Loading...
HomeMy WebLinkAbout; Carlsbad Manor Unit 1; Clearance Report on Soil Conditions; 1970-01-19- SOIL AND i!&A’IXRIAL !i?ESTINO ?iAXEiATOR~ - OF NORTH COUNTY, INC. 19 January 1970 423 HALE AVE. - ESCONDIDO, CALIF. 92025 ESCONDIDO - 746-2333 Mr. R. E. Geyer 690 Elm St. Carlsbad, California 92008 .- Re: Job No. 69-19 Carlsbad Manor Unit 1 Carlsbad, California Subject: Clearance Report on Soil Conditions Dear Mr. Geyer: - This letter is to present the results of our tests and observations of the earthwork done at your request for the above referenced site located easterly of Park Drive in Carls- - bad, California. - Carlsbad Unit 1 is recorded in the San Diego County Recorder’s Office according to Map No. 6503. - It is understood that the subject site is intended to be subdivided into lots 1 through 49 inclusive and 54 through 57 - inclusive. Lots 50 through 53 inclusive are referred to as Parcels 1 through 4 inclusive according to Parcel Map 106 and Lots 60 to 58 inclusive are referred to as Parcels 1 through - 5 inclusive according to Parcel Map 107. - The grading for this project was done betlueen 9 December 1969 and 2 January 1970. - , The preparation of the native ground, recompaction of loose soil, and backfilling of voids left by tree roots ulere done in accordance with the recommendations contained in our Prelim- - inary Soil Investigation dated 24 February 1969. A septic - - tank was removed from Lot 10 and backfilled as specified by our - laboratory. / I - Laboratory compaction tests were performed in accordance with A.S.T.M. D1557-64T (method A) to determine the optimum - moisture content and maximum dry density of the soils used in the fill construction. This test method uses the minus #4 sieve - soil in a 4 inch diameter, l/30 cubic foot cylinderical mold. - The sample is formed with a 10 pound hammer falling 18 inches for 25 blows on each of 5'layers. These results are presented below: - LABORATORY COMPACTION RESULTS - Soil Soil Max.Dry Optimum Type Description Density Moisture (pcf Content (%) - - 1 Brown Silty Fine to Medium Sand 127.5 8.8 2 Red Brown Silty Clayey Sand 125.0 11.2 - 3 Red Brown Fine to Medium Sand 121.8 12.7 - 4 Red Brown Silty Sand 123.8 11.7 5 Red Brown Clayey Sand 135.0 9.3 - 6 Gray Medium to Coarse Sandy Clay 104.7 20.3 7 Red Brown Clayey Sand 122.7 11.1 - 8 Dark Brown Clayey Sand 122.9 12.3 ,I Field density tests were taken as specified by A.S.T.M. - D1556-64, the sand cone method to check the compaction- status of the fill. The ratio of the field dry density to the labora- - tory maximum dry density is defined as the relative compaction which must attain a minimum of 90%. Areas of low compaction as - SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. 2 indicated by the field density test results were brought to the - attention of the grading contractor. The areas of low com'pac- - tion were reworked, retested, and proved to be compacted to at least 90% of maximum dry density. The compaction test results are presented on the two enclo- sures: One for the building pads and one for the streets. The area of filled ground placed under our control and ap- proximate locations of the field density tests are shown on the enclosed site plan. Our site plan is a simplification of the - grading plan for this project as prepared by Klema Eng. Inc., Escondido, California, dated April 14, 1969. - Clay is found at finished grade or within 2 feet of finish - grade on many of the lots, both cut and fill. Expansion tests were performed on representative samples of the clays to deter- - - mine if this soil would constitute a structural hazard to the building. The tests were performed on undisturbed and remolded 23 inch diameter 1 inch high ring samples. The samples were loaded with 1 psi instrumented, and allowed to air dry. After - shrinkage had ceased, distilled water was applied and the expan- - sion was recorded as a percentage of the air dried height. EXPANSION TEST - - Sample Location Lots 17 & 18 Test Description Undisturbed Air Dry % Expansion 10.3 - Parcels l-5 Remolded to 92% M.D.D. at O.M.C. - Air Dry 6.7 - Lot 2 Undisturbed 8.2 - Air Dry - SOIL AND MATERIAL TESTXNG LABORATORY OF NORTH COUNTY, INC. 3 EXPANSION TEST (CANTED) Sample Test Location Description $ Expansion Lot 1 Undisturbed - In Place 5.9 Moisture Content Lot 31 Undisturbed - Air Dry 9.0 The results of these expansion tests show that the following precautions should be taken to minimize the effects of expansion on all clay lots. 1 - Extend the footings on clay lots to either 18 inches or - 24 inches below the final grade according to the following sched- ule entitled "Recommended Depth of Footing". - - - - 2- Reinforce all footings with at least two continuous #4< deformed reinforcing bars. One bar shall be placed wit ' 4, inches of the bottom of the footings and one bar withi m 2 nc es of the top. 3- Concrete floor slabs shall be cast on a 6 inch fill of coarse sand with a plastic liner place from the top. 4- The slabs shall be at least 4 and reinforced -- with wire mesh. 5 - All exterior slabs should be underlain with 4 inches of sand and structurally separated from the building. 6 - All surface drainage should be directed away from the proposed structure - SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. /I - - _ .- - - 1 4 5 6 7 8 15 16 - 17 18 29 24 3 18 24 - 18 24 19 - r- 20 24 34 24 24 ,__..~ 18 21 18 38 18 22 18 57 18 23 18 18 24 18 18 <.y-- 25 . .__.... r 18 26 18 27 24 2 18 Depth(In.) 24 18 .A. 8.-J Parcel Depth(In.) Map 107 24 1 18 35 24 - The remaining'lots may be designed for normal 42 inch deep --.. --3r _-.._ 12 inch wide continuous footings. - -- The results of our observations, field density tests, and laboratory tests indicate the compacted fill ground has been placed at not less than-go% of the maximum dry density. It has been determined that the compacted fill ground has an allowable bearing capacity of 1500 psf for a one foot wide one foot deep continuous footing. Footings located closer than 5 feet from the top of the slope should be extended in depth until the bottom edge of the footing is 5 feet horizontally from the outside edge of the compacted slope. - SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. 5 - It is understood that all grading has been completed. - Respectfully submitted, SOIL AND MATERIAL TESTING - LABORATORY OF NORTH COUNTY, INC. - Claude 8. Parker RCE 18,987 - CBP:ec - Distribution: Addressee 8 - - - SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. F. FIELD DENSITY TEST RESULTS - . BUILDING PADS - Date 1969 - - 3 4 - 5 6 7 12-10 8 9 10 11 - - 12-11 ,12 13 - 14 15 12-9 1 9 1.0 2 10 O.G.-2 (Septic Tank Backfill) 11 1.0 12 2.0 10 1.0 26 2.0 26 4.0 28 2.0 30 2.0 32 1.0 31 2.0 30 2.0 29 2.0 10 F.G. 11 F.G. 12 F.G. 13 2.0' 14 2.0 27 1.0 28 4.0 29 6.0 Lot 49 Fill 2.0 Slope For Lot 45 23 Parcel 2 (For- 2.0 merly Lot 51) Fill Slope For Lot 43 13 F.G. 14 F.G. 44 4.0 9 F.G. 19 F.G. Test Re- Location Ht. of Field Field Max. Relative No. Test of Test Fill Moisture Dry Dry Compaction of Lot No. Tested Content % Test (Feet) % Density Density (PCf) (PCf) - 16 17 18 - 12-12 19 20 21 22 - 24 25 -a 12-15 26 27 28 10.5 121.8 127.5 95.4 11.1 123.0 127.5 96.4 11.7 125.2 127.5 98.3 13.0 122.5 127.5 96.2 10.5 119.5 127.5 93.8 9.3 118.5 127.5 93.0 7.5 121.6 127.5 95.2 11.7 116.5 125.0 93.2 10.5 113.9 125.0 91.0 11.1 112.0 125.0 90.0 11.7 120.2 127.5 94.3 12.3 119.7 121.8 98.2 13.0 119.2 121.8 97.8 11.1 121.1 127.5 94.9 9.3 120.0 123.8 96.9 13.0 120.8 123.8 97.5 11.7 119.9 127.5 94.1 12.3 119.0 123.8 96.0 12.3 118.9 127.5 93.3 13.0 116.3 125.0 92.8 11.7 116.8 125.0 93.4 12.3 121.0 127.5 94.8 10.5 124.0 127.5 97.2 11.1 119.9 123.8 96.8 8.7 121.8 127.5 95.6 13.0 115.2 123.8 93.0 9.3 117.4 125.0 94.8 11.1 114.6 127.5 90.0 SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. ? - Date Test Re- Location Ht. of Field Field Max. Relative - . 1969 No. Test of Test Fill Moisture Dry Dry Compaction -~ of Lot No. Tested Content Density Density % Test (Feet) $ (PCf) (PCf) 12-15 29 - 30 31 32 - 33 34 - 12-16 35 36 - 37 - 38 - 39 - - .40 - 41 - 42 43 - 44 - 45 - 46 - 47 - 48 .- - 49 20 F.G. 43 6.0 33 2.0 34 F.G. 35 F.G. 46 4.0 45 6.0 44 8.0 Fill Slope 2.0 West of Lot 55 For Lot 55 Fill Slope 2.0 West of Lot 57 For Lot 57 Fill Slope 4.0 Ulest of Lot 56 For Lot 56 Fill Slope 4.0 Ufest of Parcel 5 (Formerly Lot 58) For Parcel 5 Parcel 4 (For- 2.0 merly Lot 59) Parcel 3 4.0 55 6.0 Fill Slope 2.0 West of Parcel 3 (Formerly Lot 53) For Parcel 3 43 55 6.0 Fill Slope 4.0 LUest of Lot 54 For Lot 54 Fill Slope 6.0 West of Lot 57 For Lot 57 Fill Slope 8.0 West of Lot 54 For Lot 54 56 8.0 9.9 114.6 127.5 90.0 11.1 111.8 123.8 90.2 9.9 121.1 127.5 94.8 8.7 116.5 127.5 91.3 6.9 115.2 127.5 ,90.4 13.0 123.2 127.5 96.8 9.3 125.8 135.0 93.3 10.5 118.2 127.5 92.7 13.6 114.7 123.8 92.6 10.5 125.1 127.5 98.0 13.0 115.7 123.8 93.3 12.3 113.8 123.8 91.8 9.9 121.8 127.5 95.4 11.7 121.5 127.5 14.3 108.1 123.8 11.1 117.5 127.5 95.3 ,- e 92.3 11.1 116.2 123.8 93.8 10.5 121.0 127.5 95.1 12.3 115.2 125.0 92.1 12.3 118.9 123.8 96.0 8.1 124.3 127.5 97.6 SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. 0 Date Test Re- Location Ht. of Field Field -- . 1969 No. Test of Test Fill Moisture Dry of Lot No. Tested Content Density D Test (Feet) % (PCf) Max. Relative Dry Compaction ensity % (PCf) 12-16 50 - 12-17 - 12-18 54 - 12-19 - - .- .-- 12-22 51 52 53 55 56 57 58 59 60 61 62 63 64 65 - 66 67 68 - 69 12-23 70 - 71 72 - 73 ,- 74 - 75 12-24 76 Parcel 5 (For- 8.0 merly Lot 58) 55 10.0 57 10.0 Parcel 4 (For- 6.0 merly Lot 59) Parcel 4 (For- 4.0 merly Lot 52) 54 12.0 56 12.0 23 1.0 22 F.G. 24 2.0 Parcel 3 (For- 6.0 merly Lot 53) Parcel 5 12.0 (Formerly Lot 58) Parcel 2 2.0 Parcel 4 (For- 8.0 merly Lot 52) Parcel 3 10.0 (Formerly Lot 53) 10.0 Parcel 4 (Formerly Lot 59) 9.3 122.8 9.9 10.5 11.7 115.2 124.8 114.1 8.7 118.3 11.1 124.3 9.3 115.4 8.7 112.8 9.3 117.8 9.3 113.7 9.3 133.0 11.7 8.7 125.6 10.5 124.6 9.3 126.9 127.5 96.5 125.0 92.2 135.0 92.3 121.8 93.6 121.8 97.3 127.5 97.5 121.8 94.6 123.8 91.0 123.8 95.3 123.8 91.8 135.0 98.5 96.2 93.0 92.3 94.1 42 4.0 23 F.G. Parcel 3 8.0 57 14.0 55 14.0 25 2.0 31 F.G. 30 F.G. 29 F.G. 27 F.G. 42 F.G. 9.9 121.2 127.5 94.8 9.3 115.1 125.0 92.1 7.5 123.5 135.0 91.6 11.7 130.6 135.0 96.6 11.1 129.8 135.0 96.1 10.5 124.5 125.0 99.6 13.6 115.8 127.5 90.7 12.3 117.5 127.5 92.2 6.4 121.8 127.5 95.5 8.7 127.2 135.0 94.2 8.7 125.9 135.0 93.3 7.5 121.8 127.5 95.4 SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. ” - Date Test Re- Location Ht. of Field Field Max. Relative . 1969 No. Test of Test Fill Moisture Dry Dry Compaction of Lot No. Tested Content .- % Test (Feet) % Density D~;I-I+,~ (pcf) 12-24 12-26 12-29 12-30 12-31 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 43 F.G. 44 F.G. 45 F.G. 46 F.G. 54 16.0 56 16.0 Parcel 1 1.0 Parcel 4 12.0 (Formerly Lot 52) 26 F.G. 24 F.G. 33 F.G. 37 2.0 48 F.G. 47 F.G. 49 F.G. 32 F.G. 25 F.G. 37 F.G. 38 F.G. Parcel 4 (For- F.G. merly Lot 52) Parcel 3 (For- F.G. merly Lot 53) 54 F.G. 55 18.0 55 F.G. 56 F.G. 57 F.G. Parcel 5 16.0 (Formerly Lot 58) Parcel 5 (For- F.G. merly Lot 58) Parcel 4 14.0 (Formerly Lot 59) 8.7 115.1 125.0 92.2 9.9 116.4 127.5 91.3 11.1 120.1 125.0 96.0 11.1 119.8 125.0 95.8 11.7 118.2 123.8 95.4 12.3 124.7 135.0 92.3 9.9 117.9 127.5 92.4 9.3 126.2 135.0 93.5 11.7 113.8 125.0 94.8 9.3 127.4 135.0 94.3 9.9 122.2 135.0 90.5, 6.4 116.4 127.5 91.3 8.1 116.9 127.5 91.7 8.7 124.6 135.0 92.3 7.5 117.4 127.5 92.1 11.7 117.9 127.5 92.3 7.5 105.7 122.9 86.2 7.5 117.8 127.5 92.4 10.5 111.8 123.8 90.2 5.3 111.6 123.8 9O.OJ 7.5 114.8 123.8 92.7 11.1 118.3 125.0 94.5 11.7 117.1 125.0 93.7 11.7 116.2 125.0 92.8 5.3 114.0 125.0 91.2 8.7 112.0 123.8 90.5 11.7 118.4 125.0 94.8 109.5 116..8 123.8 88.4 123.8 94.3 SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. II-I - Date Test Re- Location Ht. of Field Field Max. Relative - ' 1969 No. Test of Test Fill Moisture Dry Dry Compaction of Lot No. Tested Content Density Density (pcf) (pcf) % Test (Feet) % - No. 12-31 106 Parcel 4 (For- F.G. 9.9 120.2 125.0 96.2 merly Lot 59) - 107 Parcel 3 F.G. 9.3 119.2 127.5 93.4, 108 93 25 F.G. 11.1 119.6 122.9 97.3 - 109 104 Parcel 5 (For- F.G. 11.7 115.1 123.8 92.9 merly Lot 58) 110 Parcel 2 6.0 9.9 121.2 127.5 94.8 111 Parcel 2 F.G. 7.5 111.6 123.8 90.2 112 Parcel 1 F.G. 9.9 117.0 127.5 91.7 - O.G. = Original Ground - F.G. = Finish Grade - - - - - SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. 11 -- t - FIELD DENSITY TEST RESULTS STREET TESTS Date Test Location Ht. of Field Field Max. Relative - No. of Test Fill Moisture Dry Dry Compaction Tested Content (Feet) Density (pcf) Density % 0 (pcf) - 1969 12-23 - Tamarack Ave. 2.0 11.7 130.6 135.0 96.6 OPP. Parcel 2 Tamarack Ave. 2.0 9.9 121.2 127.5 94.8 - 1970 - l-2 - - ,-- - Tamarack Ave. F.G. 8.7 119.5 125.0 95.5 OPP. Parcel 2 Tamarack Ave. F.G. 6.9 112.3 123.8 90.6 ~~~,,~;;;el 4 Lot 59) F.G. = Finish Grade Tamarack Ave. F.G. 8.1 113.5 123.8 91.7 OPP- Lot 55 - - SOIL AND MATERIAL TESTING LABORATORY OF NORTH COUNTY, INC. -I3 C . ,- -d - J *.-* f . I? L c’ z5 r$)9a7 ’ I\ 1, : ‘;\, !’ 1:\ / / i I \ \ I 1, ii I ji !I :) I / I I I