HomeMy WebLinkAbout; Stagecoach Park Grading; Stagecoach Park Final Report Mass Grading Operations; 1985-12-05u FINAL REPORT OF TESTING AND OBSERVATION SERVICES DURING GRADING OPERATIONS FOR STAGECOACH PARK CARLSBAD, CALIFORNIA For CITY OF CARLSBAD Carlsbad, California By GEOCON, INCORPORATED San Diego, California December, 1985 INCORPORATED ENGINEERS AND GEOLOGISTS • CONSULTANTS IN THE APPLIED EARTH SCIENCES File No. D-3480-J02 December 5, 1985 City of Carlsbad 1200 Elm Avenue Carlsbad, California 92008 At.ten.tion,; ,...,.,,,<Mr»,,Jiro,,.Me.Lean Subject: STAGECOACH PARK CARLSBAD, CALIFORNIA FINAL REPORT OF TESTING AND OBSERVATION SERVICES DURING MASS GRADING OPERATIONS Gentlemen: In accordance with your request and our proposal dated September 25, 1985, we have provided testing and observation services during the mass grading of the subject subdivision. Our services were performed during the period of October 23 through November 21, 1985. The scope of our services included the following: • Observing the grading operation, including the installation of subdrains and the removal and/or processing of loose -..topsoil and^-alluvial soil. « Performing in-place density tests in the placed and compacted fill. • Performing laboratory tests on samples of the prevailing soil conditions used for fill. • Preparing an As-Graded Geologic Map. • Preparing this final report of grading. General The grading contractor for the project was H & A Construction. The project plans were prepared by Rick Engineering Company and are entitled "Grading Plans for Stagecoach Park Site" with latest revision dated October 6, 1985 and a City approval date of August 28, 1985. • 9530 DOWDY DRIVE • SAN DIEGO, CALIFORNIA 92126 • PHONE (619) 695-2880 File No. D-3480-J02 December 5, 1985 The project soils report is entitled "Geotechnical Investigation for Stagecoach Park, Carlsbad, California" prepared by Geocon, Incorporated and dated July 5, 1985. References to elevations and locations herein were based on surveyor's or grade checker's stakes in the field and/or interpolation from the referenced Grading Plans. Grading Grading began with the removal of brush and vegetation from the area to be graded and the material was then exported from the site. Loose topsoils and loose alluvial soils in areas to receive structural fill were removed to firm natural ground. Prior to placing fill, the exposed natural ground surface was scarified, moisture conditioned and compacted. Fill soils derived from onsite cutting operations were then placed and compacted in layers until the design elevations were attained. As directed by the on-site superintendant, no observations of the grading operations or testing of fills was performed by our firm in the creek area or westerly of the creek area. This uncontrolled fill area is indicated on the as-graded geologic map included herein. An approximately 1-foot-thick layer of topsoil material was placed in the ball field area. During the grading operation, compaction procedures were observed and in- place density tests (ASTM D1556) were performed to evaluate the relative compaction of the placed fill. Field observations and the results of the in-place density tests indicate that the fill has generally been compacted to at least 90 percent relative compaction. The results of the in-place density tests are summarized in Table II. The approximate locations of the in-place density tests are shown on the Site Plan, Figure 1. Laboratory tests were performed on samples of material used for fill to evaluate moisture-density relationships, optimum moisture content and maximum dry density (ASTM D1557-70, Method C), expansion and shear strength characteristics. The results of the laboratory tests are summarized in Tables la, Ib and Ic. Slopes Both cut and fill slopes have inclinations of 2.0 to 1.0 (horizontal to vertical) with maximum heights on the order of 20 feet and 24 feet, respectively. The fill slopes were periodically backrolled with a sheeps- foot compactor during construction and were track-walked with a bulldozer upon completion. All slopes should be planted, drained and maintained to -2- D File No. D-3480-J02 December 5, 1985 reduce erosion. Slope planting should consist of a drought-tolerant mixture of native plants and trees having a variable root depth. Iceplant should not be used on slopes. Slope watering should be kept to a minimum to just support the vegetative cover. Finish Grade Soil Conditions During the grading operation, our observations and test results indicate that granular soils were placed within at least the upper 3 feet of finish grade on fill lots. The laboratory test results indicate that the prevailing soil conditions within 3 feet of finished grade on each building pad have an Expansion Index of 35 or less and are classified as having a "very low" to "low" expansion potential as defined by UBC Standard Table 29-C). Subdrains Subdrains were installed at the general locations shown on the approved Grading Plans. The subdrains were "as-built" for location and elevation by the project Civil Engineer. Buttress Fills A buttress fill or deep "shear key" was placed in the slope area in the western part of the site as recommended in the referenced geotechnical report. The buttress excavation was observed by the project geologist during construction. In addition, a deep key was made in an area of "soil creep" in the north—central area of the property. The buttress and deep key areas are indicated on the as-graded geologic map included herein. Soil and Geologic Conditions The soil and geologic conditions encountered during grading were found to be similar to those described in the project geotechnical report. Materials of the Delmar Formation were exposed in the cut areas. The enclosed reductions of the approved Grading Plans depict the as-graded geologic conditions observed. The approximate locations of subdrains, buttresses, deep keys and "uncontrolled" fill areas are also indicated. No soil or geologic conditions were observed during the grading which, in our opinion, would preclude the continued development of the property as planned. -3- File No. D-3480-J02 December 5, 1985 CONCLUSIONS AND RECOMMENDATIONS Based upon laboratory test results and field observations, it is our opinion that the prevailing soil conditions within 3 feet of finish pad grade in the building area consist of "very low" to "low" expansive soils as classified by UBC Table 29C. We recommend the following foundation and slab design criteria for the proposed structure. Foundations 1. Conventional spread and/or continuous footings founded at least 18 inches below lowest adjacent grade in properly compacted or dense undisturbed "very low" to "low" expansive soil may be designed for an allowable soil bearing pressure of 2,000 psf (dead plus live loads). Footings should have a minimum width of 12 inches. This bearing pressure may be increased by up to one-third for transient loads such as wind or seismic forces. 2. All continuous footings should be reinforced with at least two No. 4 reinforcing bars, one placed near the top of the footing and one near the bo t torn. 3. Concrete slabs-on-grade should have a nominal thickness of 4 inches and should be reinforced with 6x6-10/10 welded wire mesh. The slabs should be underlain with 4 inches of clean sand and, where moisture sensitive floor coverings are planned, a visqueen moisture barrier protected by, 2 inches of the sand cushion should be provided. Great care should be taken during the placement and curing of concrete flatwork to reduce the potential for shrinkage cracking. 4. Footings should not be placed within 7 feet of the top of slopes. Footings that must be located in this zone should be extended in depth such that the outer bottom edge of the footing is at least 7 feet horizontally from the face of the slope. 5. No special subgrade presaturation is deemed necessary prior to placing concrete, however, the exposed foundation and slab subgrade soils should be sprinkled as necessary to maintain a moist condition as would be expected in any such concrete placement. Lateral Loads 6. The passive pressure exerted by an equivalent fluid weight of 300 pcf should be used to provide resistance to design lateral loads. This design value assumes that footings or shear keys are poured neat against properly -4- D File No. D-3480-J02 December 5, 1985 compacted granular fill soils or undisturbed formational soils and that the soil mass extends at least 5 feet horizontally from the face of the footing or three times the height of the surface generating passive pressure, whichever is greater. The upper 12 inches of material not protected by floor slabs or pavement should not be included in design for passive resistance. 7. If friction is to be used to resist lateral loads, a coefficient of friction between soil and concrete of 0.35 may be utilized. Retaining Walls 8. Unrestrained retaining walls should be designed to resist the active pressure exerted by an equivalent fluid weight of 35 pcf. This value assumes that granular onslte material will be used for backfill, that the backfill surface will be level, and that no surcharge loads will be acting on the wall. For walls with backfill surfaces inclined at no steeper than 2.0 to 1.0, an active pressure exerted by an equivalent fluid weight of 45 pcf should be used. 9. For walls restrained from movement at the top, such as basement walls, an additional uniform horizontal pressure of 7H psf (H equals the height of the wall in feet) should be applied in addition to the active lateral pressures given above. 10. All retaining walls should be provided with a backfill drainage system adequate to prevent the buildup of hydrostatic forces. Site Drainage 11. Adequate drainage provisions are imperative. Under no circumstances should water be allowed to pond adjacent to footings. The lots and building pads should be properly finish graded after buildings and other improvements are in place so that drainage water is directed away from foundations, concrete slabs and slope tops to controlled drainage devices. Any additional grading performed at the site should be done under our observation and testing. All trench backfill material in excess of 12 inches in depth should be compacted to at least 90 percent relative compac- tion. This office should be notified at least 48 hours prior to commencing additional grading or backfill testing. -5- File No. D-3480-J02 December 5, 1985 LIMITATIONS The conclusions and recommendations contained herein apply only to our work with respect to grading, and represent conditions at the date of our final inspection, November 21, 1985. Any subsequent grading should be done under our observation and testing. As used herein, the term "observation" implies only that we observed the progress of the work with which we agreed to be involved. Our conclusions and opinions as to whether the work essentially complies with the job specifications are based on our observations, experience and testing. Subsurface conditions, and the accuracy of tests used to measure such conditions, can vary greatly at any time. We make no warranty, expressed or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and location. We will accept no responsibility for any subsequent changes made to the site by others, by the uncontrolled action of water, or by the failure of others to properly repair damages caused by the uncontrolled action of water. If there are any questions regarding our recommendations or if we can be of further service, please contact the undersigned. Very truly yours, GEQtlpN, INCORPORATED JaWes E. Likins / Michael R. Rahilly H. Tom Kuper 17030 / RCE 28188 CEG 1137 MRR:JEL:lm (4) addressee -6- C R P I- H G NOTES A PERM} Tj FROM THE CITY ENGINEER BILL BE REQUIRED FOR ANY WORK IN THE CITY RIGHT OF HAY. APPROVAL OF THESE PLANS 8V THE C1TV ENGINEER DOES NOT AUTHORIZE ANY. .WORK OR GRADING TO 8E PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS SEEN OBTAINED AND.A VALID GRADINGPERMIT HAS SEEN ISSUED. \" ALL OPERATIONS CONDUCTED ON THE PREMISES. INCLUDING THE WARMING UP. REPAIR. ARRIVAL. DEPART*!* OR RUNNING OF TRUCKS, EARTHHOVING EQUIPMENT. CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED GRADING EQUIPMENT . SHALL BE LIMITED TO THE PERIOD BETWEEN 7:00 A.M. AND SUNSET EACH DAY, MONDAY THROUGH FRIOAV. AND NO EARTHIWVUS OR GRADING OPERATIONS SHALL U CONDUCTED *M T|C PREMISES ON WEEKEMQS OR HOLIDAYS. EXCEPT AS MAY BE APPROVED BY THE EN6INEEH TO MEET fNE CONSTRUCTION SCHEDULE. 'ALL OFFSITE HAUL"»ObTEi SHALL BE SUBMITTED BY THE CONTRACTOR TO THE'CITY ENGINEER FOR )APPROVAL PRIOR TO BEGINNING OF WORK. & |IM»8»T MATERIAL SHALL. BE OBTAINED FROM, AND WASTE MATERIAL SHALL 8E .DEPOSITED AT, A • I Ljj*t Wlf APPgOVEa 81 THE CITY ENGINEER.. «. A PMCONSTRUCTION CONFERENCE SHALL BE HELD AT THE SITE PRIOR TO BEGINNING OF WORK AND SHALL BEiATTENDED BY ALL REPRESENTATIVES RESPONSIBLE FOR CONSTRUCTION, INSPECTION. SUPERVISION, TESTING ANO ALL OTHER ASPECTS OF THE WORK. NO TREES ARE TO BE REMOVEDBRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE GRADED. UNLESS SPECIFICALLY NOTED ON THE PLANS. ALL AREAS SHALL BE GRADED TO DRAIN. PONDING OF WATER IS NOT PERMITTED'. ALL GRADING AND DETAIL WILL BE IN ACCORDANCE WITH THIS PLAN. THE CURRENT CITY OF CARLSBAD STANDARDS AND SPECIFICATIONS AND GRADING ORDINANCES 3032 AND 8063. CONTRACTOR SHALL PROVIDE EROSION CONTROL MEASURES TO CONTROL SOIL MOVEMENT SATISFACTORY "* I TO THE CITY ENGINEER. IN THE EVENT THE SITE IS EXPOSED TO EROSI ON"DURING THE PERIOD —~-t FROM NOVEMBER 1ST TO APRIL 15TH SPECIAL EROSION CONTROLS MAY BE REQUIRED. EROSION CON- I |TRiL MEASURES SHALt INCLUDE. BUT ARE NOT LIMITED TO, SLOPE PROTECT ION,. ST ILL ING BASINS. SANDBAGS, AND STORM DRAINS. AN EROSION CONTROL PLAN WILL BE REQUIRED BETWEEN OCTOBER • 15TH AND APRIL 15TH.," . It. . ALL SHALES AND DITCHES SHALL HAVE A MINIMUM IX SLOPE. A MULCHINS AND FE.atIL}WION, IHZSEM MIK SHALL BE 1001 ANNUAL RYE GRASS APPLIED AT A .RATE," OF "IM" POUNDST P.ER' ACRE." ^ - - THE MULCH SHALL BE APPLIED MT-4.CfS.VtltM TiODO FOUNDS PC* ACM ANO THE FERTILIZER AT NOT LESS THAN 1,000 POUNDS P THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTES OR ADJACENT STREETS AS A DIRECT RESULT OF THE GRADING OPERATION. IAS SOON AS GRADING IS COMPLETED, - AREAS SHOWN SHALL BE STABILIZED~BY' HYDRQSEEOING. AT PESACRE UflUESS OTHERWISE SPECIFIED AND APPROVED BY THE CITY ENGINEER. SHORT TERM OUST PROBLEMS ASSOCIATED WITH CONSTRUCTION SHALL BE MINIMIZED BY PROPER USE OF DUST SUPPRESSION MEASURES DURING GRADING OPERATIONS. ALL SLOPES SHALL BE TRIMMED TO A FINISH GRADE TO PRODUCE A SMOOTH AND UNIFORM SURFACE OR CROSS SECTION/ THE SUE SHALL BE LEFT IN A NEAT AND ORDERLY CONDITION. (ALL STONES. (ROOTS. OR OTHER DEBRIS SHALL BE REMOVED AND DISPOSED OF AT A LEGAL SITE. APPROVED 8Y THECITY ENGINEER THE CONTRACTOR SMALL MAIMTAIN THE PLANTING AND EROSION CONTROL MEASURES DESCRIBED ABOVE UNTIL RELIEVED OF'SAME BY THE CITY ENGINEER. THE DEVELOPER SHALL PICK UP AND REPLACE ON • A THE SLOPES ALL MATERIAL INTERCEPTED BY THE SAND BAGS ANO STILLING BASINS AFTER EVERY ' RUN-OFF PRODUCING RAINFALL-EROSION CONTROL MEASURES WILL BE LEFT IN PLACE AND INTACT AT1THE .COMPLETION OHWORK. ~ ^EITHER THE CITY NOR THE ENGINEER OF WORK WILL ENFORCE SAFETY MEASURES OR REGULATIONS. |Kt CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, ANO SHALL BE SOLELY RESPONSIVE FOB CONFORMING TO ALL, LOCAL. STATE AND FEDERAL SAFETY AND HEALTH STAN- DAJIOi. LAWS ANO REGULATIONS. , THE CONTRACTOR SHALL VERIFY THE EXISTENCE ANO LOCATION OF ALL UTILITIES BEFORE COMMENC- ING WORK.. NOTICE. OF PROPOSED WORK SHALL BE GIVEN TO THE FOLLOWING AGENCIES: I7 EgQ GAS 4 .BElLiUNDERGROUND SERVICE ALERT: SEWER; LEUCADIA MTER JTR.CTATER: OLIVE.NHAIN MUNICIPAL WATER DISTRICT id I JALL FILLS TO BE COMPACTED TO 90S RELATIVE COMPACTION UNLESS OTHERWISE DIRECTED BY SOILS : ENGINEER. PIPE, BEDDING AND TRENCH COMPACTION TO BE AS DIRECTED BY SOILS ENGINEER. GENERAL EROSION CONTROL 1. 2. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT POLICE DEPT. AT 438-5511 e'fcc. EQUIPMENT AND WORKERS FOR EMEHGENCY WORK SHALL BE MADE AVAILABLE 41 ALL TIMES DURING [HE SAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCA- TIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAJN IS EMINENT. DEVICES SHOWN ON PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE PUBLIC WORKS INSPECTOR. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATIS- FACTION OF THE CITY ENGINEER AFTEK EACH RUN-OFF PRODUCING RAINFALL. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER OUE TO UNCOMPLETED GRADING OPERATIONS OK UNFOHESEEN CIRCUMSTANCES WHICH MAY ARISE. THE CONTRACTOR SHALL BE RESPONSIBLE ANO SHALL TAKE NECESSARY PRECAUTIONS 10 PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREATE A HAZARDOUS CONDITION. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED GRADING PLAN SHALL BE INCORPO- RATED HEREON. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. ALL REMOVEABLE PROTECTIVE DEVICES SHOWN SHALL 8E IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE-DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT. /VOTE: #£AVY TYPICAL CONCRETE GUTTER A TYPICAL 60' GRADING SECTION PXK3K TO EXCAVATWM. MOTS: fOAD FVMT., SVBBAGe .cure. 6urr&<$ G/oewut M/.C A VICINITY MAP NO SCALE G R ft 0 I N G GRADING SHALL CONSIST OF ALL CUTS ANO FILLS AS SHOWN ON THESE PLANS «ND OUTLINED IN THE EARTH- WORK SPECIFICATIONS ANO IN ACCORDANCE WITH CITY OF CARLS8AD STANDARDS. GRADING TOLERANCE NOTE GRADING SHALL BE OONE UITHIN A TOLERANCE OF O.I'; OF THE GRADES ANO ELEVATIONS SHOUN ON THESE PLANS ANO ALL SLOPES SHALL HE CONSTRUCTED UITHIN 0.5'lOF THE LOCATION SHOUN ON THE PLANS. IN NO UAY 00 THE ABOVE TOLERANCES RELIEVE THE CONTRACTOR Of THE RESPONSIBILITY OF PROVIDING A FINISH SURFACE THAT WILL NOT PONO. :. qorrevp see ABOVS TYPICAL 130' GRADING SECTION V SKtf 0-39. t#0-30(SAUOtE&O«/- * SEE SHEET NO. 4 ' Y ^Y SCALE KEY MAP LEGEND TRACT BOUNDARY-- STORM DRAIN PIPE TYPE "A" CLEANOUT TYPE "B* INLET TYPE "F" CATCH BASIN._ TYPE "0° CATCH BASIN STRAIGHT HEADWALI EXISTING STREET LIGHT.. EXISTING FIRE HYDRANT-- EXISTING SEWER . EXISTING WATER 4 VALVE . INLET APRON-_ 200 aam -.3? THIS GRADING PLAN HAS-BEEN REVIEWED BY THE UNDERSIGNED AND FOUND TO BE IN CONFORMANCE WITH THE RECOMMENDATIONS AS OUTLINED IN OUR SOILS REPORT FOR THIS SUBDIVISION. DATED JULY 5. l?8b. FILE NO. D-3480-J01 GEOCON, INC. 9530 OOviOY DRIVE SAN DIEGO. CA 92126 PHONE: 695-2880 ttORK TO BE DONE. ... . • • • • ''• THE IMPROVEMENTS CONSIST OF THE FOLLOWING WORK TO BE DONE ACCORDING TO- THESE PLANS, THE CURRENT CITY OF CARLSBAD ENGINEERING DEPARTMENT STANDARD DRAWINGS ANO SPECIFICATIONS, AND THE SAN DIEGO REGIONAL . STANDARD DRAWINGS. "DENOTES CITY OF CARLSBAD STANDARD DRAWINGS. LEGEND A FILL BANK (2:1 MAXIMUM) -------- CUT SANK (2:1 MAXIMUM) --------- CUT/FILL LINE ------------- PROPOSED CONTOUR ------------ EXISTING CONTOUR ------------ LINED DITCH -------- D-75 TYPE 0 EARTH SWALE PER DETAIL- CONCRETE LUG -'------- D-63--- TYPE "B" INLET - (NO WINGS) - D-2.1 4 DETAIL SHI. NO. 4 TYPE "ft" CLEANOUT ----- 0-9 ----------- TYPE "F" CATCH BASIN 0-7.1 4 DETAIL SHT. NO. 2 STORM DRAIN PIPE ------ 0-60.1- --------- SUBDRAIN PER SOILS REPQHT- , STRAIGHT HEAOWALL ----- 0-30- ---------- RIP RAP ENERGY DISSIPATER - 0-40.1 -------- INLET APRON -------- 0-39.1- - - - PIPE COLLAR -------- D-62.1- --------- TYPE "G" CATCH BASIN - - - - 0-8.1 - --r - BUILDING PAD ELEVATION .-.-.-' - . EXISTING FINISH GRADE" ELEVATION - -; - '-'••-'.-- CURB (FUTURE) LIMIT OF FUTURE PARKING AREAS- -'-,;-- -'-'•'''• CURB 4 GUTTER (FUTURE) "-"'-.- -''- - CONCRETE GUTTER '(FUTURE) PER DETAIL - SHEET:t: . •. LEGEND K>luLL£K£,JJllLJ, _..,^R.C.E. -z&tsg DATE):, "DECLARATION OF RESPONSIBLE CHARGE" I HEREBY DECLARE THAT I «M ENGINEER OF WORK FOR THIS PROJECT, THATI HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECTAS DEFINED IN SECTION 67043 OF THE BUSINESS ANO PROFESSIONS CODEAND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. QCT-.-.-COMPACTED FILL Quf-.-UNCONTROLLED FILL Td DEL MAR FORMATION •_ APPROX LOCATION OF IN-PLACE DENSITY TEST FG FINISH GRADE TEST S SLOPE TEST GEOCCM INCORPORATED. FILE NO. 0-348O-J02 DATE 12-9-1985 FIGURE I ENGINEER OF WORK UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS ANO SPECIFICATIONS THE CITY OF CARLSBAD IS CONFINED TO A REVIEW ONLY ANO DOES NOT __.,_.. ...D.,RELIEVE ME, AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT BENCH MARK DESCRIPTION- STD. BRONZE DISC. IN CONC. MON. LOCATION: ABOUT 200' NORTH OF STA.RICK ENgIHE.ERI.Nq, COMPANY 261*98.72 RANCHO SANTA FE ROAO- R.S. 454- NEAR FENCE EAST SIDE OF ROAD RICK ENGINEERING COMPANY Cm. EMOMCER*: MJtMNMO CONSULOUITS : SUNVCYOAS M80MUJU AOAO 3A* 0«aO. CALIFORNIA »t1O («I9) lit 0707 MM MQ nCO 0«ve CAflLMAO. CALtfOnMA •20O4 (I1»l 7» 4MT 3U t-NAMCHO SAMTA FC TO «AH UAMCO6. CA. •»«• r«1«l 74* 4»CO DESIGN. FIRM: ADDRESS: CITY, STATE TELEPHONE: BY: 365 S. RANCHO SANTA FE RO . STE 100 SAN MARCOS, CALIFORNIA 92069 (619) 74«-«800 __ . RECORD FROM: 0302 COUNTY ELEVATION; 176.18 BENCH LEVELS J- DATUM: U.SC.aG.S. dd^. BARRY C. BENDER 211*40 ...... . ..... .- PARKS DEPARTMENT - CITY OF CARLSBAD / DATE 4>/i/#>, ?/%>/g5 oat f.#. K^_ • V fj- eedse More$J&£ A/ores rrr> APP*b xj^ — Aiu ^ (^ ^j^^ \i**L ' ^ ti vC • •BARRY c IBENOER^CE. 28448 DATE \:;. ORA« J.O. N BY DESIGNED BY CHECKED BY APPRO v/EO BY; MtVATW COKTHACT SHUT 1 CITY OF CARLSBAD ENOMEeilMO DEPARTMENT IHEST* 7 GRADING PLANS FOR' STAGECOACH PARK SITE APPROVED: Ae is/ft) OWN BY: CHKD BY: FjetDBY: fi TV ENGINEER PMMCCT NO. I 83 S3 DATE: SCALBOt UJJ^AS SHOWN 261- 9 iutacATE.5 TEMPORARY'&s<®Z°&s 1fr_ \. —•_ - -- -- - MOrf^K) WORK /S TO BEPSKFVWKM me VICINI rr or AREA cv -ensTiuq CHAIN. LIUK. rente '-•-— ••"•«•*» tut/t ill ^UYZflSTIHti (.HHIN I-IHI\ i t/.^k £NCLOSIK£ WHICH WH.UM AHY• •*~iir-Si/nd,SfKLOSUKU nnn.n ...^^WAY DISH/KB THE AKCH^CiO^U,ffSMAitis canT/nueo vtrrmH/ STORM DRAIN DATA -A MIS.6N^^__ \ MTANCI-A ,'° afaj-giW.P ->4l ». ^y-"^- i2 "V tyt—x—.ray « X^ •_'£1AC£^L__! ^;/V^ \ ]- GEbCGN INCOHPOIIATID FILE NO. D-3480-JO2 DATE •• 12-9-1983 FIGURE • 2 TYPE -p- rATCH BASIN W/ HROW DITCH INTO SfOE ' RICK ENGINEERING COMPANYCIVK HNOW€EIts • PIAMMHO COtmtlUMfTS : SOBVtTORSCAltfOWNI* til to (8t«) ?«1 OTOT .JS^//-0?AWM HORIZONTAL CONTROL NOTE: ALL HORIZONTAL CONTROL TO BE SCALED WITH MINIMUM DIMENSIONS HELD AS SHOWN. FOR IMPROVEMENTS SEE IMPROVEMENTS PLANS BY OTHERS. ENGINEER OF WORK BENCH MARK DESCRIPTION' STD. BRONZE DISC. IN CONC. MON LOCATION: ABOUT 20O' NORTH OF STA. 261 t 98.72 RANCHO SANTA FE ROAD -F».S 454-NEAR FENCE EAST SIDE OF ----- RECORD FROM: COUNTY BENCH LEVELS J-0302 ELEVATION • 176. 18 DATUM : U.S.C.8 G.S. «,N3v IOES.C.NEDBY I CHECKED a. UMWOVEO a —-A/ \i so-—r $££ DW, Z53-7A ROCK Fftf>-RAP SLOPE PROTECTION HO. 3 BACK.IUG T*O.Q FT. COUST. WH£ff£ SHOWN TO TOP ELEV. SHOWU .iao-\ - w? secr/ofj s-s <3£E ^-0.5'MIN. DEPTH DETAIL' GRADED SWALE ' SXVOBA& OOMXXA I4.0 fiWMeSEE DETAIL® I SWALE / see DETAIL THIS sweetGRAVEL BAGS SILT TRAP DETAIL TEMPOffAKY(E/K>SION COMTKOL)SAHDBAG KWNDRAIH FLUME SEE DETAIL §> N.T.S. -- - I \NOTE- I) MINIMUM If. LONGITUDINAL GRADIENT 2) GffAVEL 6A6S SK. T TBAP A T MIff. IOO FT.IftTfuy/ILS. SEE DETAIL <ffl RtGUT INDICATES TEM(EROSIOH CONTROL))OIKT SHALE. SEE JSTORM DRAIN DATA DETAIL THIS SHT. GRADED SWALE, SEE DETAIL- BOTTOM-/8A6 \ MGUOf/OMIL INDICATES TEMPORARY IEROSION CONTROL}GRADED SWALE.SEE DETAIL THIS SHT.—SECTION "B-B" fO' HORIZONTAL CONTROL NOTE: / ALL HORIZONTAL CONTROL TO BE SCALED WITH MINIMUM DIMENSIONSMEHELD AS SHOWN .TOR IMPROVEMENTS I SEE IMPROVEMENT PLANS BY/OTHERS —SECTION'A-A"-^— SANDBAG DOWNDRAIN FLUME FOR TEMP. (EROSION CONTROL) NO SCALE,NOTE, ma EXIST.IN MISION CSTANCIA , SEE OF CARLSBAD OHO. NO. 205-2 ENGINEER. OF WORK RRY Cl BENDER R.C.E. 28448 1 N O Q-« F O » A T • D . 0-348O-JOZ DATE ' 12-9-1985 FIGURE • 3BENCH MARK DESCRIPTION s STU BRONZE DISC. IN CONC MON.LOCATION: ABOUT ZOO'NORTH OF STA. 26U98.72RANCHO SANTA FE ROAD-R.S .454 - NEARFENCE EAST SIDE OF ROAD.RECORD FROM:COUNTY BENCH LEVELS J-0302ELEVATION: 176.18 DATUM • U.S.C.8 6.S. CITY OF CARLSBAD GRADING PLANS FOR STAGECOACH PARK RICK ENGINEERING COMPANYavx ENaweem: PLANMHO COKSUUAKTS : sunvzTom RO*O SAM 0*faO. C «»• <>1O PICO OO1VC CAAIS81O. CALITOWaA 9200* (S!9) 7f*4MT MB 8 flAMCMO 9ANTA Cl HO 9AM MARCOS. CA. >?Oeff (Bit] M« 4MQ AADO PLUMS CeTM._eG\J.-A'C.tXQG'C~B, FUTURE CALLE ACERA/0 6f»VEi FILLED SWM7ft4TffAfALL ALOU& TOff Of &l 9LOPE3 S/TH&* A/A7MW Sf/sr 3KOUUO OK EfJBlfJ, SECTION "S-S" (TYPICAL) NOT TO SCALE STANOAHO POSITIONOF sunea eeos/ofij ca/Jreod T£CT1OHMS r*o.&'CONSTRUCT/ON TOZa HOTS: ALL DETAILS-ornea THAN THOSE ABC 10 86 COK3T P6ff O'lf.lIffDKATES TEMPORARY (EROSION CONTROL)£1^<Ai7 6f?40E0 SWALE SE-SUBDRAIU /=£V? SO/^.5 ENREPORT MOD; INLET OPENING DETAIL STORM DRAIN DATA BEDROCK ceeep HORIZONTAL CONTROL NOTE:. ALL HORIZONTAL CONTROL.TO B^ SCALED WITH MINIMUM DIMENSIONS , HELD AS SHOWN.FOR IMPROVEMENT! SEE IMPROVEMENT PLANS' BY OTHERS TIHKH CONTOUR LIHSS DEPICT FINISH DESCRIPTIOM'STO BR(^ZEOBCI*COMC»IOfft. . LOCATION: ABOUT 20OTNORTWOFSTA.26U98.7S? RANCHO SANTA FE ROAO-RJt434- NEAR FENCE EAST SIDE OF ROAO?RECORD FROM. COUNTY BENCH.LEVELS J-O302 OATUMrus,c.a asELEVATION'176.18 ENGINEER OF WORK, Q BARRY (J. BENDERS R.CE. Z8448-, DAFILE NO. O- DATE • 12-9-1989 FIGURE • 4\l, 5< "40t'Op"E 20830 mramcownucrESTANCIA n OF CARLSBAD GRADING PLANS FOR ». STAGECOACH PARK SITE ' I RICK ENGINEERING COMPANY CIVK. ENOMCERS : PLANNING CON8UUXNT8 : 9URVEVOR9 SA?0 FRIARS f*OAD 3AN OICOO CALIFOANtA «I110 <><•) ?it OTOf NOTE- FOP EXIST. IMPROVEMENTS IN MISIOfJ £STANC/4\ SEE CITY OF CARLSBAD Owe. A/0. ?05-2 \IflO NO1E, REVISE CONTOURSCAni.SRAO. CAl*CW«» 4IOO4 (•!•) '?» <1B 3 OANCHO 3AHTA FF RO SAM MARCOS, CA. tTOO* TS !•) r File No. D-3480-J02 December 5, 1985 TABLE la Summary of Laboratory Compaction Test Results Sample No. 1 2 3 ASTM D1557-70 Maximum Dry Density Description pcf Dark brown, Yellow-tan, Dark brown, Silty CLAY Silty SAND Silty-Sandy 116.8 121.0 121.9 Optimum Moisture % Dry Wt. 12.5 12.4 10.3 CLAY Yellow-tan, Clayey SAND 129.1 TABLE Ib Summary of Direct Shear Test Results 11.0 Sample No. 2 3 4 Dry Density pcf 108.9 109.5 115.9 Moisture Content % 12.4 10.9 11.1 Unit Cohesion psf 290 270 180 Angle of Shear Resistance Degrees 31 13 31 File No. D-3480-J02 December 5, 1985 TABLE Ic Summary of Laboratory Expansion Index Test Results Sample No. 1 2 3 4 Moisture Before Test JL 13.1 10.6 12.6 10.3 Content- After Test % 25.3 18.5 27.8 21.9 Dry Density pcf 99.2 108.2o 100.6 108.8 Expansion Index 46 0 85 35 M M W P CD 01 CO 0) H 4-1 •H CO 01P 01 PH I Ooo-<f CO p O 01 0) s H r-l •H O CO CL E0U rH OIpi 01 3 4-1 •H OS COC OIp >1 p C0 •H 4-1 cfl> 01. — 1 to r-ltoe 0) ^Q X tOa o B^2 4-1 S J-l P •U-l O(i 4-1 O) 0) OO ON• •^ ^ ^ *^ U O .— 1 CM CM CM CM •— 1 i— 1 i— I OCOCOCMCOv£>CO\O ONONONONONONOOOO v^" <J" «<f" p^ CM ON i — 1 \ — 1 CM in in CM co --d" ON i — i -3~ in oo in ^t ' — icoin mcMCMr-HCMCMvOO ^^ ^H 1—4 r— -4 »— 1 r-H O^ ^^ I— 1 1— 1 t— t 1— 1 T— 1 t-H 1 1 r^ocN^iAr^-coco S^^I^^l^I^I^ CN i— i • t^Ui— !•— li— Ir— 1 i— <r-H<J--^-CSJCMCMCSI CMCOCvJt— ICMCM>— ICO*— (OICMCOCT\ 00 O^ O"\ O^ O^ O^ O^ O^ O^ O*^ O^ csr^-v£).'-HOOO>i-Hr^*d'Lriooa\ CO ^^ CO *<f LO *"3" r-H O LO ^d" LO <^" O "*d" CT\ o*( o^ oO ^^ ^D > — i O^ r^- r-^ r^r^-p^io^or'^oo^o*— < «— tcsi i — 1 i — 1 r-H T— 1 t-H i-H i — 1 »-H rH i-H t— < OOOCMOCO^DCNO^fLTiCMCOr^cocooooococr\cT*a>cr\a^a\ W Co •H 4-1CO OO 10 •01 oH Z, QJ in 4-J 00to ONP -H 4-1 <1) CI o COoo OI 60 CO 4J CO oCO r-H CM CO VD CM 4-1 O COcu 4-1 O) Pi oo 4-1 O CO 0> 4-1 CU Pi C 01 Co otfloo0160to 4J CO o .e o CO encu 4-1cuPi 4-1 C 0) C% ocfloCJ OI60cfl4-1CO o C/3 m 00 ON CM CO oo CM ,C O m ON CM OO ON O CM ooo<rro p ....... -O 0) 3P 4J P OO w d H QJa>- H i-H •H Oen aeo. u ,— icuPi 0) 3 CO •H O CD PcuP >• p CO 4-1 3 PCO O 0) -H Pi I-1 rd cn aia) i— iH W ;>N4J •rH CO P CU P rH 0) •H U-l O rd 3 C/2 4J CO CU H 01 ^ l p Remarks^ XI a u-io Bx° 4-1 ^ P . M-lop. 4-J 0)a) Co 1 1 cd o ° inco 1—1 CM CM CM CN .— 1 <f •-! CO ON ON ON ON ,H <r m ON <r m o- <r vO ^«O ^^ CO ON co O ro O rH r-l ,-( 1 1 .III in ' — i ro ON ON O O ON i 1 CM CM i 1 4J 0) 3 = = =pos ordoa = : scu C30rd 4J C/3 4-1 = = = O . 4-1J_l O* - - - r-H CM CO -J- CM CM CM CM ON O CM CO^^ ^^ O 01 — 1 1 — 1 CMCNCMCNCN<±CMCN-d'~d--3''<l'-d'<l"~3'<r CNOOOOCNCNi— It— l-sf^-tfi-HfO!— li—H ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON ON <i"CMvDcMv£>r^o*»Lni — iin* — i-^toN^ftn' — i in co co co co co *xf <3* »~H i— i r— i CM ' — i CM ' — i »~^ CO t— I ^d" CM CO ^O O VO O ^" rH CO *Cf ^O »~H ON i — IONONONONCO" — ^ONOOi — ICOOI — -ONCO^D i — lOOOO' — 1" — IO> — ICM' — 1 CM *— 1 i — 1' — ^i — 1 r 1 I H I 1 I 1 I 1 . I 1 i 1 I 1 l 1 1 1 I 1 cMcomr^ONr^cMOcocor^ooocMON-d'ooooococooooNONONONr^cor^oooooN CM ' 1 i 1 i 1 1 > 1 i 1 i I i 1 i 1 i 1 i 1 ' '1 '1 = CM CM rda) 13 CM CM S-lred: --H r-<<;rrr:r PM CM CM .p ,IM id id cuo rd rd cu P-t PM r4 4J C_>rcor <4-> m rtrrr 0) CN O CM O Ai .. U •— 1 - - - r-H O £1, CM .C CN J2 O4-1 4-1 4-> ^4 3 13 M t3 S-l T)O rd o rd o a) = . W = PH= = = 2PnZPQ= = = = = 10 ' vo r^ oo o^ o i — i c^j ro •*3" LO **o r^^ oo CTN ocNc\i(>iCNjcsirocnrorororncnrocoro^r t-H •CO "^s^. 0•"* CM O•-3IO00-d- CO Q •H4-1 COCJ w H CO 4-1 ,-H 3CO CUPS 4-J CO CU H 4-1 •H CO C CU P TJ T-lcu •H O (-1cfl H § CO H mt .-H CU •H Pi OCO ^J Ou !*! M-J r-l O CU Pi E>« CU 4-1 P 23 4-1 >i CO VJ •H P •COccu •p. ^U>> P- P c0•H 4-1 4-1 CUcfl CU> fecuI— 1w co •rH 4-> Cfl 00»J 4-1 CO • CU O H S i — i i — it — i i — ii — 1« — i <r <r ~a~ ^a* co CM,— ICOCOOf-HCMCOr-ICMCO ONONONONONONONONONONON m• i— icMrHCMoor^.i— (in-— 100 i— i<fco<rcocMO'— i i— i i— ICM <t ..^ oOi — icMvOONCor^r^cMi — i r — ^ooNOOininONor^oocoOOOOOO-— ICM^-I^H^-H r^cMcovomoNoocoocMin OOONONONONONONOOO^O ' CO COcu £j 4-13,pq ocfl CU 4-1 !-4_ ______ CO a,cu cocu .cu}-t MO <£zznr»»zzz^! M)0 CO >H >-l r^l CU cflm-~~-~~-~~ PM «— i CM ro <f m \o i — OOONO^H ON ^^j o CO CO CO CO <J" *d" *3" *^" "<f CMt— lOCOi—Hr^CMCO<f ONONONONONOOONONON ON ON ~a~ ^a~ ' — i f-H r^ ' — i r^ •— Ir-ICMCM^HP^O'-HO i — 1 i— 1 i—t t— ( i— f t— 1 i— H t~H <fONCMOONCO^OONCO cMOOcor^r- IOOONO i — Ii — Ii — Ii — Ii — Ii — Ii — ^i — ICM r^ONO>— icMr-~cMr~~ ON- . CO CO= = rrr = = cu 4J 4J 3 •• — — — "••• —M-lo 4-1 CO ^ ^m cfl=fe cu)-i4-1 <£= = = = = = r o 60 4-1 C CO -HCU A! cu n)= = = = = = = PiPn C*J rO •»d~ LO ^^D r^* 00 O^ O LOlALnLOLTjl/^LnLJ^VD CUI-I•H cu to„ o.^ 0 *a(— J rH CJ •H Di O u, E ^3o s D ° IM rH 0 CJ n 2^ U ?^ CO )-i n °°U , — i wn s .u <=^L-J 0t>% ex D p 2 -3 cCO O Q) -r-l 4-1 D ei 4J a)re co^_ 1 1 •., t, .s~* 4-» ? I**•O WO) 0) Q) rH 3 H W C D'rl >-.4-1 4JC -Ho toU C ^ CU n ° 3LJ wo r4 -H D H ^ ° >jto D E 1w o•H 4-J C3 D O 0 ** nu CM D O >-> . 1 000 *^-CO D ip .o 25 ^CO • Q cu tu o rH H S •H cu m /—, ^ °°n « cy> P rH CMCNCNCNCMCMCNCMCMCN CNJ i— t CO CO ^3 *™^ ^J" C*^ CO »~Ho^ cj\ o^ o^ o^ o^ o^ o^ o^ o^ CNJ\DCsJCNli— I^DCsJCN\£)OO cocococo^rcococococ^ vDvDLOOCO^OOvr-HCOtN i-HOCMCNlCTvaNCOi— ICMO.-H^^^QQ,-^,—!,— (, — | co LO **o o^ oo r^* 1-O c^ ^^ coLO I-O LO i^1^ 1-O ^^ ^o r*** ^^ ^^ COQ)MO «: = = :::: CO CM = Q) rH }-l CN 4J 4-1 T3 3 ' COM~£--£T: PMZ , (cMco^fLOvor^oocTio^DvO\D^D\DvDvDvD\Dr^- m vo "•^^ ^^ rH rH i — 1 1 — 1 CMCNCMCMCNCNCMCM fOCMCMi— l<r-4trOCMoscrvcTicTicricrvo^cri t — IVDVOCNVOrHi — I^O -si-<n<nmro<r<fcn Ornr-^O'-ic^oor-^ {•OrHrHOCnnCNrHi — i r— i i — 1< — ii — ii — ii — it — i f""i CN CO CO VO r^» C7** f^^o **o ^D ^D vo ^o ^o r^« rH rH rH rH rH rH rH rH 10 COcu = r-l 4-1 4-1 PQ O 4-J CO CO = COQ) CO r-l 0) •*£ r-l < cn~~~~~ oo"co C M iH 4-J r^J 4J t-l3 copq-;rr- p-ir , tcMco-d'in^O'^-oor^r^ r** r^ r^ r^ r^ r^ rH CM OO 00 o uCM CN o\ \o00 00 ^J1 T-H CN rH in c^ 00 COo orH rH •— 1 rHr^ i^ rH rH CO CU r-l <^ CO S CO 0) r-l 4-1 4-13pq - CTv Or» oo ^••"•^ r-H •— 1 0) COQ. ^£ ^ii-l O) •H Oioto <a a. *E roO Z oOS u o r-Hi—I CN CM CN CXI CN CN O^ cn -Ho CN|vO LOvOCNvO^i—li—lOOCNJOO^DO^LO ,—I CN 00 O «-iU>-. n. co oo LO o cTi **o o^ r^ i—it-HO^OOOOO •oCO3 C-H 4-J Cous_x 1 1 h-l w cq H 3 CW OOJ -i-l 4-) Ci 4.) CU tO CD cn 01 O) .-! H W.^ 4-1 -HcnCcuQ ~O 01 B_j U-l O t-l 2 3 Cto o. ^ 4-1rauo T— K t— H O~J CO CO C^l ^^" LO LT*r^« r^** r^* r** r^** r*^- r^* r**« r*^ CNI O ^Iooo<r CO P CUiH-H cn01 o H "^ cu in 4-1 OO CC 0s! Q —I U-lo cn01 o cdoo cu 0 cncn 4-J 0)cn >-i 01 4-1 4-1 4-1oi 3Pi pq OO 00 00 OO 00 OO r-^ oo c*oo oo oo oo CT\ 00 U-( 0 4Jcn 01 4J 01 Ov 0 % iw 0 4-Jcncu •1-J 0) 1*4 CM C7i cd Ol <: cncn 01(-1 4J 4-13pq CO CTi cdPU E C3-v CO • CT»oo <^CTi CTi O O a) en H n r-l V •H OS Oto <a Q. o : C_J CJ OS CM CTi mo-v o~i CM CM ,-1 CM CM cu j-> 3 "* in >->•H QoS B-« vO u~)vOv£> ro CO •o0)3c cou Io00 o o S3 3incucS incuH enCcuQ cu•H (0 3 COc O w-io >-. Q.)-i O Co•H J_i J-» QJm cu cu OJin •cu oH s cu m AJ COcfl cr. Q rH oooo CM CM CM CM CM CM O O CM CM •vf 0\ - CMi—i CM CU0) u CJo 0)«, i-HCN-CO«3-lTl<>Dr~.OOCT>O OOOOOOOOO^ m CM CO u~l CO ON OO o CM tt) W >-. M H g rH CJ CMCMCMCNCMCMCNCM CL EO ^ r-l CJos QJ 3 CO•1-1o X 3 •£_! U-J O ^ JJ *~* >^u O •— ICOvOCOCOr-lr-ICOrOON ON ON ON ON ON ON ON ON m •— i so i— i vo r- i r— i in ON *^~ "^ CO ""^" CO "-3" "^" *^" t~— 1 r-l r-l 1— 1 r-t r-l r- Ir— IrHrH r-ICOr-Hr-ICMCMr- It— 1-^" ON ON ON ON ON ON ON ON ON ^d" ON -3" -si" ON CO "^ *^~ CM'-ICMCM'— ICMCMCMCM i — li — li — li — li — li — ^i — li — It — 1 I Ooo<r CO 0 0)rH •H wcQJ Q in o r^ r^^ co oo ^o ON o CM CMinCMCMOONCMO ^o <r r^ ON r— 1 .-H CM ON ON r^ r*^ oo i— < i— i i— i o m i— i i— i — ' i — i r-l oo 0CMi — i /— ^•o 0) 3 -H C Oo<*^ M M to ^J5H 3 den o QJ »H 4J OS 4J QJ tO Q)•u > Pu CO QJ Q) r-lf— I ti3 r^ co oo ON ON co O r-l O O O rH CM CM CM CM CM CM J^ -H - CO C 0)Q QJ •Hbu U-l 0 O CM CM CO <T i—I i—I i—I i—! i—I CM CM CM CM CM <f 00 -H O CM CM OO O CM ON OCM ON OCM O .-i to 0) p-0)Q) O O 13QJPQ CO • QJ O H S •U CX3to cr\Q —i ^H CM CM CM 00 CMCMCNCM CM r-l CM ON Cfl Pn = CMCMCOCOCOCOrO in NOco co oCM r^ ooco co 0) U) , s•oQJ C •J•rt 4J Coo N«^ M w t *] M H i — i O -01o 00 ro1 Q • OS3 Q) rH •rl PM wp E-t <dCO PSw o H K CO PM M O JS"i i ir— 1 r-l CO PM II II CO O ^ in 4J 3to QJ 4-1 tO 0) H £P -rl COCQJ P -a T i 0) •tH tn M-lo ^VJre g Dto r-l QJ •H & Q CO ^8 o- x£ TO O !oCJ U_( i-l OCJCC fr^ B m 4-1>-i 3 4J >^ CO 1-1 •H P ^> , 6s? CO COJ • P M-lO>-, a.M P C 0 •rl 4J 4-1 0) TO QJ OJf-H W C 0 •H O Oo 4Jto • QJ OH S QJ U~> 4J 00 Cfl 0">p ^ oo CJ CM CM CM CM <}• i — 1 . U~l i — 1 C^ O^ 00 CT» VD CM t — 1 i — I CO co *3" ~sT cr> r^ oo *^"- co o^ o Oi — i O CM > — i in in o Oo oo oo o CN i— 1 •— I CN 4-1C 0) 6 P fi Os t~; CJ CO *vj" O CTi CJ i — 1 QJ 00 T3 Cfl CO 4J CM <f PM CO rH CTl CN i— I MH .MHo orO T3cd nj ^C ^G p l p^j ^J J_l t-l rlC C 0' 0O O & 2 QJ Q) QJ Q)cx ex ex exo o o o rH rH rH rH CO CO CO CO CO CO CO CO r- 1 CM CO •<!• 1 — 1 CN*^ i — l * — l j CJ CM 00OO vD CO VO O Lf")o> 1 — 1 4-1•aQ)g ~je: ^f-* r4. O cfl0OQJ00 cd 4J CO MH 0 rf~] 4Jj_l 0 Q)ex 0 CO CO LO CM __, a-. CM CO 1 — 1 01 — 1 r^. O CM CO 0)^t•^$ ex 0)OJj-i^_j ^CJ 0 13Q) FQ MH O 4-1CO Q) QJex O rH CO CO VD CM CM^^. r-l r-l CM CN °" CN CO 00 o1 — 1 1 — 1 rH CM cfl QJ J-4 <]^ ex QJ 0) ^4O ^a 0S-i *"OOJpa MH O 4-1CO QJ QJ CX O rH CO COr^. CN Oa> i — i o- CO O Ooo1 — 1 CO CO =^5 MHo CO QJ 4-1 Q) p4 CO 00 CM r— f 0s* vD CO O O, — i u~t CTv i — 1 CO LO =>T= MH O 4— 'CO QJ 4-1 Q) P^ 00o> CM <!• CO r-H OO CM 00 CN CM r^ O o CM cO cd PM PM O O r-l CM CN CN