Loading...
HomeMy WebLinkAbout; St Patrick's Church; Compaction Test Results; 1976-01-14WOODWARD-CLYDE CONSULTANTS CONSULTING ENGINEERS. GEOLOGISTS AND ENVIRONMENTAL SClENTlSiS January 14, 1976 Froject No. 76-102-2 - - - - - - - WESTERN REGION 3467 Kurtz Street San Dle~o Calilcrwa 92110 Pholvz ill-l) 224 2911 City of Carlsbad Engineering Department 1200 Elm Avenue Carlsbad, California 92008 Attention: Mr. Russ Norrison ST. PATRICKS CATHOLIC CHURCH SITE ADAMS STREET COF:FACTICN TEST RESULTS CARLSBAD, CALIFORNIA Attach-d are the results of field density tests taken at the subject project at your request and under your direction on the date indicated and at the locations given. Also attached are the results of a laboratory test performed on a sample of the material used for fill. These tests represent the relative compaction and water contents at the locations tested. Opinions as to the relative compaction, water content or suitability of the fill in areas not tested will be expressed by us only where we have observed the placement of such fill, and have satisfied ourselves that construction procedures followed in other areas are represented by the areas tested. '&OODWARD-CLYDE CONSULTANTS - - Attachments RECEIVED ENGINEERING DEPT. LIBRARY City of Carlsbad 2075 Las Palmas Drive Carlsba(l, CA 92009-4859 c\~y OF CARLSBAD Engineering DeWtment -. COMPACTION TEST RESULTS - Joe NAME ST: PATRICK'S CATHOLIC CHURCH SITE DATE REPORTED January 13, 1976 JOB NUMBER - 76-102-2 (Street) DATES COVERED Janua'ry 12, 1976 PAGE S-l OF S-l - YOI*NRX CILLD LABORATORY "CLATIVL OITL l-err RETLST LOCATION ELE"*TION CONTENT 01NS1W 0KNSIl-V coYc*cTIoY NVMIIER OF OF TErr + Oil WT. PC, KC Ye 0, UII. DEN‘. -- JAN. 12 S-l ADAMS ST. STA. 0+30 SG-1' 7.0 118.8 122.0 97.3 s-2 ADAMS ST. STA. 4+00 II 6.4 123.2 122.0 loo+ s-3 ADAMS ST. STA. 2+00 II 6.4 116.6 122.0 95.5 -- - - - - - - - - _- ,CTERlSTlCS I PLASTICITY CHARA Liquid Limit, % Plasticity Index, % Classification by Unified Soil Classification System i w ZERO AIR VOIDS CURVES 1OOQ --. 100 10 1.0 0.1 0.01 0.001 GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA Dry Density. pcf Initial Water Content, % Final Water Content, % Apparent Cohesion, psf Apparent Friction Angle, degrees SWELL TEST DATA Initial Dry Density, pcf Initial Water Content, % -__-___ Final Dry Density, pcf Final Water Content, % SAMPLE LOCATION 1 ADAMS ST. STA 2+00 LABORATORY COMPACTION TEST TEST METHOD: ASTM-D 1557-70 A I I FILL SUITABILITY TESTS I ST. PATRICKS CATHOLIC CWRCII S.ITE DRAWN BY: AS CHECKED BY:4 PROJECT NO: 76-102-z DATE: 1-14-76 FIGURE NO: 1 WnnnWARn.Cl VllF llllNSlll TANTS - - - - - - - WOODWARD-CLYDE CONSULTANTS CONSbLllNG ENGINEERS, GEOLOGISTS AND ENVIRONMENTAL SClENTlSTS WESTERN REGION 3467 Kurtz Street San Dlego California 92110 Phone (714) 224-2911 January 12, 1976 Proposal No. P76A05 Project No. 76-102-2 City of Carlsbad Engineering Department 1200 Elm Street Carlsbad, California 92008 Attention: Mr. Russ Morrison ' AGREEMENT FOR SOIL ENGINEERING SERVICES ST. PATRICK'S CATHOLIC CHURCH SITE STREET TESTS CARLSBAD, CALIFORNIA In accordance with your request, Woodward-Clyde Consultants is proceeding with additional soil engineering services in connection with the subject project. These services will include taking field density tests in compacted fill as directed by you, determination of the maximum dry density of the fill material and obtaining the values of an E.P. & R. test. - Invoices for these services will be sent to City of Carlsbad at the above address. Payment for services is due upon presentation of the invoice. A charge of 1% per month on the unpaid balance will be made on accounts older than 30 days from date of invoice. If any action is brought to enforce this agreement, the prevailing party shall be entitled to recover reasonable attorney's fees. - - The work involved will require the services of various personnel and certain types of tests. Charges for these will be in accordance with pertinent services and tests taken from the attached List of Charges. - - City of Carlsbad Proposal No. P76A05 Project No. 76-102-Z - We appreciate the opportunity of working with you on this project. Your signature below will be acknowledgment of our mutual understanding. Please return the original to this office for our records. Very truly yours, WOODWARD-CLYDE CONSULTANTS - - - LJL/EHP/jr Attachment Page 2 AGREED TO THIS DAY OF , 1976 FIRM ADDRESS BY - - - - WOODWARD-C,LYDE CONSULTANTS