HomeMy WebLinkAbout3151; Palomar Airport Road Widening; Geotechnical Consulting Palomar Airport Road; 1987-04-22Testing Engineers—San Diego
A Division of United States Tesfing Company, Inc.
3467 Kurtz St.. P.O. Box 80985. San Diego. Ca. 92138(619) 225-9641
2956 Industry Street. Oceanside. California 92054 (619) 757-0248
April 22, 1987
Job No. 7092
City of Carlsbad
Community Development
2075 Las Palmas Drive
Carlsbad, California 92008
Attention:
Subject:
Mr. Al Virgilio
Geotechnical Consulting
Clarification of Elements
Regarding Palomar Airport Road
Widening Report
Carlsbad, California
Referenced
Report:
Referenced
Letter:
m
m
"Geotechnical Consulting
Palomar Airport Road Widening
Carlsbad, California," by
Testing Engineers-San Diego,
dated March 3, 1987
"Geotechnical Consulting
Palomar Airport Road Widening,"
by Pountney and Associates, Inc.,
dated March 30, 1987
m
m
m
Palomar Airport Road Widening Page No. 2
Carlsbad, California April 22, 1987
Dear Mr. Virgilio:
This is in response to the referenced letter written by Pountney
& Associates, Incorporated regarding our report on the project.
During the process of study, limited contact was made between
Testing Engineers and the other company in discussing the items
to be considered, and its general format. As a result, Pountney
and Associates wrote the letter asking for clarification and the
following is discussed for each of the items:
SECTION 1.1
1. "The near surface, saturated, alluvial soil,
whenever encountered, should be removed to a
minimum depth of three feet" is a general
construction recommendation.
SECTION 1.2
2. "Soil adjacent to the roadway should be
excavated and recompacted. The excavation
should extend to at least ten feet (10') from
the outside edges of the roadway". A roadway
is in this definition the pavement section,
from curb to curb. This excavation and
recompaction is intended to give lateral
support to the soil under the pavement, to
provide protection from erosion and reduce
water seepage, as explained in the report.
m
Palomar Airport Road Widening Page No. 3
Carlsbad, California April 22, 1987
SECTION 1.3
m 3. The Benching requirement refers to downslope
fills.
m
^ SECTION 1.4
^ 4. The soil removal is mentioned in the two
sections. Section 1.1 is refering to the
* excavation of local pockets of soft and
saturated soils wherever encountered. Section
^ 1.4 is referring to loose and/or compressible
^ existing top soil which is to be removed
uniformely. Unless the soil is saturated,
m removal should be limited to two foot
thickness.
m SECTION 1.8 m
m 5. Permanent cut and fill slopes should be
inclined at no steeper than 2 to 1 (horizontal
to vertical).
SECTION 2.2
mm
6. In our rough draft of the report, two
alternatives including a retaining wall and a
crib wall were mentioned. Prior to issuance
of our final report, we deleted the crib wall
m alternative without deleting the "above
alt'ernatives".
SECTION 3.1 m
^ 7. We understand there was no specific
requirement that the pavement be designed for
«• a Traffic Index (TI) value of 9. La Costa
Avenue, another important project was designed
for a T.I. value of 8. So we assumed the same
^ for Palomar Airport Road.
Palomar Airport Road Widening Page No. 4
Carlsbad, California April 22, 1987
If TI of 9 is to be used, then an asphalt
concrete thickness and crushed aggregate base
of 6 inches and 15 inches, repectively, could
be used. The City of Carlsbad requires a
minimum section of 6 and 18 inches,
respectively.
A detour pavement section of 4 inches asphalt
concrete and 8 inches of aggregate base may be
used.
SECTION 3.2
8. This section was included because we
understand that grading would generate excess
material and we suggested that the clay be
exported and the on-site granular soil be used
in the roadway.
We had a discussion about all the above items with Mr. Jay F.
Olsen in our meeting on April 10, 1987 and have come to a better
understanding. In summary, we feel that the overall
recommendations in the report cover most of the necessary design
parameters as well as construction techniques. All of the above
questions could have been clarified easily with better
communication. We hope our contact will improve in the future.
m
Palomar Airport Road Widening
Carlsbad, California
Page No. 5
April 22, 1987
m
The opportunity to be of service is appreciated, and if you have
any additional questions regarding this project, please do not
hesitate to contact us at your convenience.
AF/eh
Addressee (2)
Respectfully submitted,
TESTING ENGINEERS-SAN DIEGO
Almaz FesTseha
Project Engineer
•m
m
•m
m
Testing Eng/neers—San Diego
A Division of United States Testing Company, inc
3467 KurtzSt., P.O. Box 80985. SanDiego. Ca. 92138(619)225-9641 ^
2956 Industry Street, Oceanside. California 92054 (619) 757-0248
City of Carlsbad
Community Development
2075 Las Palmas Drive
Carlsbad, California 92008
Attention:
Subject:
Mr. Al Virgilio
May 22, 1987
Job No. 7092-1
RECEI V.:.D
fz-ay ^. r. 1937
MUNICIPAL PROJECTS
DIVISION
Supplementary Geotechnical Consulting Services
Palomar Airport Road
East of Paseo Del Norte
Carlsbad, California
Gentlemen:
This report presents results of our additional soil
investigation and pavement section design of the subject site.
The purpose of the soil investigation was to retain bulk soil
samples to be used in the laboratory for "R"-value tests. These
actual "R"-value test results were then used to estimate the
various pavement sections presented herewith.
Subsurface conditions were explored by drilling ten 8-inch
diameter test borings with a Mobile B-61 drill rig, to 4 to 20
feet depths. A staff geologist from our office was present
during the drilling of the test borings. The sample locations
and soil types with the respective "R"-value results are
presented in Table I.
fl
•m
inn
•.m
Palomar Airport Road
East of Paseo Del Norte
Carlsbad, California
Page No. 2
May 22, 1987
Job No. 7092--1
m
M
TABLE I
•m
m Bore
Hole No.
Bore
Hole
Location
Sample
Depth
Feet
Soil
Type R-Val:
•m
m
1 30+00 8 Sandy clay 12
2 32+50 13 Sandy clay 13
m 3 36+00 12-15 Sandy clay 9
4 36+00 18-20 Sandy clay 8
m
nm
5 40+00 7 Gravelly
Refusal @ 7 ft.
MM 6 42+00 7 Sandy clay 6
7 50+00 2-4 Silty sand 47
^mm 8 53+00 4-6 Clayey sand 21
9 72+50 5 Silty sand 57
'im
10 85+00 6-8 Silty clay 27
Palomar Airport Road Page No. 3
East of Paseo Del Norte May 22, 1987
Carlsbad, California Job No, 7092-1
ASPHALTIC CONCRETE DESIGN
Based on the R-value results and a T.I. value of 9 for primary
arterial, as required by the City of Carlsbad, alternate
structural sections are computed. For purposes of section
design, "R"-value results have been separated to represent three
zones of the alignment. The results are summarized and
presented on Table II.
The design assumes a minimum asphaltic concrete thickness of 6
inches and processed Class II aggregate base course. If the
three layer conventional system is preferred, we recommend
disintegrated granite (D.G.) with minimum "R"-value of 50 to be
used as select import for a subbase course.
m
m
m
•m Palomar Airport Road
East of Paseo Del Norte
Carlsbad, California
Page No. 4
May 22, 1987
Job No. 7092-1
TABLE NO, II
RECOMMENDED SECTION DESIGN ALTERNATIVES
m Materials are referenced to Cal Trans Standard Specifications
for aggregate subbase, aggregate base, and asphaltic concrete
Zone 1: Station 27+00 to Station 32+50
Basement Soil R-Value 12
Traffic Index (Prime Arterial) 9
Minimum a.c. Thickness, ft. (inch) 0.5' (6")
Minimum cover required (GE) ft. (inch) 2.55
Alternative 1: Conventional 3 Layer Svstem:
Actual
Thickness
Feet Inch Course Gf)
Gravel
Equivalent (GE)
Feet
0.50 6
0.83 10
0.75 9
Asphaltic Concrete
Class II Agg. Base
Agg. Subbase (R=50;
1,80
1.10
1.00
2.08 25
Alternative 2: Conventional 2 layer Svstem:
0,50 6 Asphaltic Concrete 1.80
1-50 18 Class II Agg. Base 1.10
2.00 24
0,90
0,91
0.75
2,56
0.90
1.65
2.55
Palomar Airport Road Page No. 5
East of Paseo Del Norte May 22, 1987
Carlsbad,.California JobNo. 7092-1
Zone 2: Station 32+50 to Station 50+00
Basement Soil R-Value 6
Traffic Index (Prime Arterial) 9
Minimum a.c. Thickness, ft. (inch) 0.5' (6")
Minimum cover required (GE) ft. (inch) 2.70
Alternative 1: Conventional 3 Layer Svstem:
Actual Gravel
Thickness Equivalent (GE
Feet Inch Course (Gf) peet
0.50 6 Asphaltic Concrete 1.80 0.90
0.83 10 Class II Agg. Base 1.10 0.91
0.92 11 Agg. Subbase (R=50) 1,00 0.92
2.25 27 2773
Alternative 2: Conventional 2 layer Svstem:
0.50 6 Asphaltic Concrete 1.80 0.90
1-67 20 Class II Agg, Base 1.10 1.83
2.17 24 2773
Note: Based on the "R"-value results and
uniform soil type at Station 36+00, either of
the above asphaltic pavement sections can be
utilized at 17 feet road level. The "R"-value
shown on Table I should be verified after
grading.
Palomar Airport Road
East of Paseo Del Norte
Carlsbad, California
Page No. 6
May 22, 1987
Job No. 7092-1
•HI Zone 3: Station 50+00 to Station 85+00
m
m
mi
Basement Soil R-Value
Traffic Index (Prime Arterial)
Minimum a.c. Thickness, ft. (inch)
Minimum cover required (GE) ft. (inch)
21
9
0.5' (6")
2,28
m Alternative 1: Conventional 3 Layer System:
m
Actual
Thickness
Feet Inch Course (Gf)
Gravel
Equivalent
Feet
(GE)
m 0,50 6 Asphaltic Concrete 1.80 0.90
•m 0,50 6 Class II Agg, Base 1.10 0.55
m 0.83 10
1.83 22
Agg. Subbase (R=50) 1.00 0.83
2.28
Alternative lA:
•m
Actual
Thickness
Feet Inch Course (Gf)
Gravel
Equivalent
Feet
(GE)
0.50 6 Asphaltic Concrete 1.80 0,90
0,83 10 Class II Agg. Base 1.10 0.91
0.50 6
1.83 22
Agg. Subbase (R= 5 0) 1,00 0.50
2,31
Alternative 2: Conventional 2 laver Svstem:
0.50 6 Asphaltic Concrete 1.80 0.90
m
1.25 15
1.75 21
Class II Agg. Base 1.10 1,38
2.28
Palomar Airport Road Page No, 7
* East of Paseo Del Norte May 22, 1987
Carlsbad, California Job No, 7092-1
The samples taken are assumed to be representatives of the
material which will be immediately under the planned structural
section. The design is based on the lowest "R"-value for that
zone since it represents the lowest quality material
encountered.
The asphaltic pavement sections recommended reflect our best
estimate of the project requirements based on an evaluation of
the subsurface soil conditions encountered at the exploration
locations and the assumption that the soil conditions do not
deviate appreciably from those encountered.
Any unusual conditions, not covered in this report, encountered
during site development, should be brought to the attention of
the soil engineer. The "R"-value results should also be
verified before construction, so that modifications can be made
if necessary.
This office should be advised of any changes in the project
scope or proposed site grading so that it may be determined if
the recommendations contained herein are appropriate.
Palomar Airport Road
East of Paseo Del Norte
Carlsbad, California
Page No. 8
May 22, 1987
Job No. 7092-1
We appreciate the opportunity to be of service to you on this
project and look forward to a continued association on this and
future projects. If you have any questions, please do not
hesitate to contact our office.
Almaz F^seha
Project Engineer
Respectfully submitted,
TESTING ENGINEERS-SAN DIEGO
Thomas H. Chapman, RCE 34228
Vice President
THC/AF/eh
Addressee (2)
cc: Jay F. Olsen
Testing Eng/neers—San Diego
A Division ot United States Testing Company. Inc.
3467 KurtzSt.. P.O. Box 80985. SanDiego. Ca. 92138(619)225-9641
2956 Industry Street. Oceanside, California 92054 (619) 757-0248
City of Carlsbad
Community Development
2075 Las Palmas Drive
Carlsbad, California 92008
Attention: Mr. Al Virgilio
March 3, 1987
Job No. 7092
Subject: Geotechnical Consulting
Palomar Airport Road Widening
Carlsbad, California
Gentlemen:
As per your request and authorization, we have completed a
geotechnical investigation of the proposed Palomar Airport Road
alignment. The purpose of this investigation was to perform a
geotechnical and geological evaluation of the above-mentioned
roadway widening and to provide geotechnical design criteria for
the planned widening.
This investigation was authorized by your acceptance of our
proposal dated December-23, 1986. Our office conducted a field
investigation and soil samplings of the site. The soil samples
were then used for laboratory testing in our office. The
results of the field exploration and laboratory testings are
included herewith.
City of Carlsbad
Palomar Airport Road Widening
Page 2
March 3, 1987
Job No. 7092
We appreciate the opportunity to be of service to you on this
interesting project and look forward to a continued association
on this and future projects. If you have any questions
regarding this report, please contact us at your convenience.
Almaz Fesseha
Project Engineer
AF/SMP:svc
Addressee (6)
Respectfully submitted,
TESTING ENGINEERS-SAN DIEGO
William Schill
Project Geologist
Stephen M. Poole, RCE 40219
Geotechnical Department Manager
TABLE OF CONTENTS
m Page
INTRODUCTION 1
PROJECT DESCRIPTION 1
* METHOD OF INVESTIGATION 1
LABORATORY TESTINGS 2
m GEOLOGIC CONDITIONS 3
FILL 3
LINDA VISTA FORMATION (Qlvs) 4
* SANTIAGO FORMATION (Tsa) 4
DEL MAR FORMATION (Tdts) 4
^ DISCUSSION AND CONCLUSIONS 5
RECOMMENDATIONS 7
GENERAL 7
RETAINING WALLS 11
NEW ASPHALT CONCRETE PAVEMENT 13
^ REVIEW 15
LIMITATIONS AND UNIFORMITY OF CONDITIONS 16
ENCLOSURES:
BORING LOGS PLATE 1-6
TEST PIT LOG PLATE 7-12
SYMBOLS & TERMS USED ON BORING LOGS PLATE 13
GENERALIZED -SUBSURFACE PROFILE PLATE 14
UNIFIED SOIL CLASSIFICATION PLATE 15
APPENDIX
LABORATORY TEST DESCRIPTION
LABORATORY TEST RESULTS
m
m
City of Carlsbad Page 1
Palomar Airport Road Widening March 3, 1987
Job No. 7092
INTRODUCTION
PROJECT DESCRIPTION
The subject site extends from east of Paseo Del Norte at about
Station 27+00 to west of Palomar Oaks Way at about Station
94+50,
METHOD OF INVESTIGATION
Site materials within the area of the proposed improvements were
evaluated by geologic mapping of surface exposures, backhoe
excavated test pits, and auger drilled test borings. The
excavations provided opportunities to evaluate subsurface
conditions, and enabled geologists to collect samples for
laboratory analysis. The approximate test boring and test pit
locations are presented on the logs. Boring logs are presented
on Plates 1 through 6 and Test Pit logs are presented on Plates
7 through 12. Symbols and terms used on the Test Pit and Boring
Logs are presented on Plate 13. A generalized subsurface
profile is presented on Plate 14. The number of blows required
to drive the sampling barrel into the soil was recorded on the
boring logs.
City of Carlsbad Page 2
Palomar Airport Road Widening March 3, 1987
Job No. 7092
LABORATORY TESTING
Soils were visually classified according to the Unified Soil
Classification System as presented on Plate 15. Laboratory
tests were performed in accordance with accepted test methods of
« the American Society for Testing and Materials (ASTM). Tests
conducted for the project included: Moisture/Density and
Expansion. The Test Results and Test Descriptions are presented
•mm
in the Appendix.
HI
mm
M
4m
mn
•M
JH
City of Carlsbad Page 3
Palomar Airport Road Widening March 3, 1987
Job No. 7092
GEOLOGIC CONDITIONS
The subject site lies in the Peninsula Range geomorphic province
and is underlain by formational materials of Eoceme age. The
Linda Vista formation was encountered on the north side of
Palomar Road at the higher elevations.
During the proposed roadway grading, natural soil and rock
material will be encountered during construction. According to
a study done by Weber entitled. Recent Slope Failures, Ancient
Landslides, and Related Geolocry of the North-Central Coastal
Area, San Diego County, California 1982, the geologic units in
question are thought to be stable.
FILL
The fill materials encountered in Test Pit 1 and 2 are thought
to be local in nature because of the resemblance to the soils
generated from adjacent formational material. Fill materials
encountered are mostly sandy silt.
mt
mt
City of Carlsbad Page 4
Palomar Airport Road Widening March 3, 1987
Job No. 7092
LINDA VISTA FORMATION (Qlvs)
This formation was encountered in Test Pit 6 and can be expected
mt
on the north side of Palomar Airport Road. This sub-unit lies
^ closer to the coast where it can be observed in some road cuts
„ (Weber 1902). Materials that can be expected to be generated
are clayey sands, sands, and small cobbles and pebbles.
SANTIAGO FORMATION (Tsa)
mm
m»
This sub-unit consists in varying proportions of silty sand,
sand, clayey-silt, and clayey sands. The formation is exposed
on the north side of Palomar Airport Road.
•am
DEL MAR FORMATION (Tdts)
-">•
The rocks of this sub-unit underlie the site where they in turn
overlie granite and metamorphic rocks. The materials generated
•HI
from these formations will be silty sands, clayey sands, and
„ clayey silts. Claystone units are thin, but may be encountered
« during excavations.
City of Carlsbad Page 5
Palomar Airport Road Widening March 3, 1987
Job No. 7092
DISCUSSION AND CONCLUSIONS
Based on our field observations, analyses of technical data
generated in this study, and our geotechnical point of view, the
site is suitable for the proposed project. The planned roadway
alignment is underlain by existing road fill soil and several
natural earth deposits which range from soft, saturated soils to
hard, cemented formational rocks. Due to the soft and saturated
nature, some soil layers may have a potential for settlement.
However, the alluvium in the valley is medium-dense to dense, so
minimum undercutting and recompacting can be expected.
Portions of the hillside, need stabilization against surficial
failure or sliding. Various methods were considered. One way
is to provide a sufficiently flat slope, depending on the
existing earth material. A minimum safe slope of two horizontal
to one vertical can be used. It is however, noted, that adverse
bedding may be present within the slope. The other alternative
is building retaining walls or a combination of retaining walls,
MM
City of Carlsbad Page 6'
Palomar Airport Road Widening March 3, 1987
Job No. 7092
benching, and sloping the soil above the walls. This will
reduce the height of the retaining wall. Crib walls can also be
used though, more excavation work will be reguired, making the
solution costly.
City of Carlsbad Page 7
Palomar Airport Road Widening March 3, 1987
Job No. 7092
RECOMMENDATIONS
* The following section presents recommendations consistent with
the underlying soil/rock units relative to the planned grades:
m
m 1- General
1.1 The near surface, saturated, alluvial soil,
* whenever encountered, should be removed to a
minimum depth of three feet (3') and replaced
with site soil or base materials having
^ acceptable moisture contents. This replaced
- soil should be compacted to a dry density of
at least ninety percent (90%) of the
laboratory Standard (ASTM Test Method,
D-1557), and should be free of debris, organic
m materials, or boulders.
m
tf
1.2 Soil adjacent to the roadway should be
excavated and recompacted. The excavations
should extend at least ten feet (10') from the
tf outside edges of the roadway. This will
City of Carlsbad Page 8
Palomar Airport Road Widening March 3, 1987
Job No. 7092
minimize settling and cracking of the roadway
and contribute to reducing water seepage under
the pavement.
1.3 When fill is to be placed and compacted
against hillsides or existing fill, the slopes
of original hillsides and old or new fills
shall be horizontally benched to key the fill
material into the adjacent ground.
1.4 Based upon the blow counts per foot recorded
in the drilling operation, we found the
alluvium soils encountered in the valley to be
in medium-dense to very dense in condition.
Therefore, excavation and recompaction may be
limited to the upper two feet (2') of alluvium
soil prior to placement of structural fill.
1.5 Drainage and positive surface gradients should
be provided so that surface water will not
pond on the pavements, shoulder areas, nor
foundations.
City of Carlsbad Page 9
Palomar Airport Road Widening March 3, 1987
Job No. 7092
1.6 Support of open trenches: All trenches excavated
in excess of five feet in depth should either be
adequately shored or laid back on a slope of one
horizontal to one vertical. In areas where sand is
encountered, the slope should be flattened to 2
horizontal to 1 vertical. On-site inspection by a
representative of this office may result in
modification based on actual field exposures.
1.7 Trench Backfill: Pipeline trenches should be
backfilled with compacted fill. Backfill materials
should be placed in lift thicknesses appropriate to
the type of compaction equipment utilized and
compacted to a minimum degree of compaction 90
percent by mechanical means. In pavement areas,
portions of the trench backfill within the pavement
section should conform to the material and
compaction requirements of the adjacent pavement
section.
City of Carlsbad Page 10
Palomar Airport Road Widening March 3, 1987
Job No. 7092
1.8 The hillside slope, may be stabilized by providing
adequate slopes depending on the existing earth
-material. If temporary slopes are reguired in the
sandstone material, then a minimum slope of one
horizontal to one vertical (1:1) may be used.
Wherever sandy soil is encountered, a slope of two
horizontal to one vertical (2:1) may be used.
These slopes, if greater than twenty feet (20')
high should be benched or stepped. However as
noted earlier, adverse bedding may be present
within the slope, and should be inspected. The
slopes may be evaluated on-site by a representative
of this office, based on actual site inspections.
City of Carlsbad Page 11
Palomar Airport Road Widening March 3, 1987
Job No. 7092
2. Retaining Walls
Retaining walls may also be used, as an alternative, to the
slope stabilization on the hillside area.
2.1 The retaining walls if preferred, should be
properly designed and be founded at least 24 inches
below the lowest adjacent grade. For design
purposes, a static, lateral earth pressure (active
case) may be approximated using an equivalent fluid
unit weight of 35 pounds per cubic foot. Drainage
behind the retaining wall should be adequate to
ensure that free moisture does not accumulate near
the wall. A coefficient of friction 0.35 times the
dead load may be used between the bearing soils and
concrete wall foundations,
2.2 The foundations of the retaining walls can be
designed for a safe allowable bearing value of two
thousand pounds per sguare foot (2000 psf), for
both of the above alternatives.
m
City of Carlsbad Page 12
Palomar Airport Road Widening March 3, 1987
Job No. 7092
2.3 When building the retaining walls, the excavated
hillside slope should be stabilized for safety
against sliding or caving. A temporary slope
gradient of one horizontal to one vertical (1:1)
may be used for the sandstone zones. This slope
should be evaluated, on-site, by a representative
of this office based on actual site inspections.
2.4 After backfilling the excavated area behind the
retaining wall, the slope above the wall should
have a minimum gradient of one and a half
horizontal to one vertical (1-1/2:1).
City of Carlsbad Page 13
Palomar Airport Road Widening March 3, 1987
Job No. 7092
3. New Asphaltic Concrete Pavement
m
^ 3.1 The new asphaltic pavement section for the widening
of the road comprises of Class II base and
** asphaltic concrete. The design was based on a
minimum "R"-value of the base material of 78 and a
^ subbase material of 10. For a traffic index (TI)
^ of 8, a minimum asphaltic concrete thickness of
• four inches and a base material thickness of twenty
inches may be used. Alternatively, a full depth
mm
asphaltic concrete section, twelve inches (12")
^ thick, may be constructed on the existing subgrade
material.
am
3.2 The site is expected to have a net export of soil.
All clay soils under base coarse may be removed and
^ replaced with sand compacted as required by ASTM
Test Method D-1557. If clay soils are not removed,
* we then recommend that granular soils be placed in
the upper three feet (3') of fill. The pavement
tf
maintenance should be minimized if granular soils
_ are placed beneath the Class II base.
City of Carlsbad Page 14 "
Palomar Airport Road Widening March 3, 1987
Job No. 7092
3.3 The placement and construction of the pavement
section, should be in confonnance with an
appropriate standard specification, such as
"Standard Specification for Public Works."
3.4 The overall design of the pavement should include
proper drainage systems and gradients for runoff
flow away from the roadway. Also, proper
channeling systems should be designed to prevent
ponding of water that may promote seepage beneath
the pavement.
City of Carlsbad Page 15
Palomar Airport Road Widening March 3, 1987
Job No. 7092
REVIEW
The final plans should be reviewed by this office to minimize
any misunderstandings between the plans and the recommendations
presented herein. In addition, excavations and earthwork
performed on-site should be evaluated by a qualified engineering
geologist or geotechnical engineer. If conditions are found to
vary from those stated herein, appropriate recommendations
should be requested.
City of Carlsbad Page 16
Palomar Airport Road widening March 3, 1987
Job No. 7092
LIMITATIONS AND UNIFORMITY OF CONDITIONS
The recommendations presented in this report are contingent upon
our review of final plans and specifications.
It is recommended that testing Engineers-San Diego, be retained
to provide continuous soil engineering services during the
earthwork operations. This is to observe compliance with the
design concepts, specifications, or recommendations and to allow
design changes in the event that subsurface conditions differ
from those anticipated prior to the start of construction.
The recommendations and opinions expressed in this report
reflect our best estimate of the project requirements based on
an evaluation of the subsurface soil conditions encountered at
the exploration locations and the assumption that the soil
conditions do not deviate appreciably from those encountered.
It should be recognized that the performance of the foundations
and/or cut and fill slopes may be influenced by undisclosed or
unforeseen variations in the soil conditions that may occur in
City of Carlsbad Page 17
Palomar Airport Road Widening March 3, 1987
Job No. 7092
the intermediate and unexplored areas. Any unusual conditions
not covered in this report that may be encountered during site
development should be brought to the attention of the soil
engineer so that modifications can be made, if necessary.
This office should be advised of any changes in the project
scope or purposed site grading so that it may be determined if
the recommendations contained herein are appropriate.
The findings of this report are valid as of this date. Changes
in the condition of a property can, however, occur with the
passage of time, whether they be due to natural processes or the
work of man on this or adjacent properties. Due to such
changes, the findings of this report may be invalidated wholly
or in part by changes beyond our control. Therefore, this
report would not be relied upon after a period of two years
without a review by us verifying the suitability of the
conclusions, and recommendations.
City of Carlsbad Page 18
Palomar Airport Road Widening March 3, 1987
Job No, 7092
The client recognizes that subsurface conditions may vary from
those encountered at the locations where our test pits, surveys,
and explorations are made, and that our data, interpretations,
and recommendations are based solely on the information obtained
by us. Our services consist of professional consultation and
observation only, and no warranty of any kind whatsoever,
expressed or implied, is made or intended in connection with the
work performed or to be performed by us, or by our proposal for
consulting or other services, or by our furnishing of oral or
written reports, or findings.
It is the responsibility of the owners, or their representatives
to ensure that the information and recommendations contained
herein are brought to the attention of the engineer and
architect for the project and incorporated into the project's
plans and specifications. It is further their responsibility to
take the necessary measures to ensure that the contractor and
his subcontractors carry out such recommendations during
construction.
Testing Engineers-San Diego
BORING LOG
Project: Airport Rd-nntp. 1-23-87 Bering No:
B-61 Hole ninmirtftr. 8 inches
cs
o
Type of Rig:
Hammer Weight a Fall: 140 lbs./30" Ground Water: none
Elevation: _
- Logged By WMS
Location: Sta: 55+50
50' North of Centerline
FIELD DESCRIPTION
CO
o <
cn
5?
O 8
O
o
CNJ
I
. 4
. 6
. 8
- 10
• 12
. 14
• 16
- 18
20
- 22
- 24
. 26
28
SC
ML
ML
Formational
0-7 Clayey Sand, tan to brown, fine to
medium grained sand, moist, medium
dense
DR
35
7-18' Sandy Silt with Clay, dark brown,
fine to medium grained sand,
moist, stiff to very stiff.
27
DR
18-43' Clayey Silt, white to tan-brown,
variable' clay content, dry to
moist, very stiff to hard 50-6"
Decreasing clay concent more
brown in color
50-2" DR
PLATE. tk
Testing Engineers-San Diego
BORING LOG
CM
O
o.
Project: Palomar A^•^-pn•r^
Type of Rig; ^=hl
Date:
Hole Diometer- 8 inches
Boring No: J.
Elevation
Hommer Weigh! a Pmi-140 ibs./30"— Ground Water: none Logged By:
Location: Sta: 55+50
50' North of Centerline
FIELD DESCRIPTION
tn
<
cn
Z U.
s
IK
cn
O 8
O O CJ
I
32
34
36
38
40
42
44
46
• 48
- 50
. 52
- 54
- 56
. 58
ML
50-2" DR 128
50'2" DR
Boring Terminated at 44 feet.
Testing Engineers-San Diego
BORING LOG
Project: Palomar Airport Rd.nni,. 1-23-87 goring No: I
Type of Rig:±11: Hole nigmetef. 8 inches Elevation:
CM
O
Hammer Weight a Fnii-i^Q ibs./3Q" Q^Qy^j Wntnf None ^^^^^ gy. WMS
a.
tn
Location: Sta: 27+90,
60' South of Center line
FIELD DESCRIPTION
CO
Q
tn
CO .— Z 1^
>-a: o
cn
o
UJ
8
O O CJ
I
. 2
. 4
, 8
.10
•12
M
16
•18
.20
•22
ML 0-4' Sandy Silt, brown, medium to fine
sand
SM
SC
SP
SM
4-8' Silty Sand, light brown, medium to
fine sand, moist 51
8-12' Clayey _ Sand, dark brown, medium to
fine sand, moist
61
12-17* Sand, red-brown, medium to fine
grained, clean, moist
71
17-21.5' Silty Sand, dark brown, medium
to fine grained, moist, dense
to very dense
Boring Terminated @ 21.5'
DR 100
DR
DR
PLATE.
Testing Engineers-San Diego
BORING LOG
Project
Type 0
Hamme
. Palomar Airoort RdCVila. 1-23-87 Bnrinn Nn-Project
Type 0
Hamme
F Riq. B-61 Hnl« ninmAter- 8 inches Elevation -
Project
Type 0
Hamme r WAir]ht ft Fnll- 140 lbs/30" firnimH W^tfr-20.5' Logged By: WMS
u.
Location: Sta: 4i-K)0,
130' South of Center line Ik 55 — «i 8 DEPTH 1 SYMBOL FIELD DESCRIPTION BLOWS/ SAMPLE DRY DEt (PCI MOISTUf CONTENl o o
CNJ
1
- 2
ML 0-3' Sandy Silt, light brown fine sand,
minor clay, moist, firm
4 LI 3-9' Sandy Clay, dark brown to black,
medium to fine sand, moist, very
stiff
6
- 8
43 DR 114 15
• 10 ML 9-20.5' Sandy Silt , light brown, fine • 10 sand, moist, hard
92 DR 114 15
. 12
. 14 - 14' Lighter brown
- 16
- 18 -
- 20
m 22 SM 20.5-24' Silty Sand, Brown, wet. dense 80-6" DR
- 24
. 26
ML 24-30' Sandy Silt, brown, fine sand,
dry to moist, hard
m 28
Boring Terminated (a 30' 00-3" DR
ON
O
PLATE,
Testing Engineers-San Diego
CN
ON o
p-
BORING LOG
Project: Palomar Airport Rdi^^^. 1-23-87 Boeing NO:
Type of Rig: B-61 ^ole Diomfltftr- 8 inches Elevotion:
Hammer Weigh! a Falh^^Q ibs./30" Q^Q^^J, Water: Ji22i_ Logged By: DEPTH (FT) 1 SYMBOL Location: Sta: 71+40,
70' South of Center line
FIELD DESCRIPTION BLOWS/FT SAMPLE 1 ORY DENSITY (PCF) MOISTURE C0NTENT(%) -200 (%) m
- 2
. 4
SM 0-4' Silty Sand, dark brown to black,
moist to wet
SM 4-8' Silty Sand, light brown, fine to
. 6 medium grained sand, moist,
medium dense 24 DR 102 20
•m . 8
•mm - 10
SM 8-16.5' Silty Sand, dark brown medium
to fine sand, moist, medium
dense
12
8-16.5' Silty Sand, dark brown medium
to fine sand, moist, medium
dense
38 DR
12
14
- 16 38 DR
tf
- 18 Boring Terminated (? 16.5'
mm
- 20
mm -
m - 22 -
mm
- 24 -
•m
- 26
• 28
-
mm
PLATE.
Testing Engineers-San Diego
BORING LOG
Prnji>rt.Palomar Airport Rd 2-11-87 gQ^j^g 5_
Type of Rig: B-fil Hole Diameter: Elevation:.
Hammer Weight a Fnii- 140 ibs/30" Ground Water: JJ Logged Ry sec DEPTH(FT) SYMBOL Location: Sta: 63+50,
110' South of Centerline
FIELD OESCRIPTION BLOWS/FT SAMPLE DRY DENSITY | (PCF) 1 MOISTURE CONTENT (%) 8
o o
OJ
1
• 2
- /.
SM 0-4' SILTY SAND, brown, with minor
clay, moist
• 6
ML-CL 4-10' CLAYEY SILT, dark brown,
organic clay
32 DR 115 15
- 8
- 1 n CL 10-15' CLAY, brown, plastic, medium
expansive potential, very stiff 23 DR
• 12
• 14
• 16 SP 15-21.5' SAND, light brown, moderately -
graded, medium dense
- 18 -
- 20 - 20
52 DR 107 19
1 22
Boring Terminated (3 21.5'
- 24 -
- 26 -
- 28 -
Testing Engineers-San Diego
BORING LOG
CM
ON o pv
Project: Palomar Airport Rd^u. 2-11-87
Type of Rig- B-61 Hole Diameter- 8 inches
Hammer Weight a Fall:
Boring No:
.140 lbs/30" Ground Wnfer- None
Elevation: _
- Logged By SCG
a. UJ o >-
cn
Location: Sta: 50+00,
90' North of Center line
FIELD DESCRIPTION
t/>
Q <
tn
fc
CO —
z u. tn o
o o
CNJ
• 2
. 4
8
10
12
14
16
18
20
- 22
. 24
- 26
- 28
SP
SM
0-27' Clayey Sand Tan to grey, moist,
medium dense to dense
- Increasing clay content
- Very dense
35
58
50-6"
DR
DR
DR
27-30' Clayey Silt, orange-tan, hard
Boring Terminated I? 30' 5Q-5"
112 13
Testing Engineers-Son Diego
TEST PIT LOG
Project No: ^092
Ground Elevation:
Project Name: Palomar Airport Rnad Jest Pit NO: L
Date Excavated: ^'27-S7 Ground Water: Nnnp
Location: Sta: 82+30, 90' South of
Center line
PENETROMETER
(tsf)
LAB TESTS
Wc% -200%
2 H
UJ
)^ 4 H
A - FILL 2,5-6.0
o. UJ a 8 H
10
B - FORilATIONAL 7.0
12 -
14 -
UNIT DESCRIPTION
Sandy Silt
Tan-brown, variable clay content, moist,
medium dense
Sandy Clay
Dark brown to black, moist, hard
Testing Engineers-San Diego
it TEST PIT LOG
Prnierf Nn- ^092 p^^,^^^ ^^^^^ Palomar Airport Road D;* w« 2
am firniinri Flpvntion- Hnfp FYrnvntpH- l-27-b7 (^rniinH Vl/nfpr-None
Location: STA - 82+00, 110' PENETROMETER LAB TESTS
0 -South of Centerline (tsf) Wc% -200%
•m
'Ml
2 -
UJ
A - FILL
u. *t •
z
X 6-
a.
UJ
° 8-B - FORMATIONAL >7.0
•M
10 -
sm 12 -
14 -
UNIT DESCRtPTlON
m
•m
mt
A Sandy Silt
Tan-brown, variable clay, moist, medium dense
mt B Sandy Clay
Dark Brown to black, moist, hard
•tm
m
•m
*m
PI iTF
Tes//ng Engineers-San Diego
TEST PIT LOG
Project No: 7092 Project Name: Palomar Airport Rd. j^^^
Ground Elevation: ^-27-67 Qg^g Excavated: Ground Water:
0 -
Location: Sta: 91+30, 80' South of Center line PENETROMETER
(tsf)
LAB TESTS
Wc% -2007o
A - TOPSOIL
2 -
UJ
ti! 4 •
B -
C - FORMATIONAL 4.5 - 6.0
UJ
o
D - FORMATIONAL
8
10 A E - FORMATIONAL
12 -
14 -
UNIT DESCRIPTION
D
Sandy Clay
Brown, medium to fine sand, organics, moist, soft to firm,
2 inches of asphaltic concrete $ 1.5'
Clayey Sand
White-tan, moist, medium dense
Sandy Clay
Dark brown with pockets of tan or red clayey sand, low
expansion potential, moist, stiff to very stiff
Silty Clay
Black, some fine sand, some organics, moist stiff
Clayey Sand
Red-brown, moist, medium dense to dense
PLATE
Testing Engineers-San Diego
TEST PIT LOG
Prniprt Nn. 7092 Prn\(^H f\lnmp- Palomar Airport Road T«i Pi* Wn. 4
•m fimiinri FlPvntinn- DntP Firnvntprf- 1-27-87 Ground Water-None
MM Location: STA - 100+00, 60' PENETROMETER LAB TESTS
0 South of Centerline (tsf) Wc% -200%
mm A - TOPSOIL 2.5 - 3.5
— £ •
UJ B - FORMATIONAL >7.0
ii! 4 • C - FORMATIONAL
— z
£ 6 • D - FORMATIONAL
Nl a.
UJ
° 8-E - FORMATIONAL
10 -
mm
1 V
12 -
"•™
14 -
UNIT DESCRIPTION
'V
A Sandy Clay
•M Brown, medium to fine sand, organics, moist. soft to firm
B Clay Stone
Black to green claystone, moist, hard
-,•
C Silty Sandstone
•m D
White, fine grained sand, cemented, hard
Sandy Claystone
Dark brown to black, fine sand, moist, hard •
mm E Silty Sandstone
Brown, moist, dense to very dense
Testing Engineers-San Diego
TEST PIT LOG
NO: Project
Ground Elevation:
7092 Project Nome: Palomar Airport Road ^^^^ p,^
Date Excovated: ^-27-8? Ground Water: None
Location: Sta: 74+50, 100 ft.
North of Center line
0
2 H
PENETROMETER
(tsf)
LAB TESTS
Wc% -200%
A - TOPSOIL
B - FORMATIONAL
\ii 4 H
C - FORMATIONAL
6
8 -
10 -
12 -
14 -
D - FORMATIONAL
UNIT DESCRIPTION
>7.0
Sandy Clay
Black, fine sand, with organics, moist, soft to firm
Clay Stone
Black, fine sand, moist, hard
Silt Stone
White to tan, little fine sand, dry, hard
Sandstone
White to tan, cemented, dry, hard with green and red striations
PLATE
Testing Engineers-San Diego
TEST PIT LOG
Project No: ^^^^
Ground Elevation:
Project Name: Paiomar Airport Road j^^^ Pit NO: _!
Date Excavated: Ground Water: ^^^^
0 -
Location: Sta: 36+00,
30' North of Center line
PENETROMETER
(tsf)
LAB TESTS
Wc% -200%
A - FORMATIONAL
2
4 H
B - FOR>iATIONAL
X 6 H *—
UJ
° 8H
C - FORMATIONAL
10 -
12 -
14 -
UNIT OESCRIPTION
Conglomerate
Red-brown sand matrix with cobbles to 4", medium grained sand,
moist, very dense
Clayey Sand
White, well graded sand, moist, very dense
Sandy Claystone
Green to tan, coarse sand, hard
P1.AT6
Testing Engineers-San Diego
SYMBOLS AND TERMS USED ON BORING LOGS
DRIVEN RING
SAMPU
DRIVEN
BAG SAMPLE
DISTURBED
SAMPLER TYPES
Shown in SAMPLE column)
H
SHELBY
TUBE
ROCK
CORE
X SPLIT
SPOON
NO
RECOVERY
TERMS DESCRIBING CONSISTENCY OR CONDITION
COARSE GRAINED SOILS (major portion retamed on Na 200 sieve); Includes (1 ] clean gravels and sands, and
(2) silty or ctoyey gravels and sands. Condition <n the following toble is bosed on our interpretotion of blow counts
using a hammer as noted on the bormg tog.
DESCRIPTIVE TERM
Very loose
Loose
Medium-dense
Dense
Very dense
SPT VALUES.N
blows per 12 in.
(After Terzaghi a Peck, 1968)
0 to 4
4 to 10
10 to 30
30 to 50
>50
FINE GRAINED SOILS (major portion passing No. 200 sieve): Includes (1) inorganic and organic silts and days,
(2) grovelly, sandy, or silty cloys, and (3) cloyey silts. Consistency is roted occording to sheoring strength, as
indicated by penetrometer readings or by unconfined compression tests.
UNDRAINED
DESCRIPTIVE TERM SHEAR STRENGTH
KIPS/SO FT
Vftfy soft
Soft
Rrm
Stiff
Vftry stiff
Hord
less than 0.25
0.25 to 0.50
0.50 to 1.00
1.00 to 2.00
2.00 to 4.00
4.00 and higher
NOTE: Ftssured days may have lower unconfined compressive strengths than shown above, because of
planes of ¥/eakness or crocks in the soii The consistency ratings of such soils are based on penetrometer
readings.
TERMS CHARACTERIZING SOIL STRUCTURE
Fissured — containing shrinkage crocks, frequently filled with fine sand or silt, usually more or less vertical
Interbedded — composed of olternote layers of different soil types
Calcoreous — containing 12 to 50 percent colcium carbonote
Carbonate — containing more than 50 percent calcium carbonate
Well graded — hoving wide ronge in groin sizes and substantiol amounts of all intermediate particle sizes
Poorly graded — predominotely of one grain size, or having a range of sizes with some mtermediote
size missing
Terms used in this report for describing soils according to their texture or gram size distribution ore in accordance
with the UNIFIED SOIL CLASSIFICATION SYSTEM, as describedm Techmcat Memorandum Na.3-257; Waterways Exp.Sla,3/53
PLATE.
GENERALIZED SUBSURFACE PROFILE
112i
102
92
:? 82^
w 72
52-1
I 42
LU
TP6 TPS
SILTY CLAY/
CLAYEY SAND
TP4
SAND STONE
FORMATIONAL) &
CLAY-SILT
100
GENERAL NOTES
Data concerning subsurface conditions have
been obtained at boring location only.
Actual conditions at locations between borings
may differ from the profiles shown.
HORIZONTAL SCALE
hi2
102
h92
82
72
-62
52
42
m
<
fl)
o
3
Testing Engineers-San Diego
No: 7092
GENERALIZED
SUBSURFACE
PROFILE
Dote: 3/2/87 14
Testing Engineers-San Diego
UNIFIED SOIL CLASSIFICATION
PLASTICITY CHART
GROUP
)YMBOL TYPICAL NAMES size) GW
Well-graded gravels,
gravel-sond mixtures,
littte Of no fines 200 sieve GP
Poorly graded grovets,
grovel-sand mixtures,
little or no fines SOILS lhan Na Silty. grovets, grovel-
sond-silt mixtures jRAINED 1 is larger GC Clayey gravels, grovel
sond-doy mixtures COARSE-( of material SW
Well-groded sonds,
gravelly sands, littte
or no fines re thon half SP
Poorly groded sands,
gravelly sonds, little
or no Hnes
o 2
SM
Silty sands, sand-silt
mixture
SC
Cloyey sonds, sond-
cloy mixtures
GROUP
SYMBOL TYPICAL NAMES )0 sieve) ML
Inorganic silts ond very
fine sands, rock flour
silty or clayey fine
sands, or cloyey silts
with slight plostidty SOILS oiler than Na 2C CL
Inorgonic days of low to
medium plasticity,
grovelly days, sondy
days, silty cloys, leon
clays -GRAINED leriol is sm OL.
Orgonic silts ond orgonic
silty cloys of low
plosticity FINE an half of moi MH
Inorganic silts, micaceous
or diotomoceous fine
sandy or silty soils,
elastic silts More thi CH Inorgonic cloys of high
plosticity, fot cloys
OH
Organic cloys of medium
to high plosticity,
organic silts
Pt Peat and other highly
orgonic soils
NOTE: l)Gn)up symbol presented in SrweOL column on BORING LOC
2) The "A" line is on empirical relationship esloblished by A. Cosogronde.
PLATE
City of carlsbad Tnl^'nJ'lllV Palomar Airport Road Widening Job No. 7092
APPENDIX
LABORATORY TEST DESCRIPTION
LABORATORY TEST RESULTS
City of carlsbad Tnl^'V'llTl palomar Airport Road Widening Job No. 7092
T.AT^nP^TQRY DESCRIPTION
1. MnTgTTTBE DENSITY TESTS
The field moisture content and dry density tests were
performed on ring drive samples retained during the field
investigation. The field moisture content was determined as
a percentage of the dry unit weight.
2. EXPANSION
Expansion tests were performed on representative samples at
existing condition of density and moisture content. The
samples were air dried and allowed to swell against a
surcharge load of 150 pounds per square foot.
City of carlsbad Tnl^'V'lHV Palomar Airport Road widening ^ob No. 7092
LABORATORY RESULTS
.... 1. Moisture Content And In-Place Densitv Tests
Field Dry
Field
Moisture
Sample No.
and Depth
BHl e 35 ft.
Density (lbs. Content Sample No.
and Depth
BHl e 35 ft.
t>er cubic foot) (percent)
Sample No.
and Depth
BHl e 35 ft. 127.9 7.6
BH2 e 5 ft. 100.1 5.1
4* BH3 @ 5 ft. 113.8 15.2
rm BH3 e 10 ft. 114.4 14.8
nM BH4 @ 5 ft. 102.4 20.0
•— BH5 @ 10 ft. 114.6 14.9
BH5 @ 20 ft. 106.6 18.8
BH6 e 20 ft. 111.5 12.9
PLATE A-1
City of Carlsbad
Palomar Airport Road Widening
March 3, 1987
Job No. 7092
2. Expansion Test
Sample No.
and Depth
TP3 e 3-4 ft.
BH3 e 5 ft.
BH5 @ 10 ft.
BH6 e 10 ft.
Expansion
Index
32
62
65
7
Potential
Expansion
Low
Medium
Medium
Very Low
PLATE A-2