Loading...
HomeMy WebLinkAbout0; Mull's Addition Map 514; Soils Report; 1966-09-08.* ‘t , /.” ; r’ / CliESSiiHAlJS ENGINEERS COA!SULT/NG C/V/L ENG/A’EE/?S 528 SOUTH HILL STREET + OCEANSIDE. CALIFORNIA + PHONE 7225126 DONALD F. ORESSELHA”S. C.E. E. BRllN SHIT”. C.E. September 8, 1966 Helton Construction Company 2829 State Street Carlsbad, California Re: Job No. 2-2557 Portion Mull’s Addition, Map 514, Carlsbad, Calif., Subject: Report of Soil Compaction Control Gentlemen: In compliance with the request of Mr. Gary Helton, we have inspected and tested the natural ground and in,ported fill placed on the reference property. The natural ground was cleared of debris and vegetation, scarified, ri:oistened and conpacted to not less than 9370 of the maximum dry density as derermined by A. E. T. M. D 1557-58T test nbethod. The imported fill, consisting of brown fine sand, v~as placed in layers of approximately six inches in thickness and uniformely compacted to at least 90% cf the E-L axing un; density. Field density tests were n a& in the fill to determine the degree of campaction. The results of the field density tests are reported on the enclcoure. The apprcximate location of each test is shown on the enclosed plot plan. Laboratory tests were made to determine the maximum density and optimum moisture of the fill soils. The results of the laboratory tests are shown on the enclosed Compaction Diagram. DRESSELHAUS ENGINEERS 2-2557 Page 2 9-8-66 The results of the field density tests and laboratory tests indicate the fill is con:pacted to not less than 90% of the maxinxml density. Respectfully submitted, DRZLSI;:LHAUS FLNGINEEYRS I?. Brian Smith KCE 13, 817 EBs:ct Enclosures: Plot Plan R,eport cf Field Den&y Tests cc: City of Carlsbad, Bldg. Dept./ Date : September 8, 1966 Re: Job No. 2-2557 He&on Constniction Co. 2829 State Street Carlsbad, California REPCRT OF FIELD DENSITY TESTS Date & Test # 8-30-66 Depth Ft. Location % Field Lab. “k Moisture Density Density Compaction: 1 E-31-66 5 6 7 9-l-66 8 9 Natural Ground 1. 3’ of Fill 1. 5’ of Fill 2. 0’ of Fill 2.0’ of i?ill 2. 5’ of Fill 3. 0’ of Fill Finish Grade Finish Gradeq 5, /ly center of bldg. pad. 8.6 52’. Corner of fill 7. 18 NV: Corner 7. 02 of fill NV. Corner 7. 23 of fill See Remedial Test #5 114.6 126. 0 90. 1 116. 9 128. 0 9 1. 2 115. 8 128. 0 90. 5 108.8 128. 0 84. 8 Nip Corner of Fill 7.16 117. 6 128. 0 91. 8 SV, Corner of Fill 5. 67 117. 9 128. 0 92. 1 b: Center of Fill 8. 36 123. 4 128. 0 96.4 S. Center of Bldg. Pad 4. 75 123. 9 128. 0 96.8 Center of bldg. pad 7.52 115. 0 128.0 90. 0 r,siv / ,’ cuwes of 100% saturation for specific gravity HELTON CONSTRUCTION CO. A,-~‘. J ~fl. . - 1NCli64iFFS’ F,Pr-~HO x ! wl !A 7~ EY ,,f’~ ., iLOif-l-iO P-J 0 r- F’~ / t I. L Ci~ :.t - 5 / T’” 7 t. Tl- $ T EI 57~ r\. -’ , w :p<,k :. ,A ;..- i c: ~, A SKETC Ii VI<1 hl ,TY i ~; ( r& ./I-’ h/t ,.k_‘: Al ‘i, i,.l /Y : bJ j’ :- ,’ 1, i. ,, , -_ : ,\ , c-i.. : hlo ~C~)LE SITE e- PC. upi. r~-~~ ~~ 1 i&T PL A N j t-i ELTON C-ON’~T~?UC.‘T ,r‘ IN c T,. i--,--.-.-.~~...~. ~~- ..~ _-_--- -.---.--~-r~ --- if L - DRESSELHAUS ENGINEERS 528 South Hill Street Oceanside, California 92054 SCHEDULE OF FEES CONSULTING ENGINEER Court Appearance per day or any portion thereof . . Court Preparation . . . . . . . . . . . . . . . . . . General . . , , . . . . . . . . . . . . . . . . . . . . PRINCIPAL ENGINEER . . . . . . . . . SUPERVISING ENGINEER . . . . . . . , . . SENIOR ENGINEER /SENIOR GEOLOGIST . . . . . . . ASSOCIATE ENGINEER . . . . . . . . . . . . . . . ASSISTANT ENGINEER: TECHNICIAN, LAB & FIELD (Continuous Inspection by Quotation) per hour 200.00 25.00 20.00 15.00 12.50 12.00 10.00 8.00 TYPING-STENO . . . . . . . . . . . . . . . . . . per hour 4. 50 FIELD CREWS: Fully Found Z-Man Crew . . . . . . . . . . . . . . . . . 3 -Man Crew . . . . . . . . . . . . . . . . . 4-Man Crew . . . . . . . . . . . . . . . . Plus Travel, Wood and Pipe Monuments Pipe l/Z” to 1” diam. - 18” long . . . . . . Pipe l-l 12” to 2” diam. - 18” long . . . . . MINIMUM FIELD CHARGES, INCLUDING TRAVEL . . . MILEAGE CHARGES (From the nearest office.) . . . per mile PRINTING CHARGES: 8-l/2” x 11” ................. 18” x 30” ................... 24” x 36” ................... (Minimum Charge - $1.00) TELEPHONE .................. AEROPLANE - (Tachometer Hours) ......... . . . . . per hour per hour per hour per hour per hour per hour per hour per hour per hour each each . . . . per sheet per sheet per sheet cost per hour 20.00 29.00 34.00 1.00 2.00 25.00 . 12 .09 .27 . 54 12.00 OUTSIDE CONSULTANTS AND SERVICES . . . , . . cost plus 10% OUT-OF-TOWN EXPENSES . . . . . . . . . . . . cost DELINQUENT ACCOUNTS will be charged interest at the rate of 10% Form No. 87 1~27.66 SheeA 1. - Schedule of Fees Sheet 2. MATERIAL TESTING CONCRETE & RELATED PRODUCTS AGGREGATES FOR CONCRETE, GUNITE, MORTAR & PLASTER GRADATION . . . . . . . . , . . . . . . . . each WEIGHT PER CUBIC FOOT . . . . . . . . . . each SPECIFIC GRAVITY . . . . . . . . . . . . . each ABSORPTION-COARSE & FINE AGGREGATES . . each LIGHTWEIGHT PIECES IN AGGREGATE . . . . each PERCENTAGE SHALE . . . . , . . . . . . . each PERCENTAGE CLAY, HYDROMETER METHOD . each PERCENTAGE FLAT AND/OR ELONGATED PARTICLES . . . . . . . . . . . . each NO. 200 WASH . . . . . . . . . . . . . each ORGANIC IMPURITIES SOUNDNESS BY SODIUM OR’ MAGNESIUM . . ’ . each METHOD (FIVE CYCLES) . . . . . . . . each $ 5.00 3. 50 4.00 5.00 3.50 5.00 15.00 3.50 3. 50 3.50 37.50 CEMENT: PHYSICAL & CHEMICAL MILL SAMPLES TYPE I ................ per barrel .04 TYPE II ................ per barrel .05 JOB SAMPLED TYPE I, II, OR III ........... cost CONCRETE MIXES DESIGN MIX (Includes complete analysis of Aggregates, calculating proportions of Cement, Aggregates and Water) . . . . . . . . . . . . . . . . . each ADDITIONAL DESIGN MIX (Based on original materials analysis) . . . . . . . . . . . . each LIGHTWEIGHT DESIGN MIX (Includes complete analysis of Aggregates, calculating proportions of cement, aggregates, and water.) . . . . each ADDITIONAL LIGHTWEIGHT DESIGN MIX (Based on original materials analysis.) . . each CONCRETE TESTS CONCRETE CYLINDER COMPRESSION TEST . . each GUMTE CYLINDER COMPRESSION TEST . . . . each 50.00 22.50 65.00 25.00 3. 50 4. 50 Form No. 87 l-27-66 Schedule of Fees Sheet 3. COMPRESSION TEST ON CONCRETE CORES, 4” to 8” in Diameter . . . . . . . STORAGE CHARGE FOR CYLINDERS NOT TESTED . . . . . , . . . . . . . . . . SLUMP CONES AND RODS ($20.00 Deposit) . . . MORTAR AND GROUT: COMPRESSION TESTS OF MORTAR CYLINDERS, 2” x 4” . . . . . . . . . . COMPRESSION TESTS OF GROUT PRISMS . . . PROPORTION OF CEMENT AND AGGREGATE IN MORTAR . . . . . . . . . . . . . . . . BRICK: COMPRESSION TEST (Five Required) . . , . . COMPRESSION TEST OF BRICK CORES . . . . SHEAR TEST ON BRICK CORES . . . . . . . . ABSORPTION TEST: 24 hours Test (Five Required) . . . . . . 5 hours Boiling (Five Required) . . . . . MODULUS OF RUPTURE (Five Required) . . . . CONCRETE BLOCK: COMPRESSION TEST OF CONCRETE BLOCK . . COMPRESSION TEST OF MASONRY CORES , . . SHEAR TEST ON MASONRY CORES . . . . . . MOISTURE CONTENT AS RECEIVED . . . . . ABSORPTION TEST (24 Hours) ........ SHRINKAGE TEST .............. UNIT WEIGHT . . . . . . . . . . . . . . . . each $ 6.00 each per day 1.50 1.00 each each 3. 50 3. 50 each 20.00 each 3. 50 each 5.00 each 18.50 each each each 3. 50 3.50 3.50 each 5.00 each 5.00 each 18.50 each 3. 25 each 3. 50 each 10.00 each 3.00 Form No. 87 l-27-66 -. Schedule of Fees Sheet 4. MATERIAL TESTING METALS REINFORCING STEEL: PHYSICAL TESTS .............................. $ 3.50 ................................... each 2.00 .............................. 7.50 ............................ 4.00 ............................... 3.00 STRUCTURAL STEEL: TENSILE TEST . . . . . . . . . . . . . , . each BEND TEST ................. Over 318” ............... each 318” and Under ............. each FLATTENING TEST . . . . . . . . . . . . . each PREPARING TENSILE AND BEND TEST SPECIMENS UP TO 3/4” THICK . . . . . each PREPARING TENSILE AND BEND TEST SPECIMENS OVER 3/4” THICK . . . . . each SOILS TESTING DRILLING AND SAMPLING: DRILLING - (Includes Drill Rig, Operator, and Helper.) . . . . . . . . . . . . . . per hour SAMPLING (Soils Technician.) . . . . . . . . per hour LABORATORY TESTS: SIEVE ANALYSIS - COHESIVE SOILS . . . . . each SIEVE ANALYSIS - NON-COHESIVE SOILS . . . each MECHANICAL ANALYSIS (Wash through #ZOO Sieve. ) . . . . . . . . . . . . , . . . each HYDROMETER ANALYSIS . . , . . . . . . . . each 4.00 3. 50 2.00 2.50 4.00 5.00 20.00 8.00 a. 50 5.00 12.50 15.00 Form No. 87 l-27-66 Schedule of Fees Sheet 5. EXPANSIVE SOILS REPORT (County) ........ LABORATORY COMPACTION TEST, Four Points . . SAND EQUIVALENT ............... LIQUID LIMIT .................. PLASTIC LIMIT ................. PLASTICITY INDEX (Liquid Limit and Plastic Limit) . SHRINKAGE LIMIT ................ SPECIFIC GRAVITY OF SOILS .......... MOISTURE DETERMINATION ......... .’ . DRY DENSITY DETERMINATION ... ...... VISUAL CLASSIFICATION ............ TRIAXIAL COMPRESSION TEST: UNDISTURBED - FAST ............ UNDISTURBED - SLOW ............ RECOMPACTED - FAST ........... RECOMPACTED - SLOW ........... CONSOLIDATION TEST: UNDISTURBED - POINTS . . . . . . . . . . . RECOMPACTED - POINTS . . . . . . . < . . CONTROL OF COMPACTED FILLS: ASSISTANT ENGINEER /SOILS TECHMCIAN . . ASSOCIATE ENGINEER ............ SENIOR ENGINEER .............. SUPERVISING ENGINEER ........... PRINCIPAL ENGINEER ............ each $ 100.00 each 25.00 each 10.00 each 12.50 each 12.50 each 25.00 each 10.00 each 10.00 each 2.50 each 2.50 each 2.50 each 25.00 each 35.00 each 25.00 each 35.00 per point per point 10.00 10.00 per hour 8.00 per hour 10.00 per hour 12.00 per hour 12.50 per hour 15.00 Form No. 87 l-27-66 Schedule of Fees Sheet 6. INSPECTION AND SAMPLING SERVICES INSPECTION: PLACING INSPECTION OF CONCRETE 81 GUNITE (Regular Time) . . . . . . . . . per hour $ 7.00 BATCH PLANT INSPECTION OF CONCRETE (Regular Time) . . . . . . . . . . . . . per hour 7. 00 MASONRY (Regular Time) . . . . . . . . . . . per hour 7.00 GLUE LAMINATED LUMBER (Regular Time) (To be charged at rate of Laboratory at area of testing. ) . . . . . . . . . . . . . . . . . . . . cost STRUCTURAL STEEL - SHOP OR FIELD WELDING FABRICATION OR ERECTION INSPECTION (Regular Time) . . . . . . . . . . . . . per hour 7.00 PERCOLATION TESTS . . . . . . . . . . . . by Quotation SAMPLING SAMPLING OF MATERIALS OR PICK-UP SERVICE per hour 7.00 MISCELLANEOUS ITEMS TRAVEL TIME: WILL BE BILLED AT THE SAME RATE AS REGULAR INSPECTION OR SAMPLING TIME RATES FROM THE LABORATORY TO THE JOB AND RETURN. PARKING: WHERE NOT FURNISHED FOR THE INSPECTOR, WILL BE CHARGED AS PAID FOR BY THE INSPECTOR. MILEAGE : AUTOMOBILE MILEAGE FROM THE CLOSEST LABORATORY TO THE JOB AND RETURN . . . . . . . . . . . . per mile . 12 SUBSISTENCE: WILL BE CHARGED AT A MINIMUM RATE . . per day 12.50 CANCELLATION: OF INSPECTION ORDER IF NOT MADE BEFORE 5~00 PM OF THE PRECEDING DAY, WILL BE CHARGED FROM 8:00 AM IN THE NORMAL MANNER OR UNTIL THE INSPECTOR IS DISCHARGED. Form No. 87 l-27-66 Schedule of Fees Sheet 7. COMPLETION: THE INSPECTOR WILL REMAIN ON THE JOB UNTIL HE IS DISCHARGED BY COMPETENT AUTHORITY. TERMS: NET 10 DAYS, ACCOUNTS NOT PAID WITHIN 30 DAYS AFTER DUE AND COLLECTABLE, WILL BE CHARGED INTEREST AT THE RATE OF 10%. OVERTIME: TIME AND ONE-HALF WILL BE CHARGED AFTER 8 HOURS ON ANY ONE DAY, TIME AND ONE-HALF ON SATURDAYS, DOUBLE TIME ON HOLIDAYS AND SUNDAYS. ATTORNEYS FEES: CLIENT AGREES TO PAY ENGINEER REASONABLE ATTORNEY FEES SHOULD AN ATTORNEY BE REQUIRED BY ENGINEER TO ENFORCE COL- LECTION OF ANY PAYMENTS PAST DUE AND PAYABLE. TERMINATION: ENGINEER AGREES TG CONTINUE WITH DUE DILIGENCE TO COMPLETE ANY PROJECT, SO LONG AS THE C,mNT IS NOT IN DEFAULT OF THE PAYMENT HEREIN PROVIDED. THE ENGINEER MAY CEASE WORK AT SUCH TIME AS ACCOUNTS PRESENTED FOR PAYMENT HAVE BECOME DELINQUENT WITHOUT JEOPARDIZING FEES PREVIOUSLY EARNED. GENERAL: CHECKING, FILING AND OTHER FEES, DEPOSITS, TITLE REPORTS, LEGAL NOTICES AND REAL ESTATE COMMISSIONER’S FEES ARE TO BE PAID BY CLIENT AND ARE NOT INCLUDED HEREIN. FEES FOR LANDSCAPE ARCHITECT ARE TO BE PAID FOR BY CLIENT WHEN REQUIRED. I HEREBY AGREE TO THE FOREGOING TERMS AND SCHEDULE OF FEES. DATE : DATE: DRESSELHAUS ENGINEERS CLIENT BY: BY: Form No. 87 l-27-66