HomeMy WebLinkAbout3187; KELLY DRIVE AT EL CAMINO REAL; MATERIAL LAB TEST REPORTS; 1986-02-27A I, 7AF # 'ORM 7 J P Testing Engineers -San Diego tpN A Division of United States Testing Company, Inc. 3467-Kurtz St., P.O. Box 80985, San Diego, Ca. 92138 (619) 225-9641 2948 Industry Street, Suite B, Oceanside, Ca. 92054 (619) 757-0248 LABORATORY NUMBER DATE 086-150 February 27, 1986. Job No.. 5024 City of Carlsbad, Engineering Dept. Attn: Mr. Pat Entazari 1200 Elm Avenue Carlsbad CA 92008 Project: Annual Material Testing Services Capital Improvement Program P.O. B-14426 Kelly Dri-ve and El Camino Real Traffic Signal Subject: Material ' sampled by Testing Engineers-San Diego.personnel and submitted to the laboratory on February 24, 1986, identified as: M/D No. 1 _Existing Class II Base Material, secured from trench on-Kelly Drive.. M/D No. 2 BroWn.sandy silty clay, secured from trench in the center of El Camino Real. Procedure: Moisture density relations of soil, tested-in accordance with ASTM-' D 1557,.Method A. Results: M/D No. 1 #1 #2 #3 Dry weight per cubic foot .132.3 136.2 134.3 Percent moisture 3.7 6.0 - 8.3 Maximum dry density, lbs./cu. ft. 136.5 Optimum moisture 6.5 M/D No.' 2 Dry weight per cubic foot 127.2 128.1 122.5 Percent moisture 8.2 10.7 12.8 Maximum dry density, lbs./cu. ft. - . --' 128.8 - Optimum moisture 10.0 TESTING ENGINEERS-S-AN DIEGO Review d boy: a Ken th M. Rowe North County Branch Manager 2) City of Carlsbad FORM 7 JP stin a Engineers -San Diego A Division of United Stat6s Testing Company, Inc. 3467 Kurtz St., P. 0. Box 80985, San Diego, Ca..-,92138 (619) 225-9641 2948 Industry Street, Suite B, Oceanside, Ca. 92054 (619) 757-0248 LABORATORY NUMBER DATE 086-150 February 27, 1986. Job No. 5024 City of Carlsbad, Engineering Dept. Attn: Mr. Pat Entazari 1200 Elm Avenue Carlsbad CA 92008 Project: Annual Material Testing Services Capital' Improvement Program P.O. B-1-4426 Kelly Drive and El Camino Real Traffic Signal Subject: Material sampled by Testing i Engineers-San Die go personnel and submitted to the-laboratory-on February 24'. 1986, identified as: M/D No. 1 Existing Class II Base Material, secured from trench on Kelly Drive. M/D No. 2 - Brown sandy silty clay, secured from trench in the center of El Camino Real. Procedure: Moisture density relations of soil, tested in accordance with.ASTM- D 1557, Method.A. Results: M/D No. 1 #1 #2 #3 Dry weight per cubic.f6ot 132 3. 136.2 134.3 Percent moisture 3:7 6.0 8.*3 Maximum dry density, lbs./cu. ft. - 136.5 Optimum moisture - 6.5 M/D No. 2 Dry weight per cubic foot 127.2 -128.1 122.5 Percent moisture 8.2 10.1 12.8 Maximum dry density, lbs./cu. ft. - 128.8 Optimum moisture 10.0 TESTING ENGINEERS-SAN DIEGO Revi: ew da bDy: 1 Ken th M. Rowe North CountykBranch Manager 2) City of Carlsbad Testina Enaineers -San Diego A Division of United States Testing Company, Inc. .04 3467 kurtz St., P. 0. Box 80985,San Diego, Ca. 92138 (619) 225-9641 2948 Industry Street, Suite B, Oceanside,. Ca. 92054 (619) 757-0248 DAILY RESULTS - IN PLACE DENSITY TESTS DATE OF TESTFebruary 24.25/1986 JOB DATA City of Carlsbad- Capitol Improvement P.O. B-14426 FILE. No 5024 PROJECT Kelly Dr. and El Cam.ino Dr. Traffic Signal LAB. No 086-151 DATE OF REPORT_ 2LL7j 8 6 CONTRACTOR TEST No. L 0 C A T 1 0 N PLIN C AC OPTIMUM MOIST. IN PLACE DRY MAX. DRY DENSITY PERCENT REL. COMP. PERCENT RELATIVE REMARKSI_ MOIST. DENSITY REQUIRED COMP. Electric trench Kel.ly Dr. 40.'W of El DOES NOT CONFORM 1 Camino,15'N of S curb @ subgrade 6.6 6.5 126.2 136.5 95.0 92.0 Electric trench Kelly Dr. 40'W of El . DOES NOT CONFORM 2 Camino,15'S on N curb @ subgrade 5.1 6.5* 126.1 136.5 95.0 92.0 Center of El Camino in electrical DOES NOT CONFORM 3. trench @ subgrade. 11.2 10.0 120.5 128.8 95.0 94.0 2/25 CONFORM 4 RETEST #3 6.9 10.0 125.2 128.8 -95.0- 97.0 5 RETEST #2 4.0 6.5* 133.9 136.5 95.0 98.0 CONFORM 6 RETEST #1 4.0' 6.5'. 134..2 1.3.6.5 95.0 98.0 CONFORM 2) City of Carlsbad P. Entazari THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM TESTS MADE BY TESTING ENGINEERS -SAN DIEGO. FOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL. : .- 0 jc TESTING ENGINEERS -SAN DIEGO R Er_ V 11 E WVV E DO B Y hunty B_r_a_n-c-h Manager Kenne h M. Rowe, North Testing Engineers -San Diego A Division of United states Testing Company, Inc.. 3467 Kurtz St., P.O. Box 80985, San Diego, Ca.'92138 (619) 225-9641 2948 Industry Street, Suite B, Oceanside, Ca. 92054 (619) 757-0248 DAILY RESULTS - IN PLACE DENSITY TESTS DATE OF TESTEebruary 24,2-5/1986 JOB DATA City of Carlsbad- Capitol Improvement P.O. B-14426 FILE No 5024 PROJECT Kelly Dr. and El Camino Dr. Traffic Signal' I-AB. No 086-151 DATE OF REPORT 2/27/86 CONTRACTOR TEST No. L 0 C A T 1 0 N IN PLACE OPTIMUM MOIST. IN PLACE DRY MAX. DRY DENSITY PERCENT REL. COMP.' PERCENT RELATIVE REMARKS MOIST. DENSITY REQUIRED COMP. Electric trench Kelly Dr. 40'W of El DOES NOT CONFORM 1 Camino,151N of S curb @ subgrade 6.6 6.5 126.2 95.0 92.0 Electric trench Kelly Dr. 40'W of El . DOES NOT CONFORM 2 Camino,15 1S on N curb @ subgrace 5.1 6.5 126.1 136.5 95.0 92.0 Center,of El Camino in electrical DOES NOT CONFORM 3 trench @ subgrade 11.2 10.0 120.5 128.8 95.0 94.0 2/25 4 - RETEST #3 6.9 10.0 125.2 .128.8 95.0 97.0 COMM, COMM 5 RETEST #2 4.0 6.5 133.9 136.5 95.0 98.0 6 RETEST #1 4.0 6.5 134.2 136.5 95.0 98. 0 CONFORM 2). City of Carlsbad. P. Entazari THE ABOVE TEST RESULTS AND CALCULATIONS CONSTITUTE THE REPORTING OF FACTUAL DATA DERIVED FROM TESTS MADE 13Y TESTING ENGINEERS-SAN DIEGO, OOLLOWING ASTM STANDARDS OR SPECIFIED PROCEDURES. THESE RESULTS SHOULD NOT BE INTERPRETED AS ENGINEERING OPINION OR JOB CONTROL. ic TESTING ENGINEERS-SAN DIEGO R E VV 11 EQ WVV E D BY Kenne h M. Rowe, North ~ounty'B_r_a_n--ch Manager