Loading...
HomeMy WebLinkAbout; Laguna Riviera Unit 6 174-195 Unit 7 196-223; Soils Report; 1975-11-10WOODWARD-CLYDE CONSULTANTS CONSULTlNG ENGINEERS. GEOLOGlSTS AND ENWRONMENTAL SCIENTISTS - - - - - - - - WESTERN REGION 3467 Kurtz Street San Diego November 10, 1975 Callfornia92110 Project No. 75-105-23 Phone (714) 224~2911 Kamar Construction Company, Inc. Post Office Box 1155 Carlsbad, California 92008 Attention: Mr. Jerry Rombotis President FINAL REPORT OF ENGINEERING OBSERVATION AND COMPACTION TESTING LAGUNA RIVIERA LOTS 174 THROUGH 195 - UNIT NO. 6 LOTS 196 THROUGH 223 - UNIT NO. 7 CARLSBAD, CALIFORNIA In accordance with your request, and our agreement dated September 22, 1975, we have provided soil engineering services in conjunction with the grading of the subject site. These services included: (1) (2) (3) (4) (5) Engineering observation of the grading operation. Observation of the removal or scarification and recompaction of loose surface soil and loose fill soils, where encountered, prior to placing compacted fill. Observation of the removal of potentially highly expansive soil from the top 2 feet of rough lot grade and replacing it with nonexpansive or low to moderately expansive soil. Taking field density tests in the fill placed and compacted. Performing laboratory tests on representative samples of the material used for fill. Current site preparation, compaction, and testing were done between September 24 and October 27, 1975 in accordance with the "Specifications for Controlled Fill" in our report entitled "Updated Soil Investigation Report, Laguna Riviera No. 6 and 7, Carlsbad,. California", dated June 20, 1975 and revised on June 23, 1975. - Kamar Construction Company, Inc. Project No. 75-105-23 November 10, 1975 - Page 2 - - - - - - - - Prior fill placed under controlled conditions was compacted and tested on this site in 1974. The results of compaction tests are included in this report. During this initial grading period, fill was placed in a canyon area in Unit 7. Some excavation was done on both Unit 6 and 7. Fill was placed, compacted, and tested during the current grading period on Lots 174 through 185 and 187 through 195 in Unit No. 6 and on Lots 196 through 206, 208, 209 and 213 through 223 on Unit No. 7. As the site grading progressed, the compaction procedures were observed, and field density tests were made to determine the relative compaction of the fill in place. Field observations and field density test results indicate that the fill has been compacted to 90% or more of maximum laboratory density. The approximate locations of field density tests and the limits of compacted fill have been recorded on a copy of the grading plan for reference. The results of field density tests and of relative compaction, expressed as a percent of maximum laboratory density, are given on the attached forms. Laboratory tests to determine moisture-density relationships, maximum dry density, optimum moisture content, grain size distribution, plasticity characteristics, and swell characteristics were performed on representative samples of the material used for fill. The results of laboratory tests are given on the attached forms. During the grading operation certain lots were specially treated to provide a specified depth of selected soil at finish grade. This special treatment consisted of the placement of special finish grade soil and undercutting of highly expansive clay from finish grade and replacing it with soil of less expansive nature. The lots were then classified in regard to whether the soil at finish grade is nonexpansive or low IIO moderately expansive in nature. In general, finish grade soil refers to the upper approximate 2 feet of soil on the lot as defined by rough or compacted lot grade. Rough lot grade is defined as that grade set in the field by the grade checker from reference stakes established by the surveyor and represents rough grade at the time we were inspecting the removal and replacement of expansive soils. Likewise the depths of undercutting of expansive soil and/or depths of placement of nonexpansive soil were in accordance with measurements made by and grades set by the contractor's grade checker. Summary of Finish Grade Soil Conditions (1) Cut, fill or cut-fill lots having nonexpansive soils at finish grade are,Lots 177 through 184, 186, 196, 197, 198, 204, 205, 206, 208, 210, 211, 212, 214, 215 and 219. (2) Cut, fill or cut-fill lots having low to moderately expansive finish grade soils are Lots 174, 175, 176, 185, 187 through 195,199 through 203, 207, 209, 213, 216, 217, 218, and 220 through 223. WOODWARD-CLYDE CONSULTANTS co**YLTI*a 1”00”11”,. OIOLWI,I. .“D 1”“1”0”11”,11 .C,lW,IST‘ - Kamar Construction Company, Inc. Project No. 75-105-23 November 10, 1975 - Page 3 - - - - - - - - - - - (3) On those lots where potentially expansive soil is evident or where it is encountered in footing excavations, special foundation design should be observed. Special foundations for single or two-story residential structures on lots that contain such potentially expansive soil, should be designed in accordance with the recommendations in Paragraph (2) below. Foundation Recommendations (1) Foundations for single or two-story residential structures placed on nonexpansive undisturbed soil or nonexpansive properly compacted fill may be designed for a bearing pressure,of 2,000 psf at a depth of 12 inches below compacted fill or undisturbed cut lot grade. (2) Foundations for single or two-story residential structures on lots tha.t contain low to moderately expansive soil should be designed for an allowable soil bearing pressure of 2,000 psf and should include the following reinforcing. Rough or Compacted Grade . t X4 Bars, top and bottm The above design recommendations are not intended to eliminate heave, but are intended to minimize its effects. Footings placed on expansive soils should be expected to experience local heaving. (3) The bearing pressures given above are for total dead plus live load and may be increased for loads that include wind or seismic forces. All footings should have a minimum width of 12 inches. (4) The exposed soils within footing excavations and under slabs should not be allowed to dry out before construction. Soils should be wetted as required prior to placment of concrete. (5) Structures that will not tolerate differential settlements (such as foundations, swimming pools, concrete decks, walls, etc.) should not be located within 5 feet of the top of a slope. (6) All slopes should be properly drained, Planted and maintained in order to help control erosion. WOODWARD-CLYDE CONSULTANTS co*‘YLTI*P s*(il*rt”l, ~baLO.aI,,S A*0 m**I”O**sY,AL sc,~*I1s,~ - Kamar Construction Company, Inc. Project No. 75-105-23 November 10, 1975 - - - - - - - - - - - - - Page 4 The elevations of compaction tests shown as finished grade (FG) tests correspond to the elevations shown on the grading plans for "Carlsbad Tract 74-19", dated September lB, 1975, prepared by Raymond R. Ribal, Brea, California. Elevations and locations shown in this report are based on field surveys established by others. This report covers the fill placed under our observation during the dates specified herein. Additional fill placed after these dates, as well as the backfill in utility trenches located within 5 feet of a building and greater than 12 inches deep, or any trench 5 feet or more from a building and in excess of 5 feet in depth, should be compacted under the observation of this office and tested to assure compliance with the earthwork specifications for the project. This office should be contacted at least 24 hours prior to backfilling operations. Utility service trenches within 5 feet of a building that are perpendicular to the building footings and are less than 12 inches wide and less than 3 feet deep are not subject to this recommendation. The inspections of foundation preparation, types of materials and soil placement and compaction as well as tests of compaction made during the period of our services on the subject site were in accordance with the local acceptable standards for this period. The conclusions or opinions drawn from the tests and site inspections apply only to our work with respect to grading and represent conditions at the date of our final inspection. We will accept no responsibility for any subsequent changes made to the site by others or by uncontrolled action of water or by failure of others to properly repair damages caused by uncontrolled action of water. WOODWARD-CLYDE CONSULTANTS n L;&. James E. Cavallin, R.E. 17553 // JEC/EHP/RPW/jr Attachments (5) Kamar Construction Company (1) Carlsbad Building Inspection Department WOODWARD-CLYDE CONSULTANTS CO”SYLTI”D mm,**‘“‘. (IeaLoOI.*. L”D I*YI”O*m~*T”I sc,r*Tl,Ts - COMPACTION TEST RESULTS - JOd N.4ME LAGUNA RIVIERA 6 & 7 q I\TE REPORTeD 11-10-75 JOB NUMBER 75-105-23F - DATE. COVERED September 25, 1975 through October 23, 1975 PA/SE 1 OF 4 - DATE -ST FIETES, LDClTlON ELEYITlDN HUMBER or OF TEST -__ - SEPT 25 1 LOT 223 113' 2 LOT 218 122' 4" LOT 220 113' - LOT 220 116' SEPT 29 5 6 - 7 LOT 219 124' 11.1 119.8 127.0 94.4 LOT 218 132' 9.0 115.3 127.0 90.7 LOT 215 113' 11.1 110.0 121.0 90.0 LOT 214 117' 16.3 117.0 121.0 91.4 E OF LOT 217 135' 14.9 112.8 122.5 92.1 - - E ocT2. - - _ OCT 6 - - 20 21 22 23 24 25 :"7 :; 30 31 32 33 34 i6" 37 3"; 40 LOT 219 125' LOT 218 127' LOT 219 UPPER 130' LOT 215 LOWER 117' LOT 216 LOWER 119' LOT 216 UPPER 123' LOT 219 LOWER 128' LOT 219 UPPER LOT 217 LOT 216 UPPER LOT 218 LOT 215 UPPER LOT 218 LOT 196 LOT 197 LOT 223 LOT 198 LOT 196 LOT 199 LOT 196 LOT 217 LOT 196 LOT 197 LOT 196 UPPER LOT 198 LOT 218 LOT 215 LOT 216 LOT 196 114' 134' 128' 127' 138' 122' 140' 1% 116' 110' 100' 117' 112' 130' 110' 116' 112' 117! 141' 123' 128' *Ol.T”RI cO*TIHT * D”” WT. - FllLD U~OIATOR” “lLAll”I CmNSIT” DEH.lTv COYPACTIOH Fc, % or LAB. OLI1.. 12.3 127.2 127.0 I oat 12.3 119.1 127.0 93.8 13.0 118.8 127.0 93.5 13.6 115.0 124.0 92.6 12.3 114.8 121.0 94.6 14.9 112.2 122.5 91.6 13.6 112.2 121.0 92.8 16.3 109.8 121.0 90.6 14.3 113.0 122.5 92.3 12.3 115.3 121.0 95.5 14.3 110.4 121.0 91.3 14.9 115.0 122.5 93.8 14.9 122.4 122.5 99.8 12.3 123.0 127.0 96.6 11.7 118.6 122.5 96.8 16.3 114.2 122.5 93.2 11.7 117.6 121.d 97.2 12.3 114.6 122.5 93.5 10.5 110.7 121.0 91.4 13.0 121.9 122.5 99.5 12.3 113.9 122.5 92.9 13.0 120.7 126.0 98.0 14.3 120.1 122.5 95.6 14.9 115.1 122.5 93.9 12.3 119.3 122.5 97.4 13.0 112.5 122.5 91.8 11.7 117.3 121.0 96.9 17.6 110.2 116.0 95.2 13.6 113.8 122.5 92.8 12.3 121.0 122.5 98.7 12.3 115.2 122.5 94.0 13.6 119.0 127.0 93.7 12.3 116.8 127.0 91.8 14.3 120.2 127.0 94.6 10.5 116.6 127.5 91.5 I COMPACTION TEST RESULTS - JOB N.4ME LAGUNA RIVIERA 6 & 7 DATEREPORTED 11-10-75 JOB NUMBER 75-102-23F DATES COVERED September 25, 1975 through October 23, 1975 PAGE 2 OF 4 - DATE __- - OCT 8 - OCT 9 - - OCT 10 OCT 13 - - OCT - - - 41 i'3 44 45 :; 48 49 50 51 52 53 2 56 57 62 63 64 65 66 67 68 69 JO 71 72 73 74 :6" 77 LOT 197 LOT 198 'LOT 199 LOT 200 LOT 201 LOT 195 LOT 174 LOT 194 LOT 190 LOT 202 LOT 203 LOT 204 LOT 205 55 LOT 195 LOT 194 LOT 174 LOT 194 SLOPE LOT 192 114' 14.3 116.0 122.5 94.8 SLOPE LOT 187 135' 12.3 112.5 122.5 91.8 SLOPE LOT 191 119' 13.6 113.0 122.5 92.2 SLOPE LOT 188 127' 14.9 116.6 122.5 95.1 42 LOT 198 LOT 218 LOT 219 UPPER LOT 222 LOT 221 LOT 223 64 LOT 219 UPPER LOT 219 LOWER LOT 206 LOT 205 LOT 204 LOT 217 LOT 216 UPPER LOT 203 LOT 202 UPPER LOT 202 LOWER 117' 119' 121' 126' 132' 10.5 10.5 lie"7 14:3 114.0 127.5 90.0 111.2 127.5 87.2 117.3 127.0 92.5 120.2 127.0 94.6 124.2 127.5 97.4 88' 13.6 108.7 120.5 90.2 85' 16.3 114.0 120.5 94.5 93' 14.9 109.8 120.5 90.8 103' 14.3 110.0 120.5 91.2 134' 12.3 115.4 127.0 90.9 138' 14.3 117.8 127.5 92.4 140' 13.6 118.3 127.5 92.7 141' 12.3 119.7 127.5 93.9 91' :cs 93' 13.0 109.4 119.5 91.5 14.9 105.8 119.5 88.5 13.6 111.2 122.5 90.7 14.3 108.0 119.5 90.3 119' 12.3 117.2 127.5 92.2 FG 142.0' 10.5 119.8 124.0 96.5 FG 136.3' 10.5 109.6 125.0 87.8 FG 121.0' 12.3 107.4 119.5 90.0 FG 120.0' 11.7 117.0 127.5 91.8 FG 11915' 13.6 108.3 119.5 90.6 FG 136.3' FG 132.0' FG 143.0' FG 142.0' FG 141.0' FG 132.5' FG 129.3' FG 139.0' FG 139.3' FG 135.0' 11.1 11.1 9.9 1% 11.7 14.9 12.3 12.3 9.3 117.3 125.0 93.8 116.0 125.0 92.8 125.8 127.0 99.1 118.9 127.0 93.6 125.9 127.0 99.1 122.4 127.5 95.9 113.9 124.0 91.9 119.6 127.5 93.7 121.6 127.5 95.4 114.9 127.0 90.5 rlrLD LA~ORlrol” DlHBlT” DIN.lrv -XL KI “lUTl”r COMPACTION ./, 0, urn. omd.. - COMPACTION TEST RESULTS - JOd NAME LAGUNA RIVIERA 6 & 7 DATEREPORTSD 11-10-75 JOQ NUMBER 75-105-23F - DATES COVERLED September 25, 1975 through October 23, 1975 PAGE 3 OF 4 - o*,c “OI,T”II nsT RETEST LOCATION ELEYATION cO*TINT NUYBCR DP OF TEST $4 Dll WT -__ - ,llLD LASOIIAT.aI1~ “IL*IIYI DINBlTI clIN*ln COY~ACTIOH 1 ?cP PC, 9. orua. YLH.. - OCT 15 - - -0CT 16 - OCT 17 - -0CT 20 - OCT 21 - -0CT 22 78 79 Et 8823 84 85 86 87 88 E 91 92 93 94 95 96 97 z9" 100 101 102 103 lO;l 105 106 107 108 109 110 111 112 113 114 115 116 LOT 216 LOWER LOT 215 UPPER LOT 215 LOWER LOT 201 LOT 200 LOT 199 LOT 198 LOT 178 LOT 197 LOT 196 UPPER LOT 196 LOWER 80 LOT 215 LOWER LOT 181 LOT 208 LOT 209 LOT 214 LOT 177 LOT 178 LOT 179 LOT 180 LOT 181 94 LOT 177 LOT 182 LOT 183 98 LOT 181 LOT 220 LOT 189 UPPER LOT 176 LOT 192 LOT 193 UPPER LOT 174 UPPER LOT 174 LOWER LOT 193 UPPER LOT 194 LOT 192 LOT 191 LOWER LOT 189 UPPER LOT 188 LOT 187 FG 125.3' FG 124.3' FG 120.0' FG 133.0' FG 127.0' FG 122.5' FG 120.0' 105' 11.1 12.3 1::: 13.6 13.0 13.0 14.3 FG 118.8' 10.5 FG 115.7' 12.3 FG 112.7' 13.6 FG 120.0' 11.1 112' 13.0 FG 142.6' 11.7 FG 142.4' 13.6 FG 120.3' 11.1 FG 103.9' FG 106.5' FG 108.2' FG 112.0' FG 113.4' FG 103.9' FG 111.5' FG 108.6' l?Y 11:1 10.5 10.5 12.3 14.3 13.6 FG 113.4' FG 119.0' 112l FG 100.7' FG 100.2' FG 99.2' 87' 90' 11.7 14.3 10.5 FG 95.2' FG 94.6' FG 100.2' FG 100.8' FG 113.2' FG 112.6' FG 113.5' 1 i El 1 5.6 1 2.3 1 3.6 3.6 i:: 1.7 4.3 i:: 116.7 127.5 91.5 116.4 127.0 91.6 109.2 127.0 86.0 124.7 127.5 97.8 116.6 127.5 91.5 121.5 127.5 95.2 120.1 127.0 94.5 119.1 127.0 93.8 14.9 127.0 90.5 15.4 127.0 90.9 19.1 127.0 93.7 16.2 127.0 91.5 16.3 127.5 91.4 24.7 127.0 98.1 19.0 127.5 93.3 17.3 127.0 92.4 111.5 118.5 116.9 115.2 109.8 117.0 118.1 119.3 127.0 87.8 127.0 93.3 127.0 92.0 127.0 90.7 127.0 86.4 127.0 92.1 127.5 92.7 127.5 93.6 115.4 127.0 91.0 116.3 124.0 93.8 120.4 127.0 94.8 111.9 119.5 93.5 123.0 127.5 96.6 122.2 127.5 95.8 116.0 127e5 91.3 115.6 127.5 90.8 119.8 126.0 95.0 117.3 126.0 93.0 120.2 127.5 94.3 115.0 127.5 go<2 116.9 126.0 92.8 115.0 127.5 90.2 114.8 127.5 90.0 I - COMPACTION TEST RESULTS - JOB NAME LAGUNA RIVIERA 6 & 7 D*TEREPoRTED 11-10-75 JOB NUMBER 75-105-23F - DATES COYERED September 25, 1975 through October 23, 1975 PAGE 4 or 4 - n*rr TEST WETEST LOClTlOH YoI*wI‘ RCLD Lm;m,r.w c~~~mKTy;" ELEVATION COWTIHT D~NIII" NUMBER -0T OF TEST * D"" WT. - . . -FL PC, % 0, LAB. DC".. -__- _ OCT 23 117 LOT 184 FG 106.8' 11.1 117.1 127.0 92.2 118 LOT 185 LOWER FG 107.6 12.3 114.9 127.5 90.0 119 LOT 189 LOWER FG 108.4' 13.6 123.1 127.5 96.5 120 LOT 190 UPPER FG 109.5' 11.1 120.7 126.0 95.7 - 121 LOT 190 LOWER FG 105.2' 14.3 121.3 127.0 95.5 122 LOT 191 UPPER FG 104.8' 14.9 120.8 127.5 94.7 123 LOT 195 FG 92.2' 14.9 120.6 126.0 95.7 - 124 LOT 175 FG 97.6' 14.3 117.5 127.5 92.2 125 LOT 174 UPPER FG 92.7' 13.6 115.8 127.5 90.8 126 LOT 174 LOWER FG 88.0' 15.6 118.8 127.5 93.2 - - - - - - - COMPACTION TEST RESULTS - JOB NAME LAGUNA RIVIERA 6 & 7 OITEREPORTED 11-10-75 JOBNUMBER 75-105-23F (Streets) - DATE. COVERED September 29, 1975 through October 24, 1975 PAGE S-l OF S-l - YOIII”“C ,ILLD DATE nsLT RETEST LOCATION ELEVATION COl4TIHT DINSIT” NUHBLR OP TEST $6 0”” WI, __-- __ - .-~ -“- -SEPT 29 S-l s-2 - s-3 S-4 -SEPT 30 s-5 OCT 9 S-6 -- S-J -0CT 13 S-8 s-9 -0CT 15 s-10 s-11 OCT 16 s-12 OCT 17 s-13 s-14 *.I s-15 S-16 - s-17 HILLSIDE DRIVE: OPP LOT 220 OPP LOT 219 OPP LOT 218 OPP LOT 218 HILLSIDE DRIVE: OPP LOT 217 HILLSIDE DRIVE: OPP LOT 195 OPP LOT 196 HILLSIDE DRIVE: OPP LOT 195 DPP LOT 196 HILLSIDE DRIVE: OPP LOT 216 NEBLINA DRIVE: OPP LOT 220 NEBLINA DRIVE: OPP LOT 223 NEBLINA DRIVE: OPP LOT 215 HILLSIDE DRIVE: OPP LOT 196 REFUGIO AVENUE: OPP LOT 174 OPP LOT 195 HILLSIDE DRIVE: OPP LOT 217 117' 11.1 115.2 127.0 90~. 7 124' 15.6 121.4 122.5 99.1 133' 16.3 111.8 121.0 92.4 130' 17.6 115.6 122.5 94.4 132' 15.6 116.8 122.5 95.3 92' 14.3 111.9 122.5 91.3 98' 13.6 111.2 122.5 90.7 11.7 113.2 122.3 92.4 13.6 117.2 122.3 95.6 126' 12.3 118.4 127.5 92.8 113' 13.6 120.0 127.5 94.3 111' 12.3 110.0 121.0 91.2 112' 11.1 117.8 127.5 92.3 106' 13.6 119.8 127.0 94.2 84' 12.3 118.0 127.5 92.5 88' 11.7 117.0 127.5 91.7 135' 15.6 108.6 119.5 90.8 “LUTlYI COYPACTION 7. or LAO. D)LNS. - - - PLASTICITY CHARACTERISTICS 1 2 3 Liquid Limit, % 29 50 35 - Plasticity Index, % 14 34 18 Classification by Unified Soil Classification System SC SC f-1 - - -. - - -. - - 150 14c 130 1x 11c 100 90 80 I- )- I- I- , I- I- 0 (COBBLESI “c”4’:’ 1 c, zy f ( SILT 6 CLAY 100 $ 80 3 2 60 z w 40 2 k? 20 0 1000 loo 10 1.0 0.1 0.01 0.001 GRAIN SIZE. mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA I I Dry Density. pcf Initial Water Content, % Final Water Content. % Apparent Cohesion, psf Apparent Friction Angle, degrees ZERO AIR VOIDS CURVES 10 20 30 40 LABORATORY COMPACTION LABORATORY COMPACTION TEST TEST METHOD: ASTM-n E57-7fY fl. I FILL SUITABILITY TESTS I LAGUNA RIVIERA 6 AND 7 CHECKED BY: WOOOWARO-CLYDE CONSULTANTS - - - .- .,- - - PLASTICITY CHARACTERISTICS 4 5 6 COBBLES~ yA; ) c, Tp f 1 SILT 6 CLAY 1 Liquid Limit, % -- 28 30 Plasticity Index. % -- 11 100 12 Classification by Unified Soil Classification System -- SC SC $ 80 g 0 60 5 tu 40 2 ZERO AIR VOIDSCURVES k! 20 0 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS 110 DIRECT SHEAR TEST DATA I I I I Dry Density, pcf I Initial Water Content, % 1 Final Water Content, % Apparent Cohesion, psf Apparent Friction Angle, degrees I SWELL TEST DATA 14 15 16 I 100 _..",.,r"." -... , L., , -.- I Cu;.ll norrmn+ I -- I371 .?~?I SAMPLE LOCATION %. I I I I I I I I I I Maximum Dry Density, pcf I *OO I I 10 20 30 40 LABORATORY COMPACTION TEST TEST METHOD: H> I M-U I FILL SUITABILITY TESTS I LAGUNA RIVIERA 6 AND 7 DRAWN BY: ALS CHECKED BY: PROJECT NO: lb- 105-2~ 1 DATE: 11-10-75 1 FIGURE NO: 2 WOODWARD-CLYDE CONSULTANTS - * . - - - - - - - - - - - - - - -. PLASTICITY CHARACTERISTICS 7 8 9 COBBLES/ :I;v; ) cl $7 f 1 SILT & CLAY >;“,,;A I i-t* 41 .A.$“,” CIIIIII, I” I -- -_ I ~~ P ‘lasticity Index, % 100 -- __ ., .I. ^ Clarslrlcatlo” Dy ““Ifled 5011 -- -- Classification System 1 1 NP i 80 $60 5 “0 40 ,” 0 20 ZERO AIR VOIDSCURVES n 150 ;ooo 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA I I Density. pcf I 130 I I I 120 Apparent Cohesion, psf I Apparent Friction Angle, degrees I SWELL TEST DATA 7 8 9 Initial Dry Density, pcf 107.7 112.6 1' Initial Water Content, % 14.4 12.0 Final Dry Density, pcf 102.bA110.9 1 . ..^I. 14.0 10.9 4 13.5 14.4 I Final Water COI Itent. % 1 LI.11 lb.31 ,~~-. ,+-+A&- I160 1160 l1t I 1 4.91 1.51 0.51 5Q.J LABORATORY COMPACTION TEST LABORATORY COMPACTION TEST METHOD: ASTM-O l55Zz FILL SUITABILITY TESTS LAGUNA RIVIERA 6 AND 7 DRAWN BY: A1.S CHECKED BY: PROJECTNO: 75-105-23F DATE: 11-10-75 FGURENO: 3 WOODWARD-CLYDE CONSULTANTS ( . ., - - - - - - - - 15 14 13 12 11 10 9 PLASTICITY CHARACTERISTICS ,(J COBBLES1 yA{y ) c, yl f 1 SILT k CLAY 1 Liquid Limit, % 31 Plasticity Index, % 15 100 Classification by Unified Soil Classification System SC $I 60 I3 ,Q 60 5 w 40 2 if 20 ZERO AIR VOIDSCURVES 0 1000 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS 1 DIRECT SHEAR TEST DATA 1 I I I Dry Density, pcf I I Initial Water Content, % Final Water Content, % Apparent Cohesion, psf Apparent Friction Angle, degrees 40 LABORATORY Cm-tTlf.&7-70 A LABORATORY COMPACTION TEST TEST METHOD: FILL SUITABILITY TESTS LAGUNA RIVIERA 6 AND 7 DRAWN BY: ALS CHECKED BY: PRaJECTNcl: 75-105-LJt DATE: 11-10-75 FIGURE NO: 4 WOOOWARO-CLYDE CONSULTANTS