Loading...
HomeMy WebLinkAbout; Laguna Riviera Estates; Soils Report; 1967-09-28WDDDWARD - CLYDE - SHERARD & ASSDCIATES CONIlULTlNO *cm. ENOlNEERS AND aEOL0018Ts Seotember 28. 1967 ,467K”**~“~ --,~~~~~~ ~~ ~~-* ~~ 8.” DI.80 Project No. 66-237 C.li‘c.rn,. 92110 (714, 114-2911 Kamar Construction Company P.O. Box 71 325 Elm Avenue Carlsbad, California LAGUNA RIVIERA ESTATES CARLSBAD, CALIFORNIA Attached are the results of compaction tests taken at the subject project September 18 through September 21, 1967, and the results of a laboratory test performed on soil types used for fill. LJL/mec Attachments (5) Kamar Construction C0mpan.y (2) City of Carlsbad Building Inspection Department .~+Ahcu c7YvpfT-& ~~. .- _.__ 1.2. d-/-- 6 3- <drnM emfit - 3&c, ALiL, c!l&.z ,3-.a- CL* /-/f-Lb yIJf-& ~+JM& (&pd. f@. &Ii!; /Pa 1?7t,9(‘d 6bL~d 54 5746 Yam& 6-f~~. cd. Lk lL~7b )-y/A4(c 3 d-23- 6 6 /yll maA/ AIL? t 6, A& 3^4: L/o, 4.5 ly2, ?&-ta 2c%t 34 .&a &Lq,, STOCK No. 753% . . l WMm IN u. 5. 1. 3MPACTION TEST RESULT5 - .,ps N*ME Laguna Riviera Estates iaTE September, 28, 1967 JOB NUMBER 661237 0*-x6 September 18 through September 21, 1967 PA&E 1 OF 2 SL-1 Sept. 18 W-l w-2 w-3 S-24 S-25 S-26 s-27 Sept. 21 S-28 s-29 s-30 KELLY DRIVE SEWER LINE Oppos. Lot #18 7' W. of 1l.H. on P.C.R. KELLY DRIVE WATER LINE oppos. Lot #17. Lateral, 5' N. of Curb Betw. Lots #34 & 35, 5' so. of CL oppos. Lot #9, 5' so. of CL KELLY DRIVE STREET SUBGRADE Oppos. Lot #16, 10' N. of CL Oppos. Lot #ll. 25' N. of CL Oppos.Lot #6, 5' N. of CL Betw. Lots #12 & 13, 10' so. of CL KELLY DRIVE STREET SELECT BASE Oppos. Lot #18, 5' ,N. of CL Prop. Line Lots 15 & 14, 15' N. of CL Oppos. Lot #ll. 25' N. of CL -1' -1' -1' -1' 9.3 11.7 13.7 13.5 F.S.G. 4.2 0 F.S.G. 8.7 F.S.G. 11.1 F.S.G. 12.3 F.G. 9.6 F.G. 5.3 F.G. 4.8 111.2 121.5 91.5 117.2 121.5 96.7 119.2 121.5 98.3 121.2 121.5 99.8 119.1 121.5 98.0 115.2 121.5 94.9 113.6 121.5 93.5 113.4 141.5 142.9 143.5 121.5 93.3 139.0 139.0 139.0 101.8 102.6 103.1 -’ OMPACTION TEST RESULT5 - 1 .l.oe NAME Laguna Riviera Estates DATE September 28, 1967 JOB NUMBER 66-237 DATES September 18 through September 21, 1967 PAGE 2 or 2 s-31 S-32 s-33 s-34 s-35 S-36 s-3~7 S-38 s-39 s-40 s-41 Prop. Line Lots 8 & F.G. 7, 10' N. of CL 5.7 136.8 oppos. Lot #5, 30' N. of CL F.G. 4.8 141.0 Prop. Line Lots 1 & F.G. 2, 2' N. of CL HILLSIDE DR.-STATIONS: 1+00, 10' w. of CL 0+70, 12' E. of CL KELLY DR. LINE OF LOTS: 2 & 3, 5' so. of CL 6 & 7, 30' So. of CL 10 & 11, 12' So.of CL oppos. Lot #14, 20' so. of CL oppos. Lot #17, 5' so. of CL El Camino Real, 20' So. of So. curb & 15' E. of E. curb F.G. 5.9 137.0 F.G. 4.6 133.9 F.G. 4.8 135.0 F.G. 3.3 136.0 F.G. 6.4 141.0 F.G. 5.7 136.7 F.G. F.G. 5.9 142.8 4.4 5.9 135.8 138.0 *Depth of fill is measured below ground surface. . . . F.S.G. indicates finish subgrade. F.G. indicates finish grade of Base material. 139.0 139.0 139.0 139.0 139.0 139.0 139.0 139.0 139.0 139.0 139.0 98.4 101.3 102.7 98.5 96.3 97.0 97.8 101.3 98.3 97.7 99.3 WOODWARD*CLYDE*SHERARD&ASSOCIATES sui, "d Puun&,,mi E"~,.cninp - JMPACTION TEST RESULTS - .IoH N/\ME Laguna Riviera Estates DATE September 28, 1967 JO8 NUMDER 66-237 D/\TES September 22, 1967 PAGE 1 OF 1 YOISNII .trw umc.RATo”” “m.hTI”I o*n TlsT RETas, LOCATIOH HmO*T SO*Tz”T DFWSri DINSmv COMPACTION N”*aEn 01 O.,lLL c Dr.” WT. FCI PC, x 0, IAs. DINS. - Following is the result of a laboratory test which was performed on the soil type used at the subject project, September 22, 1967. LABORATORY COMPACTION TESTS - A.S.T.M. D1557-64T Sample Location Visual Number Where Secured Description Maximum Dry Optimum Moisture 'Density; pcf Content, Percent 8 Job Site (So. Coast Select Base 3/4" 139.0 7.5 A.C. Plant) WOODWARD*CLYDE-SHERARD&ASSOCIATES .%, ad fi""*tia E"yi,w,,i"p WOODWARD - CLYDE - SHERARD & ASSOCIATES CONIIVLTINQ DOW ENQlNEERS AND OEOlOCtsTS 3467 Kurta *tnti September 28, 1967 8." DI.LO Project No. 66-237 Cawoml. 92110 (7141 224-2911 Kamar Construction Company P.O. Box 71 325 Elm Avenue Carlsbad, California LACUNA RIVIERA ESTATES CARLSBAD, CALIFORNIA Attached are the results of compaction tests taken at the subject project September 18 through September 21, 1967, and the results of a laboratory test performed on soil types used for fill. LJL/mec Attachments (5) Kamar Construction Company (2) City of Carlsbad Building Inspection Department JMPACTION .;&A NAME Laguna Riviera Estates JOB NUMBER 66-237 TEST RESULTS - !aTE September, 28, 1967 CMTES September 18 through September 21. 1967 P.4GE 1 OF 2 SL-1 Sept. 18 W-l w-2 w-3 S-24 S-25 S-26 S-27 Sept. 21 S-28 s-29 s-30 KELLY DRIVE SEWER LINE Oppos. Lot #18 7' W. of M.H. on P.C.R. KELLY DRIVE WATER LINE oppos. Lot #17. Lateral, 5' N. of Curb Betw. Lots #34 & 35, 5' so. of CL oppos. Lot #9. 5' so. of CL KELLY DRIVE STREET SUBGRADE Oppos. Lot #16, 10' N. of CL Oppos. Lot #ll, 25' N. of CL Oppos.Lot #6, 5' N. of CL Betw. Lots #12 & 13, 10' so. of CL KELLY DRIVE STREET SELECT BASE Oppos. Lot #18, 5' N. of CL Prop. Line Lots 15 & 14, 15' N. of CL Oppos. Lot #ll, 25' N. of CL -1’ -1' -1' -1' F.S.G. 9.3 111.2 121.5 91.5 11.7 117.2 121.5 96.7 13.7 119.2 121.5 98.3 13.5 121.2 121.5 99.8 . 4.2 . 119.1 121.5 98.0 115.2 121.5 94.9 F.S.G. 8.7 F.S.G. 11.1 F.S.G. 12.3 F.G. 9.6 F.G. 5.3 F.G. 4.8 113.6 113.4 141.5 142.9 143.5 121.5 93.5 121.5 93.3 139.0 139.0 139.0 101.8 102.6 103.1 WOODWARD*CLYDE*SHERARD&ASSOClATES Sd *wi C""ldOlion E"m‘wd"~ JOB NAME JOB NUMBER DATES _ JMPACTION TEST RESULTS Laguna Riviera Estates 66-237 September 18 through September 21, 1967 DATE September 28, 1967 PAGE 2 OF 2 s-31 S-32 sr33 s-34 s-35 S-36 s-37 S-38 s-39 s-40 s-41 Prop. Line Lots 8 & 7, 10' N. of CL oppos. Lot #5, 30' N. of CL Prop. Line Lots 1 & 2, 2' N. of CL HILLSIDE DR.-STATIONS: 1+00, 10' w. of CL 0+70, 12' E. of CL KELLY DR. LINE OF LOTS: 2 & 3, 5' so. of CL 6 E 7, 30' So. of CL 10 E 11, 12' So.of CL oppos. Lot #14, 20' so. of CL ;:po',; ;;t #17, 5' El Camino Real, 20' So. of So. curb & 15' E. of E. curb F.G. 5.7 F.G. 4.8 F.G. 5.9 F.G. 5.9 F.G. 4.6 F.G. F.G. F.G. F.G. F.G. F.G. 4.8 3.3 6.4 5.7 . 4.4 5.9 *Depth of fill is measured below ground surface. . F,S.G. indicates finish subgrade. F.G. indicates finish grade of Base material. 136.8 139.0 141.0 139.0 142.8 139.0 137.0 139.0 133.9 139.0 135.0 139.0 136.0 139.0 141.0 139.0 136.7 139.0 135.8 139.0 138.0 139.0 98.4 101.3 102.7 98.5 96.3 97.0 97.8 101.3 98.3 97.7 99.3 WOODWARD*CLYDE*SHERARD&ASSOClATES sui, "ld Fuvndarrm PwiScning 3MPACTION TEST RESULTS'- he NAME Laguna Riviera Estates DATE September 28, 1967 JOB NUMBER 66-237 DA.TES September 22. 1967 PAGE 1 OF 1 YOIOSUR‘ .ISLD UBORIIOR” “m.hllYl nrn N:pm.‘,m “ms*T LoCATlON HElOIll CON~NI D~NBlr# D*N*ln CoI,*6T10* 0, O,,,LL * 011”W. nr ?.a x or aa. DINe. Following is the result of a laboratory test which was performed on the soil type used at the subject project. September 22, 1967. LABORATORY COMPACTION TESTS - A.S.T.M. Dl557-64T Sample Number Location Where'Secured Visual Description Maximum Dry 'Density; pcf Optimum Moisture Content, Percent 8 Job Site (So. Coast Select Base 314" 139.0 A.C. Plant) 7.5 WOODWARD. CLYDE. SHERARD & ASSOCIATES s*ii wd r”lm&t,ml Enyiwsrinp BEE CEE Co. 39% STATE 3TREET CARLSAD, CALIFORNIA 92003 Apl-il A, Uiil bt. (r hr. Job0 Tr’rrttw 3436 Jww Drive carMlod, Wif. Pew Br. wd J&r. koMosr hr yWt K@@tWt, VO b&w wkad the Seltdt~ mt@nt of tbr Ctcy ef Cerlrbed to c&L+ tb sUrr8r of your o*v bow is the Saadohod Wl* r~Miv&a&o8 Lo GarlMmd. The oddrerm &iv80 VU or$&mmlty by rbv 8~5111~ Sepertavnt VW ic25 sodolwod bwo l&e am oddvar vtlt boI W36 Jwoc srirc, h&o&i tre tru8C you rt%L wrrfy cboee parlieu v&tca *co HWl8le# your lmw, to tfli* +ffmt. Sisereiy SW co* co. Lwi8L.cAwe CCK CCK SW M* aor A txcotrie co SW M* aor A txcotrie co Yaclfia Talypbnn Yaclfia Talypbnn city of krwad city of krwad RECEIVED RECEIVED APR 4 1967 CITY OF CARLSBAD Building Department 31 ;-II& DRESSELHAUS ENGINEERS @.S. CONSUL. JNG C/V/L. ENGhVERS ‘?/ 13 ;) -I,-- 528 SOUTH HlLL STREET + OCEANsIDe, CALlFORNlA + PHONE m-2126 DONALD F. DRESSELHIUS. C.E E. BRIAN SMITH. C.E. February 16, 1767 Raybob 755 Elm street Carlsbad, California .!ttention: Mr. Robert l.,. i;; atson ok cARLSBty c\Ty Departme gui\d\@ Fe: Job Xi:. Z-2583 C‘cean Viev,. ?:states Car!sba:i, Lalrforma Subject: PepGirt of Soil C;m-paciion Tests G ~ntlen:en: I* con;pliance u ith your r,-cjlrst; v~ (1 have insys?tctY 5x1 ‘~ t~ei.ed the placing of film! sc;il c:n ‘he c‘ ree:: :.i:!?!-: !-.;:,a~$ :I.?? ,:Y:-r:,z.in lc,, :s vi i;h- in C;cean Vicv ‘:s?atcr;, in Ar ‘:i :: :,? ;~:nr!sbn :, :: !i?:,, i-nia. The fill uas place ~! ?zrir. < lhi :leri,., ‘-,j.;rQay 3 ‘i, :3 ) 1 ‘Ii> 7. ;:?ricr tc the FAacinp c:! any fi.!!, Lhi: :~T~;:IE !(~’ rcc-i-go Fili~ \ ece cleared of all <;rganic or .iclet.?ri~~~.s I: 3,^:iSL. ‘i he are,as i. erc: i:i3en scarifieti an-i recon,pacten tc ncj: le*:, than ?‘~Y .f mauii-. wr -!ensity :,~I provicle a bond be,:ween the in-;,lacE s1 i! a~r.5 :~i!; 1.’ ,?t?rial. The foregoing does nc,t guarantee that vuids m geolqgic ~eaimesses ci<, not exist belcu the stril:Fe:~i and scarifiel surface. The fill was placed in six (6) inch layers, and cun-gac;ed to not less than 93% of the R axin urn density by means cf a sheepsfoot ruller. Field density tests were ta’:en every une (1) foot in vertical height uf fill placed to insure complete control of the operations. The results and locations of the field density tests are repoxed on the folkming en- closures to this report. DRESSELHAUS ENGINEERS 2-r?583 Ocean View Estates 2-16-67 Pg. 2 Following is a list of lot8 within the subdivision on which fill ground was placed. The maximum depth rzf fill is also reported. Lot Piumber -.-_. 1 2 3 4 5 l? I1 12 ‘Depth of ,Fill, Feet ----- - 3. 1 3. 1 2. 5 2. 5 3. 9 2. 9 3, ” 2. ? i .- . Any aciditional fill ~ils.ceJ il n any l,:t in the s:ub,,livi.si,un shall be @aced as Coni~Ollec~, ccm~;xt:te~C, >!ill. ‘~8 11” \ ,;r c F,i?:>L? 1 j ‘;. >$ ,~$ ~ {, < 1 : n i ,y, r the supervision of a qualifie- y,L,i!s i:nz:iricr-r. Base; I:I~ the l.'.niCt:rn ?iuii, ir:y : iL, r, -; s;;g cc:: Iy,:>a:.:r? ~_ .J:;!,:z c,:“ !:)g?? po:mds PC?\,- ,?quare ?!.,>I~,,' !- 2)' LF. .;5;; ," z ;?':c::~ if it;nal 7;:ri. in:i; I <i,<~;tinc;.s placed twelve (12) i.nc!iec l-ic::::v :~t:‘.: I ‘4, :~‘:*. .~;:t,~,1:7 si.r’x.~ in :I,: cc:r :;zctel: fill ;2r:,vi,;es a.fectustt2 ~rrii..lr~ ?’ ,~ ‘/ : .i ij.71 ,i~;:icj; 2!.! s::-uc:ures is provi:.!e:,. an-i ii ainraine :. Respectfully submi;~teL, DRESS 7; i, H P ES F~, NG IN E E: Z’S --.-L---~~.-~-.. E. Erian Smith RC:E 13, :!I7 FBS:ct Ihclosure: Report of field density tests Plot Plan Compaction diagrarr cc: City of Carlsbad, Bldg. Dept. Date: February 16, 1165 Re: Job Nr;. 2-2583 Ocean View ~Sstates Ca,rlsba,d, Ca.lifomia RSi?ORT C:F FE:!, r> 1: ?NSITY TESTS Date & Depth Field Field Tlry Max. Dry ai, Test # FL L<>catii:r: Woisturc I;..~nsity Density Conpac- .- -.-._._ - ,,-,_. -..-- .~~._--__-_---__-7,.~.---~~J~~~~~~.Ibs/cu. ft. ,I_. tion 2-3-67 Naf!? rail 1 &? ( j .I~ 122. 7 87. L 2 1J2?l,.~~,! F,oil 2-4-67 Natural 3 ‘:Cil 4 5 6 2-6-67 7 8 ‘9 10 11 2-7-67 12 1. 0’ of Fill 13 1. 0’ of Fill 14 1. 0’ of Fill E c? (! f;:, 1’ .,: ,,’ . 1. ^ ii : i ,. ,, ‘1 -~ : -’ :,~. ;? !y 11’. .i 7. 5 F? 113. ,‘: ‘:TJ: 3:l~,ie Circ!c b. “1 / 1 ‘2 ‘2 . ,,I ~: ,~~. jz,; ‘?,(~ :‘:,I;$ ,i~~ ‘y ;: : 7 ,:; ! : & , , Avon~iale Circle ii. 3:; :i ‘i. i j . ~1 .q. 111. : Bedford Circle 6. 40 !I;!. 9 6. 3a 121. 3 Avondale Circle 6. 30 119. 4 124. 3 120. ‘9 1x,4. 2 ‘26. 3 I,??. 5 12.1. :I 1.21. ” :.::3. : 132. 4 126. 3 126. 3 126. 0 81. !I 87. ‘3 87. 2 92. :i 89. I ‘) 5 k.. .! 94. 2 89. 3 91. :I 30. 3 35. 0 96. 4 94. 9 Date: February 16, 1967 Re: Job No. 2-2583 Ocean View Estates Carlsbad, California REPORT CF FIELD DENSITY TESTS Date & Depth Test # Ft. Lccation .T & ield Field Dry Max. Dry % Moisture Density Density Compac - % lba/cu. it. lbs/cu:ft. tion - -- 15 16 2-8-67 17 18 19 2-9-67 20 21 22 23 24 25 26 2-10-67 27 28 1.0’ of Fill Natural Soil Natural Suil 2. 0’ ai’ Fill 2. 9’ of Fill 2.0’ of Fill 0. 5’ of Fill Natural ‘oil LI 0. 5’ of Fill 2. 0’ of Fill 2. 0’ of Fill 2. 5’ of Fill Avondale Circle 6. 55 Lot #lo 7. 80 SEE REMVfE:;3IAL TFST A”22 Lot fi2 6. 42 .Avondale Circle 7. :38 s’I1c KJT&I;Jj;?:J; yi;s?; #32 Bedfor. Circle 6.65 Eivondale Circle 7. 34 119. 9 127. 2 Lot #IO 8. 89 112. 7 125. 0 ‘..,07 ci’) ii. 89 113.4 126. 3 Lot ii23 7.19 Ul. I 117. 5 Lot #I 1 ‘9.18 IF. 3 131. 5 Lot # 9 8. 43 119. 8 131. 5 Lot #IO 7.44 114. 2 126. 2 Finish Grade Bedford Circle 6. 23 124. 1 131. 5 94. s Finish Gradeq s/ 6. 03 122.4 131.5 93.1. 120. 8 126. 0 95. 3 ill.4 126. b 88.1 110. 8 122. 8 105. 8 126. 8 I?‘). 7 128.2 JO. 2 84. 3 93. 2 94. 2 90. 2 30. 1 94. 6 90. ‘I 91. ;2 90. b -2- Date: February 16, 1967 Re: Job No. 2-2583 Ocean View Estates Carlabad, California REPORT CF FIEL,D DE’NSITY TESTS Date &I Depth Test # Ft. Field Field Dry Max. Dry % Location Mtiisture Density Density Compac - % lba/cu. ft. lbslcu. ft. tion - 29 1. 0’ of Fill 30 1. 0’ of Fill 31 0. 5’ of Fill 32 2. O1 of Fill 33 1. 3’ of Fill 2-10-67 34 1. 0’ of Fill 35 1. 3’ ::f Fill 2-13-67 36 1. 0’ of Fill 37 Finish Grade 38 Finish Grade 39 1. 0’ of Fill 40 Finish Grade Lot #ll 7. 76 120.9 131.5 91. 8 Lot # 9 8.02 118. 9 131. 5 90 4 Lut #4 5. 94 107.6 He. 0 91. 2 L:t 4 3 8. 79 122.7 131.5 93. 2 Lot it 2 8. 49 117. 5 127.0 91. 5 :,ot K 1 7. ‘jr, 1-M $2 7. 70 s:r:17: p ?i jv:~ 3: i)t'. im 'I‘ :;‘s li' jj 3 9 Lot # 3 Avondhle Circle Lot # 2 Lot # 4 10.74 l~c!. 51 117.1 126.2 5. 71 121.7 8. 44 125.2 8. 68 117.5 115.4 128.3 90. 0 113. 2 127.7 88. Pi 13c. 0 90. 2 131.8 35. 9 127.5 ?5.4 133.0 96. 4 123.5 93. II -f,, :’ ) ‘I ., .,, ” \\ i ‘\._ _ i \I 5.55. ; 3 ’ F- EGEN; ! :“, ,~ : r *: rt. ~~ T ,’ fiCC/l! : i,“T+i~ +tj,,~ :~ ;-. ::.. :_ DRESSELHAUS ENGINEERS QlWM CARLSBAO Mr. Nicholas C. BancheEN# &mma C/O Mr. Oakley G. Parker 1092 Chiuquapin Avenue Carlsbad, California Ra: Job No. 2-2585 Subject: Report on Compactec * Fill on Lot No. 28, Seacrest Estates, Unit No. 1, Carlsbad, California. Dear Mr. Bancbe: In compliance with your request, an investigation was made at the subject site to determine the degree of compaction and the allowable bearing value of the foundation soils. On November 30, 1966, we inspected the site and made three <‘In-Place” field density tests of the compacted fill. The results of the field density tests are as follows: Date & Field Dry Max. Dry Test Depth Below Field Moist Density Density Compaction No. Grade, Ft. % Lbs/Cu. Ft. Lbs/ Cu. Ft. % 11-30-66 1 3. 5 8. 2 120.0 128.8 93.3 2 6. 0 1. 2 114.0 126.2 90.2 3 10.0 9. 3 119.0 130.0 91.6 FIELD INVESTIGATION A visual inspection of the site was made. No indication of settlement or slid- ing of the in-place fill was found. Loose fill material was found along the edge of the fill slope along the Northerly edge of the building pad as shown on the attached Plot Plan. It appears this loose fill has been pushed over the edge of the original building pad. A test pit, at the approximate location shown on the Plot Plan, was dug with a backhoe. Field density tests were taken at various depth in the test pit. The field density tests were taken in accordance with the A. S. T. M. D 1556- 58T Standard Test Method. Samples of the soils from each field test location were obtained for laboratory tests. DRESSELHAUS ENGINEERS I :, ; :, ,. Mr. Nicholas C. Banche Page 2 December 2, 1966 LABORATORY TESTS Moisture determinations were made from each “In-Place” field density test, maximum density determinations were performed according to A. S. T. M. D 1557-58T Standard Test Method which uses twenty-five (25) blows of a ten (10) pound hammer, falling eighteen (18) inches on each of five (5) layer8 in a four (4) inch diameter mold of l/30 cubic foot volume on soils obtained at each “in-Place” field density test location. CCNCLUSIONS The results of our inspection and investigation indicate the compacted fill soils on the lot are stable and will support the residential structure that is planned for the site. RECOMMENDATIONS The loose soils along the Northerly edge of the building pad should be removed and/or compacted to not less than ninety percent (90%) of maximum density. On the baees of our inspection and the results of the ‘In-Place” field density tests, we recommend design loads of one thousand (1003) pounds per square foot be used for square or continuous footings, placed a minimum of twelve (12) inches below grade. Vse recommend all continuous footings be reinforced with at least two (2) continuous No. 4 deformed reinforcing bars. Half of the bars should be placed within four inches (4”) of the bottom of the footing and half within four inches (4”) of the top of the footing. This recommendation is in order to minimise cracking and should not be construed as a footing design. Special consideration should be given to construction within ten (10) feet of the edge of the Northerly fill slope. To safeguard against erosion, exposed slopes should be planted. Additional protection devices, such as top berms and drainage swales, are recommended where applicable to further minimise erosion. DRESSELHAUS ENGINEERS Mr. Nicholas C. Banche Page 3 Respectfully rubmitted, DRESSELHAUS ENGINEERS gxL g4ci2d E. Brian Smith RCE 13.817 EBS/pw Enclosure (1) - Plot Plan j/A,: City of Carlebad Building Department December 2, 1966 _,,.: .: I i ! ! ,.,” J/’ \ L / ‘=GENb: f iTI 1 hlbICATk3 FILL SWPE m’ i I , / c / I I / / / P LOT R-AU , b-i 28, %-=SvZE5T ESTATFI/ &UT i, ; CA~L~~~D, ~AC\WJQ.N~, J DRESSELHAUS ENGINEERS CONSULTING CIVIL ENGINEERS 528 SOVTH HILL STREET + OCEANSIDE, CALlFORNlA + PHONE m?4?,26 DONALD F. DRESJELHA”S. C.E. E. BRllN SMITH. C.E. March 22, 1966 Kamar Construction Company 2. c’. Box Carlsbad, California Re: Job No. 2-2238 Lots 39, 40, 41. and 42. Block 2, Hayes Land Co. Map No. 2 Carlsbad, California Subject: Soils Compaction Control and Inspection Gentlemen: In compliance with the request of Mr. Jerry Rombotis, ue have inspected and tested con~pacted fill soils placed on the reference site. All vegetation and debris was rerxoved from the site. The natural ground was scarified and compacted to not less than 90% of maxin um density as deternined by A. 5. T. M. E 1557-58T test method. Existing loose fill material was renioved to natural ground. Seepage along the toe of the bluff was encountered during grading. A ground drainage systen, was installed to channaliae the seepage. The fill soil was placed in horieontal layers, of not more than six (6) inches in depth, and compacted to not less than 90% of the maxmun density. Field density tests were taken in accordance with A.. S. T. M. L 1556-58T test method on each layer of fill. The results of the field density tests, as shown on the following enclosure, indicate the fill is compacted ti> n:;t less than 90% of the maximum density. The results of the field density testa and laboratory tests indicate the natural ground and compacted fill is adequate for design loads of 2500 pounds per square foot. DRESSEitlAUS ENGINEERS Page 2 3/22/66 2-2230 It is recomrxended all exposed slopes be planted to provide adequate ground cover to arrest erosion of the slope faces. Additional protective devices, such as top ber?xs and intercepting ditches, are suggested where applicable to xinin ize erosion hazards. All constructirm cn the westerly side of the property should be placed well above the high tide line. As an added precaution a rip-rap or reinf.~rced ctincrete curtain wall should be considered around the westerly end of the propose? structure as a safeguard against possible tidal action. Nespectfully submitted, DR TSSE:Lf-iA L’S E-NGINEERS 2’. Brian Srr,it.h EC?. 13, 817 EBS:ct Enclosure: JPlot Plan Eeport <jf .?ield Density Tests cc: Zity <,f ~.:1;irlabad, Bldg. Dept. Date: 3-22-66 Re: Job No, 2-2238 Kamar Construction Co. Carlsbad, California REE’CRT CF FIELD DENSITY TESTS Date br Depth % Field Lab, % Test # Ft. i,:,C.ZtiOn Moisture Density Density Compaction -- 2-18-66 I Natural Soil See Plot Plan 9.6 109. 3 114. I 95.4 2 2. 0’ of Fill 10. 4 112. 5 114. 7 98. 2 3 4. 0’ uf Fill 5.6 107. I 114. 7 94. 0 4 6. 0’ tif Fill 7. 0 112.4 114. 7 98. 2 5 8. 0’ uf Fill 8. 5 196. 5 114. 7 93. 2 6 10. 0’ of Fill a. 5 109.6 114. 7 95. 7 Z-21-66’ 7 12. 0’ of ~Fill 8 14. 0’ i,,f Fill 9 16. 0’ of Fill 10 18. 0’ Gf .Fill 11 20.0’ of Fill 12 22.0’ of Fill 3-16-66 Finish Grade 13 3. 5’ of Fill 14 1. 5’ of Fill 5. 5 107.7 114. 7 94. 0 6. 0 110. 1 114. 7 96. 2 9. 8 113.7 116. 2 97. 7 10. 0 114.4 rib. L 78. 5 11. 0 105.6 116. 2 91. 0 8. 0 105.0 116. 2 90. 3 9. 0 108. 1 114. 7 94. 5 12.5 110. 0 114. 7 96. 0 ’ --w...., _-jz a ~OC Eh “4 -..._. STREET ~.~~ .~~ ~_~.. L sc”LF:: IX_ 30’ -0CEfiN - i FGEN APP. Lc~Lr~.-rlc-.r~ OF DENSiTV -Tg:‘:T $ TtST NC,. _I NDIC.FITES FILL CiRER -L rJL~Cl~,PTION: -.- LOTS 39,40,41,42 - RLscK 2 - HAYES, I. /) hl co. nct=r:IT LO N, kin F 1: tA:~L5RliD, ci:i::-. FIELO I Pi3-T PLF\ N DRAWN DRLSStlL HR”S ENGINEERS D.-E J 528 ~CWTH “,LL S-’ b 3-it-c CHECKEO OCEANSIDE CHL~~~O~+ &3X. DRESSELHAUS ENGINEERS CONSULTING CIVIL ENGINEERS 528 SOUTH HILL STREET + OCEANSIDE, CAL1FcmNIA + PHONE 72?2,26 DONALD F. DRESSELHAUS. C.E. E. BRIAN SMITH. C.E. xmnu CeuUocdLor CQtqmy 32sElw6twu culrbadu caforrrlr RI: Jab #a, 2.2ll4 ElcunQnoMou. u&Ha. 3 culdmd, CaufQd 6ubjeato Bolls Ccsasputi~a Cwtwt - FW C1*uuor Rqwzt la oompu88ce w&b the wquut al Mr. Jerry RumbQtb of yQur orgduttoe. we lmw obmmd t&o pkay aad tortod tha fU1 (lotla pleased cm El Cantno Mua, unit P&a. 3. The fill u&arid wu p&ad bawaon Tebmuy 11 and Februry23r I%& Tba auuwl gwuad wu cl*med Ua l ulflod ia uaorduw w#b t&a 8paifhtioas tamklded La car prouMmary roile lmmt~athm ?epmt dated SetstoxPbor i7*1%5. %bw trew wew rema* the *law wot *yuarr wu o8cuu.d 88d the ~a W6ePa:~@tOd to not lOBe thus 9% of mUimum density thmryla tb. ontin doptboctbeowuuiQ~ Tbo fill ~cdle won pIwed la rrtoc~o wltlr tba roeammradMiena Uo spdfluUi5na fox &a as88truut@n of toatroiled fiU# to cur pnlimlpur roils inwlttguio8 report for El c8mtur Meu, usit Ho. b dud 6eptemb.x 7, 1965. FWd de&y teata we- mu& Q~L uck layer of ffll plsob The wnilt8 of tb field dwrity tMtr aw rbow8 on the fQllOY&g l nclosun#. Tba wwait8 of sur roils com~o8 tut8 ud labrmt~ry tutr rbown In 08r PW1fnn-w -PQ* indiute tbu tba eampaatad fill muerlal I8 adequate for dmtgn locdr of k, 300 pouada per rquam foot whn fwaded at a miaham dep& of twelw QZ) inah below fiahh grad0 Into artoral wdlsturbed gramd or 4wwpactmd fill. Rwpeatfdip rubmlttotg DRESSELHAUS ENQBYEERS Esc: Repart of FWd Dweity Teat88 Ctmxprrtlom D&&ram; Plot PIan xut JbbJ8a c2ll4 9cs?daQ1y(*m UpitMa. 1 RZWCRT OF FIELD B RI: Job MO. 2.2N4 Kuau c4tutrpoHon CQnwar ElCunbaMrH, UJBitNo. 3 Cuirhd, cuifawtn REPORT UT FXELR REBWTP TE6T6 R8taL % Field L&b. k T*et 8 kra hwttw tbwmwe Lmulty Ikruitp C@~tiQn Z/WI66 18 845. s Lot m 9.5 1u. 1 us.3 90.9 19 266. b LQt Bl 9. b la.1 l2a.3 93. 3 29 266.5 Lot # 92 9.0 115.3 1st. 3 94.4 21 287.0 Lot #91 8.0 lld0 taa. 3 93.4 22 267.3 Lob $sa 7. s 113.9 l22. J 9s. 0 ma6 23 2648.0 Lot 191 all us. 0 122. s 94.0 24 26%. 5 Lot #9a 1%. 0 UT. 3 l2t. 3 96.0 2s 269. e Lot (191 8.0 101.7 il9. 0 lM.7 2 (8~ RommW Twt C26) 24 269.0 cos#vi 7.5 1Z2.3 la41 4 98.4 27 269. tl Lot rtol 1. Q la 2 124.4 948 0 2% 270. a L9t #92 8.0 UI. % 124.4 93.2 29 279. ET Lot #? 9.4 tto.2 124.4 96. 7 80 271.0 Lot #PI 10.2 lk%. 4 124.4 95.3 11 271.5 Lot 181 9.8 lS8.8 l2c4 9%. 5 8a 272. f) Let 192 9. 4 113.9 UC4 91.4 83 272.5 Lot 191 LO. 4 ll6.2 124.4 93.5 Rate: March 7. 1966 Due& Ret Job Pie. t-2ll4 Kmnu CQutrwtioa CaarRuz El camin Mora# unit x0. 3 CUl8bade c&ufanrL, REPCRT 6% FIELR DEMHTY TESTS 9b malt3 Lab. 16 Test # lawtism r/12/66 (coals&d) 84 273.0 3% 273.5 16 273.5 37 274. Q 38 274 s 39 273.0 40 27%. !4 41 276.0 42 27%. 3 43 277.0 44 277.5 4s 270.0 46 278.5 47 279.0 4e 279.5 49 280.0 LooUlQB Molitur. Dwulty Rwuitr CQWiPWtiOP 342s I)91 I). 5 UI. 3 124 4 9s. 2 Lut192 P. R I2L 2 l2d 4 97, s Lot 8 PI 9.5 118.6 12c 4 9% a Lot 8 91 8.0 l17.4 124 4 94.4 tott92 10.2 118. 1 la.4 9% 0 Lot # 91 7. b lib 8 U&4 9L4 Lot (192 8. s 11O. 9 121.7 9L 2 Lot191 9.0 116.0 124.4 93.2 Let 9 92 9. b 110.0 119.0 92, J LQt I91 9.8 ll3.3 119.0 9s. I bt 8 92 10. a 109.8 119.0 92.3 Lot I91 10.6 111.9 119.0 94eo Lot I 92 9.0 UN.6 119.0 9L4 La 191 9.2 111.4 119.0 93. 6 hit I 92 le. 3 115. 3 119.0 97.0 Let ;I 91 9.8 111.0 t19.0 93. II 40 LSO. J Lot # 92 9‘ s 111.0 124s 4 94.9 Rum Mueb 7, 1966 Rer CPI Job t-2114 iamu cQRuw&oR cemputy sacuniw.lrlN108itx% 3 CuiobMb chufeRi8 Rate& Tut @ St s2 SS $4 &5I) % $7 SQ 59 co 2& 62 (is 64 64 66 67 &I El9VMOE 25LO 281.S 2n2.0 282. s 2e3. Q 283. I 284s 0 2u,S 28% 0 US, 6 216, Q 286. rJ 2%. s MY. 0 287.5 2,17. s 28Q. 0 2lL 0 AEPGRT OF lIEuI DEX6XTY TLIITS % Fi.14 Lab+ * Mm* RetteLty Rawltq Cam~iur Let n1 7.8 lU*% we4 9QO.t LQe#2 7.6 ll8.3 w&4 9%. Lot P91 . u2.9 a%4 PO.7 Lot 491 II). 2 ll9.0 U&4 )I,7 Lot #92 10.0 114, 0 U&4 93.2 Let 191 1l.e 119.0 d&r 9s. 7 Lot 190 8. 5 lliL8 l24.4 99.6 Lot 192 8. 1 116 3 a&r 9t9 Lot m 9.8 LIB. I &a4 94#9- Let #92 7.6 uo. 1 u9,e 920s Lot HI 9.6 114.6 it9.e 96.3 Lut #92 7. % lb7.4 119. e 90.2 Lot i8Q 1.0 109.7 u9.0 9a.B Lot #91 be lot. 0 119.0 90.7 tut 192 7. 1 1040 0 119.0 67.4 Let HZ I. 0 101,Q 119.0 9e.o Lot Mm 9.5 IL!! IZ1.8 9L7 tot&p1 10. Q XlL6 uq, 0 911.0 Et.1 Job No. 2.tll4 ~tcornar Coastmetkm cwmmy El Carntpo Mem, U&t No. 3 cartebad# witcnia REPC%T CF PDELD DE!@kZTV TESTS natest lb PL*fd Lab II Tort I Elevatlma LWUloa Mobture KMudty Douuty compaetien 69 &SC. s L&ML 7, 0 110.6 121. a 90.0 70 2w. 8 Let #93 10.0 11s. 1 UC 4 92” 6 11 289.0 L;.*t 191 10.2 1u. 3 32aCt 94. 9 th6C66 72 288. s Lot #$S 10.0 114.6 124.4 92.2 73 289.0 Let Itl 10.0 115.Q l24.4 92. CL 74 286.0 Lot #PO 10.0 lL6.S 1244 93.6 7s ZS9.5 Lot t92 7, 1 109.8 119.0 92,. 3 ?6 289. s Let 191 1.0 108.2 119.0 91.0 VT 289. Q 3.~: 188 7.5 110. $ 119.0 93.0 to 266.0 Let 190 8.0 106.9 119.0 9.5 79 295.0 Lot 191 8.0 109.1 119.0 92.2 8% 290.5 Lot 191 8.0 108.6 119. Q 9L6 (II 290. !I Lot 998 8.2 109. 1 119.0 91.8 82 290.4 Let 188 7.9 110,o 119.0 92. S 83 291.8 Lot 192 &5 109.2 119.0 92.0 84 291.6 I.&t 691 7.0 109. 1 169.0 91.9 IS 292.0 LA4 $93 8. S 109.4 119.0 92.2 -86 2%. 8 Lea 190 R% lW* 2 119.0 92. II Dam Mu* 7, 1966 lt*r JabNo. t-2ll4 KamB2 ConBtrw2tiott c4asmmy El Cunl+o BAeeb, Unit No. 3 Cbrlrbu& CalLlo~ REPGRT CiB PELD DLWITY TESTS WBL rewr li sbwur~ l/l?/66 87 2928 0 88 291. s 89 292. s 90 292.5 91 293.0 92 292.3 93 293.5 94 293.5 P 294.0 M 293. s 17 a9d 0 t8 294.0 ‘9 294.5 4 296 4 1 2-5 2 295.0 3 295.0 L 29S.S Laabtlaa Lat 492 Let 4at Let 4UQ x&t 191 Let #92 Let 493 tot49Q Lot #Pi Lot 192 M l88 i&l #Ul J&t P9f ,Lat #92 I.4 I93 Let #90 Lot #Pl Lmt 492 Lat 490 n nBl4 Lab. w 36 ~~.~~lattwB VBulty *nBllY cumpratifolr 9-a UC2 u9* 0 92.0 a5 UC1 UP. cl 9L7 9.0 199.9 UP. 6 92.5 9.0 UQ. 2 ll9.0 92.9 9.0 1U.O ll9.Q 93.4 a. s uo.9 119. 0 93.1 9.0 11&B 119.Q 93. 3 9. 0 l12.3 UP.0 PC5 10. a us. I UC7 12.9 8.D ua. 9 119.0 94.9 as 111.4 UP.0 93.6 9.0 la5.8 Ud? 93.0 a. s i16.0 t2c7 93.2 9,o lb. 6 l24.7 93.6 9. Q II?. 3 l2G7 93.Q 9. 5 116.3 l24.P 93.4 10.0 117. L LZC? 94.1 10. B w.3 Ia7 94. 9 Lt.: Jeb UC% L-X&AI &m&z cewtmctiulc ccml~ El Cmmlw k&u, U&t No, 3 cwt&%a& wlfo?nla WXB?cZRT CP P&ELD DENSITY TESTS Dale& 5% IWld Jab. % ,TO6 i) xmY8ttm LWStlOlt Molatcue acuity DWBUY COEX@&$lW t/u/ 64 165 235.0 Lot #IId 9.0 u4.3 124.7 93.4 iob 295.5 Lot 633 9. a xX7.3 X24.7 94.4 10t E9S.O Lot bl8 9. s u6. % 124.7 93.7 _ LO8 295.5 Lot cw? 10.0 117.2 124.7 94.2 109 295.5 tot 6116 10.0 U6.0 124.7 93.2 2121/&b X10 a%.@ Lot #is? 9. s 115. 3 124.7 92.6 1x1 2119. Q tot #x06 Il.0 116. 1 124.4 9L4 112 239.5 Lo;t llOP 9.0 u19.9 119.6 92.4 1x3 296. B Lot no7 IL 0 x15.6 l24.4 962 114 290.5 tot dxo6 9.5 l&O 121.7 92. 1 IiS 229.5 Lot dmo 8.5 110.3 119.0 92.7 _ 116 29s. 0 tot 699 9.0 km. 7 xt9.0 93. t t/22/6b 117 292.0 ILot #93 l&Q Al3. 3 u&4 9x.2 118 293. II Lot 196 Ilk 0 111, 3 liEI. 91.6 219 2% s List 895 9. b 110.7 1X9.0 93, 1 2123m 120 294.0 LGt dloz 10.0 114 P UC4 91. 9 121 294,5 tot HO3 1% s u4.1 12C 4 9l.7 D8t.: March 7, 1966 Ro: Job No. 2.2ll4 Kmnw co6*tructies Comp86y El Camho A&ma, Unit No, 3 Cartsbad. CWifororf* lhte b Twt d 123 124 125 126 127 128 MW8tlO6 29s. 0 293.2 294. S 29s. 6 292.3 291.0 RBFOR~T OF flEI.D DENSITY TESTS % Field L&b. 94 LOGUh MOiBtUW xhwlty mldty com*an Lot#llM 11.0 112.9 124.4 99.6 Lot #PI a.5 lis.9 119.0 93.2 Lot 97 10.0 114.9 124.4 92.3 Lot I98 10.0 lla 2 124.4 92. I Lot #lo5 7.9 US. 3 lzl. 7 93.3 Lot 1107 7.5 110.5 il9.0 92.9 ,<, OM (I.,.%” impel/“,, ,1T rl,P.a*Al~. > s:‘, A i ,, II, 03T”~“rl **191z~“~~L .,,;c 1 IIT .ill*l,~e,~ .* Hl* ,noll,. 7,~. .,,,, ~., n.4Kplmnw, I : : - j :-r- : -- .,.. ~...,., .,~, ‘-.:-.~I ._ ~$i$ I JGXSWkE DENS11 : C7JqvE. I’ ~ ;j: ~:Yi’y ,,...,,:.,~ _~~.~__ _~ .~ !L_ .~~~-_~. ~.~ ‘!,~’ ,, :/.. .~.// ~, kef :Ciayspjdilitia Saad : G-3 :?enrritj 124.7 #/yf y.q .Mo++fe 9.3% , I ._ _~ -f&i ,, i\ I __~*-~.. ~..~~ _~ ~.~-1 __~.~ _.. ~. i. _..~_. ,.~. y& .Br&urn’S;Ga-Gti~: .;.-;~ ~~~* -~ / ChtiFnuixi Den& 124-4 #I Cu, ,,. -, .C&$xum Moistuie ,7.‘0% j ./ 1,: 0 Red .Bjotin Tine to: Med. Sand ‘- UfitiiiGiii Dentiitj 122-.‘3 81 Cu; : Q@ti$kn Moisture 9..5% I !~ .~ GL ~; 4 ;, h 1 ,, ! .~~.. . _: .~~~_ .~ ~, ~l$qmaj- Qqstrugt~on FL! Q&&&&$A Ca;rlebkd Glifornia I DRESSELH S ENGINEE. Foundation D I for: SHEE’I 528 South Chase-Baumgartner. Oceanside, balifornia ,/$f,,, .:;I ,, I / ST .,,. ;c;/ ./:.,,., / ,& E. Brian Smith RCE 13, 817 EBS:ct 0 I of ~*< 4 ;Lv z?%-+ : _ August 29, 1966 Following are the design calculations for a pier grade beam foundation to be used to support houses constructed on Lots 2, 3, 4, and 5 of Sandaluaood Dale Subdivision, Carlsbad, California. Loading Grade Beam Design Pier Design Section INDEX - 0 SHEET me--.. ---+ ~..,~___~ _ I L .~-‘b. i. j h!<:*~; i i urr i.CQ/ f’, I( 5 7y.u: 2 < I/I 6.F “4, -3’ C’ 6. : 1, c / “. 0, D1.L /%C % r * 1, c: <. ‘/, I’ __ .-.., ~,. D,L, of f.. (. , _i.? ;/ “A ’ gCrc ; y “4 .A<<.,; hp.. 4 ,‘<,g ,,.. ‘ +!LI’.~ ..,_. i?L: _.. ::~S!. ,.__._ 2” : f_‘,:.,C: _.___ I -- ‘? t i;i ,.A I: in P,,A r.1 i ~I, WI, i ; / i‘f I .._ __ . ..j.. .) .~ .,..., ~. , . ” y z Ticc. (5 “?( ‘0. P , 2 d 4 k n; -. , --+.. __ ,/” j I- I ;/ I 1 / / I f c,,/i :I t 4 II c! . t ru) 1 hAilL t t&f4 i _- A .~~~~ CA.-.. ,~ ~----.-_ ~,” -f -- -~~ .I ._~ . z- “4 1 Cl “4 tinr::, vir. ,,r.q\ “/ pi,-,. (6 ;” :-‘.r EL:. : ._ E_ \J A “7 \ P h& h1c.t c : r L ;‘. // ,&I ‘j )‘I- ;/ LXc-“C.IT,/jlr .,.. ‘, 5 7” .vA. /‘ ,,, : L , /+.~; E /f:~*. / E/y!‘*- r’.” :p-/ ,.;I$,‘,< / 5k‘ i’ / ,L<..,,.... ;/ < ., ‘Iii, L,~J ( i ,,:I DRESSELHAUS ENGINEE 528 South Hill Street Oceanside, California Foundation D I for: Chase-Baumgartner. SHEE’I E. Brian Smith RCE 13, 817 EBS:ct August 29, 1966 Following are the design calculations for a pier grade beam foundation to be used to support houses constructed on Lots 2, 3, 4, and 5 of Sandalwood Dale Subdivision, Carlsbad, California. INDEX Loading 2 Grade Beam Design 2 Pier Design 3 Section 4 SHEET 1 of 4 l__--- - _- ,._._- - ..-- --_-.---,--___-~-..--.---..,-._l_l___- .,_. - ii AL : IQCi ,.._ ~~~_~.~-~~~~~~ ~. i -or C’ : _._ ,~. L-i-cA CC r,, . . . D,k,:T~!c.%~ I& ,’ , ‘I”‘; , ,: < I ‘j’ . 40, ’ t ‘9 , Ir’ .3Zf> /* ;* /.L L / n .Yfi(‘(: 7.‘y /z ~ /,’ /y/ i / I,<;,,/ c/ . i ‘~38y:!.<.. 4 7 ,,.(. ,./ ,?I’ /.‘I I ! <’ A, : 33 c9 .-;-+(-jj~ _ ,y. 3 3 r, 0 (AC. ; “4 bow: /&. I/ L<~.<L& --W’ L “’ z ~I,,...> ( 36’o.r. -+ TiT- -3. TV ,‘\, : .’ z’- “4 Ffii <. (-I~,k\‘l <~‘UcX” 4 .A ~. .-.~~.- ._... ,~..,~ . /L’ 0.C~ C.*.L/ /‘:\tJ2 4 /c 27, c , :::A ( Jo ; j cr -7 ..- ._... I..~ ..~,.~” ~~. _ 0 -~----_-- -,.- 1_4.1_ .~ “% TIE?, fl. $‘&.C” ,/” z- “4 i?a<: -*-. ~.__ 1 ! I xl 11 ‘h I I - I . , t -I’ I r ,I f I \ i F-~tz.s 6 /O'o.r. '-~- ~. 2- “4 -7 4 ‘4 IYa I: L V&r- TICA\, ~‘2 -I-!<.:, fi : i- .y’.r, ~‘-‘-7 A ~&&.~~~ _ - \ . , .. 0 0 0 c d~rT1C'h-i A ,h ! 1 1 , / i / ! I 1 ! ! I I I i / 1 DRESSELHAUS ENGINEERS CONSULTING CIVIL ENGINEERS 1 528 SOUTH HILL STREET + OCEAN81DE. CALlFORNlA + PHONE mm26 DONALD F. DRE5sELH*“s. C.E. E. BRllN SHIT”. C.E. ;-up~st 25, 1966 Mr. Lewd Chase -13-15 Baldmiin Lane Carisba.i, CaXznia Re: Jtib No. 2-2554 Sandalwood Eale Carlsbad, Ca!ifornia Sub,icct: Si;ils Investigation ::.eport Lk2cL.r xr. ‘chase: In c~~ripliance ~i:b y~i.ir xquest, we have made an inspection and kxcti,<al:ion t: ;!ie t;:iis con;:.itions un the S-anGalv,wr^ UaLe Sub- ?ivici<.:n site in :i:e Z::;;r ::Z C;.rlsbad, Ccrlifiirnia. The inspecti,n ani ir.vest.i:ati:,:r ‘i, 3s ; a.2~ ;c .Leterl:.ine ihe Cxis:,in; s!,i!s con- dicik:ns in ~: Ae sui:.abili.y i:i the s~ii s to supg<~:rt ,~r~~oscJ rreidential F3t~u.C:C~CS. The site is ioca:eLj S,utheas:erly of the intersectivn of Bass- \vLi,:.i a& Valley Zlri_ci s in the City of Carlsba;. T’he natu:al yx un::l _) LL -l,,ues try, Sic X~rthv. es: ai a~,proxka:ely 3 percent avcrag,c: gra.ae. I.xis:ing houses, she&, avwad?c and peach trees are on the site. (See ?la:e I). .,. :, the i3r~r.e c;f our investigation, five buildin@ pads had been gradcci Ironting Bass~~ci~~i street. Avocado trees on the building ga:.is have been rer .oveci. G ra:Sng consisted cjf cuts and fiils GC approxii-:ateIy I. 3 fcwt ma:&-.um ;ep:h. Trenching for reskkntial footings was in progress on ihe Iive building pads. Tree rccc sys:en:s were observed in :!le roviing crcnche s at several locations. Sliding of loose 663s ini0 ‘cjiiting trenches v.a.9 alsu observed. DRESSELHAUS ENGINEERS Job No. 2-2554 Page No. 2 FIELD INVWTIGATIi:N Three test holes were excavated at the lacations fiho-Gn on the a?tacb ed Li-i :. ;:, : 1 ,/ ,;ieli ;Iensity ce6t6 were taken in each te6t hole. hcist~x~: cielcrn inatiuns wore ‘2 a&e Frw each In-g’lace” field density test. Car~ples of the soils en- countereli !‘wr: e;tch fie!,:: test location were :,b:ained for labora:,vry ‘iesi,S. I,:axirurr. ciensity :Ie;err:inations were perforxxed aAor%ng t,: .‘~. S. T. Xi. :I,. 1557-587. ‘tes: r:~~e:,hw: :,;hich ~666 twenty five (25) bl O’.iS <>I a :.en (12) ~.Ci3xI bar ri: e r, i7::Iiin~ eighteen (1::) inches on each c;i five (5) layers in a four (4) inch Car eter cyiin.STicai f: clii of 1 33 cubic f<.c.t vc,lume ;~n si:ils ,:ni::;intr:rc.:?. I Tl-.c resu1is c’ the In- ?i;*cc field density te*:s and labz:ratory test.5 :LTC re- ;r<:,rte :.i cn the a:-:~ache.: ~Plate 2. CCNC I.,.USK NS --. - 1~ is cwx:ufkil iron iar investigation snd test9 Chat: :. i here 1"CCG have becc :-en ovec: the en:lr<c r<:c; sy:::e; ':-.a .G n:>t been ta,;1en <;w:. 2. ~;le na:u~.a~ ;ruz~r..~.i an,,: Cili suil has nc;t ber:n CL:;:‘: ;zctc::. 3. T?L~ sciiis ari: ~c;r:se LC: ii depth <,f .h;ee ;eet beiv~ :,!I:. . . e:a3?1*g .~‘LL”, ani: xii11 not safely support :i-~2 :rb,;:.r:sc,~ residen:ia,i strxcz:.res. It is recoz men~:.ki where trees are rer;:ovetJ, ‘he entire rcijt sysier be t.3,:cen :.:ut. : here e,xisZing 1xil:ings anti sheds are r’e:~: i:ve-:, ,.I;c E;:‘.ire f<~un&ticm shall be :a’xn <;:lt. The ll,:cse fill 6oi16 a?l; nat~:a! c--ri:,;;il,~! Gil- :ii;i be com~a~teci to RC:L 1~~s than 73% cf the n:axix;urr: ,?cnaiLy a6 +:l:~rx kc:! Ly the A. I-. T. M. 3 l557-5::T test method to a ciepth CA n~‘t less than LLC (2) ftw. bei::\:, the bottom ol t he propt>sed building footings. The building pads ch~uld be graded so as tc:: ‘Irain all surface cater :ii:;iy Eror~’ the proposed buildings. .-!,I1 grading and con paction should be done under the supervision C.J; a qualified soil engineer and in accordance w,ith the attached Specifications for Ckmstruction of Gmirclle3 Fills . DRESSELHAUS ENGINEERS Job pu'o z-zji,& Page Ku. 3 If the above recw~ n:endations are carried out, the frjundation soils will be n<equste FOT &sign loads cf i:ne thousand (1000) pc~unds per square Eo~t ior rcsi3cn:ial fr;;J:ings placed twelve (12) inches bclovv, finish grade .z.nd \iill sa:cly support the gropcsec! structures. Fkspectfully subxitted, I;_; Srian Ssr: iti; E,CJ” 13, 317 .,, c .or <~:C In-,?lace field density lests Re: Job NO. 2-2554 Sandalwood i)a.le Carlsbad, California RI;:FCRT OF “IX-PLACE FIELD DENSITY TESTS nepth Below Date & Grcunri Surface Test # ___I__ J-eet 8-23-66 Location 5 Fiels.1 Max. Dry. 96 Field Density Density Compaction Mcisture lbs/cu. ft. Ibelcu. ft. --...-- 1 1. 0 Lot No. 3 2. 7 107.1 130. 0 82. 4 2 2. n Lot No. ,5 2. 3 102.2 130. :i 78. 5 3 3. ? :,:&$I I‘;<,,. 7 6. 4 108.2 133.3 81. 0 4. 4. ? Lt:.t r-10. 7 b. G 1 10 . CT 133.3 30. 0 IA ; ! ; .I.2 i i3 i ‘I: 1 ~.. __~.- _-.. -._-I__-___-~______ p L:’ .-r~’ i:-~~,~ L AN rao tci ;: 1, ,...l&c’r, c> D ACE ! ~-1 i i- t Specifications for Construction of Controlled Fills CONSTRUCTION OF CONTROLLED FILLS GENERAL DESCRIPTION: This item shall consist of all clearing and grubbing, removal of existing structures and foundations, preparation of land to be filled, filling of the land, spreading, compaction and control of the fill, and all other subsidiary work necessary to complete the grading of the filled areas to con- form with the lines, grades and slopes as shown on the accepted plans. CLEARING, GRUBBING AND PREPARING AREAS TO BE FILLED. (a) All timber, logs, trees, brush and other rubbish shall be removed, piled and burned or otherwise disposed of so as to leave the areas that have been disturbed with a neat and finished appearance free from unsightly debris. (b) All vegetable matter shall be removed from the surface upon which the fill is to be placed, and the surface shall then be scarified to a depth of at least six inches (6”) and until the surface is free from ruts, hummocks or other uneven features which would tend to prevent uniform compaction by the equipment to be used. (c) Fills over three feet (3’) high shall have steps cut in the original ground at two foot vertical intervals on the slope. The steps shall be eighteen inches ( 18”) wide, more or less, and may be constructed by dozing or blading. The general direction of the bench shall run parallel with the contours and the maximum slope shall be three horizontal units to one vertical unit. (d) After the foundation for the fill has been cleared or scarified, it shall be disced or bladed until it is uniform and free from large clods brought to the proper moisture content and compacted to not less than 90% of maximum density in accordance with A.S.T.M. D1557-58T. No fill shall be placed until the soils engineer has given written clearance that the foundation is acceptable for receiving fill. MATERIALS: Material for the fill shall be free from vegetable matter and other deleterious substances, and shall not contain rocks or lumps of greater dimensions than six inches (6”). No pockets of rocks shall be allowed, PLACING, SPREADING A ND COMPACTING FILL MATERIAL. (a) The selected fill materill sh~lll be placed in layers which, when compacted, shall not exceed six inches (6”). Each layer shall be spread evenly and shall be thoroughly blade mixed during the spreading to insure uniformity of material in each layer. Form #78 -l- (b) When the moisture content of the fiil materials is low water shall be added to bring the fill within the specified density ranges (c) When the moisture content of the material is above that specified by the density range. the fill material shall be serated by blading or other satisfactory methods until the moisture con;tnt is within the density range. (d) After each layer has been placed, mixed and spread evenly, it shall be thoroughly compacted to not less than the specified maximum density in actor - dance with A, S. TV M, D1557-58T Compaction shall be by means of tamping or sheepsfoot rollers, multiple-,wheel pneumatic-tired rollers or other types of rollers. Rollers shall be of such design t~hat they will be able to compact the fill to the specified moisture content. Rolling of each layer shall be contin- uous over its entire area and the roller shall make sufficient trips to insure that the desired density has been obtained (e) Fill shall be compacted one foot beyond :he iinish grade line and cut back to grade line by removmg fluff and undercompac ted fill, (f) Field density tests shall be made by the soils engineer at intervals not exceeding two feet of fill height provided ali la.yers are tested. Where sheeps - foot rollers are used the soil may be disturbed to a. depth of several inches. Density readings shall be t&en in the compacted material below the disturbed surface. When these readings indicate that the density of any layer of fill or portion thereof is below the requiled density~ that particular iayer or portion shall be reworked until !he required densit~y ha,s been obtained, (g) The fill operation shall te continued in six imh (6”) compacted layers, as specified above, until the fiii hzs ‘been brought to the finished slopes and grades as shown on the accepted plans SUPERVISION: Supervision by the soils engineer shall be made during the fill and contracting operations so that he can ccl tify that the fill was made in accor- dance with accepted specifications SEASONAL LIMITS. No fill material shall be placed spread or rolled while it is frozen or thawing 0.1 du+mg u:,fa~\:oxable weathers conditions When the work is interrupted by heavy rain fill operations shai!. not be resumed until field tests by the soils engineer indicate t&at the nmismre conten: and density of the fill are as previously specified,, 111 t’he event :hai. in the opmicn of the engineer, the soils unsatisfactory for grading purposes are encountered. they shall not be incorporated in the grading and disposirlLn wll ‘ot made a! the engineer’s discretion, Form #78 -2 _ DRESSELHAUS ENGlNEERS CONSULTlNG CWIL ENGINEERS 528 SOUTH HlLL STREET + ocEAN81DE. CALtt=ORNtA + PHONE iz.2126 DONALD F. DRESSELHA”S. C.E. E. BRIAN SUIT”. C.E. July 28, 1966 Kamu Construction Company 325 Elm Avenue Culrb&& California Ra: Job No. 2-2114 El Camino h406p, Unit No. 4, Carlrbad, California Subject: Report of Soil Compaction Control Centl*ma : In compliancs with you? rsquort, we have provided COntinUOU6 inrpectioa of the 6it6 clearing, grading, and placing of fill soil6 on the refuenca 6UbdiviEion. Thi6 report con6tituter the find cl8arance of all fill and rough grading on the 6UbdiVi6iOn. The natural ground was cleared and rcarified in accordance with the recommendations and 6pecificationr included in our preliminary roil6 investigation report &ted February 5, 1966. A 6tr&t8 of expan6ive roil war encountered within throw (3) faot of finish grade on lot6 133, 134, 135. and 136. The sxpanriva soil was removed from the entire rite of lot6 133, 134, 135. and 136. cxclurivve of rear and ride 6lopa6, to a depth of three (3) vertical below finish grade. Non- expanrive roil was u6ad to replace the expanrive soil. The native 6Oil on cut and fill lot6 wa6 removed and replaced with compact- ed fill mrterial 60 that there i6 at 1006t one foot of fill between the pro- pored building foundation and the native roil DRESSELHAUS ENGINEERS Job No. 2-2114 Page No. 2 The fill roil8 were plaued in accordance with the recommendation8 and l pecificatione for the conetauction of controlled fills contained in our preliminary aoilr investigation report, lleld density tests were made on each layer of fill to determine the degree of compaction. The torts wro made in aecordauca with the A. S. T. U D 1556-58T te8t method, The recwlte and location of these tent.8 arc reported oa the enclo8ure8. The laboratory determination of tba maximum dry densitio8 and optimum moi8turo CODt6St8 of the fill 8oil8 Wa8 detexmined by the A. 5. T. M. D 1557-38T te8t method, that ~888 25 blow8 of a 10 pound hammer falling from P height of 18 inch88 on so& of 5 layer8 in a 4 inch diameter l/30 cubic foot compaction cylinder. The xe8ult.8 of our 8oil compUtion te8t8 and lrbotatory te8t8 indiC8te th& the compacted fill Oad Ui&.Ixti 8Ou axe adequate fox &8ign lOad8 of I!500 pound8 per equars foot when fcauded 8 mtuimum of 12 inchar b&ow fiairh grade and into the tI&tur8l ground or compacted fill. DRESSELHAUS ENGfNEERS yf?dg&<, d. E. Brian Snith RCE 13, 817 EBs:ct EEU2108~: =Ot i%a Report of Field DeMity Tert8 ECI, F.H. A. (2) City of aU18hd. Bldg. Dept. (l) Date: Jply 29, 1966 Ro: Job No. t-2114 E~hXYlinoM.8~ Unit No. 4, Carl8bw$ California REPORT CF FXELD DENSITY TESTS D8HIlr Approximate % Field Dry Max. Dry re8t # Elevation Location MOi8tUX8 Denrity Dendty % lbrr/cu.ft. lb8/ cu. ft. Conapaction t-18-66 1 260.0 2 260.5 3 261.0 4 261.5 5 262.0 6 262.5 7 263.0 8 263.5 9 264.0 10 264.5 11 265.0 i2 265. s 13 266.0 14 266.5 t-19-66 15 261.0 16 267.5 17 268.0 Fill Slope &8t of Late 119.120, & 121 II !/ I! $3 ,I 0 ?I /I ,h 11. 5 11. 0 11.0 11. 5 11. 5 11.0 11. 0 8.0 10.0 9. 9 9.5 10. 0 11. 0 10. 0 10. 0 9. s 11. 0 .s 1 112. 3 124.4 90.2 113. 8 124.4 91.4 113. 0 124.4 91. 9 113. 3 124. 4 ~91.2 114.0 124.4 91.6 114.4 124 5 92.0 115.4 UC5 92.7 116.8 124 5 93. 8 115. 5 124.7 92.9 114. 9 124. 7 92.3 115. 5 124.7 93.0 11% 6 124.7 92.9 113. 7 ua. 7 91.4 114. 6 l24. 7 92.0 114.4 124.7 92.0 116. 3 124.7 93.4 113. s u4.4 91.2 Date: July 29, 1966 Re: Jab No. 2-2114 El Gamin0 MOO& Unit No. 4, Carl8bd, Caltiorda Field Dry Max. Dry Date& A rodmate E % DenPity Daumnrity 4c Tert # Elvmtion c&tioa Moisture Ibs/cu ft. lbs/cu. ft. Ccmpaction Fill Slope East of 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Z&q-66 33 34 3g 268.5 269.0 269.5 270.0 270.5 271.0 271.5 272.0 272, 5 273.0 273. s 274.0 274.5 275. B 275.5 Lots 114,120. & 121 $0 il I: ., 1 (9 10. 5 115. 1 124. 5 92. b 10. 5 114. 8 124. 5 92. 3 10. 5 115.7 124. 5 93.0 9.5 114. 1 124.7 91. 8 9. 5 114. 6 124. 7 92. 1 8. 5 116. 1 124.7 93. 4 8. 5 115.5 124.7 92. ? 8. 0 116. 3 124.7 93. 5 9.0 116. 3 124.7 93.4 8. 5 115. 9 124.7 93.0 8. 5 115. 3 124. 5 92. I 9.0 117. 0 124. 5 94.0 8. 0 115. 5 124. 5 92. 8 a. 0 117. 1 124.5 94.2 9.0 115. 1 124.5 92.7 276.0 276.5 277.0 8. 5 9.0 9.0 -2- 109.6 119.0 92. 1 108. 3 119.0 91. 1 109.3 x19. 0 91. a REPORT OF FIELD DENSITY TESTS Date: July 29, 1966 It.: Job No. 2-2ll4 El Camfno Mea Unit No. 4 Carlnbad, CaLlfonda REPORT GF FIELD DENSITY TESTS Field Dry Mu. Dry Date t Approximate % DlBdty Deluity % Test # Elevattoai Location Moiotura lbdcu. ft. Ibrlcu. ft. Compact Ion 36 277.5 Fill #lops East of 11.0 113. 1 124.4 91.2 1ote 119,120, 8s 121 t-22-66 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 278.0 278.5 279.0 279.5 280.0 280.5 281.0 281.5 282.0 282.5 283.0 283.5 284.0 284.5 285.0 285.5 286.0 Lot # 121 Fill slope Eort of lota 119,120. ik 121 Lot # 121 Fill wlopa Eaet of I&S 119,120, b 121 Lot # 120 Fill slope East of lot* 119,120, & I21 Let # 121 Lot # 120 Fill crlopc East of lore 119.120, & 121 I, t, Lot a 121 Lot II 121 Fill dope East-of ldo ll&,uO, I 12l Lot it 121 9.0 9. 0 10.0 8. 5 9. Q 9. 0 10. 0 9. ri 8. 5 I. 5 8. 5 8. 5 9.0 7.5 9. 0 8.5 9.0 109.8 108.9 111. 7 108.6 108.8 109.8 111.9 112. 6 114. 4 110.3 109.9 109.3 109.4 109. 1 112. 2 112.0 111. 0 119.0 92.3 119. 0 91. 6 121.7 92.0 Ll9.0 91. 3 119. 0 91. 4 Ll9. 0 92.3 12h Y 92.0 L21.7 92.7 121.7 94.2 119.0 92.9 119. 0 92. 5 119. a 91.9 119. 0 92. 1 119. 0 91. 7 124.4 90.2 121.7 92.2 119.0 93. 3 Date: July 29. 1966 RI: Job No. 2-2114 El Gamin0 Mela, Untt No. 4, Carl&au& CaLiformia REPORT OF FIELD DENSITY TESTS Field Dry Max. Dry Date C Approximate k Density Denrity @A Tort I Elevation LOCatiOCl MOWtIre lbdca. ft. lbdcu. ft. compwtien 54 55 6-25-66 56 57 58 59 60 61 62 63 6-27-66 64 65 66 67 68 6-28-66 69 286.5 Lot II20 9. 0 111.6 119.0 93.9 287.0 Let t 120 9. 5 111.5 119.0 93.8 228.0 228.5 229.0 229.5 230.0 231.0 232.0 233.0 Fill alope SF of Lot # 129 !i 234.0 235.0 236.0 237.0 238.0 239.0 9.3 107.6 119.0 90. 3 9.1 117.0 124.7 93.9 8.2 110. 9 lk2.3 90.6 12.3 110.8 122.3 90.5 776 114.7 122.3 93. 7 11. 0 121.2 122.3 99.0 10.0 116.0 122.3 94. 8 11.0 115.3 122.3 94.5 11. 0 10. 0 8. 0 11. 0 10. 0 122.3 96.0 122.3 94.2 119.0 90. 3 122.3 92.8 122.3. 94.6 13.0 9.0 117.9 115. 1 107.4 111.9 115.9 119.0 112.2 124.3 96.1 70 240.0 122.3 92.6 Date: ,July 29, 1946 Field Dry Etax. Dry Dlte 0 Approximate % Dmrity DWtty % Tart d Mevatien LOC8tiOll Moieture Lbslcu ft. ibs /cu. ft. Compaction Fill slope S’v, of Lot -# 129 I$ 71 241.0 72 242.0 73 243.0 74 244.0 6-29-66 75 245.0 76 2%. 0 17 247.0 t8 248.0 79 249.0 B-3Q-66 I 80 250.0 81 251.0 82 252.0 83 253.0 f-1-66 84 2S4.0 89 255.0 86 256.0 7-2-66 87 2w. 0 Lot ir 129 ‘! 19. e 118. s 129. e 9&M 7.0 115.5 122.3 93. 5 6.0 112.2 122. 3 92.5 8.0 117.3 124.4 94.3 FW Slope SI’; of Lot I129 ,I Lat # 129 0 8.0 121.0 124.4 97. 3 7. 0 111.3 122.3 91. 3 7.0 114.2 L24.4 91. 8 9. 5 115.7 122.3 93.6 9.0 112.2 122.3 92.4 II :t Fill rlope SW 0f Lot # 129 Lot i 129 8.0 110.2 122.3 90.2 10.0 1lb.6 L24.4 93.7 12.0 LLS.4 124.4 92. 7 14.0 115.2 124.3 92.7 I&t # 130 Lot # 129 8.0 LL2.Q L24.3 90.9 9.0 116.4 124.3 93.6 10.0 113.2 124.4 91.7 8.0 114.3 122.3 93.4 Rs: Job No. 2-2114 EL Chdno Mom, Unit No. 4, Caritsbad, CaLLfords REPORT CF FIELD DEIWTY TEGTS Date: Jply 29, I%6 Re: Job No. 2-2114 El eunillo Meea# Unit No. 4. Carlrba$ Califonlh REF’ORT OF FIELD DENSITY TESTS Field Dry Mu, Dry Date & Appaosirnate % DW&ty Danrkty ?6 Teat # Elevation Looation Moiatura lbe/cu. ft. Ibs / cu. ft. Compaction 88 89 90 7-S-66 91 92 93 94 95 96 7-6-66 97 9% 99 100 101 7-7-66 102 103 258.0 259.0 Lb@.@ Lot #129 IT %I 262.0 262.0 263.0 244.0 262.0 262.0 Fill dope SF of lob # 129 8, Lot 1130 Lot #129 Fill slope Eut of I.&s 126,127,l28 Lot a27 265.0 266.0 262. 5 267.0 268.0 Lot129 Lot 130 Fill 6a0pe-, East of lotr 126,127, & a28 Lot # 129 263.9 Fill elope Ea8t af aoh 126,12?,& 128 264.5 'I 10. 4 115.8 124.4 90.9 13.0 117.3 124.4 93.9 ai. 7 117. 1 122.9 90.2 6. a 105.7 166. 2 90.7 7. 5 114.0 124.4 91. 3 10.4 110.3 122.9 90.0 10. 3 116.4 124.4 93.2 9. 3 120.2 124.4 w.7 8.2 108.2 119.0 91. 0 8.0 109.0 119.0 91.6' 9.8 109.6 aa9.0 92. 8 10.2 115.3 a24.4 92. '1 11.7 107. a 119.0 90.0 9. s 106.7 116.3 91. 9 9. 8 118.3 11. 2 116. 1 124.2 124.4 95. 3 93.4 Field Dry M--Dry DatO& Apprwdmate % Don&y Denmity % Test # Elevation Locrrt~on Moi8tuta Ibs / cu. ft. lbs/cu. ft. Compact ion Fill slope East of lote a26; 127, & 128 Sl 104 105 106 107 7-2-66 108 109 110 111 112 113 114 115 116 t-9-11 117 118 119 120 265.0 266.0 266.5 269.0 ., bt d a29 6. 6 107.6 119.0 90.5 10. 0 108.9 119.0 91. 5 1% 0 117.6 124.4 94.6 8. 4 107.2 119.3 me.2 270.0 271.0 267.9 272.0 269.0 270.0 273.0 274.0 271.0 L&d131 LQt 130 Fill &Op8 Eaet of lotr 126, W?. 128 Lot I30 Fill elope Eant of lot0 126,129,a28 Id ll30 I, Fiat rlope EMt of lot* 126,127,128 1.0 103.7 115.0 90. 2 8.0 107.5 119.0 90. 3 8.8 114.0 124.2 91. 7 7.9 113.1 124.4 91. 0 9.2 110.2 119.0 92. 5 7.9 108.4 119.0 91. 2 8.2 101.8 119.0 90.4 9.0 116.9 124.4 94. 0 9.6 110. 3 121.6 90. 7 279.0 288.0 272.0 273.0 x8 St. -weet Qf Lot I29 Lot c an Fill s?cqm-Ea8t of lots 126.127.128 1, 9.8 ao. a 10. 1 9.7 110.7 120.3 110.9 110.5 119.0 lZ%.O 119.0 119.0 93.0 96.3 93.2 91.* -7 - Date: July 29, 1966 RI: Job No. 2-2ll4 El Gamin0 Mew, Unit No. 4, Qrl*brd. California REPORT OF FIELD DENSSFTY TESTS Data: hly 29. 1966 Re: fob No. 2-2ll4 m ~tlIdll4 M884, Unit No. 4. caraebad. Csliforni8 REPORT UF FIELD DENSITY TESTS Date & Tart # Elmration Ajqmdmats Location Fidld Dry Mu. Dry % Den&y Dan&y w Moiclture lbs/ cu. ft. lbdcu. ft. Compactian . 121 122 123 124 125 7-U-66 126 127 128 129 130 . 7-12-66 an 132 133 134 135 136 137 289.0 Lot # 120 7. 2 112.2 124. 4 276.0 274.0 275.0 290.0 277.0 Lot R129 8.0 * Fill 6lnpaEaet of 276.0 lot8 126,12?,122 7.5 278.0 ht a3a 11. 0 278. Eo 276.5 279.0 Lot #131 277.0 I~ 278.0 280.0 284.5 * 279.0 286.5 Lot #no 7.0 Fill slop-Eaot of Iotr 126,127.128 10.0 ‘t IO. 8 Lot I 121 9.6 Lot 129 7.6 Lot #128 8.6 Lot # 127 Lot #la2 ht #a29 Lot #l33 Lot #128 Lot #I34 6.4 6.7 7.2 6.5 6.7 9.3 6. a 123.9 124.4 108.2 119.0 114. 1 124.4 114.0 124.4 108. 9 112. 1 123.4 10455 107.0 109.7 113.2 115. 1 112.2 112.7 108.9 103.7 119.0 124.4 124.4 115.0 115.0 119.0 124.4 124.4 124.4 119.0 119.0 115. D 90.2 99.5 91. 0 91. 7 91.6 91. 5 40.2 99.3 91. 0 93. 1 _ 92.2 91.0 92.5 90.4 94.8 91. 5 90. 2 -8- Date: July 29, 1966 - _ Ra: Job MO. Z-P14 El Camino Meaa, Unit No. 4, Carlrbad. Galifornia REPCJRT OF PIELD DENSITY TESTS Field Dry Max. Dry Date * A~roxianbte 46 D*n*ity DEE&Q % Test # ELaV#iOU LOCotiOSl Moisture Ibr/cu. ft. Ibrlcu. ft. Compaction 138 280.0 139 280.5 7-13-66 1eB 286.5 141 2s5.0 14% 285.5 143 286.0 144 287.5 * 144 287.0 146 287.5 147 2%&O 148 288.0 I-14-66 - I49 288.5 150 289.0 151 289.5 * 152 290.0 153 290.5 154 291.0 Lot $128 Fill alope East of &t ND. 126 Lot #134 Lot I133 :, 1, Lot I134 Lot 9134 11 Lot #135 1, I, !I Lot 5134 !, hat #136 ,a 6.5 122.2 124.4 98. 3 8.2 108.0 119.0 90. Q 12.0 107.0 119.0 90, 1 6.8 105.8 115.0 92.0 9. 5 104.4 115.0 90.8 9.5 107.9 119.0 90.7 7.4 105.3 116.2 90.6 7.6 115. 1 119.0 96.7 9.5 119.0 124. 3 96. 3 9.5 111.9 119.0 94.2 4.0 107.8 119.0 90.5 6. 5 113.0 119.0 95.5 8.0 10%. 2 119.0 91.0 6.8 114.0 119.0 95.9 5.7 107.0 119.0 90.0 6.5 107. 3 114.0 90.5 8.4 107.8 119.0 9a. 5 -9- Data: July 29, 1966 Re: Job Na. Z-WI El ‘Amino Mooa, Unit No. 4. cbrlbbad, californi* REPORT CF FIELD DENSITY TESTS Data I Tent # 155 156 157 E&with 281.0 281.0 _ _ 282.0 Agpr0%bXlbt* Location Lot 10130 Lot 127 Lot #I31 9b Moirtura 9.0 10.2 9.0 B’hld Dry Dkc. Dry DWl8ity Den&y % lbr/cu. ft. Ibs/cu. ft. Compaction 112.8 119.0 94. 8 106.3 115.0 92.0 116.0 124.4 93. 3 158 283.0 Lot $132 6.5 107.4 119.0 90. 4 159 t94.0 11 9.4 105.3 115.0 91.7 160 284.5 Lot Cl32 9. 2 104. a 115.0 19.2 l61 285.0 Lot #I32 8. 0 104.4 115.0 90. 9 a.1546 - 162 282.0 I& #I27 lo. 6 108.5 115.0 949 3 163 283.0 Lot lb126 8. 0 103.9 115.0 90.3 164 284.0 Lot #lZb 9.6 108.3 115.0 94. 0 -IO- DRESSELHAUS ENGINEERS Juaruty 18, 1%6 Kurrt Conrtruction Campany 520 Fhr Street ChrIsbad, C8Wornir Re: 2-2114 El calnlao More Unit No. 3 Carl&ad Caiifomh Subj6ct: Charancs Repott on SoiIr Corrp8ctiaa Control perfc-rrr od on portions of Vnit No. 3. during pa&q apemttone on Vnit No. 2. Attached 8m wpies of cterrance rapsrrtr previnu6ly crubwittcd. that covered hi. offrite area6 af FI Camino Me68 Unit No. ? and that are now portic:ns c-f ?Tnit No. 3. Attachment No. 1, dated Seplewber I. 1965 and t&lad. “SO116 Cawpactim Crrtltral- offvite Arm #I.', ccwef6 portion6 of 't&t6 112. 113, 116. 115, IIfi in Ihi? No. 3. Attacbmemt No. 2. dated Septmber 2. 1965 &ad titled, “Sails Cowpactien Control- oft&e Arm # 2+. cwera pcrtiuns of Lus 88, 90, 91, 92 in Unit NO. 3. Roqsectfully submit.ted, DRESEELHAUS l!WGXNEEM DFD:RLT:ct cre: FHA (2) DRESSEL+,US EN”&NEERS CONSULTiNG CIVIL ENGINEERS 523 SOUTH HILL STREET + OCEANSIDE, CALlFORNlA + PHONE 7Z?~lfC ?~“.:,. __ ~,-.“UII~~,Ct,i?E; c’,~.~~,::,:-:“-li _ _..~...“‘__ “II,_, ..,,‘_ r- 1 1:-s-_* “,-rm,r& _I.,,; ./ _~,a ._I 4’” \..** c ,; -iv .* %, ^ ~1 .c*i . *. Yrc., Cz>::oy&2* y.($z 7..*,. -7..\ - . -., .a &.~... ;?a,:, ?:T y:p *:,c:~‘> i::.:) : j ,,,, .::,,-? y~z~-il-‘zc,;,~, ,-. 7; _ ,,, !.> ” 2 ,...., ,, a . , / :. “- I .r I %-~, .~. i. * II 7: Jo, .:: ^~~,._.i .,.,, n. ‘t ;;l-.., 3.‘: ~. :1~ i, [ ” ‘: ., ,L, .” <-,,;,.;y: ** : :~ . :‘ ; ,. 1, :z ‘ ;. :‘%f 8% r ‘? PJ.*J,;y 4 e;2 .a y.4 Pi&d L&a % -” ,,. ,.../ >? * c..,-,*.em, ..:’ ‘,,‘,Z ..., 2% sli.‘&,~, .~ ,.. >.* XC!~+m=e Danci,ty rk53t~ Gary?-.nt.:e ;;;j~;1;; l,I’i:::C & -.yys.-~. ,.~, ,,.“.?$ “o p.iZ $2 . ..,., i ,, _> .j . xrFoi * Ciri’ri 1 XI 1, ,1 *I II ..a ,Cl a> c, ,I 6.3 8.0 iz* 0 9.0 9.9 ‘2.0 9.0 9.5 IQ.3 7.6 120 If.2 6.7 9.5 9. Q 9. a 7.0 3.2 6.0 3.0 IQ2 P3.0 e. 0 7. ii : I* 0 5.7 13.0 9.3’ 11.5 13.$ I;?, 9 St:3 EZ.4 a. 0 , XERO iCOP”, 6;: r9 -. ‘, ,: ,.: , ; ,. ,’ ,. .~’ ,. . . ,: .p ,,;, ‘1; ‘;r<, t; : : ,:~ I ‘;: 2. :: x 5 ,~ ,- :.,~ i:.. e,/ ‘~ ,‘> .~ ,;. II :,., ., .A . L _,: ,,I~ F .,/* 2 ,.,. r\ :: . . II. “l :. . . ._$_. ., i ., .:, ::’ a,, : . II .,, ,, - ,,. . _,, > I ._l :; ‘,,* :i I .,.~ , ‘.I .~ ~.’ ~ .: ,<‘, :, ~. 0 .’ _,, ;. .,. :,. ‘~~ 1 .I . ” L ,:z .~. 1 ! ‘: ~, ii *~ I: ,/, , ‘. .., .I ,, , ,_, .‘.~~,.C . ,. .~ ;‘.,,, . . j, ..,, ,~i: ‘.’ ;,I :Y- “, ; ..,. ,~ ? ., ,. I ,” ~,, .~ .~ ,... ., . -..,,. .., .z,.i .I :, i ,... .~ ,’ . ./ (,.. . j (. ,J < .&’ “._,_ .~, . . 2, . . . . ., ,.,. ,1- \- I ‘I ) % ; f-J j... : i I,,, - .- i. - ,!A, ‘>v’l, ; y. ;, ;‘_i: : i.j, / .I: !L’ T\/!) il. 71,. ‘\.,.~ \.~.. L,,- / i .FS 6 ET t\L ” ‘, a c1 ; p.j;~ I,,::,” : .T., A< i- c.:i:i : :_. :,,. t:-. i ~‘:C*“i- i,? p.1 CC’< f-i Qi,- ;I, G: 1-q ‘; i\~‘., TV;- c...<~ :;“-. ;ct T-c- = ‘.r bi’“~ t I .c ; in_.,/ :-..: I,-‘; (L. I ” . $8 ‘I 1 / ” , i,‘; i y: 2 , 5 c-;- c- ,\ ,~~., ..~ _ . ._,. ; % I . ~.:_,~ <.Y~, I i , c-p, i / ,-=c --.--___ .-_ p ;~~;,,,.;‘;il: ’ i: > l.c~z.Ct ,,,, ,c,( i:> E: ,.-,. ,. .- ii:-. ,” iit’>(&::.r. . LY ‘:, L1 ,. - ,‘_ = c:-<+ :,. ; I, / _ L_<.. I.~\ ii\,~ ‘=,~iitc.i_r’ _,_~ __.._..__ _I ,.._.I -..-,_ .._..-.,.. -_.-- ..^ ” ‘,;i; :, j ~-- I, .( j ,,; ,.ji I_ ,, ; -i &S? J ,. ‘$:z; / ‘i 6;;: DRESSELHAUS kG!NEERS .’ ‘, CONSULTING CIVIL ENGINEERS 628 SOUTH HlLL STREET + OCEANSIDE, CALlFORNlA + PHONE 7m125 sapember 2, r94s ’ ‘; -,- j .i Z% ! i: j Ad”2 OLtPX _’ a.> i I MY 5 5--t t;‘i’? 7 . . ZT.$* $ Y;., ‘I ? I, ;:, ” ;.., /:. xl ;: ij f * 0 2 :; -f * -5 ^ .:.7 L .li.. 0 1 ,,,,? 6.%.. /* 5 yJ”* .?J 2::: ‘1. ?z zt’,, 3 :’ :t II / : ,l ,< <, I, I, ;> il il .i I/ 2: I’: 1s ,a ‘: ..> :: ? :i _‘ ‘1 ,/ i‘ al .3 ,: ij it $1 $9 is !I 2: c i: (1 ,i ,t i 7. 3 L., . r, :a ., L. i- 3 !1, D ‘i’, .? I. ..‘. ? s-> <. i * >a :,* ;: ‘;I, $ L’, .a \ .l. ‘d ..( .,. *_ 1 .d ‘F, L’ I: I. L’. 3 9.3 ?,” 3 c .” _. 1) /4-&$g /A$.~,; -“;Q~ ,,;w3 \.L7 ,p 5-a ‘“.“..:.~-..r~ . . ..__. .-....--.. -.----\ -3 -~~~ EX,S-T. Wnco FCiAhlE !-\UUSt_S ---_ e” 1 NOICATbZ5 APPPmt. LOCA-wrJ ~.JIE~ DENSITY ?%sr 4 ES 0. DRESSELHAUS ENGINEERS CONSULTING CIVIL ENGINEERS 528 SOUTH “ILL STREET + OCEANSIDE, CALlFORNlA + PHONE 7z2-2126 March 24. 1964 Mr. Maw Humphreys Re: SMC 2-2079 2699 State Street Chestnut Heights Carlabad, California C?rlsbad, (California Subject: Soils Compaction Test - pinal Clearance Report Dear Mr. Humphreys: This clsaranca applies to fill ground placed under our super- vimion on the referenced subdivision between February 5, 1964 and March 16, 1964. The natural ground was cleared of all vegetation and debris. The natural ground surface was scarified to a minimum depth of six (6) inches and compacted to not less than 90% of maximum density. Where trees were removed, the entire root system was excavated and the area recompacted to not less than 90% of maxi- mum density through the entire depth of the excavation. The fill soils consisting of ii dark brown silty sand and light brown clayey sand were placed in horizontal layers approximately six (6) inches in thickness and compacted to not less than 9070 of maximum density. F!eld density tests were made at interva.ls of two (2) feet of fill. The results of the field density tests are reported on the following enclosure. Basic information concerning the stability of soils is included in the attachad enclosures under Stability of Soils’ and Moisture Censity $ rvd . The approximate location and number of our soils compaction tests are shown on the attached plot plan. Marv Humphreys -2 . March 24, 1964 ‘The results of our soils compaction tests and la.boratory tests indicate that the compacted fill material is ~xdequ:+,te for design loxds of 1, 200 ;ounds ,.x:r square Zooe <or ~qu.:.,re or continuouti footings w-hen Cou:ldei twelve inches bel.ow rinished grade. Respectfully submitted, CRGSC:EI.H,P~ C:: ~:~GINGE;IS &&4&H &d .- ._-._. ___.- ‘5. Brian 5mith iJ.ci: 13, 817 i:F,::- ,‘I’ “P c ~‘dV,C Enclosures: &port of -‘ield Density i‘j.,st 3t;ibility d ;oi!s Moisture Ikn~ity Curve ‘.;:i,ot ~,‘-lxn DRESSELHAUS ENGINEERS March 24, 1964 Mr. Marv Humphreya Rc: Sh4C Z-2079 2699 State Street Chestnut Heights Carlsbad. California Carlabad, California REPORT OF FIELD DENSITY TESTS Date & Depth of Teat I Fill-Ft. Location 2fSib4 1 216164 2 .5 4 5 6 7 8 2/f/64 9 10 11 12 13 Z/8/64 14 ,l 5 16 2/10/64 17 18 2 IO’from Nly PL 20’ from Wly PL Lot 1 2O’from u’ly PL 40’ from Nly F’L Lot 1 50’ from ‘flly PL 35’ from Sly PL. L3t 1 2O’from Nly PL, 15’from Wly PIN. Lot 2 60’from wly PI.. 50’ from Sly PL, Lot 1 25’ from Wly PL 40’ from -Sly PI. Lot 2 IO’ from Wly PL 20’ from Sly PL I.,ot 3 35’ from Wly T”L 30’ from Nly PI., Lot 2 4 8 2 IO’ from Wly PL 10’ from Nly PL Lot 3 50’ from Wly PL 40’ from Nly PL, Lot 2 70’ Ely of Lot 14 PL offsite fill@ 65’ Ely of Lot 14 PL 65’ NEly of Lot 14 PL 8 10 12 PL Lots 14 & 15 60’ Ely of Lot 14 FL 55’ Ely of Lot 14 PL 14 40’ Ely of Lot 14 PL 16 20’ Ely of Lot 15 PL % Field Lab. % Moisture Density Denlity Compaction a.7 116.0 129.5 91.3 10.5 9.7 9.0 9.0 9.7 9.7 10.0 10.0 9.0 10.0 8.7 9.0 9.8 9.8 11.7 10.0 10.0 125.1 131.9 95.0 i19.7 129.5 92.5 115.2 127.7 90.5 120. I 129.5 92.9 123.3 131.9 93.2 116.2 127.7 91.3 125.0 131.9 94. a 123.2 127.7 97.0 123.3 131.9 94. 0 122.0 131.9 92.1 115.5 127.7 90.5 122.3 131.9 92.7 123.6 131.9 93.0 115.0 127.7 90.3 121.9 131.9 92.5 123.4 131.9 93.6 120.2 129.5 92.9 Mr. Marv Humphreya Ra: SMC t-2079 2699 State Street Chestnut Height6 Carlsbad, California Carlsbad. California Date & Depth of Test # Fill - 3-t. L/10/64 19 20 21 22 23 2/U/64 24 2s 26 27 28 29 30 31 32 33 a/12/64 34 33 36 37 18 20 22 2 2 4 4 6 6 2 4 6 0 8 10 12 14 8 a Location 25’ Ely of Lot 14 PL. 15’ ;1y of Lot 14 FL PL. L,ot.s 14 & 15 10’ from Ely :?I., 20’ from Nly PI, Lot 15 1 O’from Ely i’L 15’ from Nly PL, Lnt 14 1O’from Ely PL 15’ from Wly FL. Lot 15 55’ from Sly Iii., 5’ from Xly :-,L .Lot 14 10’ from NEly Corner Lot 15 10’ from Ely FJL. 40’ from Nly FL. L.ot 14 25’ from Sly ‘UL 10’ from sly PI. Lot IQ 25’ from Yly ;;I., 10’ from Qy PL Lot 10 30’ from Nly f” 15’ from Ely PL Lot 10 20’ from :Ely P1~; 40’ from Sly PI.. Lot 10 20’ from Ely PL 30’ from Sly I’L Lot 10 ~. 1C’ from i:ly 13 3’trom Nly PL Lot 10 251 from Ely SL, 40’ from c;ly “L Lot Y 25’ from Ely PL 50’ from Nly PL L’3t 10 20’ from Ely PL 50’ from Nly ‘.?I~. Lnt 15 10’ from Ely PL 2.5’ from Sly ;,L I.ot 14 R Field Lab lo Moisture Censity mlsity Compaction 10.0 121.6 131.9 92.2 9.7 i20.4 131.9 91.3 10.0 115.9 127.7 91.0 IC. i: 119.4 129.5 92.4 10.0 119.1 129.5 92.3 i0.0 121.9 131.9 92.4 10.0 119.8 129.5 92.5 9.7 120.0 129.5 92.7 10. 0 124.8 131.9 94. 5 10.5 123.2 131.9 93.4 1c.c 116.2 127.7 91.3 10.3 122.8 131.9 93.2 10.0 115.3 129.5 89.0 10.0 123. i 131.9 93.4 10. @ li8.9 129.5 91.9 10.5 123.5 131.9 93.7 10.5 124.4 131.9 94.3 9.7 117.3 127.7 92.2 9.7 117.0 127.7 91.7 Marc.. 24, 1964 Mr. Marv Humphreys Re: SMC 2-2079 2699 State Street Chestnut Heights Csrlabad. California Carlrbad, California Date & Depth of Test # Fill-Pt. 2/12/64 38 4 2/13/b4 39 2 40 2 41 6 42 10 43 10 44 4 45 4 46 ‘8 2/14/64 47 6 48 6 49 10 $0 10 51 10 52 8 33 10 94 2 Z/20/64 55 4 March 24. 1964 Location 70 Field Moisture Oensity 10’ Ely of Lot 11 PL‘ 10.0 25’ from NXy FL, 12.0 40’ from Ely FL Lot 10 45’from .Xly -,$ 10.0 30’ from Sly t;L Lot 9 15’ from Ely PC 10.0 10’ from Sly FL. Lot 11 30’ from Ely PZ. 10.0 411’ from Xly ‘?L L:ot 15 20’ from Ely ‘>I., 10.0 20’ from Nly k.L Lot 14 40’ from C=ly PI, 10.0 60’ from Sly ?L. I,ot 10 40’ from Zly ?I.~. 10.0 45’ from ‘~1~ c>L Lit 9 15’ from Zly PL 10.0 25’ from ?ly i’L. Lot 11 60’ from Ely PI, 10.0 20’ from ‘;ly PL L,ot 9 55’ from Ely FL. 11.0 15’ from Sly FL. Lot 10 20’ from Ely .PI,. 10.0 50’ frsm Cly Y’E ‘L,ot 11 30’ from 21~ ~Pi, 10.0 20’ from Sly :2Ix Lot 15 20’ from Ely F-L 70’ from 9.7 Sly PL, Lot 14 60’ from Ely PL 9.7 20’ from Nly PL, Lot 9 50’ from Ely FL 10.0 15’ from Nly FL Lot 10 10’ from Ely PX, 10.0 15’ from Sly PL Lot 12 20’ from Ely FL 10.0 30’ from Sly ~PL Lot 8 122.8 125.2 118.7 125.4 120.0 124.1 120.1 124.4 122.0 Lab Cend ty i31.9 131.9 129.5 131.9 129.3 131.9 129.5 131.9 131.9 118.9 127.7 124.2 131.9 118.0 127.7 123.3 131.9 121.5 129.5 123.3 131.9 123.0 131.9 119.0 129.5 116.7 127.7 7, Compaction 93.2 95.0 91.” 95. : 92.7 93.1 92.9 94.4 92. i 93.2 94.4 92.5 93.5 93.8 93.5 94.7 92.5 91.7 March 24. 1964 Mr. Marv Humphreys Re: SMC Z-2079 2699 State Street Chestnut Heights Carlsbad. California Carlsbad. California Date I Depth of % Field Lab % Test # Pill-:?t. Location Moisture Den&y De~elty Compaction Z/20164 96 57 3/U/64 58 59 60 61 62 63 64 65 66 10 A2 70’ from Ely PL 10.0 30’ from Sly i-‘L, Lot 9 60’ from Ely PI. 9.7 50’ from Nly FL Lot 10 Fin. Gr. Center of L>ot 7 9.0 123.5 131.9 94.0 Fin. Cr. Center of Bldg Tad Lot 8 9.0 122.8 131.9 93.2 Fin. Gr . ;,entsr of Bldg ?‘ad Lot 9 8.7 127.5 131.9 96.6 !%I. Ck. Zenter of Bldg Fad Lot 10 9.0 128.7 1,31.9 97.4 Fin. Gr. Center cf Rldg Pad :,,ot 11 9. 0 124.4 131.9 94.5 Fin. Gr. Center of Bldg ~t:.ad Lot 12 8.7 126.1 131.9 95.7 Fin. Gr. Center of Bldg ?ad Lot 13 8.7 128.6 131.9 97.6 “in. Cr. Center of Bldg Pad Lot 14 8.7 127.9 131.9 96.9 Fin. Gr. Center of Bldg ‘Pad Lot 15 S.? i28.6 131.9 97.6 122.2 :3:.9 92.8 117.2 127.7 92.0 March 24, 1964 Mr. Maw Humphreys Re: SMC 2-2079 2699 State Street Chestnut Heights Carlebad, California Catlsbad. California STABILITY OF SOILS Sample No. 1 Dark Brown Silty Sand Sample No. 2 Light Brown Clayey Sand LABORATORY COMPACTION TEST PsSTM D-155:-58T S.o~M~?YL,G NO 1 S.AMPLE NO 2 % Trial # MOiStWe 1 3.65 2 7.73 3 10.69 4 13. bi Optimum Density Optimum Moisture MECHANICAL ANALYSIS Density w Dell&y Lb. /Cu. Ft. Mofsture Lb. /Cu. Ft. 119.05 3.20 123.54 i25.59 5.59 128.12 126.29 7.89 129.66 119.35 12.99 121.59 127.7 #/Cu. FL. 131.9 ft/Cu.Pt. 9.5 %I 8.0 % Sieve # SAMPI..E No. 1 SAMPLE No. 2 % Finer than shovrn % Finer than rhown 4 100.00 100.00 14 95.49 100.00 20 83.84 94.64 48 4,a. 50 60.51 100 25.95 32.17 200 7.90 :5.41 : : ~13cf; ..~ 1,3Q ,d ,.,.*,1 .>~I,** 17 .*,n3u/,, ..,, _ ; r: <,;,lr,r/ll a,, _ EKziDm> 1 I ..,, MQISTtiRE DENSI$Y kUR*E \ .,j,, _._I,. . . ,,. ” ..,, _. ~~ Test,Mkth’id:’ ASTM Dl557-58T a Light brlwn clayby sand ~ Maxinxm Density 131.7 #if-u. Ft. 9-tlmum M~vis/zrre 8; 0 % ; _~~.. &rk:brown ‘silty:sand i ! I Ma>timum Density 127, 7 #/.Cu. Ft. G*>timum Moisture 9.5 70: . :PZR CENT MOISTURE CHESTNUT HEIGt-ITS I / -1. fit l +a\ , -~loo’ :HK’o : ~ d , ,~ --cE-PY I I iai ,I .A iZ ,-.cc ,“,‘ .I.\.‘,-,‘,“.~~ ‘! [,(-I~ ,-i<.‘N ‘Y I- {‘/.K(. J DRESSELHAUS ENGINEERS CONSULTING CIVIL ENGINEERS 528 SOUTH HlLL STREET + ocE.4NSIDE, CALIFORNM + PHONE 7,?24126 December 31. 1963 Kamat Construction Company Re: 2-1859 325 Elm Avenue Falcon Hills, Unit No. 2, Carlsbad, California Carlebad, Califanir Subject: Addendum to the Certification of Natural Poundatioa Materialr and Fill Soils. Dated June 8, 1963 Gentlemen: In compliance with the request of Mr. Jerry Rambotis of your organication, and to comply with the requirements of the Feder81 Houalng Administration, we are encloeing Addendum No. 1 to subject certification fcr Falcon Hille, Unit No. 2. Sincerely, DRESSELHAUS ENGINEERS 2c@254k Ld E. Brian Smith, RCE 13817 EBS:mg Encloeure: Addendum No. 1 cc: Federal Housing Administration City of C&rlsbad, Building Department ADDENDUM NO. 1 & The Certification of Natural Foundation ‘Materials and Fill Soils to Be Placed on Falcon Hilirr, Unit No. 2 Carlsbad, California Dated June 8, 1963 Item No. 4 Item No. 4 rhall be revised to read “A maximum rlope ratio of l-$ horizontally to 1 vertically for cut slopes and 2 horizontally to 1 vertically for fill slopes rhall not be exceeded”. The following additional item shall ba a part of the certification, Item No, 5 Where treem are to be removed, the entire root system shall be excavated. The excavated area shall be backfilled with material free from vegetable matter and other deleterious subrtances and compacted to not less than 90% of maximum density as determined by the ASTM Designation 1557-58T test method Re rpsctfully &rnitted, DRESSELHAUS ENGINEERS f,&.. J&j/ E. Brian Smith, RCE 13817 EBS:mg