Loading...
HomeMy WebLinkAbout3151; Palomar Airport Road; Palomar Airport Road; 1987-03-03GEOTECHNICAL CONSULTING PALOMAR AIRPORT ROAD WIDENING CARLSBAD, CALIFORNIA FOR CITY OF CARLSBAD COMMUNITY DEVELOPMENT 2075 LAS PALMAS DRIVE CARLSBAD, CALIFORNIA 92008 JOB NO. 7092 MARCH 3, 1987 ff jn Testing Engineers—San Diego //^^/// // ol United States Testing Company, Inc. . OL/ 3467 Kurtz St., PO. Box 80985, San Diego, Ca. 92138(619)225-9641 iff ' ' i 2956 Industry Street, Oceanside, California 92054 (619) 757-0248 March 3, 1987 Job No. 7092 City of Carlsbad Community Development 2075 Las Palmas Drive Carlsbad, California 92008 Attention: Mr. Al Virgilio Subject; Geotechnical Consulting Palomar Airport Road Widening Carlsbad, California Gentlemen: As per your request and authorization, we have completed a geotechnical investigation of the proposed Palomar Airport Road alignment. The purpose of this investigation was to perform a geotechnical and geological evaluation of the above-mentioned roadway widening and to provide geotechnical design criteria for the planned widening. This investigation was authorized by your acceptance of our proposal dated December 23, 1986. Our office conducted a field investigation and soil samplings of the site. The soil samples were then used for laboratory testing in our office. The results of the field exploration and laboratory testings are included herewith. City of Carlsbad Palomar Airport Road Widening Page 2 March 3, 1987 Job No. 7092 We appreciate the opportunity to be of service to you on this interesting project and look forward to a continued association on this and future projects. If you have any questions regarding this report, please contact us at your convenience. Almaz Fesseha Project Engineer AF/SMP:SVC Addressee (6) Respectfully submitted, TESTING ENGINEERS-SAN DIEGO William Schill Project Geologist Stephen M. Poole, RCE 40219 Geotechnical Department Manager TABLE OF CONTENTS Page INTRODUCTION 1 PROJECT DESCRIPTION 1 METHOD OF INVESTIGATION 1 LABORATORY TESTINGS 2 GEOLOGIC CONDITIONS 3 FILL 3 LINDA VISTA FORMATION (Qlvs) 4 SANTIAGO FORMATION (Tsa) 4 DEL MAR FORMATION (Tdts) 4 DISCUSSION AND CONCLUSIONS 5 RECOMMENDATIONS 7 GENERAL 7 RETAINING WALLS 11 NEW ASPHALT CONCRETE PAVEMENT 13 REVIEW 15 LIMITATIONS AND UNIFORMITY OF CONDITIONS 16 ENCLOSURES: BORING LOGS PLATE 1-6 TEST PIT LOG PLATE 7-12 SYMBOLS & TERMS USED ON BORING LOGS PLATE 13 GENERALIZED SUBSURFACE PROFILE PLATE 14 UNIFIED SOIL CLASSIFICATION PLATE 15 APPENDIX LABORATORY TEST DESCRIPTION LABORATORY TEST RESULTS city of Carlsbad Page 1 Palomar Airport Road Widening March 3, 1987 Job No. 7092 INTRODUCTION PROJECT DESCRIPTION The subject site extends from east of Paseo Del Norte at about Station 27+00 to west of Palomar Oaks Way at about Station 94+50. METHOD OF INVESTIGATION Site materials within the area of the proposed improvements were evaluated by geologic mapping of surface exposures, backhoe excavated test pits, and auger drilled test borings. The excavations provided opportunities to evaluate subsurface conditions, and enabled geologists to collect samples for laboratory analysis. The approximate test boring and test pit locations are presented on the logs. Boring logs are presented on Plates 1 through 6 and Test Pit logs are presented on Plates 7 through 12. Symbols and terms used on the Test Pit and Boring Logs are presented on Plate 13. A generalized subsiirface profile is presented on Plate 14. The number of blows reguired to drive the sampling barrel into the soil was recorded on the boring logs. city of Carlsbad Page 2 Palomar Airport Road Widening March 3, 1987 Job No. 7092 LABORATORY TESTING Soils were visually classified according to the Unified Soil Classification System as presented on Plate 15. Laboratory tests were performed in accordance with accepted test methods of the American Society for Testing and Materials (ASTM). Tests conducted for the project included: Moisture/Density and Expansion. The Test Results and Test Descriptions are presented in the Appendix. city of Carlsbad Page 3 Palomar Airport Road Widening March 3, 1987 Job No. 7092 GEOLOGIC CONDITIONS The subject site lies in the Peninsula Range geomorphic province and is underlain by formational materials of Eoceme age. The Linda Vista formation was encountered on the north side of Palomar Road at the higher elevations. During the proposed roadway grading, natural soil and rock material will be encountered during construction. According to a study done by Weber entitled. Recent Slope Failures, Ancient Landslides, and Related Geology of the North-Central Coastal Area, San Diego County,, California 1982, the geologic units in question are thought to be stable. FILL The fill materials encountered in Test Pit 1 and 2 are thought to be local in nature because of the resemblance to the soils generated from adjacent formational material. Fill materials encountered are mostly sandy silt. city of Carlsbad Page 4 Palomar Airport Road Widening March 3, 1987 Job No. 7092 LINDA VISTA FORMATION (Qlvs) This formation was encountered in Test Pit 6 and can be expected on the north side of Palomar Airport Road. This sub-unit lies closer to the.coast where it can be observed in some road cuts (Weber 1902). Materials that can be expected to be generated are clayey sands, sands, and small cobbles and pebbles. SANTIAGO FORMATION (Tsa) This sub-unit consists in varying proportions of silty sand, sand, clayey-silt, and clayey sands. The formation is exposed on the north side of Palomar Airport Road. DEL MAR FORMATION (Tdts) The rocks of this sub-unit underlie the site where they in turn overlie granite and metamorphic rocks. The materials generated from these formations will be silty sands, clayey sands, and clayey silts. Claystone units are thin, but may be encountered during excavations. City of Carlsbad Page 5 Palomar Airport Road Widening March 3, 1987 Job No. 7092 DISCUSSION AND CONCLUSIONS Based on our field observations, analyses of technical data generated in this study, and our geotechnical point of view, the site is suitable for the proposed project. The planned roadway alignment is underlain by existing road fill soil and several natural earth deposits which range from soft, saturated soils to hard, cemented formational rocks. Due to the soft and saturated nature, some soil layers may have a potential for settlement. However, the alluvium in the valley is medium-dense to dense, so minimum undercutting and recompacting can be expected. Portions of the hillside, need stabilization against surficial failure or sliding. Various methods were considered. One way is to provide a sufficiently flat slope, depending on the existing earth material. A minimum safe slope of two horizontal to one vertical can be used. It is however, noted, that adverse bedding may be present within the slope. The other alternative is building retaining walls or a combination of retaining walls. City of Carlsbad Page 6 Palomar Airport Road Widening March 3, 1987 Job No. 7092 benching, and sloping the soil above the walls. This will reduce the height of the retaining wall. Crib walls can also be used though, more excavation work will be reguired, making the solution costly. City of Carlsbad Page 7 Palomar Airport Road Widening March 3, 1987 Job No. 7092 RECOMMENDATIONS The following section presents recommendations consistent with the underlying soil/rock units relative to the planned grades: 1. General 1.1 The near surface, saturated, alluvial soil, whenever encountered, should be removed to a minimum depth of three feet (3') and replaced with site soil or base materials having acceptable moisture contents. This replaced soil should be compacted to a dry density of at least ninety percent (90%) of the laboratory Standard (ASTM Test Method, D-1557)," and should be free of debris, organic materials, or boulders. 1.2 Soil adjacent to the roadway should be excavated and recompacted. The excavations should extend at least ten feet (10') from the outside edges of the roadway. This will city of Carlsbad Page 8 Palomar Airport Road Widening March 3, 1987 Job No. 7092 minimize settling and cracking of the roadway and contribute to reducing water seepage under the pavement. 1.3 When fill is to be placed and compacted against hillsides or existing fill, the slopes of original hillsides and old or new fills shall be horizontally benched to key the fill material into the adjacent ground. 1.4 Based upon the blow counts per foot recorded in the drilling operation, we found the alluvium soils encountered in the valley to be in medium-dense to very dense in condition. Therefore, excavation and recompaction may be limited to the upper two feet (2') of alluvium soil prior to placement of structural fill. 1.5 Drainage and positive surface gradients should be provided so that surface water will not pond on the pavements, shoulder areas, nor foundations. City of Carlsbad Page 9 Palomar Airport Road Widening March 3, 1987 Job No. 7092 1.6 Support of open trenches: All trenches excavated in excess of five feet in depth should either be adequately shored or laid back on a slope of one horizontal to one vertical. In areas where sand is encountered, the slope should be flattened to 2 horizontal to 1 vertical. On-site inspection by a representative of this office may result in modification based on actual field exposures. 1.7 Trench Backfill: Pipeline trenches should be backfilled with compacted fill. Backfill materials should be placed in lift thicknesses appropriate to the type of compaction equipment utilized and compacted to a minimum degree of compaction 90 percent by mechanical means. In pavement areas, portions of the trench backfill within the pavement section should conform to the material and compaction requirements of the adjacent pavement section. City of Carlsbad Page 10 Palomar Airport Road Widening iviarch 3, 1987 Job No. 7092 1.8 The hillside slope, may be stabilized by providing adequate slopes depending on the existing earth material. If temporary slopes are required in the sandstone material, then a minimum slope of one horizontal to one vertical (1:1) may be used. Wherever sandy soil is encountered, a slope of two horizontal to one vertical (2:1) may be used. These slopes, if greater than twenty feet (20') high should be benched or stepped. However as noted earlier, adverse bedding may be present within the slope, and should be inspected. The slopes may be evaluated on-site by a representative of this office, based on actual site inspections. city of Carlsbad Page 11 Palomar Airport Road Widening March 3, 1987 Job No. 7092 2. Retaining Walls Retaining walls may also be used, as an alternative, to the slope stabilization on the hillside area. 2.1 The retaining walls if preferred, should be properly designed and be founded at least 24 inches below the lowest adjacent grade. For design purposes, a static, lateral earth pressure (active case) may be approximated using an equivalent fluid unit weight of 35 pounds per cubic foot. Drainage behind the retaining wall should be adequate to ensure that free moisture does not accumulate near the wall. A coefficient of friction 0.35 times the dead load may be used between the bearing soils and concrete wall foundations. 2.2 The foundations of the retaining walls can be designed for a safe allowable bearing value of two thousand pounds per sguare foot (2000 psf), for both of the above alternatives. City of Carlsbad Page 12 Palomar Airport Road Widening March 3, 1987 Job No. 7092 2.3 When building the retaining walls, the excavated hillside slope should be stabilized for safety against sliding or caving. A temporary slope gradient of one horizontal to one vertical (1:1) may be used for the sandstone zones. This slope should be evaluated, on-site, by a representative of this office based on actual site inspections. 2.4 After backfilling the excavated area behind the retaining wall, the slope above the wall should have a minimum gradient of one and a half horizontal to one vertical (1-1/2:1). city of Carlsbad Page 13 Palomar Airport Road Widening March 3, 1987 Job No. 7092 3. New Asphaltic Concrete Pavement 3.1 The new asphaltic pavement section for the widening of the road comprises of Class II base and asphaltic concrete. The design was based on a minimum "R"-value of the base material of 78 and a subbase material of 10. For a traffic index (TI) of 8, a minimum asphaltic concrete thickness of four inches and a base material thickness of twenty inches may be used. Alternatively, a full depth asphaltic concrete section, twelve inches (12") thick, may be constructed on the existing subgrade material. 3.2 The site is expected to have a net export of soil. All clay soils under base coarse may be removed and replaced with sand compacted as reguired by ASTM Test Method D-1557. If clay soils are not removed, we then recommend that granular soils be placed in the upper three feet (3') of fill. The pavement maintenance should be minimized if granular soils are placed beneath the Class II base. City of Carlsbad Page 14 Palomar Airport Road Widening March 3, 1987 Job No. 7092 3.3 The placement and construction of the pavement section, should be in conformance with an appropriate standard specification, such as "Standard Specification for Public Works." 3.4 The overall design of the pavement should include proper drainage systems and gradients for runoff flow away, from the roadway. Also, proper channeling systems should be designed to prevent ponding of water that may promote seepage beneath the pavement. city of Carlsbad Page 15 Palomar Airport Road Widening March 3, 1987 Job No. 7092 REVIEW The final plans should be reviewed by this office to minimize any misunderstandings between the plans and the recommendations presented herein. In addition, excavations and earthwork performed on-site should be evaluated by a qualified engineering geologist or geotechnical engineer. If conditions are found to vary from those stated herein, appropriate recommendations should be requested. city of Carlsbad Page 16 Palomar Airport Road Widening March 3, 1987 Job No. 7092 LIMITATIONS AND UNIFORMITY OF CONDITIONS The recommendations presented in this report are contingent upon our review of final plans and specifications. It is recommended that testing Engineers-San Diego, be retained ^ to provide continuous soil engineering services during the earthwork operations. This is to observe compliance with the design concepts, specifications, or recommendations and to allow ^ design changes in the event that subsurface conditions differ from those anticipated prior to the start of construction. ^ The recommendations and opinions expressed in this report reflect our best estimate of the project requirements based on an evaluation of the subsurface soil conditions encountered at 0 the exploration locations and the assumption that the soil conditions do not deviate appreciably from those encountered. H It should be recognized that the performance of the foundations and/or cut and fill slopes may be influenced by undisclosed or unforeseen variations in the soil conditions that may occur in city of Carlsbad Page 17 Palomar Airport Road Widening March 3, 1987 Job No. 7092 the intermediate and unexplored areas. Any unusual conditions not covered in this report that may be encountered during site development should be brought to the attention of the soil engineer so that modifications can be made, if necessary. This office should be advised of any changes in the project scope or purposed site grading so that it may be determined if the recommendations contained herein are appropriate. The findings of this report are valid as of this date. Changes in the condition of a property can, however, occur with the passage of time, whether they be due to natural processes or the work of man on this or adjacent properties. Due to such changes, the findings of this report may be invalidated wholly or in part by changes beyond our control. Therefore, this report would not be relied upon after a period of two years without a review by us verifying the suitability of the conclusions, and recommendations. City of Carlsbad Page 18 Palomar Airport Road'Widening March 3, 1987 Job No. 7092 The client recognizes that subsurface conditions may vary from those encountered at the locations where our test pits, surveys, and explorations are made, and that our data, interpretations, and recommendations are based solely on the information obtained by us. Our services consist of professional consultation and observation only, and no warranty of any kind whatsoever, expressed or implied, is made or intended in connection with the work performed or to be performed by us, or by our proposal for consulting or other services, or by our furnishing of oral or written reports, or findings. It is the responsibility of the owners, or their representatives to ensure that the information and recommendations contained herein are brought to the attention of the engineer and architect for the project and incorporated into the project's plans and specifications. It is further their responsibility to take the necessary measures to ensure that the contractor and his subcontractors carry out such recommendations during construction. Testing Engineers-San Diego BORING LOG CM ON o o -3 Project: Palomar Airport Rd.n„,,. 1-23-87 Bohng No: Type of Rig:__±±i Hole Diameter: ^ inches Hammer Weigtit 8 Fall 140 lbs./SO" Ground Water: none Elevation: _ _ Logged By: WMS a. UJ o o m >-CO Location: Sta: 55+50 50' North of Centerline FIELD DESCRIPTION to O _l CO Q. s < to to .— Z U. LU U Q a. >-oz o o o OJ . 4 . 8 - 10 • 12 . 14 • 16 _. 18 20 . 22 24 _ 26 28 SC ML ML Formational 0-7 Clayey Sand, tan to brown, fine to medium grained sand, moist, medium dense DR 35 7-18' Sandy Silt with Clay, dark brown, fine to medium grained sand, moist, stiff to very stiff. 27 DR 18-43' Clayey Silt., white to tan-brown, variable clay content, dry to moist, very stiff to hard 50-6" X Decreasing clay content more brown in color 50-2" DR PLATE. Iff Testing Engirieers-San Diego BORING LOG Project: Palomar Airport Type of Rig: B-61 T-?^-«7 Date: Hole ninmetPr- 8 inches Boring No: Elevation: CM ON o r-< Hammer Weight a Fall: i^o lbs./so" Ground Water: none Logged By: WMS o -3 a. UJ o o m >-to Location: Sta: 55+50 50' North of Centerline FIELD DESCRIPTION to o —I m < to to . Z U. UJ u O Q. >• " OC is o o CJ - 32 S4 36 S8 40 42 44 46 - 48 50 - 52 - 54 - 56 . 58 ML 50-2" DR 128 50'2' DR Boring Terminated at 44 feet, PLATE. Testing Engineers-San Diego BORING LOG 1-23-87 CM <J\ O Project: Palomar Airport Rd. Qg|g. Type of Rig- Hole Diameter Hammer Weight a Fall:^"^" lbs./so"— Q^Q^^jj yi^g^g^. 8 inches Boring No: None Elevation: _ _ Logged By: .WMS X I— Q. UJ O O m >-to Location: Sta: 27+90, 60' South of Center line FIELD DESCRIPTION to o < to to .— Z U. UJ (_> o a. >• oc a Z CJ o o OJ . 8 .10 •12 .16 -18 -20 •22 ML SM SC SP SM 0-4' Sandy Silt, brown, medium to fine sand 4-8' Silty Sand, light brown, medium to fine sand, moist 51 DR 100 8-12' Clayey^Sand, dark brown, medium to fine sand, moist 61 DR 12-17' Sand, red-brown, medium to fine grained, clean, moist 71 DR 17-21.5' Silty Sand,' dark brown, medium to fine grained, moist, dense to very dense Boring Terminated (3 21.5' PLATE. Testing Engineers-San Diego BORING LOG Project: Palomar Airport RdDntft- 1-23-87 Type of Rig- ^-^^ Hole ninmPtPr- 8 inches o 1^ Hammer Weight a Fall: ibs/30"— Ground Water: Boring No: = Elevation: _ 20.5' Logged By: WMS o a. UJ o o m Z >-to Location: Sta: 41-1-00, ISO' South of Center line FIELD DESCRIPTION to o -I CD < to to — Z U. Ul o a Q. > ~" tr a o o Z <_) - 8 - 10 . 12 . 14 . 16 . 18 . 20 - 22 . 24 . 26 . 28 ML LI ML SM ML O-S' Sandy Silt, light brown fine sand, minor clay, moist, firm 3-9* Sandy Clay, dark brown to black, medium to fine sand, moist, very stiff 43 DR 114 9-20.5' Sandy Silt , light brown, fine sand, moist, hard 92 DR 114 14' Lighter brown 20.5-24' Silty Sand, Brown, wet, dense 80-6" DR 24-30' Sandy Silt, brown, fine sand, dry to moist, hard Boring Terminated @ SO' .00-r-S" DR 15 15 PLATE. 3 Testing Engineers-San Diego BORING LOG fsl ON o Project- Palomar Airport Rd[:)f,fp. 1-23-87 Type of Rig- ^"^^ Hole ninmPtPr- 8 inches Hammer Weight a Fall: Boring No: .140 lbs./SO" Ground Water: None Elevation: _ _ Logged By: WMS X »- UJ a o CQ >- to Location: Sta: 71+40, 70' South of Center: line FIELD DESCRIPTION to o _j CD < to to .— LLJ CJ O Q. >-tr a o o Z u o o OJ - 2 - 8 . 10 12 14 . 16 . 18 20 - 22 - 24 - 26 - 28 SM SM SM 0-4' Silty Sand, dark brown to black, moist to wet 4-8' Silty Sand, light brown, fine to medium grained sand, moist, medium dense 24 DR 102 20 8-16.5' Silty Sand, dark brown medium to fine sand, moist, med:Lum dense 38 DR S8 DR Boring Terminated @ 16.5' PLATE. Testing Engineers-San Diego BORING LOG Pmjpr.t-Palomar Airport Rd QQ\Q. 2-11-87 Type of Rig- B-6I Hole Diameter:-^ Boring No: Elevation: Hammer Weight a Fnii- 140 ibs/so" Ground Water: J.5 Logged By:_scG_ CL UJ o o CD z >• to Location: Star 63+50, no' South of Centerline FIELD DESCRIPTION to o < to to .— z u. UJ o O Q. >-tr o <2 S 2 o o o OJ - 2 - 4 - 6 - 8 - 10 - 12 - 14 - 16 - 18 20 22 - 24 - 26 - 28 SM 0-4' SILTY SAND, brown, with minor clay, moist ML-CL 4-10' CLAYEY SILT, dark brown, organic clay 32 DR 115 15 CL 10-15' CLAY, brown, plastic, medium expansive potential, very stiff 23 DR SP 15-21.5' SAND, light brown, moderately graded, medium dense 52 DR 107 19 Boring Terminated @ 21.5' PLATE. Testing En^ih^ers-San Diego BORING LOG Project: Palomar Airport Rdpj^^^ 2-11-87 Borina No: 6 Project: T«ne nf Pin- B-61 Hnip ninmPtPr- 8 inches Elevation: Hammer Weight a Fall:^^° ibs/so" Ground Water-None Logged By:. SCG DEPTH (FT) SYMBOL Location: Sta: 50+00, 90' North of Center line FIELD DESCRIPTION BLOWS/FT SAMPLE ORY DENSITY (PCF) MOISTURE CONTENT (7o) o o OJ 1 SP 0-27' Clayey Sand Tan to grey, moist, medium dense to dense - 2 . 4 6 35 DR 8 - 10 - Increasing clay content - 10 58 DR . 12 - 14 - 16 . 18 . 20 - Very dense - Very dense 50-6" DR 112 IS . 22 . 24 - 26 - . 28 SM 27-30' Clayey Silt, orange-tan, hard Boring Terminated (3 SO' ^50-5" DR CN o o PLATE. 6: Testing Engineers-San Diego TEST PIT LOG Project No; 7092 Ground Elevation; Project Name: Palomar Airport Road Test Pit NO: L Date Excavated: 1-27-87 Ground Water: —None. 0 -. Location: Sta: 82+30, 90' South of Center line PENETROMETER (tsf) LAB TESTS Wc% - 2007o 2 -A - FILL • 2.5-6.0 li! 4 UJ O 8 10 B - FORLIATIONAL 7.0 12 - 14 - UNIT DESCRIPTION Sandy Silt Tan-brown, variable clay content, moist, medium dense Sandy Clay Dark brown to black, moist, hard PLATE Testing Engineers-San Diego TEST PIT LOG 7092 Project No: Ground Elevation: Project Name: Palomar Airport Road Jggi pjf NO: _L Date Excavated: 1-27-87 Ground Water: None Location: STA -82+00, 110' South of Centerline PENETROMETER (tsf) LAB TESTS Wc7o - 2007o 2 -A - FILL li! 4 z I 6 t— Q. UJ ° 8 10 -f 12 14 - B - FOR^IATIONAL >7.0 UNIT DESCRIPTION Sandy Silt Tan-brown, variable clay, moist, medium dense Sandy Clay Dark Brown to black, moist, hard PLATE Testing Engineers-San Diego TEST- PIT LOG Project No: 7092 Project Name: Palomar Airport Rd. jg^^ pj^ 3_ Ground Elevation: ^-^1-^'^ Date Excavated: Ground Water: _j2fi£ a. Ul o 0 - 2 - 4 6 8 10 12 - 14 - Location: Sta: 91+SO, 80' South of Center line A - TOPSOIL B - C - FORMATIONAL D - FORMATIONAL E - FORMATIONAL PENETROMETER (tsf) 4.5 - 6.0 LAB TESTS Wc7o - 2007o UNIT DESCRIPTION D Sandy Clay Brown, medium to fine sand, organics, moist, soft to firm, 2 inches of asphaltic concrete (3 1.5' Clayey Sand V7hite-tan, moist, medium dense Sandy Clay Dark brown with pockets of tan or red clayey sand, low expansion potential, moist, stiff to very stiff Silty Clay Black, some fine sand, some organics, moist stiff Clayey Sand Red-brown, moist, medium dense to dense PLATE Testing Engineers-San Diego TEST PIT LOG Project Ground NO: 7092 Test Pit No: L Elevation; Project Name: Palomar Airport Road Date Excavated: ^"^7"°^ Ground Water: None Location: STA - 100+00, 60' South of Centerline 0 2 I— UJ \it 4H z X 6 8 i 10 PENETROMETER (tsf) LAB TESTS Wc7o - 2007o A - TOPSOIL B - FOR^IATIONAL C - FORMATIONAL D - FORI-IATIONAL Q. Ul E - FORMATIONAL 12 - 14 - 2.5 - S.5 > 7.0 UNIT DESCRIPTION Sandy Clay Brown, medium to fine sand, organics, moist, soft to firm Clay Stone Black to green claystone, moist, hard Silty Sandstone White, fine grained sand, cemented, hard Sandy Claystone Dark brown to black, fine sand, moist, hard Silty Sandstone Brown, moist, dense to very dense PLATE Testing Engineers-San Diego TEST PIT LOG Project No: . Ground Elevation 7092 Project Name; Palomar Airport Road j^^^ p-^ 5_ Date Excavated: ^-^7-87 Ground Water: None Location: Sta: 74+50, 100 ft. North of Center line 0 2 -i *— Ul H! 4 z X 6 8 10 -f A - TOPSOIL B - FORMATIONAL C - FORMATIONAL a. Ul o D - FOR]>IATIONAL 12 - 14 - PENETROMETER (tsf) >7.0 LAB TESTS Wc7o - 2007o UNIT DESCRIPTION Sandy Clay Black, fine sand, with organics, moist;, soft to firm Clay Stone Black, fine sand, moist, hard Silt Stone White to tan, little fine sand, dry, hard Sandstone White to tan, cemented, dry, hard with green and red striations PLATE Testing Engineers-San Diego TEST PIT LOG Project No: Ground Elevation; 7U92 Project Name: Palomar Airport Road jgg^ pj^ N0:_1 Dote Excavated: --^ Ground Water: 0 -I 2 4 Location: Sta: 36+00, SO' North of Center line PENETROMETER (tsf) LAB TESTS Wc7o - 2007o A - FORI>'iATIONAL B - FORj^iATIONAL Q. UJ a C - FORMATIONAL 8 10 - 12 - 14 - UNIT DESCRIPTION Conglomerate Red-brown sand matrix with cobbles to 4", medium grained sand, moist, very dense Clayey Sand White, well graded sand, moist, very dense Sandy Claystone Green to tan, coarse sand, hard PLATE Testing Engineers-San Diego SYMBOLS AND TERMS USED ON BORING LOGS SAMPLER TYPES (Shown in SAMPLE column OR BK DRIVEN RING SAMPLE DRIVEN BAG SAMPLE DISTURBED BULK SAMPLE H SHELBY TUBE ROCK CORE SPLIT SPOON NO RECOVERY TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE GRAINED SOILS (major portion retained on No. 200 sieve): Includes (1) clean gravels and sands, and (2) silty or clayey gravels and sands. Condition in the following table is based on our interpretotion of blow counts using a hommer as noted on the boring log. DESCRIPTIVE TERM SPT VALUES, N blows per 12 in. (After Terzaghi a Peck, 1968) 0 to 4 Very loose Loose Medium-dense Dense Very dense 4 to 10 10 to 30 30 to 50 >50 FINE GRAINED SOILS (major portion passing No. 200 sieve): Includes (1) inorganic and organic silts and cloys, (2) gravelly, sandy, or silty cloys, and (3) cloyey silts. Consistency is rated according to shearing strength, as indicated by penetrometer readings or by unconfined compression tests. DESCRIPTIVE TERM UNDRAINED SHEAR STRENGTH KIPS/SO FT Very soft less than 0.25 Soft 0.25 to 0.50 Firm 0.50 to 1.00 Stiff 1.00 to 2.00 Very stiff 2.00 to 4.00 Hard 4.00 and higher NOTE: Fissured days may iiave lower unconfined compressive strengths than stiown above, because of planes of weakness or cracks in tlie soii TJie consistency ratings of sucti soils are based on penetrometer readings. TERMS CHARACTERIZING SOIL STRUCTURE Fissured — containing shrinkage cracks, frequently filled with fine sand or silt, usually more or less vertical Interbedded — composed of alternate layers of different soil types Calcareous — contoining 12 to 50 percent colcium carbonate Carbonate — containing more than 50 percent calcium carbonate Well graded — having wide range in groin sizes and substantial amounts of all intermediate particle sizes Poorly graded — predominately of one groin size, or having a range of sizes with some Intermediate size missing Terms used in ttiis report for describing soils according to ttieir texture or grain size distribution are in accordance witti the UNIFIED SOIL CLASSIFICATION SYSTEM, as described in Technical Memorandum No.3-35'^ Waterways Exp.Sta,3/53 PLATE. 112 102 92 ^ 82 72 I 62 O = 52 I 42 UJ GENERALIZED SUBSURFACE PROFILE TP4 •^li^ SANDSTONE :SANDY__^FORMATIONAL) & CLAY-SILT S.ILTY CLAY/ CLAYEY SAND GENERAL NOTES Data concerning subsurface conditions have been obtaii-j.ed at boring location only. Actual conditions at locations between borings may differ from the profiles shown 100 HORIZONTAL SCALE 112 102 m 5" < 82 72 62 52 42 o 3 Testing Engineers-San Diego GENERALIZED • SUBSURFACE PROFILE vk>b ^4d: 7092 Dote.- 3/2/87 Testing Engineers-San Diego UNIFIED SOIL CLASSIFICATION PLASTICITY CHART 60 SO 40 = 30 20 10 CH * V y OH and 1 /IH CL ML ind 0 / / ML ind 0 0 10 20 30 40 so 60 70 80 30 100 Liquid Liinit V > O O CM _ C O o </> £ 0 a> LU c z 5 1 I I ^ QC O < E O CJ o o .c e a> o 2 GROUP SYMBOL TYPICAL NAMES- GW Wfeil-groded gravels, gravel-sond mixtures, little or no fines GP Poorly graded gravels, gravel-sand mixtures, little or no fines GM Silty gravels, gravel- sand-silt mixtures GC Clayey gravels, gravel sand-cloy mixtures SW Well-graded sonds, gravelly sands, little or no fines SP Poorly graded sands, gravelly sands, little or no fines SM Silty sands, sand-silt mixture SC Clayey sands, sand- clay mixtures > O O cvi c o <o J: -I o iJ o Q e < _ Q: O CD w 1 " UJ o 2 £ o GROUP SYMBOL TYPICAL NAMES ML Inorganic silts and very fine sands, rock flour silty or clayey fine sands, or clayey silts with slight plasticity CL Inorganic clays of low to medium plasticity, gravelly cloys, sandy cloys, siity cloys, lean cloys QL Organic silts and organic silty cloys of low plasticity MH Inorganic silts, micaceous or diatomoceous fine sandy or silty soils, elastic silts CH Inorganic cloys of high plasticity, fat cloys OH Organic cloys of medium to high plasticity, organic silts Pt Peat and other highly organic soils NOTE: DGroup symbol presented in SYMBOL column on BORING LOG. 2) The A line is on empirical relationship estoblished by A. Casogronde. PLATE city of Carlsbad March 3, 1987 Palomar Airport Road Widening Job No. 7092 APPENDIX LABORATORY TEST DESCRIPTION LABORATORY TEST RESULTS City of Carlsbad Marcti 3, 1987 Palomar Airport Road Widening Job No. 7092 LABORATORY DESCRIPTION 1. MOISTURE DENSITY TESTS The field moisture content and dry density tests were performed on ring drive samples retained during the field investigation. The field moisture content was determined as a percentage of the dry unit weight. 2. EXPANSION Expansion tests were performed on representative samples at existing condition of density and moisture content. The samples were air dried and allowed to swell against a surcharge load of 150 pounds per square foot. city of Carlsbad Palomar Airport Road Widening March 3, 1987 Job No. 7092 LABORATORY RESULTS 1. Moisture Content And In-Place Density Tests Sample No. and Depth BHl @ 35 ft. BH2 @ 5 ft. BH3 @ 5 ft. BH3 @ 10 ft. BH4 @ 5 ft. BH5 % 10 ft. BH5 @ 20 ft. BH6 @ 20 ft. Field Dry Density (lbs. per cubic foot) 127.9 100.1 113.8 114.4 102.4 114.6 106.6 111.5 Field Moisture Content (percent) 7.6 5.1 15.2 14.8 20.0 14.9 18.8 12.9 PLATE A-1 city of Carlsbad March 3, 1987 Palomar Airport Road Widening Job No. 7092 2. Expansion Test Sample No. Expansion Potential and Depth Index Expansion TPS @ 3-4 ft. 32 Low BH3 (§ 5 ft. 62 Medium BH5 @ 10 ft. 65 Medium BH6 @ 10 ft. 7 Very Low PLATE A-2