Loading...
HomeMy WebLinkAbout1056; Holiday Park Comfort Station; Holiday Park Comfort Station Exterior Footings; 1979-02-06o o 3467 Kurtz Street San Diego, California 92110 714-224-2911 Telex 697-841 February 6, 1979 Project No. 58409L-EC01 City of Carlsbad Engineering Department 1200 Elm Street Carlsbad, California 92008 Attention: Mr. Russ Morrison r73 71979 HOLIDAY PARK COMFORT STATION EXTERIOR FOOTINGS COMPACTION TEST RESULTS _ , . _. .CARLSBAD, CALIFORNIA Engineering Department EXTERIOR FOOTINGS pn-y Of f£Pi QRAH COMPACTION TEST RESULTS V! f U' v-'"r\!-^D"W Gentlemen: Attached are the results of field density tests determined in accordance with•ASTM Test Method No. D1556-64, taken at the subject project at your request and under your direction on the dates and at the locations indicated. Also attached are the results of a laboratory compaction test which was performed in accordance with ASTM Test Method No. D1557-70 on a sample of the material used for fill. To our knowledge, these tests represent the relative com- paction and water contents at the locations tested. Opinions as to the relative compaction, water content or suitability of the fill in areas not tested will be expressed by us only where we have observed the placement of such fill and have satisfied ourselves that construction procedures followed in other areas are represented by the areas tested. Very truly yours, WOODWARD-CLYDE CONSULTANTS tJames E. Cavallin R.E. 17553 JEC/EHP/dm Attachments (4) Consulting Engineers, Geologists and Environmental Scientists Offices in Other Principal Cities oCOMPACTION TEST RESULTS HOLIDAY PARK COMFORT STATION 58409L-FC01 DATES COVERED JANUARY 23, 1979 THROUGH FEBRUARY 5, 1979 o NAME JOB NUMBER DATE REPORTED 2/6/79 PAGE 1 OF T«8T NUMBER JAN 23 FEE 5 2 3 4 5 6 RETEST OF 2 3 1 LOCATION Surface MOKTUR* CONTENT % DRY WT. EXTERIOR FOOTING TRENCH, -12" 15.4 S.W. SECTION; EXTERIOR FOOTING TRENCH, -12" 5.4 N.E. SECTION EXTERIOR FOOTING TRENCH, -12" 12.4 N.W. SECTION EXTERIOR FOOTING TRENCH, -12" 10.3 N.E. SECTION EXTERIOR FOOTING TRENCH, -12" 11.9 N.W. SECTION EXTERIOR FOOTING TRENCH, -12" 9.4 S.W. SECTION FIELD DENSITY PCC LABORATORY RELATIVE DENSITY COMPACTION PCP % OF LAB. DCN*. 96.5 128.5 75 111.9 128.5 87 108.8 128.5 84 123.0 128.5 95 118.1 128.5 91 121.9 128.5 94 Woodward-Clyde Consultants AMD ENVIRONMENTAL SCIENTISTS o o 150 140 130 120 110 100 90 80( PLASTICITY CHARACTERISTICS Liquid Limit, % Plasticity Index, % Classification by Unified Soil Classification System \DRYUNITWEIGHT, pcf\ \ * \ \ v\\\\\\\\ i \\H \ V \A \\ / / ZER( — 2.8 2. \ \ A \ V\ vOA \ \ \ \vAV \v\ Maximum Dry Density, pcf Optimum Moisture Content, % DA DSC 70, 2.6( - 2. \ V\\\ V\ R VOIDS CURVES 5G DSG 50 SG k \ \\A A \y A A\.VAA"V\ A\Ar>"\\ _^VC\ x3\\ \V\v\ C^A\ \ \VK Vv\ vo 1 \N 128.5 _ N 9.0 | MOISTURE CONTENT, % Oz PERCENT PASS100 80 60 40 20 0 10 C „ GRAVEL SAND „ T c f c m f 4 CLAY i ii ii it i ] 00 100 10 1.0 0.1 0.01 0.0< GRAIN SIZE, mm MECHANICAL ANALYSIS DIRECT SHEAR TEST DATA Dry Density, pcf Initial Water Content, % Final Water Content, % Apparent Apparent Cohesion, psf Friction Angle, degrees SWELL TEST Initial Initial Final DATA Dry Density, pcf Water Content, % Dry Density, pcf Final Water Content, % Load, Swell v «\ ?\K \\\ ) 10 20 30 i AortDATrtov r»r»iuioAOTiriiu TCOT psf percent v V\NN\ \1 40 SAMPLE LOCATION 1 m COR. 'COMFORT STA/''PAi; LABORATORY COMPACTION TEST METHOD: ASTM D 1557 70 f FILL SUITABILITY TESTS HOLIDAY PARK DRAWN BY: mrk | CHECKED BY Jfjjf* \ PROJECT NO: 58409L-EC01 DATE: 2/6/79 j FIGURE NO: 1 WOODWARD-CLYDE CONSULTANTS