Loading...
HomeMy WebLinkAbout3079; POINSETTIA LN BRIDGE CONSTRUCTION; CONCRETE PIPE CERTIFICATION; 1984-08-29CALCO CONSTRUCTION- General Engineering Contractor r.. ^ 71- DESIGN C. J. LUMSDAINE CO. CONSTRU&ION WM. A. CORN - RCE#15483 MANAGEMENT -KJp-M1WD AUG 2.9 1984 LETTER OF TRANSMITTAL CITY OF CARLSBAD ENGINEERING DEPARTMENT SENT BY: Pam Romanello DATE: 8/29/84 OUR JOB NO. 404' TO: Pat Entezari City of'Carlsbad PROJECT DESCRIPTION: Poinsettia Lane Bridge Project ENCLOSURES: Letter of Certification for,RCP Ameron COMMENTS: Pamela Romanello Project Coordinator 438-8441 5245 AVENIDA ENCINAS, STE. G P. 0. BOX 1171 e CARLSBAD, CA 92008. (619) 4444W— "v 4700 Ramona Boulevard Post Office Box 2024 Monterey Park, California 91754-0924 (213) 268-4111 A .%%JJ fa P 11 kI Pipe Division Southern California August 27, 1984 CALCO P.O. Box 1171 Carlsbad, California 92008 Reference: Poinsetta Lane - Avenida Encinitas to Carlsbad Blvd. Contract 3079 - City of Carlsbad Ameron #5823 Gentlemen: This letter is to certify that the 54" - 1350D; 3011 - 1350D; 24" - 1350D; 18 11 - 1350D; Reinforced Concrete Pipe furnished to CALCO on the above referenced job has been manufactured in accordance with the applicable provisions for the project specification. Sincerely, Roy Oda r Engine rinag Supervisor RO: bs 17A