Loading...
HomeMy WebLinkAbout; La Costa Greens NHB 1.09; Inspection Report; 2004-10-27HOUSTON HARKS PCS. INC 21831 BARTON RD. GRAND TERRACE, CA 92313 Tel: <909) 422-8990, Fax: (909)422HJ24a INSPECTION REPORT DATE: 1(VZr/20M SHEET NUMBER: END STATION*: 24+97.76 START STATK)N#: 234-69.76 SECTION NR: 1 LINE ID: MAPPED LGTH: ENDMAP-htt^: DRAWING NUMBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: LARS RD CITY: CARLSBAO WORKn'ASK«23S2 START MAP PG.: END MAP PG.: START MAP-WH: 1 START MH: 12 END MH: 3 TVD LGTH: 138.83 ft INSPECT REASON: OPERATOR: AREA: NEW CONSTRUCTION ANGEL SM4 DIEGO PROJECT NAME: MATERIAL: LINING: RECOMMENDATION: LA COSTA GREENS NMB 1.09 PVC PIPESIZE: 8"" REMARK: 1:360 DIST OC OBSERVATION ST Begin Inspection At Upstream Mar^hc^ 75.80 CN Ser^nce Connection at 10 o'clocit 138.83 DESS Light Debris Sitt 138.83 FH End Inspection At Downstream Manhole HOUSTON HARRIS PCS. JNC. 21831 BARTON RD. GRAND TERRACE, CA 92313 lei: {909)422-8990, Fax: (909)422-0248 INSPECTION REPORT DATE: 10/27/2004 SHEET NUMBER: END STATION*: 21+60.00 START STATION*: 23+69.76 SECTION NR: 2 LINE ID: MAPPED LGTH: ENDMAP-MH: DRAWING NIMBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: LAPIS RD START MAP PG.: START MH: 12 CITY: CARLSBAD END MAP PG.: ENDMH: 2 WORKn-ASK#2352 START MAP-MH: 1 TVD LGTH: 21444 ft INSPECT REASON: OPERATOR: AREA: NEW CONSTRUCTION ANGEL SANDIEGO PROJECT NAME: MATERIAL: LINING: RECOMWIENDATION: LA COSTA GREENS NMB 1.09 PVC PIPE SIZE: 8" REMARK: 1:526 DIST OC OBSERVATION ST Begin Inspection At Upstream Manhole CN Senm» Connection at 02 o'clock 99.24 CN Service Connection at 02 o'clock 182.42 C N ^rvk» Connection at 02 o 'clock ^ 214.44 FH End Inspection At Downstream Manhole «k»f lewiu HOUSTON HARRIS PCS. INC. i MnxZHfif 21831 BARTON RD. ^ -*«"nH^j. GRAND TERRACE, CA 92313 TBI: (909) 422-8990, Fax (909>422.0248 INSPECTION REPORT DATE: 10^7/2004 SHEET NUMBER: END STATION*: 10+00.00 START STATION*: 21+60.00 SECTION NR: 3 UNE ID: MAPPED LGTH: END MAP-MH: DRAWING NUMBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: LAPIS KD CITY: CARLSBAD WORKrrASK»2362 START MAP PG.: END MAP PG.: START MAP^H: 1 START MH; 2 ENDMH: 1 TVD LGTH: 369.86 ft INSPECT REASON: NEW CONSTRUCTION OPERATOR: ANGEL AREA: SAN DIEGO PROJECT NAME: LA COSTA GREENS NHB 1.09 MATERIAL: PTC RPE SEE: 8" LINING: RECOh««ENDATK)N: REMARK: 1:900 DIST 320.96 359.85 OC OBSERVATION 0.00 ST Begin Inspection At Upstream Manhole 38.00 C N Sen/ice Connection at 02 o 'clock 49.07 CN Setvice Connection at 10 o'ctock 110.01 CN Service Connection at 10 o'clock 175.04 CN Service Connection at 10 o'ckwk 248.05 CN Sennce Connection at 10 o'clock CN Sen/ice Connectton at 10 o'clock FH End Inspectron At Downstream Manhole HOUSTON HARRIS PCS. INC. i'MJmJ^OpN 21831 BARTON RD. "^ARnffl^^. GRAND TERRACE, CA 92313 TBI: (909) 422-8990, Fax (909)422-0248 INSPECTION REPORT DATE: 1(VZ7/2004 SHEET NUMBER: END STATION*: 16+60.00 START STATION*: 13+89.34 SECTION NR: 4 LINE ID: MAPPED LGTH: ENDMAP-K#H: DRAWING NIMIBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: LEUCITE PL CITY; CARLSBAD WORK/TASK *2352 START MAP PG.: END MAP PG.: START MAP-MH: 1 START MH: 6 END MH: 6 TVD LGTH: 174.14 ft INSPECT REASON: NEW CONSTRUCTKM OPERATOR: ANGEL AREA: SAN DIEGO PROJECT NAME: LA COSTA GREENS NHB 1.09 MATERIAL: PVC PIPE SIZE: 8" UNING: RECOMMENDATION: REMARK: 1:426 DIST OC OBSERVATION 8.00 8.08 p. 74.70 81.88 153.60 ST CN Begin Inspectton At Upstream Manhole Senflce Connection at 02 o'ctock CN CN Service Connect at 10 o'clock Sen/ice Connection at 02 o'ctock CN CN Service Connection at 02 o'clock Sennce Connectton at 10 o'ctock FH End Inspection At Downstream Manhole HOUSTON HARRIS PCS. INC 21831 BARTON RD. GRAND TERRACE, CA 92313 Tel: (909) 422-8990, Fax: (909)422-0248 INSPECTION REPORT DATE: 10/27/2004 SHEET NUMBER: END STATION*: 17+79.74 START STATION #: 16+60.00 SECTION NR: S UNE ID; MAPPED LGTH: ENDMV>-MH: DRAWING NUMBER: 406 MT/ST: REC. CLEANING; CLEANED: 0 ST NAME: LEUCITE R. CITY: CARLSBAD WORKn-ASK»2362 START MAP PG.: END MAP PG.: START MAP-MH: 1 START MH: 6 END MH: 7 TVD LGTH: 233.98 ft INSPECT REASON: OPERATOR: AREA: NEWCONSTRUCTK)N ANGEL SANDIEGO PROJECT NAME: MATERIAL: UNING: RECOhMENDAHOg: LA COSTA GIVENS NHB 1.09 PTC PIPE SIZE: 8" REMARK: 1:575 DIST 37.40 63.43 OC OBSERVATION 0.00 ST Begin Inspectton At Up^ream Manhole CN Serw» Connection at 02 o'clock CN Servtoe Connection at 10 o'ctock 100.54 CN Servtoe Connection at 02 o'clock CN Senflce Connection at 02 o'ctock 216.93 CN Service Connection at 02 o'clock 233.96 FH End Inspectton At Downstream Manhole HOUSTON HARRIS PCS. INC 21831 BARTON RD. GRAND TIERRACE, CA 92313 Tel: (909) 422-8990, Fax: (909)422.0248 INSPECTION REPORT DA-re: 1W27/2004 SHEET NUMBER: END STATON *: 12+00.00 START STATICXJ*: 13+89.34 SECTION NR: 6 UNE ID: MAPPED LGTH: END MAP-MH: DRAWING NUMBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: LEUCITE PL CITY: CARLSBAD WORK/TASK *2352 START MAP PG.: END MAP PG.: START MAP-MH: 1 START MH: S END MH: 4 TVD LGTH: 206.26 ft INSPECT REASON: OPERATOR: AREA: NEW CONSTRUCTION ANGEL SANDIEGO PROJECT NAME: MATERIAL: LINING: RECOMMENDATION: LA COSTA GREENS NHB 1.09 PVC RPE SIZE: 8" REMARK: 1:626 DIST 00 OBSERVATION ST Begin Inspection At Upstream Manhole CN Service Connection at 10 o'clock CN Sen/ice Connection at 10 o'clock 113.90 CN Service Connectton at 10 o'clock 154.09 CN Sendee Connectkm at 10 o'ctock 179.73 CN Sen/ice Connectton at 02 o'clock 206.26 FH End Inspectton At Downstream Manhole HOUSTON HARRIS PCS. INC 21831 BARTON RD. sfMlffln^^, GRWJD TERRACE, CA 92313 -^^^ Tel: (909) 422-8990, Fax: (909)422-0248 INSPECTION REPORT DATE: 10^7/2004 SHEET NUMffiR: END STATION*: 10^00.00 START STATION*: 12+00.00 SECTION NR: 7 LINE ID: MAPPED LGTH: END MAP-MH: DRAWING NUMBER: 406 MT/ST; REC. CLEANING: CLEANED: 0 STNAI^: LEUCITE PL CITY: CARLSBAD W<»^K/TASK 02362 START MAP PG.: END MAP PG.: START MAP-MH: 1 START MH: 4 END MH: 1 TVD LGTH: 201.47 ft INSPECT REASON: NEW C(»ISTRUCTK)N OPERATOR: ANGEL AREA: SAN DIEGO PROJECT NAME: LA COSTA GREENS NHB 1.09 MATERIAL: PVC RPE SEE: 8" LINING: RECOAMENDATION: REMARK: 1:600 DIST 0.00 21.54 75.10 86.37 124.87 124.87 131.06 201.47 00 OBSERVATION ST Begin Inspection At Upstream Manhole CN 124.87 FT//01:10:23 Sen/ice Connection at 02 o'clock CN Senflce Connectton at 10 o'ctodt CN Senflce Connection at 02 o'clock CN Service Connection at 10 o'clock DES Light Debris IN SERVICE CN Senflce Connection at 02 o'clock FH End inspectton At Downstream Manhole HOUSTON HARKS PCS. INC. 21831 BARTON RD. GRAND TERRACE, CA 92313 Tel: (909)422-8990, Fax (909)422-0248 INSPECTION REPORT DATE: 10/27/2004 SHEET NUMBER: END STATION *: 10+00.00 START STATraN *: 13+30.66 SECTION NR: 8 LINE ID: MAPPED LGTH: END MAP-MH; DRAWING NUMBER: 406 MT/ST: REC. CLEMMING: CLEANED: 0 ST NAME: KORITE PL CITY: CARLSBAD WORK/TASK #2352 START MAP PG.: END MAP PG.: START MAP-MH: 1 START MH: 11 END MH: 7 TVD LGTH: 334.42 ft INSPECT REASON: OPERATOR: AREA: NEWCONSTRUCTKM ANGEL SANDIEGO PROJECT NAME: MATERIAL: LINING: RECOMMENDATION: LA COSTA GREENS NHB 1.09 PVC PIPE SEE: tT REMARK: 1:825 DIST OC OBSERVATION 8.08 ST Begin Inspection At Upstream Manhole 8.08 CN Senflce Connectton at 10 o'ctock 13.17 CN Service Connection at 10 o'ctodc 18.65 CN Sennce Connection at 02 o'dock 27,23 CN Sennce Connection at 02 o'clock 97.64 CN Sendee Connection at 10 o'ctock CN Service Connection at 02 o'clock 152.50 CN Senflce Connection at 10 o'clock 190.10 CN Senflce Connectton at 02 o'ctock 210.45 CN Sen/toe Connectton at 10 o'clock 248.25 CN Senflce Connectton at 02 o'clock 262.91 CN Sen/toe Connection at 10 o'dock 334.42 FH End Inspection At Dovmstream Manhole HOUSTON HARRIS PCS. INC 21831 BARTON RD. GRAND TERRACE. CA 92313 Tel: (909) 422-8990, Fax (909)422-0248 INSPECTION REPORT DATE: 10/27/2004 SHEET NUMBER: ENDSTATK3N*: 20+80.19 START STATK)N*: 17+79.74 SECTION NR: 9 UNE ID: MAPPED LGTH: END MAP-MH: DRAWING NUMBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: LARtHAAR AVE CtTY: CARLSBAD WORK/TASK «2352 START MAP PG.: END MAP PG.: START MAP-MH: 1 START hM: 7 ENDMH: 8 TVD LGTH: 309.19 ft INSPECT REASON: OPERATOR: AREA: NEW CONSTRUCTON ANGEL SANDIEGO PROJECT NAME: MATERIAL: UNING: RECOMMENDATION: LA COSTA GREENS NHB 1.09 PVC PIPE SEE: ff" REMARK: 1:775 DIST 163.17 238.07 2SU2 309.19 OC OBSERVATION 8.00 ST Begin Inspection At Upstream Manhole 34.81 CN Sennce Connectton at 02 o'ctock 92.76 CN Sennce Connection at 02 o'ctock CN Service Connectton at 02 o'clock CN Service Connection at 02 o'clock CN FH Sen/toe Connectton at 02 o'ctock End Inspectton At Downstream Manhole ' HOUSTONHMWSS PCS. INC ,',JjtMlSTpN 21831 BARTON RD. SfTAnffiQ^;, GRAND TERRACE, CA 92313 -=0*^ Tel: (909) 422-8990, Fax (909)422-0248 INSPECTION REPORT DATE: 10/27/2004 SHEET NUMBER: ENDSTATK)N •: 23+76.08 START STATION*: 20+80.19 SECTK»I NR: 10 UNE ID: MAPreO LGTH: ENDMM>-MH: DRAWING NUMBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: JADE LANE CITY: CARL»A0 WORKn-ASK#2362 START MAP PG.: END MAP PG.: START MAP-MH; 1 START Rff^: 8 END MH: 9 TVD LGTH: 306.1 ft INSPECT REASON: NEW CONSTRUCTION OreRATOR: ANGEL AREA: SAN DIEGO PROJECT NAME; LA COSTA GREENS NHB 1.09 MATERIAL: PVC RPE SEE: 8" UNING: RECOMMENDATK>N: REMARK: 1:760 DIST OC OBSERVATION ST Begin Inspection At Upstream Manhoto CN Sen/ice Connection at 02 o'clock CN Service Connection at 02 o'clock (iM 101.13 CN Senrice Connection at 10 o'ctock 109.11 CN Senrice Connectton at 02 o'clock 164.57 CN Service Connection at 02 o'ctock 172.94 CN Senrice Connection at 10 o'ctock 223.21 CN Senrice Connectton at 02 o'ctock 244.46 CN Sen/toe Connection at 10 o'clock 277.17 CN Senrice Connectkwi at 02 o'ctock 305.10 FH End inspectton At Dovmsfream Manhole HOUSTON HAfflUS PCS, INC. ^.-J^MSSTQiV 21831 BARTON RD. <^AHm^^ GRAND TERRACE, CA92313 Tel: (909) 422-8990, Fax (909)422-0248 INSPECTION REPORT DATE: 1007/2004 SHEET NUMBER: END STATION »: 26+58.38 START STATIONS: 23+75.08 SECTK3N NR: 11 UNE ID: MAPPED LGTH: END MAP-MH: DRAWING NUMBER: 406 MT/ST: REC. CLEANING: CLEANED: 0 ST NAME: JADE LANE CITY: CARLSMD WORK/TASK #2352 START MAP PG.: END MAP PG.: START MAP-MH: 1 START MH: 9 END MH: 10 TVD LGTH: 288.34 ft INSPECT REASON: NEW CONSTRUCTK>N OPERATOR: ANGEL AREA: SAN DIEGO PROJECT NAME: LA COSTA GREENS NHB 1.09 MATERIAL: PVC PIPE SEE: 8" UNING: RECOAMENDATK?N: REMARK: 1:726 DIST 206.06 254.43 272.08 OC OBSERVATION ST Begin Inspection At Upstr^mi Manhoto CN Senrice Connectton at 10 o'clock CN Service Connection at 02 o'clock CN Service Connection at 10 o'clock CN Service Connection at 02 o'clock 134.75 CN Senrice Connectton at 10 o'clock 154,48 CN Senrice Connectton at 02 o'ctodc CN Senrice Connectton at 10 o'ctock CN Service Connection at 02 o'clock C N Senrice Connection at 02 o dock CN Senrice Connecfion at 10 o'clock 288.34 FH End Inspectton At Downstream Manhde HOUSTON HARRIS PCS. INC. 21831 BARTON RD. GRAND TERRACE, CA 92313 Tel: (909) 422-8990, Fax (909)422-0248 INSPECTION REPORT DATE: 10/27/2004 SHEET NUMBER: END STATION »: 27+30.66 START STATION »: 26+68.38 SECTION NR: 12 LINE ID: MAPPED LGTW: END MAP-MH: DRAWING NUMBER: 406 MT/ST: REC. CLEANING; CLEANED: 0 ST NAME: JADE LANE CITY: CARLSBAD WORKnrASK»2362 START MAP PG.: END MAP PG.: START MAP-MH: 1 START MH: 10 END MH: EXT MH TVD LGTH: 142.33 ft INSPECT REASON: OPERATOR: AREA: NEW CONSTRUCTION ANGEL SANDIEGO PROJECT NAME: MATERIAL: UNING: RECOMMENDATION: LA COSTA GIVENS NHB 1.09 PVC PIPE SEE: 8" REMARK: 1:350 DIST OC OBSERVATION 0.00 ST Begin Inspection At Upstream Manhde CN Senrice Connecdon at 02 o'clock CN Servtoe Connedion at 10 o'ctock 142.33 FH End Inspectton At Downstream Manhole HOUSTON HARRIS PCS. INC 21831 BARTON RD. GRAND TERRACE, CA 92313 Tel; (909) 422-8990, Fax (909)422-0248 INSPECTION REPORT DATE: 10/27/2004 SHEET NUA^R: END STATK3N *: 0+00.00 START STATKW *: 10+00.00 SECTION NR: 13 UNE ID; MAPPED LGTH: END MAP-MH; DRAWING NUMBER: 406 MT/ST: REC. CLEANING: CLEANED; 0 ST NAAK: LARS RD CITY: CARLSBAD WORKn-ASK#2362 START MAP PG.: END MAP PG.: START MAP-A*H: 1 START MH; 1 END MH: EXT MH TVD LGTH: 227.4 ft INSPECT REASON: OPERATOR: AREA: NEWCONSTRUCTI(»J ANGEL SANDIEGO PROJECT NAME: MATERIAL: LINING: RECORMENDATION: LA COSTA GREENS NHB 1.09 PVC RPE SIZE: 8"" REMARK: 1:575 DIST 100.54 180.13 192.09 227.40 OC OBSERVATION 8.00 ST Begin inspedion At Upstream Manhole €^ 26.23 CN Service Connedion at 10 o'clock CN Senrice Connectk»i at 10 o'clock CN CN Senrice Connectton at 10 o'ctock Senrice Connectton at 02 o'ctock FH End Inspect At Downstream Manhole