Loading...
HomeMy WebLinkAbout; Rancho Agua Hedionda Lot H; Soils Report; 1966-05-04DRESSELHAUS ENGINEERS CONSULTNG C/V/L EA’GINEB?S 528 SOUTH HlLL STREET + OcEANSlDE, CALlFORNlA + PHONE 7.2?4?1.?6 OONALD F. DRISSELH*“S. C.E. 2. BRllN SYITH. GE. May 4, 1966 Matich Corporation P. 0. Box 183 Cardiff, California Re: Job No. 2-2429 Portion of Lot H, Rancho Agua Hedionda, Carlsbad. California Subject: Report of Soil Compaction Control Gentlemen: In compliance with your request. we have inspected and tested the fill soil placed on the reference site. The site is located South of Palomar Airport Road and East of the new Interstate 5 Freeway. The Southerly portion of the rite lies in the Canyon de las Encinas flood plane. The natural soils in the low lying Canyon de las Encinas area are soft and compressible. The natural soils above the Canyon de 1~s Encinas area are firm and well compacted. The site was cleared of vegetation and debris. The natural surface eoile were scarified and compacted, where practical, to not less than 90% of the maximum density am determined by A. S. T. M. D 1557-58T test method. The natural surface soils in the Canyon de las Encinas area were in a saturated condition and would not support the earth moving equipment. The natural soile in the Canyon de lam Encinan area were “Bridged” with fill material by pushing the fill material ahead of the earth moving equip- ment in order to form a base to support the equipment. The fill material was placed in horizontal layers approximately six inchen in depth, moistened, and compacted to not less than 90% of the maximum den*W excepting the lower Sub’feet of fill “Bridging” the natural soils in Job No. 2-2429 Page No. 2 DRE.SSElHAUS ENGINEERS the Canyon da la* Enainer we& Field deueity terte were taken, in accordance with A. S. T. M. D 1556~SST teet methad at intervals of two vertiaal feet of fill. The resutta of the field denrity teats are ehown on the followtag enclorure. The results of tbe field deaetty teetr md laboratory tests indicate the natural ground and compacted fill on the higher grcuaid above the Canyon de lam En&tar area is admpate for deriga loada of l200 pounde per equare foot for l quere or contiauoue footingr founded in the uadiaturbed natural ground or compacted fin. It is recormnonded teat boles be drilled end oonrolidrtion tarts be mede on samples of the natural compresrfble eoilr underlying the fill in the Canyon de las Encinas area to determine the alloweble bearing value and probable consolidation of the aoil. This work should be done prior to any proposed construction. This report doee not cover materiel placed kstween the fill slope and the new Interrtate 5 Freeway. Reepectfully submitted, DRESSELHAUS ENGINEERS $Q& fsfiLY E. Brian Smith RCE 13. 817 EBS:ct Enclosure: Plot Plan Report of Field Density Terte hrioieturc-Demlty Curves cc: City of Carlsbrd. Sk&. Dept. “0 . - ,hlDtCaTE5 APPROX~ “0 : l - I hlDtCaTE5 APPROX~ \ LOC4TION OF !=!ELD DENSITY I TEST AND TEST NO. I II- FILL SLOPE cTc\klvoM cfe I Eww,s hem -sA#j blE&Q - CtWY 101 !\IEW FwE.EW~~*Y _ _ _ - __---_---- SITE 4 J ;--5E-L 2% 5; VlClNtTy Slfe’TCH ;P* No ScaLP I P? FbOimLTY CWWGR ; Teua-r~ \NV’L$TM’CNT 6. 816 w, sTH %-rcwzT Los At+sz~is, &JFOPLUth. L&SAL ~E=nL~PTIcJN: PCI~T\UN OF i-0-T ti, i?Abzt+O Aaw. Hta WwA, Cbec%aA,o, CALIFUR.bu4 P LOT P LRN I FOR I rl ATICH CORE 1 I WnWN DRCSSELHAUS EUCINNLERS jon1r: i Date: May 4, 1966 Re: Job No. 2-2429 Meticb Corp. REPORT OF IFIELD DENSITY TESTS Date t D-b Teat # Ft. Location k Field Lab. w Moisture Den&y Den&y Compaction U-5-65 1 2 11-8-65 3 4 11-10-65 5 6 U-12-65 7 8 1. 0’ of Fill 1.0’ of Fill 3.0’ of Fill 3.0’ of Fill 5.0’ of Fill 5.0’ of Fill 6.0’ of Fill 6. 0’ of Fill 9 6. 0’ of Fill See Plot Plan 9. 0 117. 4 128.5 91. 4 see Plot Plan 13.9 110.9 118.8 93. 5 II 15. 8 110. I 118.8 92.8 a.6 121.0 128.5 94.2 7. 5 111. 2 118.8 93.7 :I 15.2 108.7 118. 8 91.7 I, tz. 3 II& 8 128.5 92. 5 i, 5. 8 4, 16. 3 See Remedial Teet # 9 115.7 106. t 128.5 90.1 118.8 89.3 Re: Job No. 2-2499 Matieh Corp. REPORT OF FIELD DENWTY TESTS Date 81 Depth Teat # Ft. Location 70 Field Lab. % Moiahua Density Density Compaction 2-21-66 10 11 2-22-66 12 13 2-24-66 14 15 2-25-66 16 2.0’ of Fill See Plot Plan 5.5 106. a 118. 8 90. 0 4.0' of Fill ,I 5.6 106.8 118. 8 90.0 6.0' of Fill 8. 0’ of Fill 10. 0’ of Fill II 7. 6 10. 0’ of Fill /L 8. 1 12.0’ of Fill 17 12.0’ of Fill la 19 2-28-66 20 l2.0’ of Fill 12.0' of Fill 14. 0’ of Fill II 5. 0 II 13. 0 It 6.8 See Remedial Test # 18 See Plot Plan 8. 1 See Remedial Test # 19 See Plot Plan 6. 0 *I s. 0 8.6 110.3 121.0 91. 1 112.0 121. 0 92.7 111.2 121.0 111.6 121.0 104.0 121. 0 106.5 121.0 110. 0 121. 0 129. 3 La. 3 111.2 121.0 92.2 92.2 86.0 88.0 91. 0 98.8 91. 9 Re: Job No. 2-2499 Matteh Corp. REPORT Op‘ FXELD DENSITY TESTS Dote 6s -Pa Teat # Ft. Location k Field Lab. w Moi4t?lr4 hlldQ DenDity comp4ction 21 3/l/66 22 23 312166 24 25 313166 26 27 314166 2% 29 3/7/66 30 31 16.0’ of Fill See Plot Plan 6. 5 109.0 16. 0’ of Fill 16. 0’ of Fill 16.0’ of Fill 18.0’ of Fill 20. 0’ of Fill 20.0’ of Fill 22.0’ of Fill 22.0’ of Fill 24. 0’ of Fill 24. 0’ of Fill IO. 0 8.0 8.2 8. 2 6.0 6. 1 9.2 6.0 9.0 IO. 2 117.9 114.5 113.2 109.5 109.9 109.9 109.2 106. 5 110.4 110.3 121.0 121.0 121.0 121. 0 121.3 121, 0 121.0 121.0 118. 8 121. 0 121.0 90.2 97. 3 94.6 93. 5 90.6 90.6 90.9 90.4 90. 0 91.4 91. 4 13c 11.5 110 115 II0 lo5 100 M~~GTURC DE~ITY -URVE 5 TEsr MET HOD : A.S.T.M. 13-1557-358~ > O- BRowM FINE To MED. 5fi~0 I-lAXlmUM DSNSlTY - lZ8.S LOS Cu. Cock OPtlnUM MoIsr‘uRh - 8.a -7, IS- BROWN CLRYEY SAND McIXlPlUM DEN5ITY - IIS.8 LB% CU.FX OPTIMUM MOISTURE- 12.0 70 Q - i3ROWt.J b?ED. SRN0 ~l~.tr:\MUiY\ DENSIT+ - IZI LI3s.c~. F7 OPTIMUM blOlSTuRE-6.0 + 1 Pl QISTUKE DENSITY CLIRVEZ 0 5 IO IS 20 J 06 NO. 2-242.9 b’+fATeR CoNTr.NT - 90 OF DRY WLIQCWT i