HomeMy WebLinkAbout; La Costa Meadows Unit 1; Soils Report Interim; 1971-10-12/’ 1 /” -’ ,~- - -~ - -~ - - - - - ,c BENTON ENGINEERING. INC. APPLIED SOlI. MECHANICS -~.- FO”NDATIOH* 67rll EL CAJON BOULEVARD **I% DIEGO. CALIFORNIA *z,,s October 12, 1971 SAN DIEGO 5s3-5654 LA ME**: 468.5654 PHILIP HENKlNG BENTON PI1ESIDENT. ClYfL ENClHlLLI Ran&a La Costa Route 1, 80x 2550 Encinitas, California 92024 Subject: Project No. 70-lO-28D County Permit No. L3785 interim Report an Compacted Filled Ground And Classification of Soil Condltlons Lok 1 to 184, inclusive, 186 to 189, inclusive 192 to 253, inclusive, and Certain Street Areas d San Dlego County, California Gentlemen: This is to report the resulk of tesk and obseervatians made in order to Inspect the compaclion of filled ground placed on certain areas of Lok 1 ta 5, inclusive, 9 to 15, inclusive, 23 b 53, inclusive, 55 to 59, inclusive, 61, 64, 67 to 72, inclusive, 75 to 91, inclusive, 104 to 108, Inclusive, 112 to 119, inclusive, 121 to 154, inclusive, 160, 173 to 184, Inclusive,186 to 189, inclusive, 192 to 218, inclusive, 220, 221, 222, 224, 231, 232, 233, 237 to 247, inclusive, and portions of Unicomlo Street, Alga Road, Luciemaga Street, Luciemago Place, Alisma Street, Antilope Street, Abe/orro Street, Grulla Street, Pen0 Street, Unicomlo Way, Unicomio Place, Unicorn10 Court, Unicomio Street, Ave Del Pamiso Street, Abedul Street, Abedul Place, and Zodiac Street in La Costa Meadows Unit No. 1, San Diego County, California. Tests were also taken in soils placed as backfill over utili!y lines in Unlt No. 1 and in compacted filled gmund placed on Lok 466, 467, 468, 469, and 470 of La Costa Meadows Unit No. 3. Compac- ting of filled ground has nat been completed on Lot 185 and the results of final tests and inspec- tlons on this lot will be included in our flnal report on this unit. The fills on Unit No. 1 reported herein were placed during the period between November 9, 1970 and September 20, 1971. The approximate areas and depths of filled ground placed under our inspection in accordance with the approved specifications are shown on the attached Drawing No. 1, entitled “Location of Compacted Filled Ground.” The grading plan used for the placement of filled ground was prepared by Rick Engineering Company and last revised January 29, 1971. The approximate locations at which the tesk were token and rhe final test results are presented on pages T-l to T-43, inclusive, under the “Table of Test Resul k.” A group of 9 tests taken during the initial grading of Alga Road am included on page T-43 of the “Table of Test Results.” The labomtary determinations of the maximum dry densities and optimum moisture contenk of SlOlO .17.81 .- - - _~ - .- -- - .- Pro/act No. 70-lO-28D kancho La Costa -2- October 12, 1971 the major fill materials am presented on pages L-l and L-2, under the “Laboratory Test bulk.” Some of the maximum dry densities shown in the “Table of Test Rdk” were combinations of these. The tests were taken during the weekly periods indicated below: Lots 190 and 191 were not graded and therefore remain at their original natuml slope. Test Numtxtr Week Ending 1 to 12, inclusive November 14, 1970 13 to 48, inclusive November 21, 1970 49 to 79, inclusive November 28, 1970 80 to 106, inclusive December 5, 1970 107 to 158, inclusive December 12, 1970 159 to 200, inclusive December 19, 1970 201 to 247, inclusive January 2, 1971 248 to 319, inclusive January 9, 1971 320 ta 360, inclusive January 16, 1971 361 ta 441, inclusive January 23, 1971 442 to 552, Inclusive January 30, 1971 553 ta 629, inclusive February 6, 1971 630 to 705, inclusive February 13, 1971 706 to 774, Inclusive February 20, 1971 775 to 870, inclusive February 27, 1971 871 to 947, inclusive March 6, 1971 948 to 1039, inclusive ESarch 13, 1971 1040 to 1121, inclusive March 20, 1971 1122 to 1167, inclusive March 27,, 1971 1168 to 1216, inclusive April 3, 1971 1217 to 1232, inclusive April 10, 1971 1233 to 1274, inclusive April 17, 1971 1275 to 1283, inclusive April 24, 1971 1284 May 15, 1971 1285 to 1291, inclusive May 22, 1971 1292 to 1293, inclusive May 29, 1971 1294 to 1303, inclusive June 12, 1971 1304 to 1307, lncluslve June 19, 1971 1308 to 1320, inclusive July 17, 1971 1321 to 1329, inclusive August 7, 1971 1330 to 1335, Inclusive August 14, 1971 1336 ta 1350, inclusive August 21, 1971 1351 to 1356, inclusive August 28, 1971 1357 and 1358 September 11, 1971 1359 to 1370, inclusive September 18, 1971 1371 to 1376, inclusive September 25, 1971 BENTON ENG#NEERING. INC. - Proiect No. 70-lO-28D Rancha ,La Costa -3- October 12; 1971 The final resulk of tests and observations indicate that the compacted filled graund has been placed at 90 percent of the maxlmum dry density or greater. It has been determined that the fill materials, compacted to 90 percent of the maximum dry density, have a safe bearing value of 1930 pounds per square foot far one foot wide continuous footings founded at a minimum depth of one faot below finish grade and placed five feet or more inside the tap of compacted filled ground slopes. If footings am placed closer ta the exposed sloper than 5 feet inside the tap of compacted filled ground slopes, these should be deepened l ne Foot below a 1 l/2 horlzantal to 1 vertical line prolected ouhvard and downward from a point 5 feet horizontally inside the top of compacted filled ground slopes. Tesk indicate that the campacted filled ground is adequate ta satisfactorily support the proposed wood frame dwellings without detrimental settlemenk. Expansive clay, silty clay, and sandy clay soils were placed In the upper three feet in certain compacted fill areas and alsa exist in the upper three feet belaw finfshed gmde in certain cut amas. The final classifications of the soil conditions existing on each lot are presented as follows: Type A - Critically Expansive Soils Lok Lots - - - - - - 1 to 16, inclusive 18 k ~%Z, Inclusive 34 to, 50, inclusive 52 and 53 58 to 64, inclusive 66, 67, and 68 70 to 82, inclusive 87 to 92, inclusive 105, 106, 107 117,?,131, inclusive 134 to 149, Inclusive 152, 153, 154 158 to 161, inclusive 167 to 176, inclusive 179 ta 182, inclusive 184, 186 ta 189, inclusive 194 to 230, inclusive 234,237 239 to 243, inclusive 246 and 247 Type B - Marginally Expansive Soils Lok Lak 17, 51(,& 2 55, 56, 57 132, 133, 150, 151 65, 69,‘W, f&, 85, 86 155, 156, 157, 162 &a && 108,109, 110 177 and 178 112 ta 115, inclusive 183, 192, 193, 238,244and24B Type C - Nonexpansive Soils Lok 33 94 to 98, inclusive 100 to 103,?nclusive 111, 116 Lab 163 to 166, inclusive 231, 232, 233, 235, 236, 245 249 ta 253, inclusive t3ENION ENGINEERING. INC - .- - - .- - - .L .~ - - - _~ - .- .- - - Project No. 70-lO-28D Ran&o La Costa 4 October 12, 1971 it is recommended that the following special &sign and precautions be taken for the houses to be constructed on the above lok: Type A Lots 1. 2. 3. 4. 5. 6. Avoid the use of isolated interior piers. Use continuous footings throughout, and place these at a minimum depth of two feet below the lowest odiocent exterior final ground surface. Reinforce and interconnect continuously with steel bars all interior and exterior footings with one #5 bar at 3 inches above the bottom of the footlngs and one #5 bar placed 1 l/2 inches below the top of the stems of the footings. Exercise every effort to assure that the soil under the foundations and slatxl has a uniform moisture content, 1 percent to 3 percent greater than optimum through- out the tcp 3 feet below ffnished gmde at the time of placing foundations and slabs. Use raised wooden floors that span between continuous footings, or use all concrete slabs with 6 x 6 - lo/10 welded wire fabric and provide a minlmum of 4 inches of clean sand beneath all concrete slabs. A moisture barrier should be provided in the sand layer 2 inches below slabs under living areas. Separate garage slabs from perimeter Footings by a l/2 inch thickness of con- struction felt or equivalent, to allow independent movement of garage slabs relative to perimeter footings. Assure complete separation by extending the felt over the full depth of the front thickened edge of the garage slab. Also, cut off the gamge door stops at least l/2 inch above the slab. Provide positive dminage away from all perimeter footings to a horizontal distance of at least 6 feet outside the house walls. Type B Lok Those fob listed as Type B lok should follow all the above-listed recommendations with the two following exceptions: 1. The continuous footings may be placed at a minimum depth of 18 inches below the lowest adjacent exterior fInal ground surface mther than the two feet recommended far Type A lok. 2. Single #4 bars placed as directed (above) near taps and battams of all interior and exterior footings may be substituted for the #5 bars recommended for Type A fok. Recommendations 3 to 6, inclusive, as listed for Type A lok, are also applicable to the Type Blots. E?FN’i”N ENGINEERING. iNC, Pralect No. 70-lO-28D Ranch0 La Costa -5- October 12, 1971 Only nonexpansive soil conditions were observed in the upper thme feet on the Type C Iok and therefore specially designed footings and slab will not bs required on these lok. Respectfully submitted, BENTON ENGINEERING, INC. BY&/?&&~ R. C. Remer -- Reviewed Philip/H. Bentan, Civil Engineer - Dlstr: .- - I:; Addressee Ranch0 La Costa, Inc. Attention: Mr. Burtan L. Kramer Rick Engineering Company San Dlego County Building Inspection Vista Office - - - - - BENTON ENCIINEERING. INC, - - - - .~ - - - - - PCllLlP HENKING BENTON PRESIDENT. Cl”lL ENGlNEEll BENTON ENGINEERING. INC. APPLIED SOIL MECHANICS ~~~~ FO”HDATIONS 6741 EL CAJON BO”LE”*FlLl S&N DIEGO. CALIFOR)*IA 82115 June 28, 1972 La Casta Land Canipany Costa Del Mar Road Rancha La Casta, California 92008 Sublect: Pmiect No. 70-lO-28D (Gradirrg Permit L 3785) Final Repart on Compacted Filled Ground Lok92and 1850f La Costa Meadows Unit No. 1 San Diego, Califamia SAN OiEG.3 583~5654 L. MESA: 469~,5654 This IS ta report the final resulk of tesk and observations made in order to inspect the compaction of filled ground placed on certain amar of Lok 92 and 185 in La Costa Meadows Unit No, 1. The resulk of tesk and abservations made ta inspect the compaction of filled ground placed during the major grading of this subdivislon and special recommendations for construction on expansive soils were included in our interim report on this project dated October 12, 1971. This report includes the resulk of test Nos. 1377 to 1380, inclusive, taken in compacted filled ground placed on Lok 92 and 185. These fills were placed on April 24, 1972 and June 13, 1972. This report includes all test data and information not previously reported and completes our final mpart an La Costa Meadows Unit No. 1. The approximate areas and depths of filled ground placed under our inspection in accordance with the approved specifications am shown on the attached Drawing No. 1, entitled “Location of Compacted Filled Ground.” The grading plan used for the placement of filled ground was pm- pared by Rick Engineering Company and last revised January 29, 1971. The approximate locations at which test Nos. 1377 ta 1380, inclusive, were taken and the final test resulk were presented on pqe T-44, under the “Table of Test Resulk.” Test Nos. 1 to 1376, inclusive, were presented on pages T-l to T-43, inclusive, of our previous report. The laboratary determinations of the maximum dry denslties and optimum moisture contenk of the malor fill materials placed durirlg this recent grading period am presented on page L-l under the “Labom- tory Test ttesulk.” Test Nor. 1377 ta 1380, inclusive, reported herein, were t&en on the dates indicated &low: Test Number Qate 1377 and 1378 April 24, 1972 1379 and 1380 June 13, 1972 Y - - - - - .- - - - Pmiect No. 70-lo-28D La,Costa Meadows Unit No. 1 -2- June 28, 1972 The final resulk of tesk and observations indicate that the compacted filled ground has been placed at 90 percent of maximum dry density or greater. It has been determined that the fill materials, compacted to 90 percent of the maximum dry density, have a safe bearing value of 1930 pounds per square foot for one foot wide continuous footings faunded at a minimum depth and placed 5 feet or more inside the top of the compacted filled ground slopes. if footings am placed closer to the expased slopes than 5 feet inslde the top of compacted filled ground slopes, these should be deepened one foot below a 1 l/2 horizontal to 1 vertical line projected ouhvard and downward from a point 5 feet horlrontally inside the top of compacted filled ground slopes. Task indicate that the compacted filled ground is adequate ta support the proposed wood frame dwellings without detrimental settlements. Critically expansive soils exist in the upper three feet below flniahed grade on Lok 92 and 185. Therefore the special design and precautions presented far Type “A” lok in our previous interim report dated October 12, 1971 am recommended far buildings constructed on these hvo iok. Respectfully submitted, BENTON ENGINEERING, INC. R. C. Renter Reviewed by Philip H. Benton, Civil Engineer Dlstr: (4) Addressee (1) La Costa Land Company Attention: Mr. Burtan L. Kmmer (1) Rich Engineering Company (2) San Diego County Building Inspection, Vista Office (1) San Diego County Engineering Department Attention: Mr. Joe Sovella RCR/PHB/sw eENTON ENGINEERING. INC Project NoI 70-lo-28D LoCosto Meadows No. 1 ,T-1 Test ,No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Approx- Depth imate of Fill location at Test Lot No. inFeet 57 2 58 2 57 6 59 4 58 6 57 10 58 10 59 a 57 14 32*** 2 32*** 4 TABLEOFTEST RESULTS 35 2 inter. Unicomio 2 Ave. 8 DeIPamiso 33*** 14 12 32**' 34***, 33 35 Ave Del Pamiso 8 Unicomio St. Inter. 13 14 34 13 32 33 35 35 34 33 Ave Dsl Poraiso B Unicomio St. 14 32 35 15.0 107.8 116.0 92.9 17.7 105.3 116.0 90.7 17.6 108.5 116.0 93.6 15.7 108.3 120.2 90.1 17.3 106.0 116.0 91.3 15.2 107.5 118.1 91.0 17.0 106.3 116.0 91.5 14.9 107.0 116.0 92.9 ii 8 6 12 10 10 10 12 14 10 15.6 108.0 119.0 90.8 15.1 115.1 120.2 95.7 15.0 107.9 116.0 93.0 15.1 103.9 120.2 90.5 15.7 115.3 120.2 95.8 17.2 105.9 116.0 91.1 9.5 104.3 116.0 09.9 Reworked 14.2 104.9 116.0 90.4 Checkon 128 16.2 110.8 120.2 92.1 10.2 107.2, 116.0 92.4 13.5 105.2 116.0 96.6 12 16.8 104.0 115.3 90.1 16 14.9 105.2 115.3 91.2 14 14.9 108.4 116.0 93.5 Field b Moisture Density %drywt Ib/cu ft Maximum Dry Density Ib/eu ft 13.9 104.8 111.9 17.2 107.9 111.9 14.5 102.0 111.9 12.1 107.0 111.9 12.4 109.4 117.8 16.6 100.8 111.9 18.3 87.3 111.9 14.3 101.4 111.0 17.6 91 .a 111.9 17.0 105.3 116.0 14.2 103.1 116.0 15.4 109.9 116.0 13.7 109.8 120.2 October 12, 1971 Percent Compaction Remarks 93.6 96.4 91.0 95.5 92.7 90.0 78.0 Rt3Wdd 91.4 82.7 Reworked 90.7 93.2 94.6 91.3 l ** Indicates test token In orea for Sewer Pump Station near Lot 32 BENTON ENGINEERINO. INC. -~ -. - - - - - - - ProiectNo.70-lO-2aD La Costa Meodows No. 1 Test No. 3 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 z3 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 Approx- imate Location Lot No. 34 32 64 64 185 186 33 12 13 11 12 13 13 11 132 la4 184 183 184 183 183 132 131 12 Unicornio Way 13 132 11 Unicomio Way 10 12 182 187 186 13 141 142 132 9 9 11 182 la4 183 T-2 October12, 1971 TABLEOFTEST RESULTS(CONT.) Depth of Fill at Test in Feet 16 20 2 4 2 2 18 6 10 2 10 14 14 6 2 2 6 4 10 8 12 : 14 2 18 8 10 4 4 18 2 4 6 22 ; 12 4 4 14 6 14 16 FIold Moirlure %drywt DV Density Ib/cu ft 16.2 13.8 14.8 14.1 14.2 14.1 16.0 11.2 12.4 9.6 11.0 9.6 13.0 12.1 12.4 13.8 13.9 14.1 15.9 15.6 15.4 12.5 11.2 8.8 11.5 12.3 16.3 12.0 10.3 16.1 12.7 14.0 14.3 13.8 16.8 11.7 13.1 16.7 10.1 12.2 12.4 12.2 12.2 12.1 L%ENTON ENGINELeIxC. “ic 105.1 105.0 112.8 108.1 109.6 112.8 103.8 103.9 105.1 109.1 103.9 102.8 110.3 105.4 114.1 101.8 125.0 112.0 113.5 112.4 112.5 102.0 113.8 110.3 111.2 110.2 106.6 108.9 105.5 104.1 116.8 119.8 118.9 118.2 104.1 106.9 113.8 110.1 102.0 102.9 103.0 108.0 117.8 111.0 Maximum Dr/ Density Ib/cu ft 116.0 116.0 119.0 119.0 119.0 119.0 113.7 113.1 113.1 113.1 113.2 115.3 115.3 116.0 120.2 111.3 137.8 120.2 120.2 120.2 120.2 111.0 120.2 116.0 120.2 116.0 116.0 116.0 116.0 115.3 120.2 129.0 129.0 129.0 111.1 111.0 120.2 120.2 115.3 111.0 111.0 111.3 124.5 117.8 Percent Compaction Remorkr 90.6 90.4 94.8 90.8 92.2 94.8 91.3 91.8 92.8 96.5 91.6 89.2 Reworked 95.7 Checkon 14: 90.7 94.9 91.4 90.6 93.1 94.4 93.5 93.6 91.9 94.5 95.0 92.5 95.0 91.8 93.8 90.9 90.2 97.1 92.7 92.1 91.6 93.6 96.2 94.5 91.6 88.4 Reworked 92.6 Checkon 174 92.7 97.0 94.6 94.2 - ,.- - - - - - - .- - ProjectNo.70-IO-28D Lo Costa Meodows No. 1 Approx- imate Test Location No. Lot No. 80 58 al 52 a2 27 a3 26 a4 27 a5 26 86 27 a7 26 88 27 a9 57 90 56 91 56 92 70 93 71 94 Unicomio PI. & Unioomio St. 95 9 96 9 97 Unicomio PI. d Unicomio St. 98 143 99 143 ID0 143 101 144 102 58 103 58 104 59 105 58 106 59 107 144 108 5 109 5 110 144 111 Unicornio Way a Porscl street 112 Unicomb Way 8, Pena street 113 Lot Line 11 812 114 2 115 57 T-3 TABLE OFTEST RESULTS(CONT.) Depth of Fill ot Test in Feet Field W Moisture Density % drywt Ib/cu ft Maximum DV Density Ib/cu ft Compaction Remarks 10 13.5 100.5 111.0 90.6 2 12.2 99.9 111.0 90.0 2 14.1 110.4 120.2 91.8 4 15.0 101.7 111.0 91.6 6 16.9 108.7 120.2 90.4 a 14.5 102.8 111.0 92.6 10 14.5 107.7 116.2 92.6 12 14.3 105.0 115.3 91.0 14 14.8 102.9 113.6 90.6 14 16.9 112.3 124.5 90.1 3 la.2 114.4 124.5 91.8 7 13.9 117.6 124.5 94.4 2 15.9 115.2 124.5 92.4 4 15.9 114.9 124.5 92.3 4 14.9 106.8 115.3 92.6 a 12 a 17.0 15.4 15.3 104.9 108.5 107.0 115.3 115.3 115.3 90.8 94.0 92.8 2 9.4 104.5 115.3 90.5 4 9.1 106.3 115.3 92.1 6 12.7 106.0 115.3 91.9 2 7.4 99.8 111.0 89.9 14 16.3 113.9 124.5 91.4 la 16.7 116.7 124.5 93.7 12 13.6 107.0 117.8 90.9 22 12.6 117.9 124.5 94.6 16 12.5 118.6 124.5 95.2 2 11.7 103.6 111.0 93.4 4 11.1 101.8 111.0 91.8 a 10.4 106.9 115.3 92.5 6 12.1 108.8 115.3 94.3 2 10.9 106.3 115.3 92.2 4 a.4 105.2 111.0 94.6 20 11.0 15.3 15.6 106.6 111.0 96.0 4 26 107.3 115.3 93.0 114.9 124.5 92.3 October12,lWl Check on 17 Check on #9 Reworked Check on #IO1 DENTON ENOINEERING. INC. Proiect No. 70-lo-28D Lo Costa Meadows No. 1 T-4 October 12, 1971 Test No. 116 117 118 119 120 121 122 123 124 125 - 126 127 128 .~ 129 130 131 - 132 133 - 134 135 - 136 137 138 139 140 141 142 143 - 144 145 146 - 147 148 149 - 150 151 152 - 153 - Approx- Depth imate of Fill Location at Test Lot No. in Feet 58 182 184 186 187 51 50 49 183 184 186 181 51 48 285 27 29 26 14 la 10 a : 2 20 22 14 4 6 4 3 14 3 iABLE OFTEST RESULTS(CONT.) Luciemaga St. 2 Opp. Lot196 Luciemaga St. 4 Opp. Lot196 Luciernaga St. 6 Opp. Lot196 192 2 46 1 49 6 50 a 26 16 26 20 27 la 27 22 26 24 28 7 27 26 28 3 26 28 31 1 35 la 34 20 15 2 14 16 Field DV Moisture Density %drywt Ib/cu ft Maximum @Y Density Ib/cu ft Percent Compaction Remarks 15.1 119.5 124.5 96.0 13.8 105.7 115.7 91.4 13.8 105.2 115.7 91.2 13.7 105.0 115.7 90.9 14.2 loo.8 111.3 90.5 13.6 106.1 111.3 95.2 12.9 108.8 111.3 97.8 15.5 108.9 111.3 97.7 14.8 105.3 111.9 94.2 13.3 101.8 111.3 91.4 12.4 111.5 120.6 92.3 11.2 111.7 120.6 92.6 ii.8 110.7 120.6 91.7 10.9 103.4 114.1 90.6 a.7 97.8 111.0 88.2 Reworked 14.2 106.1 115.3 91.9 14.6 105.6 115.3 91.4 12.4 106.8 115.5 92.3 12.3 108.1 93.7 12.4 106.4 115.5 115.5 92.1 17.1 102.1 111.0 16.0 111.6 120.6 14.0 107.8 115.5 15.1 116.0 120.6 13.6 98.2 108.7 16.7 106.5 115.3 12.1 105.3 115.3 12.3 lo4.9 111.0 13.9 102.3 111.0 12.4 111.3 115.3 14.7 104.6 111.0 14.3 105.8 111.0 15.5 102.5 113.1 11.5 112.2 118.4 14.4 101.1 111.0 9.7 105.8 116.2 13.6 102.3 113.6 13.9 107.6 116.2 92.0 92.4 93.3 96.1 90.4 92.2 91.4 94.4 92.2 96.5 94.2 95.4 Checkon 030 90.6 94.7 Kfi 9oio 92.6 HENTON ENGINEERING. iNC - - _. -. - - - - Pro/ect No. 70-IO-28D La Costa Meadows No. 1 Approx- imate Test Location No. Lot No. 154 Inter. Luciernaga St. &Court 155 141 156 143 157 142 158 144 159 141 160 143 161 Unlcornio St. & Perso st. 162 105 163 2 164 104 165 2 166 105 167 3 168 104 169 4 170 105 171 5 172 104 173 106 174 104 175 Unlcomio St. sto. 28+00 opp. Lot5 176 Unlcomio St. Sta. 24+75 I77 Unlcomlo St. sto. 21+50 178 Del Paralso St. Sta. 0+50 179 Rear Lot 34 180 28 181 29 182 25 la3 27 T-5 TABLE OF TEST RESULTS (CONT.) Depth of Fill at Test in Feet Field DW Moisture Density % dry wt Ib/cu ft Moxlmum Dry Density Ib/cu ft Percent Compaction Remarks 10 14.9 111.3 120.6 92.2 6 11.3 102.8 111.0 92.5 10 14.0 106.7 115.3 92.4 6 9.3 108.9 111.0 90.9 10 13.8 107.1 115.3 92.8 10 16.2 107.8 115.3 93.3 14 13.6 105.1 115.3 91.0 a 15.3 105.3 115.3 91.2 2 15.5 110.4 119.0 92.6 a 11.2 103.2 113.1 91.2 2 16.4 107.6 119.0 98.4 12 11.7 106.9 115.3 92.6 6 12.4 loo.3 111.0 98.3 2 17.3 104.8 115.3 90.7 6 11.3 103.3 111.0 93.1 4 17.4 103.2 111.0 93.0 10 10.7 104.5 115.3 98.6 12 11.8 105.1 115.3 91.1 10 10.6 108.1 115.3 93.7 4 a.9 105.7 116.0 91.2 14 16.0 112.4 118.9 94.4 2 t. 13.1 105.3 115.3 91.4 2 tt 2** 2'. 2** ! 1 7 4 30 12.7 13.2 19.4 16.1 14.6 14.0 13.8 15.5 107.8 108.5 102.2 99.4 108.1 115.9 99.2 99.9 115.3 93.3 117.4 92.5 115.3 88.6 Reworked 113.1 87.9 117.4 92.1 120.6 96.0 110.0 90.2 111.0 98.1 l * 2’ over storm drain pipe October 12, 1971 Reworked BENTON ENGINEERING. INC. Proiect No. 70-lo-28D Lo Costa Meadows No. 1 T-6 October 12, 1971 Test No. 184 185 186 187 188 189 190 191 192 193 - 194 195 - 196 197 . _~ 198 - 199 200 201 - 202 203 - 204 205 206 207 208 209 210 211 - 212 213 214 - 215 216 217 - TABLE OF TEST RESULTS(CONT.) Approx- Depth imate of Fill Location at Test Lot No. In Feet 26 28 30 31 32 Rear Lot 34 30 35 33 Del Paraiso St. sto. o+so 25 27 29 28 33 35 26 35 33 Ave Del Par&o & Unicornlo St. 31 132 128 25 27 130 129 131 31 26 32 28 32 25 32 14.8 110.8 116.9 94.8 15 13.4 108.0 116.9 92.4 1 13.5 110.3 117.4 93.9 5 12.8 103.2 114.2 90.2 24 21.4 96.0 112.8 85.1 2- 17.0 103.0 111.0 92.6 5 20.6 100.1 111.0 90.1 22 20.8 101.7 112.8 90.1 2 16.2 108.5 117.4 92.4 2,' 12.8 103.8 111.0 93.4 a 13.2 106.2 114.2 92.9 34 14.4 106.6 117.4 90.8 11 16.6 99.0 111.0 90.1 19 19.2 101.0 111.0 91.0 22 12.0 102.7 111.0 92.5 22 18.1 95.7 111.0 86.1 36 15.6 107.1 115.1 93.0 22 19.8 102.2 111.3 91.9 22 15.8 109.7 115.1 95.1 14 16.4 99.1 110.0 90.0 9 12.7 95.4 111.0 16 16.1 98.3 111.0 2 14.7 104.2 115.1 12 17.1 106.1 117.4 38 15.3 Ill.1 120.2 2 14.6 106.1 115.1 4 15.8 103.5 111.3 4 16.6 102.9 111.3 9 18.1 108.4 120.2 40 13.2 106.9 117.4 24 12.2 110.2 120.2 23 12.4 103.8 115.1 28 19.2 100.9 111.0 16 14.6 99.2 108.6 Field Dry Molsture Density %dry wt lb/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 85.9 88.6 90.5 90.4 92.4 92.1 92.9 20" 91.0 91.6 90.0 90.8 91.4 Reworked Checkon #I79 Checkon 1178 Reworked Checkon #I99 Reworked Reworked Checkon 1204 Checkon 1188 ** 2' over storm drain pipe BENTON ENGINEERING. INC ..~ -. - - __ - - - - - - - - Plsect No. 70-10-281) L La osta Meadows No. 1 T-7 Test No. 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 Approx- Depth imote of Flli Location at Test Lot No. in Feet 24 70 71 70 9 10 10 Unicornio PI. 6 Unlcomio St. 11 30' 36 31 34 9 35 71 70 35 36 34 36 33 31 32 71 34 70 69 71 128 127 128 34 33 35 34 2 9.6 99.3 108.6 91.5 6 14.2 106.2 115.7 91.6 a la.4 89.4 115.7 85.1 Reworked 10 17.9 102.2 115.7 88.2 Reworked 16 13.0 105.8 116.0 91.1 a 9.5 93.7 111.0 84.4 Reworked a 11.4 100.9 111.0 90.9 Checkon t223~ 12 la.2 106.3 116.0 91.7 18 9.9 101.9 111.0 91.6 20 18.8 98.0 108.9 90.0 9 17.3 96.1 106.4 90.3 2 la.2 103.2 112.8 91.4 13 23.0 97.0 107.8 90.0 24 13.6 105.2 116.2 90.4 24 12.1 104.8 112.3 93.2 26 18.0 96.0 106.4 90.2 a 12.9 loo.8 111.3 90.6 Checkon 1220 10 13.0 102.2 111.3 91.7 Checkon "221 30 15.9 99.9 109.3 91.3 6 10.2 101.1 111.2 90.9 28 16.6 101.4 111.2 91.1 10 9.9 111.9 116.0 96.4 26 11.5 101.2 III.2 91.0 17 18.9 97.4 106.4 91.4 32 20.3 99.6 110.0 90.6 12 17.9 113.8 120.2 94.5 32 11.6 98.3 106.4 92.5 14 17.9 113.2 120.2 94.0 2 17.5 111.0 120.2 92.2 16 17.3 113.4 120.2 94.2 6 13.2 105.5 113.7 92.7 1 10.6 100.5 111.0 90.5 10 10.2 105.4 115.3 91.3 32 12.4 103.3 114.8 90.0 30 13.4 100.9 lit.8 90.1 34 13.4 102.7 113.7 90.2 36 11.5 102.4 113.7 90.0 TABLE OF TEST RESULTS (CONT.) Field Dry Molsture Density % dry wt lb/& ft BENTON ENGINEERING. INC, Maximum W Density lb/cu It October 12, 1971 Percent Compaction Rem&s - - ,- - - - - - - - - - - Pn/ect No. 70-lo-28D LcCbstdMadews No. 1 T-8 October 12, 1971 TABLE OF TEST RESULTS (CONT.) Test No. 255 256 257 250 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 Appmx- Depth imate of Fill Location at Test Lots No. in Feet 34 127 36 34 43 44 45 132 133 132 133 132 134 133 134 133 134 142 141 142 107 140 107 140 ii 49 48 47 46 143 107 143 1.44 106 144 36 12.5 103.0 114.5 90.0 5 10.8 104.2 115.3 90.2 14 13.0 108.9 115.3 94.4 40 9.9 103.1 113.7 91.0 3 15.9 109.0 120.2 90.6 4 15.7 111.0 120.2 92.3 4 15.3 112.1 120.2 93.2 16 18.7 111.8 117.8 94.8 Checkon 5205 4 16.5 108.7 119,o 91.3 20 13.5 106.1 115.3 92.0 8 12.8 114.0 120.2 94.6 24 11.6 107.1 115.3 93.0 2 13.4 114.8 117.4 97.7 12 10.5 110.6 120.2 91.9 6 9.9 111.6 118.9 93.9 16 16.0 106.2 117.4 90.5 10 13.6 105.6 114.9 91.8 10 11.6 110.8 117.4 94.3 14 11.2 104.4 115.3 90.5 14 12.2 103.0 112.2 91.6 2 13.7 104.2 114.9 90.6 2 10.0 97.9 108.2 90.4 6 17.4 101.9 111.3 91.5 6 9.1 103.2 109.3 94.4 16 15.9 106.2 117.8 90.1 12 17.2 111.1 120.6 92.1 14 17.5 112.7 120.6 93.4 16 15.6 113.6 120.6 94.1 8 16.7 114.5 120.6 95.0 9 16.6 113.6 120.6 94.1 18 14.3 102.3 113.7 90.0 10 15.3 96.0 113.7 84.4 Reworked 22 11.3 101.8 111.0 91.6 14 14.8 106.0 116.0 91.3 8 13.8 101.9 111.0 91.7 18 15.0 95.7 106.4 90.0 Field DV Moisture Density % drywt Ib/cu ft Maximum Dry Density Percent Ib/cu ft Compaction Remorlb BENTON ENGlNttRING. INC. ..~ - -. - - - - - - - - - - - Proiect No. 70-10-280 LaC&taMeadowr No. 1 T-9 Test No. 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 ApPry- Dapth imate of Fill Location at Test Lot No. in Feet 107 126 128 36 124 127 125 35 45 44 43 128 126 124 128 127 128 125 128 123 125 124 127 126 182 185 187 192 Luciernoga St. opp. Lot 192 35 36 35 128 126 185 187 124 10 15.6 99.9 108.7 92.0 Check on #28t 2 9.9 101.3 111.0 91.2 14 12.3 104.8 116.0 90.4 18 10.4 106.3 117.0 91.0 2 10.8 105.0 116.0 90.5 9 14.0 loo.9 111.0 90.9 2 12.5 102.9 113.7 90.6 36 12.4 106.2 117.0 90.7 8 15.7 114.2 120.6 94.6 8 14.9 117.1 120.6 97.0 7 13.7 117.5 120.6 97.3 14 11.4 96.2 109.3 88.0 Reworked 6 14.8 102.1 111.0 92.0 6 12.6 105.0 114.8 91.4 14 11.9 103.0 113.7 90.6 Checkon#30; 13 16.1 106.4 116.0 91.6 18 16.4 98.9 109.3 90.6 6 13.5 101.5 111.0 91.5 22 13.1 99.4 110.1 90.2 4 14.0 113.4 120.6 94.0 10 17.6 107.2 118.3 90.5 10 16.8 103.7 111.3 93.1 17 17.8 108.7 118.3 91.8 10 16.3 104.8 115.1 91.1 18 17.7 102.2 111.9 91.3 6 16.6 112.5 120.6 93.2 12 15.6 114.4 120.6 94.8 6 21.6 101.7 111.3 91.3 14 20.5 103.2 111.3 92.6 42 9.9 108.0 117.0 92.3 22 16.2 97.0 107.7 90.0 46 20.3 Q7.4 107.7 90.2 26 18.4 103.9 114.0 91.1 14 15.2 103.1 111.9 92.0 10 14.4 107.0 115.9 92.2 16 14.4 108.9 115.9 93.8 14 16.8 102.9 Ill.9 92.0 TABLE OFTEST RESULTS (CONT.) Field Moisture % drywt Dry Demlty fb,'cu ft Maximum Dry Density Ib/cu ft Octoberl2, 1971 Percent Compaction Remarks BENTON ENOINEERING. INC. Proloci No. 70-JO-28D La Costa Madows No. 1 T-JO October 12, 1971 .- - - - - - - - - - - - - Test No. 328 329 330 331 332 333 534 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 ApPmX- Depth lmate of Pill Location ot Test bat No. in Feet 125 126 124 125 124 123 127 124 123 127 56 57 56 55 126 125 124 123 127 126 125 49 47 45 43 124 35 36 Grullo St. opp. Lot 1147 124 37 Alga Rd. Sta. 42+00 5. AlgoRd. Sta. 42x)0 S. Unicornio St. opp. Lot#37 14 16.6 103.9 114.8 90.4 18 17.2 105.1 112.1 93.8 18 15.2 101.9 109.1 93.2 18 14.9 111.0 120.6 92.1 22 16.6 100.0 111.0 90.1 8 15.5 111.2 120.6 92.2 21 17.0 107.1 116.0 92.2 26 12.9 105.1 110.6 95.0. 12 19.4 103.8 110.6 93.7 25 13.7 101.1 110.6 91.4 11 17.0 115.0 120.6 95.4 30 14.2 108.1 118.2 91.5 15 14.9 112.0 120.6 92.8 2 14.2 114.8 120.6 95.2 22 20.2 103.5 114.5 90.3 22 13.5 96.6 106.4 90.7 30 18.5 105.9 110.6 95.8 16 17.6 106.1 110.6 95.8 29 22.2 98.4 109.0 90.2 26 17.1 103.8 110.6 93.9 26 18.8 106.9 113.3 94.2 18 14.7 118.9 129.2 91.9 12 15.9 123.1 129.2 95.3 12 14.7 119.2 129.2 92.3 11 15.4 122.2 129.2 94.6 34 14.0 104.1 113.7 91.6 50 18.1 100.8 110.6 91.0 26 16.9 97.8 106.4 91.9 2 16.1 104.9 110.6 94.9 38 2 2 2 4 TABLE OF TEST RESULTS (CONT.) Field Dry Moisture Density % drywt Ib/cu ft 19.3 100.2 11.3 Pp.1 21.8 102.6 19.1 16.2 106.1 97.1 Maximum Dry Density Ib/cu ft 111.0 111.0 111.9 111.9 106.4 Percent Compaction Remarks 90.5 90.0 91.6 94.8 91.3 BENTON ENGINEERING. !.NC. - - - - - - - - - - - - Proiect No. 70-lo-28D Lo Costa Meadows No. TABLE OF TEST RESULTS (CONT.) Test No. 362 363 364 z: 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 Approx- Depth imate of Fill Location at Tort Lot No. In Feet 37 36 15 36 127 30 131 JO 36 15 14 130 129 29 3 126 125 123 125 Unicornio St. opp. Lot t37 GNIIo St. opp. Lot1147 127 j"7 36 185 37 187 48 46 44 33 Unicornio St. opp. w 137 37 Unlcornio St. opp. Lot137 6 18.0 30 17.3 6 16.3 30 16.5 33 18.8 13 15.4 8 18.4 12 24.2 30 18.1 JO 16.1 20 13.4 6 14.6 8 14.6 15 15.9 22.5. 10.3 30 19.4 30 14.1 20 23.4 34 21.6 8 11.4 4 24.2 96.0 106.4 90.1 37 34 ii 14 14 20 20 13 12 34 12 18 16.4 98.1 108.5 90.5 16 26.8 96.7 106.4 90.9 * Finished Grade Field Dry Moisture Density % drywt Ib/cu ft Maximum Dry Density lb/cu ft Percent Compaction Remarks 98.5 93.1 108.8 93.4 97.4 105.9 103.7 97.5 103.6 100.9 110.5 105.2 107.8 104.8 105.8 2: 96.7 97.3 104.7 109.0 90.4 109.3 85.1 Reworked 115.3 94.1 109.3 85.2 Reworked 107.8 90.4 112.8 93.8 108.0 96.0 106.4 91.6 110.6 93.6 Checkon 1363 836 106.4 94.9 117.4 94.1 112.8 93.6 117.4 91.8 113.3 92.6 116.0 91.1 106.4 90.3 106.4 91.4 106.4 90.9 106.4 91.4 114.8 91.2 17.4 99.4 109.3 90.9 16.5 103.8 113.7 91.2 17.3 109.4 115.6 94.6 18.2 102.6 110.6 92.8 13.1 120.1 129.2 93.0 17.0 104.7 116.0 90.3 13.1 118.9 129.2 91.9 16.5 108.8 120.6 90.2 16.1 110.9 120.6 92.0 15.9 112.9 120.6 93.7 12.4 100.2 Ill.0 90.4 21.3 99.4 109.3 91.0 Octoherl2,1971 BENTON ENGINEERING. IHC - - - - - - - - - - - Ptoiect No. 70-10-281) Lo Costa Meadows NO. 1 L-12 Octcberl2, 1971 TABLE OF TEST RESULTS (CONT.) Test No. Approx- tmate Locatlon Lot No. 397 126 398 125 399 139 400 138 401 133 402 134 403 Untcomio Way Opp. Lot1136 404 135 405 134 406 135 407 134 408 136 409 135 410 136 411 127 412 126 413 125 414 124 415 123 416 Grullo St. opp. Lot 1147 417 Grullo St. opp. Lot 1147 418 147 419 115 420 Unicornio St. opp. Lot137 421 37 422 m 423 71 424 m 425 71 426 m 427 37 428 Unlcomio St. opp. Lot 137 429 1 430 Untcornio St. & Perso St. Depth of Fill at Test in Feet Field DV Molrture Density %drywt Ib/cu ft Maximum DfY Density Ib/cu ft Percent Compaction Remarks 34 23.8 100.8 110.6 91.1 38 21.4 100.1 110.6 90.5 2 15.7 101.7 112.8 90.1 2 14.9 103.6 113.7 91.1 20 14.3 110.1 117.4 93.9 14 14.4 106.0 114.8 93.0 4 21.8 102.9 109.4 94.1 4 13.4 104.2 115.0 90.7 18 16.0 106.5 115.8 92.0 8 12.4 107.1 117.0 91.6 22 15.0 110.0 112.1 98.0 4 16.7 105.1 111.1 94.7 12 15.6 105.9 116.2 91.1 8 14.1 109.3 117.4 93.1 41 16.9 100.2 111.0 90.3 38 12.1 105.2 113.7 92.5 42 15.7 109.2 117.0 93.3 42 18.2 106.2 117.0 90.9 24 14.0 102.9 110.6 93.0 6 16.9 111.5 115.0 97.1 8 19.5 107.9 110.6 97.5 2 15.1 117.0 120.6 97.0 2 14.7 96.6 106.4 90.8 20 15.7 107.9 117.0 92.1 22 17.7 98.4 113.7 86.6 Reworked 18 11.8 119.9 129.2 92.8 20 14.6 117.4 129.2 90.8 22 11.5 119.4 129.2 92.5 24 12.4 116.9 129.2 90.4 26 13.2 98.3 109.3 90.4 22 16.0 103.9 113.7 91.4 Checkon 1421 24 17.5 . 106.1 113.7 93.2 2 21.8 101.6 Ill.9 90.9 12 14.9 108.7 115.6 94.1 BENTON ENGINEERING. INC. - - - - - - - - - - - - Proiect No. 70-JO-28D La Costo Meadows No I Test No. MP==- Depth imote of Fill Location at Test Lot No. in Feet Field DV Moisture Density % dry wt Ib/cu ft Maximum Dry Density lb/cu ft 431 123 28 14.8 118.1 120.6 432 124 46 18.1 103.2 113.7 433 125 46 20.6 loo.2 111.0 434 126 42 16.8 107.9 117.4 435 127 45 12.8 105.9 116.0 436 114 2 13.8 99.1 109.3 437 115 6 15.7 103.0 113.7 438 114 6 14.5 108.8 116.0 439 115 10 10.8 104.8 113.7 440 124 50 12.0 107.5 117.4 441 1 6 15.2 110.7 116.7 442 106 12 13.1 107.2 111.4 443 5 16 20.0 100.2 109.9 444 124 54 14.7 105.6 116.0 445 106 14 13.1 110.4 115.6 446 114 10 15.1 112.6 118.0 447 116 2 14.7 98.4 109.0 448 115 14 15.3 103.7 114.5 449 114 14 13.8 103.7 114.5 450 116 6 14.7 105.3 114.5 451 4 8 12.8 106.1 115.5 452 106 16 12.2 112.5 118.9 453 113 4 13.3 104.2 114.5 454 115 18 15.9 105.9 116.0 455 114 18 15.8 100.9 111.0 456 116 10 16.7 106.9 116.0 457 115 22 14.5 108.9 116.0 458 114 22 12.6 109.9 118.9 459 116 14 14.8 99.7 109.3 460 115 26 16.0 98.9 115.5 461 114 26 14.4 104.8 115.3 462 105 14 16.1 101.7 Ill.0 463 4 12 12.6 103.5 113.7 464 115 26 20.4 98.4 109.0 465 116 I8 15.8 108.1 116.0 466 115 30 20.4 100.1 108.5 467 117 2 16.5 103.9 113.4 TABLE OF TEST RESULTS (CONT.) October 12, 1971 Percent Compoctlon Remorb 97.9 90.8 90.4 91.9 91.3 90.6 90.7 93.6 92.1 91.6 94.9 96.4 91.1 91.0 95.5 95.4 90.3 90.5 90.5 92.0 91.9 94.6 91.1 91.2 91.0 92.0 93.6 92.4 91.2 85.6 Reworked 90.9 91.5 91.0 90.3 Chockon#460 93.1 92.1 91.5 BENTON ENGINEER”’ INC -. -- - - - - - - - - - - - Proiect No. 70-10-281) ~ocosto Mewodows No. 1 T-14 October 12, 1971 TABLE OF TEST RESULTS(CONT.) Approx- imate Test Locotlon No. Lot No. 468 116 469 114 470 113 471 117 472 116 473 117 474 104 475 469 l *** 476 185 477 187 478 185 479 104 480 3 481 4 482 3 483 37 484 Unicornio St. opp. Lot 137 485 38 486 Unicornio St. opp. Lot'37 $8' 37 37 489 38 490 2 491 1 492 470 **** 493 3 494 4 495 1 496 38 497 38 498 182 499 I88 500 187 501 186 502 183 503 182 504 Algo Rd. 55+00 505 Alga Rd. 55+25 Depth of Fill at Test in Feet Field Moisture % drywt DrY Density Ib/cu ft Maximum Dry Density Ib/cu ft Percent Compaction Remarks 22 14.6 101.9 112.8 98.4 30 15.2 106.3 113.7 93.4 8 16.6 114.0 120.6 94.4 6 14.9 108.1 115.3 93.6 26 18.8 102.2 110.6 92.4 IO 11.7 98.6 109.8 90.0 18 14.8 114.1 118.9 95.9 4 13.8 107.4 115.3 93.0 18 13.3 118.2 129.2 91.4 24 14.5 117.9 129.2 91.1 22 14.6 116.7 129.2 90.2 22 12.2 104.8 113.7 92.2 6 13.1 104.9 115.3 90.9 16 13.5 106.0 115.3 91.9 10 9.8 loo.9 111.0 98.9 26 17.1 107.8 116.0 92.8 28 13.2 97.9 113.7 86.2 4 16.2 103.2 110.6 93.2 28 13.1 102.5 113.7 90.1 30 10.3 98.7 110.1 89.6 30 10.9 100.1 110.1 91.0 8 16.7 109.9 115.6 95.0 16 9.5 110.8 120.6 91.9 JO 13.0 108.3 116.0 93.5 4 1408 107.9 113.3 95.1 I4 17.5 109.1 113.3 96.2 20 11.4 107.9 116.0 93.0 14 13.6 104.9 113.3 92.5 JO 14.6 116.8 120.6 96.8 I2 13.9 107.9 116.0 93.0 22 10.9 113.9 120.2 94.7 4 12.2 109.1 120.6 90.6 28 12.2 110.9 120.6 92.0 18 13.0 111.9 120.2 93.0 24 11.9 113.9 120.2 94.6 26 11.2 113.9 120.2 94:6 2 14.2 119.3 129.2 92.4 6 13.2 120.3 129.2 93.2 **a* Indicated test taken on Lot 469of the adjacent Lo Costa Meadows Unlt No. 3. Reworked Checkon 1484 Reworked Checkon I487 - - - - - -~ - - - - - - - Project No.70+10-28D ~a Costa Meadows No. 1 T-15 October 12, 1971 TABLE OF TEST RESULTS(CONT.) Test No. 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535 536 537 538 539 540 541 Appmx- Depth lmote of Fill Location ot Test Lot No. in Feet 38 38 127 126 'I 2 470 l **t 184 470 +*** 192 183 3 469**** 188 187 186 186 183 181 Luciernogo St. opp. Lot'192 186 188 107 108 107 107 108 107 108 107 192 107 182 187 193 184 14 12.6 105.1 113.7 92.7 16 9.1 102.1 113.7 90.2 49 11.6 104:4 111.3 93.8 46 '9.7 107.0 115.9 92.5 18 12.0 107.2 116.0 92.5 20 10.4 109.1 117.4 93.0 6 15.3 109.5 116.0 94.5 26 14.1 130.9 137.8 95.1 8 16.1 107.9 119.0 90.5 10 13.5 107.1 115.5 92.7 28 15.5 109.7 116.0 94.5 18 11.6 98.4 109.3 90.0 8 11.5 100.5 109.3 91.9 8 14.4 116.1 124.8 93.2 32 14.2 115.9 124.8 92.9 22 14.0 122.1 132.0 92.6 26 14.0 120.3 132.0 91.3 32 16.0 103.9 111.9 92.9 8 12.9 113.9 124.8 91.4 18 17.0 102.8 113.7 90.5 30 18.3 102.8 111.9 91.8 12 15.3 105.1 111.9 94.0 14 9.4 111.9 117.4 95.2 2 12.8 107.4 114.0 94.4 16 13.1 106.3 114.0 93.4 18 13.6 104.9 113.7 92.2 4 10.6 108.1 116.0 93.1 22 10.4 107.3 116.0 92.6 8 12.8 111.2 116.0 95.9 26 12.9 100.0 111.0 90.2 14 11.7 101.8 111.0 91.8 30 9.9 104.9 113.7 92.3 30 13.2 103.5 113.7 91.2 36 15.4 100.9 111.0 91.0 4 16.6 110.1 119.0 92.6 30 16.3 110.2 115.5 95.6 Field Dry Moisture Density % dry wt Ib/cu ft Maximum b Density Ib/cu ft Percent Compaction Remarks **** Indfcatertest token on Lot 469ofthe ad'ocent La Costo Meadows Unft 13. BENTON ENGINEERING. INC. Project No. 70-lo-28D Lo Costa Meadows No. I T-16 Test No. Approx- imate Location Lot No. 542 '87 543 '86 544 184 545 183 546 '92 547 Luciemoga St. Opp. plot 1192 548 193 549 186 550 18' 551 '84 552 Luciernaga St Opp. Lot 1192 553 85 554 84 555 86 556 85 557 84 558 86 559 85 560 192 56' 184 562 '87 563 '82 564 '83 565 '8' 566 Luciamoga St. Opp. Lot ll92 567 '93 568 84 569 '49 570 '86 571 '92 572 Luciernaga St. opp. Lot 6192 573 '93 574 '92 TABLE OF TEST RESULTS(CONT.) Depth of Fill at Test in Feet Field Moisture % drywt DV Density Ib/cu ft 40 '8.0 34 '6.8 34 17.4 36 '1.2 '8 '4.8 22 11.6 '10.9 '09.8 106.9 104.8 '06.' '03.8 8 14.6 38 '3.0 '2 17.1 38 '5.2 26 14.5 '07.9 '03.2 1'0.9 104.3 103.3 2 '4.1 2 '4.7 4 '5.8 6 '8.0 6 18.' 8 '3.2 JO '6.' 22 18.0 42 '5.2 44 '5.' 34 '3.1 40 14.3 I6 '6.4 30 16.6 '06.9 '04.3 '06.' 102.8 '03.1 '04.2 '03.9 '06.1 '03.6 '04.9 1'0.9 108.9 "5.3 '09.9 12 '3.8 IO '3.2 4 17.8 42 16.3 26 14.6 34 14.8 '06.2 '04.0 '01.4 '03.2 '09.1 '08.7 16 14.1 "0.6 30 13.5 111.0 October 12, 1971 Maximum DV Density Ib/cu ft Percent Compaction Remarks "4.6 96.7 "7.4 93.4 "7.4 91.0 1'3.7 92.3 1'5.5 92.0 1'3.7 91.3 "5.5 93.4 "3.7 91.' 1'7.4 94.3 '13.4 92.0 110.6 93.6 '17.4 90.9 '13.7 92.1 "7.4 90.4 "3.7 90.6 "3.7 90.9 113.7 91.7 113.7 91.4 "0.6 96.1 "0.6 93.7 '10.6 95.0 '17.9 94.0 1'7.9 92.4 120.6 95.7 1'7.9 93.2 "0.6 96.0 "1.0 93.7 "0.6 91.9 "4.8 90.0 1'6.2 93.9 1'6.2 93.5 "6.2 116.2 95.' 95.5 BENTON ENGINEERING. INC. - - - - - - - - - - - Project No. 70-lo-28D La Corto Meadows No. 1 T-17 October 12, 1971 TABLE OF TEST RESULTS,,(CONT.) Test No. 575 576 577 578 579 580 581 582 583 584 585 :586 587 588 589 590 591 592 593 594 595 596 597 598 599 600 601 602 603 604 605 606 607 608 609 610 Approx- Depth imate of Fill Location at Test Lot No. in Feet Alga Rd. 55+00 69 71 m 72 123 148 147 148 147 146 145 146 145 122 148 147 151 149 122 148 122 146 122 147 145 146 39 39 151 149 151 39 69 71 Unicornio d Persa St. 10 14.2 110.1 116.2 94.8 6 17.5 99.9 111.0 90.0 28 17.4 103.2 111.9 92.6 30 14.7 118.1 120.2 98.2 3 14.7 116.7 120.2 96.9 32 14.9 107.3 117.4 91.6 4 18.6 91.7 107.4 90.0 6 16.7 100.9 112.1 90.0 8 11.8 103.1 113.7 90.7 10 11.5 105.5 116.0 91.0 2 14.8 112.1 117.4 95.6 2 13.7 110.5 117.4 94.1 6 16.5 109.3 117.4 93.2 6 13.2 109.0 117.4 92.8 1 15.5 105.1 113.7 92.6 12 12.7 104.8 113.7 92.2 14 13.9 103.9 113.7 91.4 2 17.2 96.3 106.4 90.5 8 19.8 98.9 109.3 90.3 3 12.0 112.9 117.4 96.1 16 11.7 105.9 111.9 94.7 5 13.1 108.7 116.8 93.1 JO 10.4 101.9 111.0 91.7 7 12.4 109.0 116.8 93.3 18 13.0 104.8 113.7 92.3 10 14.4 106.9 116.8 91.4 12 11.4 103.0 109.3 94.3 2 9.6 110.8 117.4 94.4 4 10.6 104.3 113.7 91.8 6 17.7 112.8 119.0 94.7 12 15.1 99.2 109.3 90.8 8 16.6 109.2 116.8 93.6 6 13.2 106.3 116.8 91.1 10 16.6 110.6 120.6 91.6 32 15.1 113.1 120.6 93.8 16 12.0 106.8 116.0 92.0 Field Dry Moisture Density % drywt Ib/cu ft Maximum Dry Density Percent lb/'cu ft Compaction Remarks BENTON ENGINEERING. INC. - - - 2. - - - - - - - - - Project No. 70-10-280 Lo Costa Meadows No. 1 T-18 October 12, 1971 TABLE OF TEST RESULfS(CONT.) Test No. Approx- imote Location Lot No. Depth of Fill at Test in Feet Field Moisture % dry wt 611 469**- 10 12.0 612 469**** 12 12.7 613 n 7 15.6 614 40 3 11.8 615 469a.n 14 11.2 616 467***. 4 13.8 617 108 I2 11.0 :618 150 2 15.8 619 108 14 12.1 620 108 16 9.8 621 m 34 18.2 622 149 16 17.3 623 151 12 16.8 624 n 11 17.9 625 152 2 12.0 626 151 16 17.1 627 151 I6 14.5 628 152 6 14.2 629 71 36 13.0 630 64 8 6.7 631 61 4 22.8 632 71 40* 16.6 633 m 38.5 l 12.9 634 69 14 17.3 635 68 JO * 16.7 636 69 18 l 18.0 637 52 6 18.3 638 n 15 15.8 639 n 17 l 16.2 640 58 30 14.7 641 55 6 13.0 642 57 34 17.0 643 58 34 ' 15.4 644 64 10 + 15.4 645 56 19 11.5 646 59 20 15.7 647 30 15.0 * 13.3 DV Density Ib/cu ft Maximum DrY Density Ib/cu ft Percent Compaction Remarks 99.9 105.1 1::;' 112.8 104.1 103.1 102.7 111.9 103.8 104.1 100.2 97.1 106.2 101.9 91.6 92.7 94.8 103.9 111.8 100.2 104.1 107.1 100.4 103.5 107.2 106.9 111.9 111.2 101.0 102.5 104.0 107.0 108.0 105.3 99.7 100.9 109.3 91.4 116.0 90.7 108.2 90.8 119.7 94.4 117.4 95.9 115.5 90.0 113.7 90.6 113.7 90.2 117.4 95.2 113.7 91.2 115.6 90.0 111.0 90.3 106.7 91.0 115.6 91.8 111.0 91.7 106.4 86.1 106.4 87.1 106.4 89.1 113.7 91.4 116.0 94.4 110.6 90.6 110.6 94.2 113.7 94.2 110.0 91.4 110.0 94.1 117.4 91.4 115.6 92.5 119.0 94.0 119.0 93.4 111.9 90.4 111.0 92.4 113.7 91.4 113.7 94.0 116.0 93.1 113.7 92.6 109.3 91.2 111.0 m.9 l Finished Grade l *** Indicates test taken on Lot 469of the odiacent La Costa Meadows Unit 13. Reworked Reworked Rework&d BENTON ENGINEERING. INC. - - - - - - - - - - - - Project No. 70-lo-28D T-19 October 12, 1971 La Costa Meadows No. 1 TABLE OF TEST RESULTS (CONT.) Test No. 648 649 650 651 652 653 654 655 656 657 658 659 660 661 662 663 664 665 666 667 668 669 670 671 672 6ti 674 675 676 677 678 679 680 681 682 Apprax- Depth imate of Fill Location at Test Lot No. in Feet 27 28 29 51 52 51 53 55 51 31 32 33 34 469’ l *** 46 &j&j*** * 49 48 47 50 2 44 47 46 45 44 43 151 152 Unicornio St. Opp. Lot 163 Sta. 3+15 469***+ 466 l *** 469 l *c l 468 +*** 42.0 * 14.5 104.1 114.8 90.6 24.0’ 10.7 108.6 118.2 91.7 17.5’ 10.5 104.8 114.8 91.3 10 10.8 113.5 120.6 94.2 10.0 * 11.9 111.1 119.4 93.1 14 13.4 102.2 113.7 90.0 3.5 l 14.0 107.1 115.3 92.8 8.5 * 12.5 112.2 117.0 95.9 15.0 l 12.8 106.4 117.5 90.6 20.5 * 16.2 99.9 111.0 90.0 36.5 l 17.2 96.9 107.8 90.0 36.5 * 11.1 108.1 117.4 92.1 43.5 + 10.2 101.2 111.0 91.3 16 11.4 101.2 115.3 87.8 Reworked 17 14.4 105.1 113.7 92.4 2 9.9 110.1 115.3 95.6 Checkon 6661 22.0 l 12.9 108.1 117.4 92.1 24 16.7 99.0 110.0 90.0 16 14.3 100.1 111.0 90.2 19 16.7 106.8 117.4 90.9 16 17.6 104.1 113.3 91.9 15 15.9 102.2 113.3 90.3 16 15.9 103.9 113.3 91.6 20 14.0 112.4 117.4 95.6 21 12.3 107.1 115.3 92.8 20 14.5 108.1 115.3 93.8 20 18.9 116.1 119.0 97.7 19 18.7 94.0 106.4 88.3 Reworked 20 14.5 103.1 113.7 90.7 10 10.0 109.5 117.0 93.6 2 18.8 94.4 106.4 88.6 Reworked 20 10.4 106.2 115.3 92.2 2 12.2 108.8 117.6 92.6 20 9.5 108.1 115.3 93.7 6’ 9.6 110.9 115.3 96.1 l Finished Grade . . Field DV Moisture Density % (ry wt Ib/cu ft Maximum DV Density lb/cu ft Percent Cempaction Remerks **** Indicates test taken on Lot469ofthe adjacent La Costa Meadows Unit 13. BENTON ENGINEERING. INC. - 1 - -. Proiect No. 70-lo-28D La Costa Meadows No. 1 Test No. Approx- Depth imate of Fill Location at Test Lot No. in Feet 683 466 **** 684 195 685 194 686 193 687 Luciemega St. opp. Lot ‘192 688 Rear Lot 1184 689 192 690 182 691 469 .*** 692 467 **** 693 43 694 Unicornio St. opp. Lot t63 Sta. 3+15 695 193 696 154 697 Unicornio St. opp. Lot 168 698 192 699 183 700 186 701 188 702 182 703 Luciemago St. Opp. Lot 1192 704 192 -705 193 706 159 707 41 708 41 709 41 710 42 ,711 IS 712 14 T-20 October 12, 1971 TABLE OF TEST RESULTS (CONT.) Field Dry Meisture Density % dry wt Ib/cu ft Maximum Dry Density Ib/cu ft Percent Compaction Remarks 2 9.0 109.8 117.1 93.8 2 14.6 103.2 114.8 90.0 4 11.7 119.1 129.7 91.8 20 14.8 105.1 114.8 91.6 38 13.5 101.9 111.9 91.0 38 10.3 110.0 115.3 95.4 34 9.7 103.6 113.7 91.2 38 14.8 109.6 114.0 96.1 24 12.2 108.1 115.3 93.8 8 14.7 98.1 108.3 90.5 19 12.5’ 107.1 113.7 94.2 2 14.9 97.3 106.4 91.4 24 9.7 98.8 113.7 87.0 2 13.1 99.5 109.3 91 .o 2 14.9 101.4 109.3 92.8 38 9.4 109.8 120.2 91.4 44 13.7 109.4 114.0 96.1 46 14.6 110. I 114.0 96.7 16 15.8 108.3 114.0 95.2 42 13.0 110.0 114.0 96.5 42 13.5 110.0 114.0 96.5 42 14.0 110. I 114.0 96.6 24 9.1 109.5 116.9 93.8 1 14.0 110.1 117.4 93.3 1 15.5 98.6 106.4 92.7 3 15.3 105.1 110.8 95.0 5 17.1 99.8 106.4 93.7 1 13.4 105.8 117.5 90.1 12.5 * 11.3 112.0 121.4 92.2 22.5 l 13.8 109.9 116.9 94.0 l Finished Grade - l *** Indicator test taken on Lot 469 of the adjacent La Costa Meadows Unit ‘3. - Check on 1675 Check an 1678 Reworked Check on 1695 BENTQN ENOINEERING. INC. Project No. 70-lo-28D La Costa Meadows No. 1 T-21 October 12, 1971 - Approx- imate Test Location No. Lat No. 713~. 12 714 11 715 10 716 9 717 5 718 4 719 3 720 2 721 42 722 42 723 185 724 185 725 145 726 145 727 Unicornio St. Opp. Lot+160 728 84 729 80 730 81 731 114 RI115 732 I 733 105 734 104 TABLE OF TEST RESULTS (CONT.) Depth of Fill at Test in Feet Field DV Meirture Density % dry wt Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 24.0 + 15.5 104.7 115.3 90.7 20.5 l 14.4 110.9 116.9 94.8 20.5 l 14.0 105.4 113.7 92.9 26.5 l 13.5 107.3 113.7 94.7 20.5 l 11.7 107.4 117.4 91.5 22.0 * 11.4 107.9 117.0 92.1 20.5 l 12.0 110.1 117.0 94.1 24.5 l 11.7 110.6 117.0 94.5 5 16.2 103.1 113.2 91.0 7 11.7 106.0 117.0 90.6 26 15.4 121.8 131.8 92.5 28 16.0 119.9 131.8 91.1 14 12.8 109.1 116.7 93.6 16 13.1 108.1 117.0 92.4 2 15.9 97.4 106.4 91.5 14 4 2 1.5 23.0 * 19.0 l 24.5 l 8.0 110.7 115.3 95.9 10.0 104.0 115.3 98.1 9.3 110.6 117.4 94.1 13.7 111.4 118.8 93.7 13.5 105.7 117.4 90.0 9.0 95.8 117.4 81.7 12.3 100.5 117.4 85.5 16.8 107.2 118.8 90.2 8.2 102.7 117.4 87.5 17.8 110.0 118.8 92.6 10.7 103.3 113.7 91.1 16.5 110.9 118.8 93.3 14.3 107.1 117.0 91.5 11.6 102.8 113.7 90.4 15.5 121.2 131.8 91.8 15.6 120.3 131.8 91.5 16.6 119.6 131.8 90.6 16.7 120.0 131.8 91.1 735 Bet. Lot114 8115 5.5 736 108 18.5 l 737 738 739 740 741 742 743 744 745 746 747 Bet.gLet114 dl15 9.5 6 Bet. Lot114 8,115 13.5 106 18.0 l 80 8 183 48 184 46 187 48 Luciemoga St. 46 Opp. Lot 1192 193 28 81 10 l Finished Grade 14.4 122.2 131.8 92.6 14.1 108.2 119.0 91.0 Reworked Reworked Reworked BENTON ENGINEERING. INC. - -~ -. - - - - - -. - - Proiect No. XI-lo-28D La Costa Meadows No. 1 Test No. 748 749 750 751 752 753 754 755 756 757 758 759 760 761 762 763 764 765 766 767 768 769 770 771 772 773 774 775 776 777 778 779 780 781 782 Approx- Depth imate of Fill Location at Test Lot No. in Feet 80 82 81 80 82 80 83 85 80 81 82 83 195 143 142 141 81 140 139 136 135 134 12 4 14 16 8 20 4 14 ;: 12 8 6 25.0 l 21.0 l 19.0 * 18 10.5 l 6.0 l 12.5 l 21.0 + 26.5 l 24.5* 8 32 46 52 18 24 22 12 8 28 26 16 133 194 193 182 183 84 80 81 82 83 80 81 82 l Finished Grade T-22 cctobr 12, 1971 TABLE OF TEST RESULTS(CONT.1 Field DV Moisture Density % dry wt Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 13.4 103.1 113.7 90.9 10.5 111.9 121.4 92.1 12.2 113.2 121.4 93.2 12.2 111.9 121.4 92.0' 15.6 106.9 117.5 91.0 11.4 107.7 115.3 93.2 12.8 106.9 115.3 92.6 13.9 99.1 109.0 90.9 25.4 90.3 106.4 84.7 Reworked 21.8 90.1 106.4 84.7 Reworked 18.0 95.1 121.4 78.3 Reworked 20.2 95.0 110.0 86.5 Reworked 12.5 114.1 120.6 94.8 15.5 112.5 119.0 94.5 13.5 114.0 119.0 95.8 11.9 113.0 119.0 95.0 13.4 114.5 121.4 94.3 14.1 100.1 117.4 85.3 Reworked 14.8 103.6 117.4 88.2 Reworked 15.8 111.0 119.0 93.3 13.9 106.9 119.0 89.8 Reworked 14.7 103.9 119.0 87.3 Reworked 10.1 110.9 115.3 96.1 15.1 111.5 120.6 92.6 11.2 110.9 120.6 92.0 11.9 111.1 120.6 92.1 13.0 112.9 120.6 93.6 12.1 103.0 108.8 94.7 15.3 95.9 106.4 90.0 Checkon 1756 16.6 98.0 108.6 90.4 Checkon 1757 13.7 104.1 108.6 95.9 Checkon 1758 13.8 100.3 108.6 92.5 Checkan 6759 13.0 102.0 111.3 91.6 13.3 103.9 113.7 91.4 13.2 103.0 113.7 90.7 BENTON ENGINEERING. INC. - - -, - - - - - - - - Proiect No. 70-lo-28D La Costa Meadows No. 1 Approx- imate Test Location No. Lot No. 783 83 784 84 785 82 786 83 787 85 788 195 789 196 790 198 791 Grulla St. opp. Lot 1145 792 153 793 152 794 Grulla St. opp. Lot 1147 795 150 796 Grul'la St. opp. Lot 047 797 153 798 152 799 Unicornio St. opp. Lot X68 800 152 801 203 802 43 803 44 804 151 805 Pipe, between Lots 6114 &#115 806 Unicornio St. opp. Lot168 807 Unicarnia St. opp. Lot #78 808 118 809 118 810 Pipe, between Lots #114 b 115 * Finished Grade T-23 October 12, 1971 TABLEOF TEST RESULTS (CONT.) Depth of Fill at Test in Feet Field DV Moisture Density % drywt Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 12 16.9 104.6 113.7 92.1 22 15.2 101.9 108.6 93.9 20 15.3 102.8 113.7 90.5 16 12.1 105.8 113.7 93.2 18 14.2 100.7 111.0 90.7 10 14.7 114.0 120.6 94.6 2 15.9 109.0 120.6 90.6 2 16.2 99.4 109.3 90.9 10 10.8 103.9 115.3 90.0 4 16.7 107.3 117.4 91.5 14 10.2 114.7 117.4 97.6 12 15.4 109.2 115.6 94.6 6 12.4 109.9 117.4 93.5 14 13.8 109.8 115.1 95.4 8 14.5 114.2 121.4 94.0 18 13.6 117.4 121.4 96.8 4 16.7 108.2 117.4 92.2 22 13.4 108.5 117.4 92.3 2 17.2 100.9 109.3 92.1 23.0 l 18.1 104.0 112.3 92.5 25.5 l 17.5 100.9 111.0 91.0 24 13.2 105.0 114.5 91.7 1 16.9 110.9 117.4 94.4 4 4 1 5 21.5 15.0 104.8 11.4 8.5 13.4 115.3 119.0 111.0 117.4 117 4 90.7 13.0 111.9 101.7 110 5 107.7 94.0 91.6 94.2 90.7 BENTON ENGINEERINO. INC Proiect No. 70-lo-28D La Costa Meadows No. 1 T-24 October 12, 1971 TABLE OF TEST RESULTS (CONT.) Test No. 811 812 813 814 815 816 817 818 819 820 821 822 823 824 825 826 827 828 829 830 831 832 833 834 835 836 837 838 839 840 841 842 Approx- Depth imate of Fill Location at Test Lot No. in Fee! 119 1 119 3 205 2 195 14 207 2 205 6 197 4 204 4 206 4 196 6 Bet. Lots 114 & 115 25.5 Bet. Lots 114 8 115 29.5 144 22.5 l 132 27.0 l 207 6 222 131 130 129 128 127 126 125 198 203 Alga Rd. Sta. 55+50 222 204 Luciernago PI. Opp. Lot 1203 208 Alisma St. opp. Lot 1222 194 * Finished Grade 2 11.0 l 10.5 l 16.0 l 28.0 * 54.0 * 50.5 l 51.5 * 6 6 12 2 8 4 4 4 12 Field DV Moisture Density % dry wt Ib/cu ft 10.5 108.1 11.3 113.5 12.0 110.9 13.5 108.2 14.7 107.1 10.6 107.8 12.4 108.1 12.1 101.0 11.2 108.7 13.5 99.6 16.0 109.9 15.1 . 114.0 12.8 112.2 12.3 114.1 16.9 104.9 19.7 94.5 18.4 110.0 20.0 106.5 15.1 109.9 19.0 104.8 12.7 111.5 19.4 102.7 15.0 110.8 11.6 116.1 14.6 110.3 16.7 108.5 17.4 100.6 18.3 106.4 17.8 105.2 20.0 99.9 13.9 97.4 17.6 106.9 Maximum Dry Density Ib/cu ft Percent Compaction Remarks 115.3 93.7 119.0 95.4 113.5 97.6 111.6 97.0 113.0 94.7 114.3 94.3 114.3 94.6 109.3 92.4 116.1 93.5 109.3 91.1 117.4 93.6 Trench Backfill 117.4 97.1 Trench Backfill 117.4 95.6 117.4 97.2 115.3 90.9 109.3 86.3 Reworked 119.0 92.2 117.4 98.6 119.0 92.3 112.4 93.2 117.4 94.8 112.0 91.6 117.4 94.4 121.4 95.6 115.4 95.6 119.0 91.2 111.'8 90.0 Checkon 1826 117.4 90.6 111.9 94.0 111.0 90.0 106.7 91.2 117.4 91.0 mP4TON ENGINEERING INC. - - - - - - - - - - ,- Project No. 70-lo-28D La Costa Meadowr No. 1 T-25 October 12, 1971 TABLE OF TEST RESULTS (CONT.) Approx- imate Test Location No. Lot No. 843 193 844 192 845 Luci St. opp. Lot 1192 846 Alga Rd. Sta. 55+25 847 Algo Rd. Sto. 58+25 848 Alga Rd. 849 sto. 55+50 ~, Alga Rd. Sta. 58+00 850 180 851 57 852 124 853 123 854 122 855 57 856 145 857 160 858 159 859 Pipe, Lot '57 860 15 861 157 862 156 863 155 864 181 865 182 866 184 867 181 868 180 869 Pipe, Lot 158 a Lot 159 870 186 871 Luci St. opp. Lot 1192 l Finished Grade Depth of Fill at Test in Feet Field Moisture % dry wt Dry Denrity Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 36 18.1 105.7 111.9 94.4 46 14.5 92.1 111.3 82.6 Reworked 50 16.2 Fo.2 106.7 84.6 Reworked 14 17.4 107.4 112.8 95.1 2 16.4 108.7 115.5 94.0 16 18.2 107.1 112.8 94.9 4 17.8 107.1 114.6 93.4 4 13.3 116.5 126.5 92.0 3 16.0 112.6 117.4 95.9 48.0 l 16.2 111.8 117.4 95.2 36.0 l 15.2 104.2 115.3 98.2 11.0 l 18.2 105.7 113.4 93.2 5 15.0 109.9 117.4 93.5 18.5 * 17.0 110.4 118.2 93.3 2.0 l 20.0 102.7 113.4 90.6 1.0 * 18.4 102.4 113.4 90.3 7 16-4 106.3 117.4 98.5 2.0' 19.1 96.6 117.4 82.3 1.0 * 16.1 109.5 117.4 93.2 1.0 * 12.1' 112.3 117.4 95.6 1.0 l 18.4 105.5 116.1 90.8 20 14.0 105.2 115.3 91.2 52 12.5 103.2 113.7 90.8 50 11.5 108.7 115.3 94.2 24 14.0 110.8 119.0 93.0 8 13.1 113.2 119.0 95.2 11 16.5 103.0 113.7 98.7 Reworked 50 15.4 102.8 113.7 98.5 50 15.9 105.4 113.7 92.6 Checkon '845 BENTON ENGlNEERIN6. INC. - - - - - - - - - - - - Project No. 70-10-281) LaCosta Meadows No. 1 T-26 October12, 1971 Approx- imate Test location No. Lot No. 872 192 873 Pipe, Lot 158 al Lot 159 874 184 875 186 876 187 877 188 878 188 879 187 880 188 881 189 882 188 883 187 884 188 885 189 886 Pipe, Lot1158 a Lot #ta9 887 188 888 187 889 189 890 188 891 189 892 184 893 187 894 188 895 189 896 186 897 187 898 Pipe, Lot il58 & Lot Q59 899 177 900 179 901 180 902 Pipe, Lot 1158 gL0t‘159 903 183 TABLE OF TEST RESULTS (CONT.) Depth of Fill at Test in Feet Field Moisture % drywt Dry Maximum Dry Density Density Percent Ib/cu ft Ib/cu ft Compaction Remarks 46 17.2 95.9 106.4 90.1 Checkon #844 15 17.4 104.3 113.7 91.6 54 54 52 20 24 56 28 4 32 60 3e" 19 17.8 105.9 115.7 91.5 15.4 102.9 113.7 90.5 14.2 97.4 '106.7 91.2 17.0 101.0 110.2 91.6 15.6 103.1 110.2 93.5 15.6 104.9 113.7 92.2 15.4 100.2 111.0 90.4 14.9 103.2 113.7 90.7 14.0 103.1 113.7 90.6 16.2 108.8 113.7 95.7 17.2 96.5 106.7 90.4 14.9 99.2 109.3 90.6 14.4 103.5 114.5 90.4 40 15.9 105.8 114.1 92.8 64 19.7 98.1 108.3 90.6 12 14.0 106.9 115.3 92.6 44 13.3 106.1 115.3 92.0 16 10.3 109.1 117.4 93.0 58 18.8 95.9 106.4 90.1 68 19.9 98.9 109.3 90.3 48 20.0 103.3 111.3 92.8 20 18.7 97.5 106.7 91.5 58 17.9 104.0 115.3 90.2 72 18.2 105.9 112.8 93.8 24 16.2 108.8 117.4 92.7 2 4 12 28 95.0 112.8 84.4 Reworked 106.0 112.8 94.0 114.3 115.4 99.2 107.0 115.3 92.7 56 19.5 17.5 15.7 14.4 17.1 99.5 106.4 93.5 BENTON ENGINEERINCI. INC. - - - - - Project No. 70-lo-28D LaCorta Meadows No. 1 T-27 October 12, 1971 TABLE OF TEST RESULTS (CONT.) Test No. 904 m5 906 907 908 909 910 911 912 913 914 915 916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 Approx- Depth imate of Fill Location at Test Lot No. in Feet Luci St. opp. Lot 1192 177 179 Pipe, Lot 1158 d Lot"159 468 175 182 181 181 180 178 179 178 180 179 178 186 187 188 186 189 188 184 Pipe, Lot1158 a Lot 1159 194 189 188 187 186 184 183 120 189 212 54 12 8 32 24 2 56 28 32 16 2 12 6 20 16 10 62 76 52 66 24 56 62 36 16 28 60 80 70 66 60 2 32 2 Field DV Moisture Density % dry wt lb/c" ft Maximum Dry Density Percent Ib/cu ft Compaction Remarks 104.2 115.3 90.4 14.0 100.8 106.7 94.5 Checkan l899 17.6 102.2 113.7 m.0 18.0 104.9 115.3 90.9 8.8 101.9 111.0 91.8 17.6 103.1 109.3 94.4 17.0 96.0 106.7 90.0 16.1 95.8 106.4 90.0 16.8 103.2 112.0 92.2 11.5 117.0 127.6 91.6 12.3 106.2 115.3 92.3 13.2 107.0 115.3 92.7 12.2 106.5 117.4 90.6 12.5 108.9 117.4 92.8 14.0 107.5 119.0 90.4 13.3 105.4 115.3 91.4 13.7 105.1 115.3 91.2 15.1 107.1 117.4 91.3 13.7 105.2 115.3 91.2 13.9 101.3 111.0 91.4 19.3 103.2 114.8 90.0 13.5 106.1 117.4 90.5 15.8 103.2 113.7 90.8 13.2 106.1 115.3 92.1 13.8 99.4 106.7 93.3 16.6 99.2 106.7 93.1 14.5 99.8 110.6 90.3 15.7 99.9 111.0 90.0 16.9 104.1 115.3 90.3 16.5 105.0 115.3 91.0 17.3 98.5 109.3 90.0 13.3 101.9 111.0 91.7 15.6 Ill.1 119.0 93.4 17.7 107.7 115.3 93.3 BENTON ENGINEERING. INC - - h I -’ i. - I - - - - - - - - Project No. 70-lo-28D La Costa Meadows No. 1 T-28 October 12, 1971 TABLE OF TEST RESULTS (CONT.) Test No. 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953 954 955 956 957 958 959 960 961 962 963 964 965 966 967 968 969 970 Approx- Depth imate of Fill Location at Test Lot No. in Feet 214 217 216 215 90 91 216 213 218 217 182 181 183 184 186 187 192 Luci St. opp. Lot 6192 193 180 189 188 187 186 184 183 182 Sewer Backfill Lot Line 181-182 181 174 Sewer Pipe bet. Alga Rd. &bench 173 172 1 18.6 96.5 106.7 90.4 4 9.7 95.8 106.4 90.0 2 14.9 98.4 106.7 92.2 2 20.0 98.4 106.7 92.3 1 19.2 105.6 115.3 91.4 4 12.6 104.1 115.3 90.3 6 13.5 116.0 120.6 96.1 4 15.7 108.4 115.3 94.0 2 14.1 113.3 118.9 95.3 8 14.3 102.2 113.7 90.0 60 16.7 110.1 115.6 95.2 36 12.7 99.2 113.7 87.2 Reworked 64 18.5 107.7 115.6 93.2 70 11.3 113.3 120.6 93.9 74 15.5 114.2 122.1 93.6 84 14.4 103.1 113.7 90.6 50 12.9 104.0 113.9 91.3 58 16.7 101.9 111.c 91.7 40 14.0 100.5 111.5 m.0 24 17.9 105.2 115.3 91.2 36 14.0 104.9 115.3 m.9 64 16.8 103.1 113.7 90.6 88 14.9 100.8 111.5 90.4 78 12.1 101.1 111.5 90.8 74 14.4 103.5 113.7 91.1 68 14.2 104.9 115.3 91.0 64 13.8 104.9 115.3 91.0 3 l * 14.6 102.2 113.7 90.0 36 2 2 1 2 l * 3'over storm drain pipe Field Dry MoTsture Density %drywt Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 14.2 102.9 113.7 m.4 Checkon 1949 13.1 110.3 121.4 91.0 11.6 111.1 115.3 96.4 13.8 114.3 123.5 92.7 13.3 110.0 117.4 93.6 BENTON ENGINEERING. INC. Proiect No. %lO-28D La Costa Meodowr No. 1 T-29 October 12, 1971 - - - - - - - - - - - - TABLE OF TEST RESULTS (CONT.) Test No. 971 972 973 974 975 976 977 978 979 980 981 982 983 984 985 986 987 988 989 990 991 992 993 994 995 996 997 998 999 1000 Approx- Depth imate of Fill Location at Test Lot No. In Feet 188 68 177 6 176 4 Sewer Pipe backfill 6 Alga Rd. to bench Lot Line 179 20 178 16 177 10 176 8 175 6 Sewer Pipe backfill 10 between Alga Rd. to bench 182 187 189 467 172 174 176 178 181 175 Sewer backfi II Alga Rd. to bench Sewer backfill Luc iemoga Ct. opp. Lot #I92 174 174 180 1’19 177 175 176 174 68 18.8 92 16.3 40 12.5 10 11.2 6 l 14.5 6 24.8 12 13. I IA 18.7 40 14.6 10 14.7 14 18. I 13.9 10 11.3 10 18.9 28 14.6 24 18.0 14 12.2 14 18.7 16 16.5 14 15.8 l * 4’ over storm drain pipe l Finished Grade Field Moisture %drywt 11.2 14.0 13.2 19.9 17.1 18.3 20.0 16.5 22.6 18.9 DV Demity Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 105.2 116.8 90.0 108.2 117.4 92.1 105.5 115.3 91.4 99.5 109.3 91.0 103.3 113.7 90.8 102.9 113.7 90.4 102.2 113.3 90.3 101.5 109.3 92.8 98.5 106.7 92.2 103.9 115.3 90.1 96.6 106.7 90.6 111.2 117.4 94.8 107.9 117.4 91.8 104.8 115.3 90.7 105.9 115.3 91.7 93.3 103.1 90.5 104.9 115.3 90.9 92.8 115.3 80.4 106.1 115.3 92.0 105.6 113.6 93.0 106.6 117.0 91.1 Reworked 113.9 124.1 91.6 96.9 Ill.0 87.2 Reworked 100.0 111.0 90.0 Check an 1993 105.9 111.9 94.7 101.5 111.9 90.7 108.0 117.0 92.2 106.1 115.3 92.0 110.0 117.4 93.6 108.3 115.3 93.8 BENTON ENGINEERING. INC - - - -- -. - - - - - - - Project No. 7O-lo-28D Lo Costa Meadows No. 1 T-30 TABLE 0~ TEST RESULTS (CONT.) October 12, 1971 Approx- Depth imote of Fill Test Location at Tort Na. Lot No. in Feet 1001 Sswerbockfill 18 between Alga Rd. &bench 1002 175 18 1003 I77 18 1004 176 20 1005 177 22 1006 178 22 1007 179 28 1008 181 44 1009 Sewer Pipe backfill 22 Alga Rd. to bench 1010 178 26 1011 176 24 1012 183 1013 180 zi 1014 182 72 1015 193 44 1016 195 18 1017 197 8 1018 Sewer backfill 4,. Lot Line 195 6, 196 1019 192 54 1020 184 78 1021 186 82 1022 Alismo St. 8 opp. Lot1222 1023 240 2 1024 240 4 1026 243 2 1026 Intersection 1 Abejorra St. 6 Antflope St. 1027 238 2 1028 244 2 1029 224 2.5' l e 4' over stom drain pipe l Finished Grade Flold DV Moisture Density %drywt Ib/cu ft Maximum DV Density Ib/cu ft Percent Compaction Remarks 15.7 108.2 119.0 90.8 16.3 106.5 115.3 92.4 13.6 107.8 115.3 93.4 13.4 106.0 115.3 91.8 Checkon 1988 12.4 109.9 117.4 93.5 15.7 106.3 115.3 92.2 17.3 107.2 117.4 91.4 13.8 108.0 115.3 93.6 13.5 101.2 111.0 91.3 19.1 104.5 115.3 90.6 15.4 106.1 115.3 92.0 15.2 106.5 115.3 92.4 10.0 107.9 115.3 93.6 14.4 102.1 111.0 92.0 15.2 104.3 115.3 90.4 15.8 103.5 113.3 91.2 15.1 109.8 117.4 93.6 16.6 97.2 106.7 91.1 17.1 104.2 115.3 90.2 14.8 113.9 121.4 93.6 16.4 107.8 117.4 91.8 14.8 110.7 117.4 94.1 19.5 101.1 111.0 91.0 18.6 105.9 117.4 90. I 19.1 . 106.0 117.4 90.3 21.3 87.8 102.9 85.2 Reworked 16.6 103.5 113.7 91.1 15.1 104.0 115.3 90.1 17.5 109.2 119.0 91.7 BENTON ENGINEERING. INC. Project No. iQ-lo-28D La Costa Meadows Na: I T-31 October 12, 1971 TABLE OF TEST RESULTS (CONT.) Test No. 1030 1031 1032 1033 - 1034 1035 1036 - 1037 1038 1039 - 1040 -- 1041 1042 1043 - 1044 1045 1046 - 1047 1048 - 1049 IQ50 1051 - 1052 1053 1054 1055 1056 1057 - 1058 1059 1060 - 1061 1062 1063 - 1064 1065 1066 - 1067 - imote Lacation Lot No. 196 183 in 178 179 180 181 207 206 179 Intersection Abejorra St. 8 Antilcpe St. 175 173 174 177 194 179 221 194 222 181 221 178 180 218 205 216 216 192 193 194 I95 206 196 198 199 210 209 Depth of Fill at Test in Feet Field Maisture %drywt Dry Density Ib/cu ft Maximum DV Density Ib/cu ft Percent Compactien Remarks 10 20.6 97.8 108.0 W.6 75 11.0 102.9 113.7 90.6 26 15.4 108.1 117.4 92.1 30 13.4 93.4 106.7 92.1 32 15.6 100.1 111.0 90.1 36 13.0 101.1 111.0 91.0 48 12.2 105.1 115.3 91.0 10 18.5 101.7 112.2 90.5 8 18.7 102.9 112.2 91.6 36 14.2 105.2 115.3 91.1 2 11.2 97.4 106.7 91.1 Check on 11026 22 13.9 111.8 119.0 93.9 5 12.7 108.9 115.3 94.4 16 13.7 106.1 115.3 92.0 30 14.9 107.0 115.3 92.8 20 14.2 99.9 113.7 87.8 Reworked 40 20.4 98.4 109.3 90.0 4 13.1 109.1 119.0 91.7 20 20.1 102.7 113.7 90.4 Checkon 11045 6 15.5 107.9 117.4 91.9 52 13.4 110.2 116.1 94.8 8 17.1 101.3 111.0 91.2 34 22.6 100.9 111.9 90.2 ..4Q 14.0 103.9 113.7 91.2 4 18.4 104.1 115.3 90.3 10 19.1 105.2 115.3 91.3 10 14.1 100.1 113.7 88.1 Reworked 10 15.2 100.2 111.0 90.2. Checkon 11056 58, 11.5 110.0 119.0 92.4 48 12.0 105.3 114.5 92.1 24 13.8 108.0 117.4 92.0 22 14.0 105.8 117.4 90.2 12 15.8 110.1 117.4 93.8 14 14.3 96.4 106.7 90.3 10 16.1 98.5 106.7 92.4 2 13.0 101.2 106.7 94.8 4 15.9 102.0 109.3 93.3 2 12.3 105.0 113.7 92.2 - - - -. - - - - - - - - - Proiect No. 70-IO-28D LaCosta Meadows No. 1 T-32 October 12, 1971 Test No. Approx- Depth imate of Fill Location at Test Lot No. in Feet Field DV Moisture Density %drywt Ib/cu ft Maximum DV Demity Ib/cu ft 1068 198 I4 19.4 102.3 113.3 1069 203 10 17.1 104.8 112.1 1070 197 I2 15.2 97.6 106.7 1071 204 12 18.7 87.5 106.7 1072 208 8 21.0 96.3 106.4 1073 211 4 16.8 93.1 111.0 1074 204 I2 14.6 116.1 122.7 1075 211 4 16.5 113.7 121.4 1076 203 14 il.3 115.1 121.4 1077 202 2 16.8 103.9 113.7 1078 45 25.5 * 14.1 104.9 115.3 1079 46 24.5 * 16.1 110.1 119.0 1080 47 22 l 18.0 98.5 108.7 1081 48 26.5 l 17.2 105.1 115.3 1082 186 86 19.6 99.8 110.2 1083 187 96 13.4 114.0 121.8 1084 19% 44 15.7 102.9 113.7 1085 49 22 * 14.8 103.2 110.7 1086 50 20.5 * 15.9 100.1 110.7 1087 51 15.5 * 15.3 108.8 116.1 1088 52 10 * 11.5 114.8 121.4 1089 35 52.5 l 23.2 99.8 110.3 1090 36 42.5 * 14.2 107.8 117.4 1091 37 32.5 * 14.1 108.1 117.4 1092 33 18.5 * 14.7 113.9 ~119.0 1093 39 10.5 l 12.9 110.7 119.0 1094 40 8 * 15.9 105.2 116.1 1095 41 9 l 17.6 102.5 113.7 1096 42 9 * 16.0 111.1 119.0 1097 79 11.5 * 15.8 107.1 115.3 1098 80 29.5 * 17.8 104.8 115.3 1099 81 30.5 t 19.2 100.8 111.0 1100 82 22.5 1 20.2 94.2 109.3 1101 83 18.5 e 12.3 110.1 117.4 1102 84 26.5 t 15.6 101.9 111.0 1103 188 72 Il.3 110.9 121,.9 1104 184 82 17.1 101.1 110.7 1105 187 100 18.6 106.8 115.6 1106 188 76 13.6 103.1 113.7 1107 56 21.5 l 15.6 105.5 115.3 l Finlrhed Grade TABLE OF TEST RESULTS (CONT.) Percent Compaction Remarks 90.2 93.3 91.5 82.1 Reworked 90.6 83.9 Reworked 94.5 Checkon 11071 93.5 Checkon 11073 94.8 91.3 90.8 92.4 90.6 91.0 90.4 93.6 90.5 93.3 90.4 93.7 94.6 90.4 91.7 92.1 95.6 93.0 90.5 90.0 93.2 92.8 90.7 it: Reworked 93.8 91.7 91.0 91.3 92.4 90.6 91.4 BENTON ENGINEERING. INC. Project No. 70-IO-28D La C&ta Meadawi~Na. 1 T-33 October 12, 1971 - - - - - - - - - - - - - Test No. 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 ii24 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 1135 1136 1137 1138 1139 1140 Appmx- Depth imata of Fill Location at Test Lot No. in Feet 57 35.5 l 59 20.5 l 61 6.5 l 146 14.0 l 147 22 * 148 20 * 149 18.5 ' 150 10 l 151 28 l 112 6 l 113 10 * 114 32 l 115 32.5 l 116 27.0 * 203 I6 233 2 TABLE OF TEST RESULTS (CONT.) 231 1 232 1 232 1 231 5 232 5 Luciemaga St. 4 opp. Lot188- 189 Luciemaga St. 8 opp. Loti88- 189 189 48 186 90 182 North 80 Side 188 80 223 2 240 6 242 2 239 4 241 2 242 6 l Finished Grade Field DV Moisture Density %drywt Ib,'cu ft Maxium DV Density Ib/cu Ft Percent Compaction Remarks 20.8 93.7 110.8 84.5 Reworked 14.1 108.8 115.3 94.3 15.8 108.2 115.3 93.9 16.7 108.6 117.4 92.5 18.3 113.3 119.0 95.2 17.6 105.6 115.3 91.5 16.0 107.8 115.3 93.5 17.1 97.8 109.3 89.4 Reworked 10.5 108.6 115.3 94.1 11.1 108.3 119.0 91.0 11.7 110.8 119.0 93.1 18.9 95.3 113.7 83.9 Reworked 14.2 111.2 119.0 93.3 14.6 98.8 113.7 87.0 Reworked 17.6 103.8 115.3 90.0 20.8 100.8 109.3 92.2 il.5 104.9 113.7 92.2 11.5 100.5 113.7 88.4 Reworked 13.6 104.3 113.7 91.8 Checkon yl125 11.1 105.2 113.7 92.5 12.9 101.5 111.0 91.4 15.5 106.3 115.3 92.0 13.0 102.0 111.0 91.8 10.2 108.1 117.4 91.9 12.9 110.6 117.4 94.1 11.3 107.7 115.3 93.2 13.0 104.0 19.3 93.5 15.1 105.5 14.0 115.0 17.3 99.5 17.8 102.2 114.5 90.6 109.3 90.1 115.7 91.1 121.4 94.7 109.3 90.9 112.7 90.7 121.4 93.2 14.6 . 113.1 BENTON ENGINEERING. INC ProjectNo. 70-lo-28D LaCosto Meadows No. 1 Test No. 1141 1142 1143 1144 - 1145 1146 1147 - 1148 1149 1150 - 1151 1152 1153 -~ 1154 1155 1156 - 1157 1158 1159 - 1160 1161 1162 - 1163 1164 1165 1166 1167 1168 1169 - 1170 1171 1172 - 1173 1174 1175 - 1176 - 2tY Location Lot No. 246 222 240 221 222 239 243 221 222 221 222 212 213 214 215 216 217 218 221 222 179 223 Alismo St. opp. 222 241 223 244 Alisma St. opp. 222 223 240 223 242 223 241 238 Intersection Abe/orro St. & Antilope St. 183 T-34 TABLE OF TEST RESULTS (CONT.) Depth of Fill at Test in Feet Field b Moisture Density %drywt Ib/cu ft Maximum Dry Density Percent Ib/cu ft Compaction Remarks 2 14.4 113.0 121.4 93.1 10 14.9 98.6 109.3 90.0 10 21.7 99.3 109.3 90.7 12 13.3 106.3 115.3 92.2 14 11.1 103.6 106.7 97.1 8 17.4 102.3 113.7 90.0 6 13.3 103.1 110.6 93.2 16 12.4 106.8 110.6 96.6 18 15.9 98.8 109.3 90.2 20 14.8 104.2 111.0 93.9 22 12.2 112.3 121.4 92.4 6 l 16.8 104.5 116.1 90.0 6* 11.3 114.0 121.4 93.8 4* 11.4 109.6 121.4 90.2 2' 10.0 112.7 121.4 92.8 10 l 14.8 112.2 121.4 92.4 12 l 15.6 107.3 119.0 90.1 7* 14.4 106.2 717.4 90.5 24 l 14.9 102.3 117.4 87.2 Reworked 25 - 15.0 101.7 117.4 86.6 Reworked 2 17.3 106.5 113.7 93.8 6 15.8 107.0 113.7 94.0 12 17.9 105.5 113.7 92.7 6 18.1 104.5 113.7 91.8 10 14.3 104.5 113.7 91.8 6 19.9 97.5 106.7 91.4 16 12.6 111.0 117.4 94.6 14 17.6 98.7 109.3 90.2 14 17.2 98.1 106.7 91.9 16 13.0 112.4 117.5 95.5 10 15.4 108.9 117.4 92.8 18 17.4 96.1 117.4 81.6 Reworked 10 9.9 111.0 117.4 94.5 6 11.7 102.5 113.7 90.0 5 14.4 109.0 117.4 92.8 75 15.7 112.3 121.4 92.5 October 12, 1971 ' Flnlshed Grade BENTON ENGINEERING. INC. Pmiect No. 70-lo-28D La Costa Meadows No. 1 1-35 October 12, 1971 Test No. APPWX- Depth imete of Fill Location at Teat Lot No. in Feet 1177 1178 1179 1180 1181 1182 1183 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1104 11% 1196 1197 1198 184 North Side 187 189 184 North Side 201 199 198 200 197 199 199 197 200 196 198 201 197 179 178 199, 198 Luciernaga Pi. Opp. 203 240 238 238 241 241 245 241 246 241 247 241 241 243 l Finirhed Grade 1199 1200 1201 1202 1203 1204 1205 1206 1207 1208 1209 1210 1211 TABLE OF TEST RESULTS (CONT.) Field W Moisture Density % dry WI Ib/cu ft Maximum W Density Ib/cu ft Percent Compaction Remarks 82 15.5 108.3 117.4 92.1 104 12.9 110.2 117.4 93.8 52 13.1 103.8 115.3 90.0 84 12.3 105.9 117.4 90.2 2 13.2 118.5 129.7 91.2 6 13.6 105.5 118.9 97.2 18 12.4 104.1 115.3 90.1 2 12.4 105.8 115.3 91.6 16 12.2 105.7 117.4 90.0 10 13.8 101.1 115.3 87.5 Reworked 10 15.1 111.5 116.1 96.0 Checkon 61186 m 15.6 108.5 116.1 93.5 6 12.8 105.5 116.1 90.8 18 14.8 107.5 116.1 92.5 22 13.6 106.1 116.1 91.4 6 11.3 102.4 113.7 90.0 24 13.6 108.7 115.3 94.2 43' 12.1 99.6 116.1 85.8 Reworked 38 * 11.5 107.3 118.7 PO. I 14 13.7 108.2 116.1 93.2 26 13.1 111.6 119.7 93.2 8 l 15.7 99.8 109.3 91.3 18 11.8 109.2 117.4 92.9 8 13.7 105.6 116.1 91.0 10 10.4 104.7 116.1 90.1 14 16.2 94.3 109.3 86.2 Reworked 14 14.5 101.6 109.3 92.8 Checkon 1202 4 10.5 109.7 117.1 93.6 16 13.9 108.0 114.0 94.5 6 10.8 105.0 116.1 90.3 18 17.4 96.8 110.6 87.5 Reworked 2 17.0 99.3 109.3 90.8 20 19.6 94.1 106.7 88.2 Reworked 22 16.8 102.3 116.1 88.1 Reworked 10 15.1 96.8 106.7 90.7 BENTON ENGINEERING. INC, Project No~70-lo-280 La Costa Meadows No. 1 T-36 October 12, 1971 - - -. - - - - - - Test No. 1212 1213 1214 1215 1216 1217 1218 1219 1220 1221 1222 1223 1224 1225 1226 1227 1228 1229 1230 1231 1232 1233 1234 1235 1236 1237 1238 1239 1240 Approx- Depth imate of Fill Location of Test Lot No. in Feet 244 10 154 3' 153 12 * 152 24 * 85 21 * 86 15 l 87 4' 88 3' 89 2' 186 94 * 189 53 * 188 82. 187 105' Between Lots 4 182 8 183 Trench Backfill 90 2* 91 5* Between Lots 8 152 8 183 Trench,Backfill 184 86 * 183 76 l Between Lots 12. 182 & 183 Trench Between Lots 16 182 8 183 Trench Between Lots 20 182 8, 183 Trench 182 76 l 181 54 * 180 45' 179 43 * Between Lots 4 59 860 Trench 108 18.5 l 107 33 l * Finished Grade Field DV Moisture Density %drywt ib/cu ft Maximum DV Density ib/cu ft Percent Compaction Remarks 18.2 94.2 106.7 88.3 Reworked 12.7 103.2 113.7 90.7 9.9 119.0 126.5 94.1 7.5 109.2 115.3 94.7 11.9 106.8 117.4 90.9 12.7 112.0 117.4 95.2 10.5 108.8 116.1 93.6 1,2. 1 109.9 117.4 93.6 17.7 104.8 109.3 95.7 11.1 108.3 115.3 93.8 13.2 115.3 126.5 91.0 12.3 105.4 116.1 W.6 11.8 109.8 121.4 90.4 13.7 106.3 117.4 90.6 14.8 101.2 111.0 91.0 12.8 108.4. 116.1 93.1 12.0 109.1 116.1 93.8 9.8 112.2 116.1 96.4 10.1 110.9 115.3 96.0 12.9 109.4 116.1 94.2 11.8 118.1 121.4 97.1 10.5 106.1 116.1 91.2 9.5 108 1 116.1 93.0 9.2 107.2 116.1 92.3 10.4 106.1 116.1 91.2 13.1 109.9 117.4 93.6 Checkon 11194 16.5 106 0 117.4 90.2 13.2 106.2 117.4 90.3 14.3 109.1 117.4 92.8 BENTON ENGINEERING. INC Project No 70-10-280 La Costa Meadows No. 1 T-37 October12, 1971 Test No. 1241 1242 1243 1244 1245 1246 1247 1248 - 1249 1250 1251 - 1252 1253 1254 -- 1255 1256 1257 1258 .- 1259 1260 1261 - 1262 1263 1264 1265 1266 1267 1268 1269 - 1270 1271 1272 1273 1274 1275 - -. - Approx- imate Location Lot No. tABlI OF TEST RESULTS (CONT.) Depth Maximum of Fill of Test in Feet 123 158 176 175 Trench,Woter Line Between 36” 2* 29” 30 l 8 Lots 59 b&I Alga Rd. 173 7* 202 7’ 201 10 * 200 9’ 199 15* 177 32 * 174 18 l Trench backfill 12 between Lots 59 660 198 28 * 197 28 l 196 21 l 192 62 * 193 51 l 194 26’, 195 26 + 206 15 l 204 15 l 203 18 * 207 14* 208 11* 209 7’ 210 7* 211 5+ 220 3.5 * 241 22.5’ 240 19.5* 239 11* 242 12 * 243 12 * Trench backfill 16 Over Woter Line Between Lots 59 a 60 * Finished Grade Field Moisture % dry wt DV Density lb/c” ft 107.2 101.1 105.8 106.2 103.2 104.1 107.1 114.2 112.9 107.6 105.1 107.1 100.7 14.6 15.7 11.0 13.0 16.5 11.1 9.3 11.2 11.8 10.7 8.5 12.3 18.4 15.9 14.9 14.8 17.1 16.1 14.7 13.8 14.9 14.5 19.8 10.7 14.2 16.7 16.3 16.3 15.6 16.2 15.6 16.5 18.8 17.9 18.0 BENTON ENGINEER,NC. INC. 107.8 113.0 113.9 111.2 106.6 112.0 117.2 115.9 115.1 102.7 109.6 112.2 108.2 111.9 104.3 112.3 107.3 103.6 113.5 106.4 102.9 101.3 DV Density Ib/cu ft Percent Compaction Remarks 115.3 92.8 111.0 90.8 Checkon 115.3 91.7 115.3 92.1 113.7 90.6 115.3 50.2 117.4 91.1 117.4 97.2 117.4 96.1 117.4 91.6 116.1 90.5 117.4 91.1 111.0 90.6 115.3 93.4 121.4 93.0 121.4 93.9 121.4 91.6 115.3 92.3 121.4 92.3 121.4 96.5 121.4 95.5 121.4 94.8 113.7 90.2 116.1 94.4 121.4 92.4 117.4 92.2 121.4 92.1 113.7 91.6 121.4 92.4 117.4 91.3 114.5 90.4 121.4 93.4 117.4 90.6 113.7 90.4 111.0 91.2 Pmjeot No. 70-lo-28D La Costa Meadows No. 1 T-38 October 12, 1971 Test No. 1276 1277 1278 1279 1280 1281 1282 1283 1284 1285 1286 1287 1288 1289 1290 1291 1292 1293 1294 1295 1296 1297 1298 1299 1308 1301 Approx- Depth TABLE OF TEST RESULTS (CONT.) Maximum imate of Fill Location of Test Lot No. in Feet 245 8* 238 12 * 247 5’ 233 2* Trench backfill 20 Over Water Line Between Lots 59 a 60 Trench backfill 24 Over Water Line Between Lots 59 a 60 59 26 l 60 28 l 232 5* 231 5.5+ 105 19’ 104 24.5* 139 6* 140 10* 134 26.5 * 135 21.5 l 150 10 l 244 10 Alga RocdW. 2 * Side Sta. 66+00 Alga Rood W. 2 *, Side Sta. 64+00 Alga Road W. 2 l Side Sta. 62+00 Alga Road W. 2 l Side Sta. 60100 Alga Road W. 6 l Side Sta. 58+00 Alga Rood W. 18 l Side Sta. 56coo Alga Road W. 12 l Side Sta. 54+00 Alga Road W. 2 l Side Sto. 52xX) * Finished Grade Field W DV Moirture Denrity %drywt Ib/cu ft Density Ib/cu ft 17.8 105.6 116.1 13.8 106.2 117.4 15.9 102.5 113.7 16.5 105.7 116.1 18.8 96.6 106.4 Percent Compaction Remarks 90.8 90.4 90.0 91.0 90.8 15.7 105.9 114.2 92.7 12.8 105.7 114.2 92.6 12.6 106.0 114.2 92.8 18.4 106.4 117.4 90.4 13.8 109.1 115.3 94.5 11.4 115.1 117.8 97.6 Check on 733 11.4 108.0 116.1 92.9 Checkon 734 18.9 103.0 111.0 92.7 Check on 766 13.1 107.6 115.3 93.3 Check on 765 11.6 110.3 117.4 94.0 Check on 769 12.1 111.5 117.4 95.0 Check on 768 11.4 108.9 117.4 92.8 Checkon 1115 20.7 96.2 106.7 90.3 Check on 1212 13.5 112.9 117.4 96.1 14.3 110.3 117.4 94.0 13.0 106.7 113.1 94.2 15.2 113.4 117.4 96.4 13.9 104.6 113.1 92.4 12.7 109.4 115.3 94.8 13.7 112.8 117.4 96.1 14.7 105.9 116.1 91.1 BENTON ENGINEERING. INC. Project No. 70-lo-28D La Costa Meadows No. 1 Ap~rox- October 12, 1971 -. -. -~ _. - - -~ - - - - Test No. 1302 1303 1304 1305 1306 1307 1308 1309 1310 1311 1312 1313 1314 1315 1316 1317 1318 1319 1320 1321 1322 1323 1324 1325 1326 I I imate Location Lot No. Maximum TABLE OF TEST RESULTS (CONT.) Depth of Fill of Test inFeet Field Moisture %drywt 14.7 W DV Density Density Ib/cu ft Ib/cu ft Alga Road W. 2 ’ Side Sta. 50+00 AlgalbadW. 2* Side Sta. 48+00 Alga RoadW. 2 l Side Sta. 46+00 Alga Road W. 2 l Side Sta. 44+00 Alga RoadW. 2 l Side Sta. 42+00 Alga Road W. 2 * Side Sto. 4OtOO 57 35.5 l 114 32* 116 27’ 82 22.5* 244 10 75 1 75 3* 76 2 76 4’ 77 2 77 4’ 78 2 78 4’ 244 12.* : Pressure Sani- 2Above tary Sewer Line Pipe Bet. t.oh34&35 Pressure Sani- 2Above tory Sewer Line Pipe Bet. Lots 34 8 35 PressuN Sani- 4Above tary Sewer Line Pipe Bet. Lats 34 U 35 Pressure Sanl- 4Above tary Sewer Line Pipe Bet. Lots 34 8 35 Pressure Sani- 6Abovs tary Sewer Line Pipe Bet. Lots 34 u 35 110.1 117.4 Percent Compaction Remarks 93.6 13.4 112.3 117.4 95.6 13.9 114.8 117.4 97.7 15.9 109.4 116.1 94.2 12.9 107.2 116.1 92.3 11.4 109.1 116.1 94.0 15.5 96.4 106.7 10.9 110.1 Ilk,0 9.5 105.2 116.1 20.5 96.9 106.7 18.4 98.3 106.7 13.9 104.1 113.0 10.5 101.8 111.0 11.3 107.7 117.4 13.9 109.8 117.4 13.0 103.9 115.3 15.3 104.1 115.3 12.2 114.3 119.0 12.2 115.1 119.0 11.8 108.1 116.1 18,3 107.6 117.4 98.2 Checkon 1108 92.4 Checkon 1119 98.5 Checkon 1121 90.8 Checkon 1100 92.1 Checkon 1212 &1293 92.0 91.6 91.7 93.5 90.0 90.3 96.0 96.6 93,6 91.7 South Side 1815 107.8 15.6 101.0 14.7 102.6 15.8 113.2 115.3 93.2 North Side 112.0 90.1 South Side 112.0 91.6 North Side 117.4 96.3 South Side BENTON ENGINEERING. INC Project No. 7O-lo-28D La Costa Meadows No. 1 T-40 October 12, 1971 TABLE’oF ~EST’RESULTS (CONT.) Test No. 1327 1328 1329 1330 1331 1332 1333 1334 1335 1336 1337 1338 Approx- Depth imate of Fill Location ot Test Lot No. in Feet Pressure Sani- 6 Above tary Sewer Line Pipe e-e. Lots 34 a 35 Pressure Sani- 8 Above tory Sewer Line Pipe Bet. Lots34a35 Pressure Sani- 8 Above tary Sewer Line Pipe Bet. Lots34g35 241 20 223 2, 222 25 221 24 Pressure Sani- 2 Above tory Sewer tine Pipe Using Concrete Vibrator Bet. Lots 34 & 35 Pressure Sani- 2 Above tary Sewer Line Pipe Using Concrete Vibrator Bet. Lots34d35 Pressure Sani- 2 Above tary Sewer Line Pipe Using Concrete Vibrator Bet. Lots 34 a 35 Pressure Sani- 2 Above tary Sewer Line Pipe Using Concrete Vi brator Bet. Lots 34 a 35 Pressure Sani- 2 Above tary Sewer Line Pipe Using Concrete Vibrator Bet. Lots 34 a 35 Field DV Moisture Den&y %drywt Ib/cu ft 18.6 107.7 Maximum DV Density Ib/cu ft Percent Compocticn Remarks 17.2 103.7 117.4 115.3 91.7 North Side 90.0 South Slde 16.5 109.1 1 91.6 North Slde 12.8 105.8 11.0 108.8 10.5 104.3 17.1 105.9 19.5 88.3 1 1 1 117.4 109.6 19.0 13.7 17.4 13.7 93.2 Check an 11209 92.7 Check on I1 172 91.8 Check on #116O 90.2 Check an I1 159 80.6 Reworked 19.4 83.7 109.6 76.4 Reworked 16.5 96.8 109.6 88.4 Reworked 15.2 97.3 109.6 88.8 Reworked 15.4 99.4 109.6 90.8 Reworked BENTON ENGINEERING. INC Project No. 7Q-lo-28D La Costa Meadows No. 1 T-41 October 12, 1971 Test No. 1339 1340 1341 1342 1343 1344 1345 1346 - 1347 - 1348 - Approx- imate Location Lot No. Pressure Soni- TABLE OF TEST RESULTS (CONT.) Depth of Fill at Test in Feet 2 Above tary Sewer Line Pipe Using Concrete Vibrator Bet. Lots 34 & 35 Pressure Sani- 4 Above tory Sewer Line Pipe Using Concrete Vibrator Bet. bh 34 a 35 Pressure Sani- 6 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 a 35 241 22 Pressure Sani- 8 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 8, 35 Pressure Sani- 10 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 a 35 Pressure Son i- 12 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 &35 Pressure Sani- 14 Above tory Sewer Pipe Trench on Slope Bet. Lots 34 a 35 Pressure Sani- 16 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 a 35 Pressure Sani- 18 Above tory Sewer Pipe Trench on Slope Bet. Lots34835 Field W Moisture Density %drywt Ib/cu ft 14.4 112.0 Maximum Dry Density lb/cu ft 109.6 Percent Compaction Remarks 102.3 Check an #1334,#1335, #1336, 11337, 51338 15.0 102.9 109.6 94.0 12.0 105.1 109.6 96.0 20.2 107.0 109.6 97.7 Check on fl210 6.8 103.8 105.0 98.8 7.8 103.9 105.0 98.9 6.9 107.2 109.6 97.9 6.5 103.7 105.0 98.7 12.3 100.9 105.0 96.0 13.6 116.3 121.4 95.9 BErTrON ENGINEERING. ,NC Praject No. 70-lo-28D La Costa Meadows No. 1 T-42 October 12, 1971 Test No. 1349 1350 -. 1351 - 1352 - - 1353 - 1.354 - - 1355 1356 - 1357 - - - - 1358 TABLE OF TEST RESULTS (CONT.) Approx- Depth imate of Fill Location at Test Lot No. in Feet Pressure Sani- 20 Above tory Sewer Pipe Trench an Slope Bet. Lots 34 8 35 Pressure Sani- 22 Above tory Sewer Pipe Trench on Slope Bet. Lots 34 8, 35 Pressure Sani- 10 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 8 35 Pressure Sani- 10 Above tory Sewer Pipe Trench on Slope Bet. Lots 34 8 35 Pressure Sani- 12 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 a 35 Pressure Sani- 12 Above tory Sewer Pipe Trench on Slope Bet. Lots 34 8 35 Pressure Sani- 14 Above tary Sewer Pipe Trench on Slope Bet. Lots 34 h 35 Pressure Sani- 14 Above tory Sewer Pipe Trench on Slope Bet. Lots 34 a 35 North Side of 10 Sewer Pump Sta. Rear of Lots 34 and 35 South Side of 12 Sewer Pump Sta. Rear of Loh 34 and 35 Field Moisture %drywt 14.8 Maximum Dry Density Density Percent Ib/cu ft Ib/cu ft Compaction Remarks 113.1 117.4 96.4 14.2 114.0 121.4 93.8 13.7 104.2 115.3 90.4 19.3 101.6 112.3 90.4 Rear of Lot 14.3 110.3 121.4 90.7 Front of lot 13.0 110.2 116.1 95.0 Rear of Lot 15.0 103.0 113.7 90.6 Front of Lot 18.3 107.8 119.0 90.4 Rear of Lot 15.3 14.1 109.3 111.5 117.4 93.0 11.z.4 94.9 eENTON ENGINEERING. INC, Project No. 70-1%28D La Costa Meadows No. 1 T-43 October12, 1971 Test No. 1359 1360 1361 1362 1363 - 1364 1365 1366 - 1367 1368 1369 1370 1371 - 1372 1373 - 1374 1375 1376 - - 1 2 3 4 5 - 6 7 8 - 9 - - - TABLE OF TESTRESULTS (CONT.) Approx- Depth imate of Fill Location at Test Lot No. In Feet North Side of 14 l Sewer Pump Sta. Rear of Lots 34 and 35 241 79 79 79 25 Rear 24 Rear 25 Rear 24 Rear 25 24 23 151 18 22.6 98.4 109.3 2 12.0 111.1 121.4 4 11.8 110.0 121.4 6 19.3 102.6 109.3 10 11.8 111.3 119.0 6 10.1 111.1 119.0 14 13.3 109.3 119.0 8 11.4 103.3 113.7 18 13.7 111.7 119.0 l@ 13.1 110.6 119.0 3 12.9 100.9 111.0 16 15.3 98.8 109.3 90.0 91.3 90.6 93.8 93.5 93.4 91.9 91.0 29' 91.0 90.2 152 6 13.9 111.2 119.0 93.5 26 43 l 12.2 114.6 119.0 96.1 25 20 l 11.6 109.8 119.0 92.2 24 12 l il.5 115.7 119.0 97.2 23 5.5' 13.3 108.1 119.0 90.9 Sta. 34+00 Sta. 34+00 Sta. 34+00 Sta. 42+75 Sta. 42+75 Sta. 42+75 Sta. 42+75 Sta. 42+75 Sta. 42*75 TESTTAKENINALGAROAD r- cn October, 1YAl and April, f971 2 14.3 104.0 114.0 4 14.7 113.7 121.0 ; 14.7 14.5 106.1 105.6 116.3 114.@ 2 15.2 114.2 121.2 4 15.3 104.0 112.8 6 15.4 109.8 119.4 8 15.4 105.8 112.8 10 15.0 112.9 119.4 91.1 lo-28-7tI 93.8 10-28-70 93.0 10-28-70 90.8 10-30-m 94.3 4-29-71 92.1 4-29-71 91.8 4-29-71 93.9 4-29-71 94.4 4-29-71 Field W Maistun Density % dry wt Ib/cu ft 13.2 ill.5 Maximum DV Density Ib/cu ft 117.4 * Finished Grade Percent Compaction Romorks 94.9 Checkon 11207 Checkon 1626 & 1627 Checkon 1628 BENl~ON EHGINEERING. INC. - - - - - - - - - Project No. 70-lo-28D La Co*0 Meadows Unit No. 1 Test No. 1377 1378 1379 1380 Depth of Fill Location at Test Lot No. in Feet 185 30.0 185 32.5 l 92 1.0 92 2.3 l l Ftnlshed grade T-44 June 28, 1972 TABLE Cf TEST RESULTS Field b hblsture Density %drywt Ib/cu ft 14.5 102.3 14.6 104.1 14.3 103.6 14.4 107.7 Maximum DV Density Percent Ib/cu ft Compaction ill.3 92.0 111.3 93.5 115.0 90.1 117.4 91.8 BENTON ENGINEERING. INC. - - - Project No. m-10-28 D La Costa Meadows No. 1 L-l October 12, 1971 June 28, 1972 LABORATORY TEST RESULTS The maximum dry densities and optimum moisture contents of the major fill materials as deter- mined by the A.S.T.M. D 1557-667 method, that uses 25 blows of a 10 pound rammer falling from a height of 18 inches an each of 5 layers in a 4 inch diameter l/30 cubic foot compaction cylinder, are presented as follows: Soil Type Maximum Dry Density Ib/cu ft Optlmum Maist- ture Content % dry wt Light gray-brown silty fine sand with mica 109.6 12.4 Medium brown fine to medium sandy clay 126.5 9.4 with scattered gravel Light brown fine sandy silt Light gray silty fine sand Yellow silty clay with light gray streaks Dark gray-black fine sandy clay with flecks of lime Light yellow-brown silty fine sand with streaks of lime Light gray silt (lightly cemented limestone) Medium brown clayey silt Medium brown silty fine to medium sand Gray-brown silty fine sand with clay binder Brown fine sandy clay (topsail) Light brown-yellow clayey fine sand Light olive-green silty clay Brown silty clay Medlum brown fine sandy clay Brown fine sandy cloy with scattered gravel Light yellow-gray silty fine sand Light olive-gray clayey silt Gray-yellow slightly silty fine sand Light yellow-brown silty clay with fine to medium sand Yellow-brown slightly clayey fine sand with lime streaks Olive-gray clayey silt with siltstone Light gray clayey silt with streaks of rust Red-brown silty clay Brown fine to medium sandy clay Groy-brawn clayey fine to medium sond Light yellow-brown fine sandy silt Medium brown fine to medium sandy cloy with 115.0 13.5 116.1 13.2 110.7 15.1 115.6 13.8 113.3 14.2 96.5 21.6 106.7 17.4 121.4 11.3 117.8 13.1 118.9 13.0 116.9 12.4 116.9 13.0 110.6 16.7 119.0 13.2 119.0 11.5 117.0 11.7 109.0 16.2 115.3 13.7 109.3 14.0 113.7 13.8 106.4 13.8 111.3 16.0 111.9 15.3 120.2 11.5 123.3 11.7 115.6 14.4 118.0 12.4 flecks of rust Groy-brown silty fine to medium sand with sithtone 117.4 13.1 Light olive silty clay with siltstone 117.0 13.7 Dark gray clay (topsoil) 114.0 16.1 Light olive silty fine sand 118.3 12.2 Brown silty fine to coarse sand with 137.8 8.4 30 to 40 percent grovel BENTON ENGINEERING, INC. -- -~ - - - Praject No. 70-IO-28D Lo Costo Meadows No. 1 L-2 October 12, 1971 LABORATORY TEST RESULTS (CONT.) Soil Type Yellow-brown silty ffne to medium sand with siltstone Yellow-brown silty fine to medium sand Light groy silty cloy with rusty-brown streaks Light brown silty clay with rusty streaks Brown-yellow clayey fine sand Light gray fine to medium sand Light yellow-brown silty fine to medium sand with scattered coarse groins Maximum Optimum Mals- Dry Density ture Content Ib/cu ft % dry wt 116.0 13.7 111.0 15.4 112.8 16.9 120.6 12.2 116.8 12.4 105.0 14.2 116.2 13.5 BENTON ENGINEEIINCI. INC.