPLORATION LOG KETCHUM ENGINZERING LOGGED BY: ENK DATE LOGGED: 27181, JO8 NUMBER: 8~30 Plate #3 5 ;i 0” 2 TRENCH NUMBER T-2 sg +;* : us ; -: = 2” *rt u 0 :: Luym Gi : ;E 2 c G ELEVATION P$Z Y ij l * ;s : a. *o;;. 25 2;;: 2 “-E 2: i r: ;=a :* ;; : :, <2 go z =0 ; OESCR.lPTlON s 0 SM Tan-brown silty sand Dry Loose (alluvium) l- ?- _ CK Humid Loose- 3 Med. - Dense Moist 1- 5 -- Very _ CK Loose 96.9 3.7 . 5 _ CK SM/ Red brown clayey and - Humid- Med. SC 97.6 12.5 . silty sandstone ?- Dense- (slightly weathered) Dense - 3- - ) BOTTOM SUgSURFACE EXPLORATION LOG KETCHUM ENGINEERING LOGGED BY: ENK DATE LOGGED: L/27/8/. JOB NUMBER: 8430 Plate #4 :, 2 : ; TRENCH NUMBER T-3 ; ; ; $ : = Yij z -: 2 4 w 0 := ww;; ;i 2 Au- :+ ?F g ,L ELEVATION LL;z Y *In s= c 2 2; : “zj : 25 2;: “i fn u 2 <2 :2&x 5; ;g :, : E” 5 20 0 =0 DESCRIPTION 0 0 SM ~~~~~,~~~~;,~;~~~ sand Dry Loose tc Med. Dense ) - SM Dark brown silty sand Moist Med. (weathered sandstone) Dense _ CK 105.6 13.4 - BOTTOM 7 j SUBSURFACE EXPLORATION LOG ~ KETCHUM,ENGINEERING LOGGED BY: ENK DATE LOGGED: 4,27,8; JOB NUMBER: 8130 Plate #5 0’ ii z! ; TRENCH NUMBER T-& 2 ; ,t* z uz z f z < trc w 0 :: ;j = 22 vl~ol PC+= 5+ 2: I y ou ELEVATION tw := c 2 c 0 2 : 2 “cj ,‘,x 0 0 v) w its -0 2: :o’g 5; : :, <I := : s s 0 0 0 u DESCRIPTION 0 0 0 - SM 7;: k;;; silty sand Dry Loose l- CK ' P SM Tan silty sandstone Humid Dense slight clay binder 2- - 3- . . 4- CK - 5- - - 6- v 7- CL Olive green sandy clay Damp Very 96.1 la.8 _ BG Stiff a- 3- 3- Increased sand content L BOTTOM I SUBSURFACE EXPLORATION LOG KETCRUM,ENCINEERING LOGGED BY: ENK DATE LOGGED: 27/aL JOB HUYEER: a43o Plate #6 z E w 0 2; 5: tag =0 0 , I , ! ; ! , t i lRENCH NUMBER T-5 ZLEVATION 1’ 2' 3’ 5’ 5. ?- 3- ?- I- t- s- I- j- i- t 3M Light brown-red brown silty sand (alluvium) Dry Loose -B IL IL S Dark brown sandy silt (alluvium) Humid Soft Silt, clay and sand Med. mixture Stiff 11.5 .08.6 .X+.2 14.2 - IL Dark brown silt (alluvium) Moist Damp Damp weL Med. Stiff ;M M: Red brown silty sand (alluvium) Loose- Med. Dense s: Red brown slightly silty sand (alluvium) 1 Loose- Ied.Dens -L KETCHUM,ENGINEERING LOGGED BY: ENK DATE LOGGED: 4127184 JOE NUYBER: 8430 Plate #? ,,- :, z : c 0 : > ; TRENCH NUMBER ~4 *a : z *,= i”, Z? zzt - uz 5 ; y s c ELEVATION ;K$ : l” 2 ‘,r z 2,; W= 5+ 2 : ; “Z 0 0 : 2: 2=a -Pi $i : ;: Z” z 0’: 3 0 2; ; 0 =0 DESCRIPTION 0 0 SM Tan silty sand Dry Loose (alluvium) l- 2 ML Dark brown sandy silt Moist Soft (alluvium) 3- /+ CK SM ~;~l~fp;;,silty sand Damp Loose 5- Wet - 5- - 7- 3- )- 1 SM/ Dark red brown clayey Damp Med. SC silty sand (weathered Dense sandstone) , nZi3e- CK VeryDense BOTTOM SUBSURFACE EXPLORATION LOG KETCHUM ENGINEERING LOGGED BY: ENK DATE LOGGED: 2?/8L JOE NUMBER: 8430 Plate #S ,- ,- 3’ :- j- - ;- ?- 3’ ?- 7- - G rRENCH NUMBER T-., ELEVATION OESCAIPTION Red brown silty clayey sand Red brown silty sand- stone with slight clay binder BOTTOM Dry Humid Loose- Med. Dense Med. Dense Dense SUBSURFACE EXPLORATION LOG KETCHUM,ENGINEERING LOGGED BY: ENK DATE LOGGED: L/27laL JOE NUlA8ER: a430 Plate #9 1 : z z! p TRENCH NUMBER T-8 c Y ; $ = E uz 3 7 - t < z= w 0 = -ro_ w;j :E : :* ? c 0’ Y ELEVATION : !5 SEW ;; ;: 2: 0 “&. 1L - i 4 0 2”O -0 Y l s 5; ii o ITi z <Z” z = 0 0 =0 OESCR~IPTION 0 0 SM Red brown silty sand Humid Me~d.Densc (fill) l- 2- 3- 4- 5- 6- SM Humid Loose- hf:lyrown,silty sand Med. Dense 7- a- - CK - 9 SM Red brown silty sand- Humid Med. stone o- Dense ( Natural) l- BOTTOM SUBSURFACE EXPLORATION LOG KETCHLJM,ENGINEERING LOGGED BY: ENK DATE LOGGED: L,27,a4 JOE NUMBER: a4~o Plate #lO ,- L - m > - 3 - m 1- m j - s ;- I - ) - l- )- - !- 3 1 - - - TRENCH NUMBER ELEVATION OESCRlPTlON Red brown silty sa (fill) Tan Caving BOTTOM Moist Med. Dense Wet SUBSURFACE EXPLORATION LOG KETCHUM.ENGINEERING LOGGED BY: ENK DATE LOGGED: 4,27/a4 JOB NUMBER: a43o Plate #ll I ,- 2 z : T 5 TRENCH NUMBER T-10 & 2 s = = 20 5 4 : $ ,w;; wz w 0 z c ELEVATION z= IL;2 z- 5+ ? f I ii l uI I- f k ; “zj :s 2;; :; y)Y :=a -0 $I: : :, 2 l 3 so 2 0’; 3 0 i$ 0 0 =0 OESCR~IPTION 0 u SM/ Light brown silty sand Dry Loose ML and silt L-- (alluvium) SM/ Black clayey and silty Humid 2- SC sand and sandy clay Very iz;i;;z&;f) (weathered Stiff 3 SM Tan-red brown silty Moist Dense I- sandstone S- BOTTOM SU.BSURFACE EXPLORATION LOG LOGGED BY: ENK DATE LOGGED: 4,27,84 JO8 NUMBER: 8430 Plate #12 I- ,. -- +;* 2 2 2 ; TRENCH NUMBER T-ll i” ; I f < 2 : do- 2 2’ ELEVATION is zzk &Ii! MO <Z ‘:; ;i : it5 :zw z- 2; 1; 0 2 : t2 t a 0 ;; -0 LGy 2: z :, z z 5; 2 0 ii =0 ” OESCRIPTION +” 0 0 SM Tan silty sand Dry Loose l- (alluvium) 2-- -- SM Dark brown silty sand Humid Med. Weathered sandstone Dense- 3’ Slightly porous Dense 4’ 5’ 6- 7- SM Brown silty sandstone Humid Med. - Dense- a- Dense - 9 Red brown - BOTTOM .l- KETCHUM.ENGINEERING SUBSURFACE EXPLORATION LOG LOGGED BY: ENK DATE LOGGED: 27,a JOB NUMBER: 8430 Plate #13 DIRECT SHEAR TEST RESULTS DESCRIPTION MAXlMUbi DENSITY and OPTIMUM MOISTURE CONTENT AsrM 1557 A METHOD- I KETCSUM XNGINEERING 0-i RNK / OATE /ll /8f, JOB YO. a430 1 Plate #14 I US. Stondord Sieves 1” Yz’ I4 40 .x, WI llso . 7. Y : :: : : :: Ji : :: + ; 1; ~’ __~~A _~: ~1 L$~ ty- 1~~17 : z : ,: : : y : I : :,:: j -Loll. i. 2 ,LYe PARTICLE @mm S/z.+ lmnd SIZE LIMITS I BGUlQER j COBBLES GRAVEL I SAN0 SILT OR CLAY COWU Fin* CQarr. Mtdlum Fh. I I (12 in.) 3in. 3/4 in. No.4 No.lQ No.40 No. 200 u. s. STANQARO SIEVE SIZE ORIGINAL GROUND / . . / . . ~: ., *.. COMPACTED FILL . : I /. - * I . / I, . : * . *. ., I>( :. : : . . . : \a: *.I . 1 -. . 1 1 -. . ., . . . ’ . . . . G . . \- . ’ * *. * 1 . .- . - . . , . . - . /’ I . / / 7 ’ * * . \ . * * , - s/ . I Y-l---- ?-!INUS 1" CRUSt!ED ROCK CO?-'PCETELY SURROI;FIDED BY FILTER FABRIC, OR CLASS II PERMEAFiI I?ATER:AL 4" DiAMETER PERFORATED PIPE - MINIMUM 1% SLOPE PIPE DEPTH OF FILL MATERIAL OVER SUBDRAIN ADS (CORRUGATED POLETHYLENE a TRANSITE UNDERDRAIN PVC OR ABS: SDR 35 :i SDR 21 100 SCHEMATIC ONLY NOT TO SCALE KETCHUM ENGINEERING -~ LINCOLN APARTMENTS a/ DATE TYPICAL CANYON SUBDRAIN .ENK 5/u/84 JOB NO. 8130 Plate #16 I-- TRAFGVERSE WEAKENED v ;: . . :_ :;,, ‘, .‘,‘, ..‘...‘. ‘.’ “.’ . ;‘. :. . . ‘. ,’ 1. ‘.‘. ji!lGT _,: .;: _._ . ..‘. .‘.‘.’ .‘.’ ” :, ‘. ‘_ ;. ‘,‘,‘.. ; ‘,‘..’ ‘, 51-10’ I SLALS 114 EXCESS OF 10 FEET IN hIDTH SLAES 5 TO 10 FEET IN PiIDTH PLAN i<#T*S, + l/8 TO l/4 , , JUIIYI SC%LCK 6"x6"-lO/lO WWM 6"X6"-10/10 WWM STRIP IN ADDITiON TO CON- TINUOUS REINFORCEMENT D&TAIL-WEAKENED PLANE JOINT ii,TaSa .- SETCHUM ENGINEERING~ LINCOLN APARTMENTS BY DATE ENK 5/11/SL JOB NO. 8430 Plate #17 Appendix A, Page 1 ,- RECOMMENDED GRADING SPECIFICATIONS - GENERAL PROVISIONS GENERAL INTENT The intent of these specifications is to establish pro- cedures for clearing, compacting natural ground, pre- paring areas to be filled, and placing and compacting fill soils to the lines and grades shown on the accepted plans. The recommendations contained in the prelimin- ary soil investigation report and/or the attached Special Provisions are a part of the Recommended Grading Specif- ications and shall supersede the provisions contained hereinafter in,the case of conflict. These specifi- cations shall only be used in conjunction with the soil report for which they are a part. No deviation from these specifications will be allowed, except where specified in the soil report or in other written com- munication signed by the Soil Engineer. OBSERVATION AND TESTING .- A qualified Soil and Foundation Engineering Company shall be retained as the Soil Engineer to observe and test the earthwork in accordance with these specifi- cations. It will be necessary that the Soil Engineer or his representative provide adequate observation so that he may provide an opinion that the work was or was not accomplished as specified. It shall be the responsibility of the contractor to assist the soil engineer and to keep him apprised of work schedules, changes and new information and data so that he may provide these opinions. In the event that any unusual conditions not covered by the special provisions or KETCHUM ENGINEERING 9508 MARKWOOO DR,, SANTEE, CA., 92071 619-446-3929 Appendix A, Page 2 ,- preliminary soil report are encountered during the grading operations, the Soil Engineer shall be contacted for further recommendations. If, in the opinion of the Soil Engineer, substandard conditions are encountered, such as; questionable or unsuitable soil, unacceptable moisture content, inad- equate compaction, adverse weather, etc., he will be empowered to either stop construction until the condi- tions are remedied or corrected or recommend rejection of this work. Test methods used to determine the degree of compaction should be performed in accordance with the following American Society for Testing and Materials test methods: Maximum Density & Optimum Moisture Content - A.S.T.M. D-1557-78. Density of Soil In-Place - A.S.T.M. D-1556-64 or A.S.T.M. D-2922. All densities shall be expressed in terms of Relative Compaction as determined by the foregoing A.S.T.M. testing procedures. PREPARATION OF AREAS TO RECEIVE FILL All vegetation, brush and debris derived from clearing operations shall be removed, and legally disposed of off site. All areas disturbed by site grading should be left in a neat and finished appearance, free from unsightly debris. I-- / KETCHUM ENGINEERING 9508 MARKWOOO OR., SANTEE, CA?.. 92071 61S-446-3929 i- ,L Appendix A, Page 3 Any abandoned buried structures encountered during grading operations must be totally removed. All under- ground utilities to be abandoned beneath any proposed structure should be removed from within 10 feet of the structure and properly capped off. The resulting de- pressions from the above described procedures should be backfilled with acceptable soil that is compacted to the requirements of the Soil Engineer. This includes, but is not limited to, septic tanks, fuel tanks, sewer lines or leach lines, storm drains and water lines. Any buried structures or utilities not to be abandoned should be investigated by the Soil Engineer to deter- mine if any special recommendation will be necessary. All water wells which will be abandoned should be back- filled and capped in accordance to the requirements set forth in the Geotechnical Report. The top of the cap should be at least 4 feet below finish grade or 3 feet below the bottom of footing whichever is greater. The type of cap will depend on the diameter of the well and should be determined by the Soil Engineer and/or a qualified Structural Engineer. When the slope of the natural ground receiving fill ex- ceeds 20% (5 horizontal units to 1 vertical unit), the original ground shall be stepped or benched. Benches shall be cut to a firm competent soil condition. The lower bench shall be at least 10 feet wide or 1 l/2 times the equipment width which ever is greater and shall be sloped back into the hillside at a gradient of not less than two (2) percent. All other benches should be at least 6 feet wide. The horizontai por- tion of each bench shall be compacted prior to receiving fill as specified hereinbefore for compacted natural i- KETCHUM ENGINEERING 3506 MARKWOOD OR., SANTEE. CA.. 92071 619-446-3929 Appendix A, Page A ground. Ground slopes flatter than 20 % shall be benched when considered necessary by the Soil Engineer. After clearing or benching, the natural ground in areas to be filled shall be scarified to a depth of 6 inches, brought to the proper moisture content, compacted and tested for the minimum degree of compaction in the Special Provisions or the recommendation contained in the preliminary soil investigation report. All loose soils in excess of 6 inches thick should be removed to firm natural ground which is defined as natural soil which possesses an in-situ density of a least 85% of its maximum dry density. FILL MATERIAL Materials placed in the fill shall be approved by the Soil Engineer and shall be free of vegetable matter and other deleterious substances. Granular soil shall contain sufficient fine material to fill the voids. The definition and disposition of oversized rocks, expansive and/or detrimental soils are covered in the soils report or Special Provisions. Expansive soils, soils of poor gradation, or soils with low strength characteristics may be thoroughly mixed with other soils to provide satisfactory fill material, but only with the explicit consent of the Soil Engineer. Any import material shall be approved by the Soil Engineer before being brought to the site. PLACING AND COMPACTION OF FILL Approved fill material shall be placed in areas pre- pared to receive fill in layers not to exceed 6 inches K E I .C. I4 U M t!NGlNE~ERING 9508 MARKWOOO OR., SANTEE, CA., 92071 SIS-448-3929 Appendix A, Page 5 ,,- in compacted, thickness. Each layer shall have a uniform moisture content in the range that will allow the com- paction effort to be efficiently applied to achieve the specified degree of compaction. Each layer shall be uniformly compacted to the minimum specified degree of compaction with equipment of adequate size to econ- omically compact the layer. Compaction equipment should either be specifically designed for soil compaction or of proven reliability. The minimum degree of com- paction to be achieved is specified in either the Special Provisions or the recommendations contained in the pre- liminary soil investigation report. ,- Whenthe structural fill material includes rocks, no rocks will be allowed to nest and all voids must be carefully filled with soil such that the minimum degree of compaction recommended in the Special Provisions is achieved. The maximum size and spacing of rock per- mitted in structural fills and in non-structural fills is discussed in the soil report, when applicable. Field observation and compaction tests to estimate the degree of compaction of the fill will be taken by the Soil Engineer or his representative. The location and frequency of the tests shall be at the Soil Engineer's discretion. When the compaction test indicates that a particular layer is less than the required degree of compaction, the layer shall be reworked to the satis- faction of the Soil Engineer and until the desired relative compaction has been obtained. Fill slopes shall be compacted by means of sheepsfoot rollers or other suitable equipment. Compaction by sheepsfoot rollers shall be at vertical intervals of KETCHUM ENGINEERING 9508 MARKWOOO OR,, SANTEE, CA., 92071 61S-44e-392s Appendix A, Page 6 not greater than four feet. In addition, fill slopes at ratios of two horizontal to one vertical or flatter, should be trackrolled. Steeper fill slopes shall be over- built and cut-back to finish contours. Slope com- paction operations shall result in all fill material six or more inches inward from the finished face of the slope having a relative compaction of at least 90% of maximum dry density or that specified inthe Special Provisions section of this specification. The compac- tion operation on the slopes shall be continued until the Soil Engineer is satisfied that the slopes will be stable in regards to surficial stability. . I- Slope tests will be made by the Soils Engineer during construction of the slopes to determine if the re- quired compaction is being achieved. Where failing tests occur or other field problems arise, the Con- tractor will be notified that day of such conditions by written communication from the Soil Engineer in the form of a daily field report. If the method of achieving the required slope compaction selected by the Contractor fails to produce the neces- sary results, the Contractor shall rework or rebuild such slopes until the required degree of compaction is obtained, at no additional cost to the Owner or Soils Engineer. CUT SLOPES c- The Engineering Geologist shall inspect all cut slopes excavated in rock or lithified formational material during the grading operations at intervals determined at his discretion. If any conditions not anticipated in the preliminary report, such as perched water, seepage, KETCHUM ENGINEERING 9508 MARKWOOO OR., SANTEE, CA., 92071 SIS-44e-3929 . . Appendix A, Page 7 ,-- lenticular or confined strata of a potentially adverse nature, unfavorably inclined bedding, joints or fault planes are encountered during grading, these conditions shall be analysed by the Engineering Geologist and Soil Engineer to determine if mitigating measures are neces- sary . Unless otherwise specified in the soil and geological report, no cut slopes shall be excavated higher or steeper than that allowed by the ordinances of the con- trolling governmental agency. ENGINEERING OBSERVATION Field observation by the Soil Engineer or his represen- tative shall be made during the filling and compacting operations so that he can express his opinion regarding the conformance of the grading with acceptable standards of practice. The presence of the Soil Engineer or his representative or the observation and testing shall not release the Grading Contractor from his duty to compact all fill material to the specified degree of compaction. SEASON LIMITS Fill shall not be placed during unfavorable weather conditions. When work is interrupted by heavy rain, filling operations shall not be resumed until the proper moisture content and density of the fill materials can be achieved. Damaged site conditions resulting from weather or acts of God shall be repaired. K E TC # U I# ENGINEERING 9508 MARKWOOO OR., SANTEE, CA., 92071. sis-048-392s Appendix A, Page 8 ,-- RECQMMENDED GRADING SPECIFICATIONS-SPECIAL PROVISIONS The minimum degree of compaction to be obtained in com- pacting natural ground, in the compacted fill, and in the compacted backfill shall be at least 90 percent. Detrimentally expansive soil is defined as soil which an expansion index (EI) of greater than 20. Oversized fill material is defined as rocks or lumps over 6 inches in diameter. At least GO percent of the fill soils shall pass through a No. L U. S. Standard Sieve as determined by weight. Transition Lots: Where transitions between cut and fill occur within the proposed building pad, the cut portion should be undercut a minimum of one foot below the base of the proposed footings and recompacted as structural backfill. KETCHUM ENGINEERING 9503 MARKWOOC CR,, SANTEE, CA., 92071 SIS-448-3929