HomeMy WebLinkAbout; La Costa Valley Unit 5 Lot 245; Soils Report; 1973-07-24PHILIP HENKING BENTON PRESIDENT. ClVlL ENGINEER BENTON ENGINEERING, INC. APPLIED SOIL MECHANICS ~- FOUNDATIONS 57f7 CONVOY COURT July 24, 1973 Associated Developers 110 West ,“A” Street Suite 1170 San Diego, California 92101 Attention: Mr. Peter Baborovich 3 Subject: Project No. 72-5-8D Report on Compacted Filled Ground Arroyo Villas Condomlnium Lot i45 of La Costa Vdeey Unit No. 5 Rcmcho La Costa Carl&d, California Gentlemen: This is to report the results of tests and observations made in order to inspect the compaction of filled ground placed on certain areas of the subject site. The fills were placed during the period between June 13 and 22,1973. The approximate areas and depths of filled gtuund placed under our inspection In accordance with the approved speciflcatlons are shown on the ottached Drawing No. 1, entitled “Location of Com- pacted Filled Ground. ” The grading plan used for the placement of filled ground was prepared by Tri State Engineering Company. The cppmximate locations at which the tests were token and the final test results are presented on pages 3 and 4, under the “Table of Test I,.esults.” The labsratbly determinations of the maximum dry &nsIHoa and optimum moisture conhnh of the majot fill matotials are presented on page 4, under the “Laboratory Test Results.’ Some of the maximum dry densities shown in the “Table of Test Rmulh” were combtnations of thus. The tesb were taken on the dotes indicated blowt Test Number Dote 1 to 4, Inclusive 5 to 9, inclusive 10 to 16, inclusive 17 to 24, inclusive 25 to 29, inclusive 30 to 37, inclusive 38 ta 43, inclusive June 13, 1973 June 14, 1973 June 15, 1973 June 18, 1973 June 19, 1973 June 20, 1973 June 21, 1973 Project No. 72-5-X) Associctcd Decelo~rs /I&. ; July 24, 1973 The final results of tests and observations inidcate that the compacted filled ground has been placed at 90 percent of the maximum dry density or greater. Recommendations re- garding the safe bearing value of the fill materials, compacted to 90 percent of maximum dry density, and the placement California. I’ Respectfully submitted, BENTON ENGINEERING, INC. D. F. Leake, Civil Engineer Disk (5) Addressee (1) Burkett Engineers (2) City oFCarlsbad Attention: Engineering Department DFL/mpm SENTON ENGlNEERlNG. INC - - - - - - - - - - - Project No, 72-5-80 Associated Developers -3- Test No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Appmx- imate Location l 1+35 2+65 4+00 2+00 1+25 2+50 3+75 1+00 1+25 4+40 2+25 4+20 1+20 2+50 1+25 2+50 2+25 4-m 3+50 Upper Tier 3+50 Upper Tier 2+25 3+75 3+50 Upper Tier 1+25 3+50 Upper Tier 2+50 3+50 Upper Tier 3+50 Upper Tier 3+50 Upper Tier 4+40 Upper Tier 3+50 Upper Tier 4+40 Upper Tler 3+50 Upper Tier Depth of Flll at Test in Feet Field DV DV Molrture Density Density % dry wt Ib/cu ft Ib/cu ft Percent Compaction 2.0 11.7 112.0 123.7 90.5 2.0 12.1 108.1 119.1 90.6 2.0 14.4 108.2 119.1 90.9 4.0 11.4 114.2 124.1 92.0 6.0 12.8 116.1 121.0 96.0 6.0 14.7 110.6 120.6 91.7 4.0 15.1 105.4 115.5 91.4 8.0 13.3 115.2 121.0 95.2 10.0 12.6 114.7 121.0 94.7 6.0 12.4 108.1 118.4 91.2 890 P.6 116.9 127.2 91.8 8.0 12.2 115.3 121.0 95.3 12.0 12.7 113.1 121.0 93.4 10.0 12.0 115.0 121.0 95.0 14.0 11.4 110.1 121.0 91.0 12.0 11.2 111.5 121.0 92.1 14.0 11.8 105.5 121.0 87.2 10-o 13.4 110.2 121.0 91.1 2.0 12.5 112.3 121.0 92.8 4.0 14.0 12.0 ** 6.0 16.0"" 8.0 16.0"* 10,o 15.0 105.4 91.2 12.1 11.2 13.7 119.1 115.0 104.9 115.5 121.0 127.2 115.5 121.0 119.1 127.2 117.3 127.2 119.1 122.3 121.0 127.2 98.4 90.4 90.7 12.0 14.0 6.0 16.0 8.0 16.0 13.3 109.2 14.3 107.2 11.2 116.6 14.8 105.9 ll"5 117,6 13.1 107.3 15.4 110.2 13.5 103.3 13.9 116.1 10.7 109.7 121.0 90.2 90.0 91.5 90.2 92 .*4 90.1 90.1 85.4 91.2 90.6 TABLE OF TEST RESULTS July 24, 1973 Reworked Ckonfl7 I Reworked Ck on 131 BENTON ENGlNEERING. INC. -~ - - - - - - - - - - - - ?mject No. Z?-MD Associated Developers Test No. 34 35 35 37 38 39 40 41 42 43 44 Approx- imate Location l 3+50 Upper Tler O+SO Upper Tier 0+50 Upper Tier 1+00 Upper Tier 6+00 Upper Tier 6+00 Upper Tier 6+00 Upper Tier 6+QO Upper Tier 6+00 Upper Tier 6+00 Upper Tier 6+00 Upper Tier -4- July 24, 1973 TABLE OF TEST RESULTS (CONT.) Depth of Fill at Test in Feet 18.0 Old Fill 2.0 2.0 2.0 4.0 6.0 8.0 8.0 10.0 12.0 Field DV Moisture Density % dry wt Ib/cu fi 13.3’ * 112.4 15.2 110,8 14.7 113.1 12.2 ‘~ 108.6 16.5 108.6 17.2 110.2 13.5 106.8 12.8 102.0 13.1 106.3 13.3 107.1 13.2”‘, 112.3 Maximum DV Density Ib,‘cu ft 124.7 122.3 124.7 119.1 119.1 121.0 117.3 121.6 115.5 119.1 122.3 Percent Compaction Remarks 90.2 90.5 90.7 91.1 91.1 91.1 91.0 83.9 92.0 90.0 91.7 Ck on #41 l Station numbers indicate general vicinity of test location along the statloning line as shown on Drutiing No. 1. Unless otherwise nobd, the tests were located in the lower tier area. ** Finlshed Grado. LABORATORY TEST RESULTS The maximum dry densities and optimum moisture contents of the major till materlals as determined by the A.S.T,M. D 1557-70, that uses 25 blows of a 10 pound rammer falling from a height of 18 inches on each of 5 layers in a 4 inch diameter l/30 cubic foot compaction cylinder, ore presented as follows: Maximum Dry Densit\/ Soil Description Ib/cu ft Dark gray clay (topsoil) 114.0 Gray-brown very fine sandy clay 115.5 Groy-bmwn fine to coarse sandy clay 119.1 Groy-bmwn clayey fine sand 121.0 Yellow-brown sllghtly clayey fine to coarse sand 121.6 Light olive-ray, very fine sandy clay 122.3 Gray-brown slightly clayey fine to medlum sand 127.2 BENTON ENGINEERING. INC. Optimum Mois- ture Content % dry wt 16.1 13.7 12.5 12.0 10.6 10.2 8.8