HomeMy WebLinkAbout3190; Rancho Santa Fe North Phase 2; Rancho Santa Fe North Phase 2; 2006-09-12Dudek i& Associates, Inc. 1645 So. Rancho Santa Fe Rd,. #202 San Marcos, CA 92078 September 12, 2006 Contract No.: 65808 SEP 1 4 2006 Attention: Mr. Jason Linsdau Subject: As-Graded Compaction Report Projeci: Rancho Santa Fe Road North - Phase 2 Carisbad. CA References: 1, 'Xlradiug Plam for Remcho Sonki Fc Road Phase 2, " dated November 7, 2003, prepared by Dokken Engineering. 2, "Structure Foundalion hn'e.sligalion. " dated July 2000. prepared by Geocon Inc. Dear Mr. Linsdau: In accordance with your request. Testing Engineers San Diego (T ESD) has conducted grading observafions and compaction testing during the road construction at the above referenced project site (see Figure I Site Location Map). Services described herein were provided by l ESD from June 2, 2004 to July 11.2006. A lepresentative ofthis office observed the grading of Rancho Santa Fe Road North in general accordance with the approved geotechnical report, plans- and specifications. Our construction monitoring consisted of the observation and testing ofa 5100 foot section ofthis 6 lane arterial street, from Station 244+00 to Station 295-100, This section of roadway contained £i 368 foot bridge over San Marcos Creek from Station 270+32 lo 274+00. Road construction for this projeci also included improvements on sections of San Elijo Road. La Costa Meadows Drive, Melrose Drive, Corintia Street, and 2 Vallecitos Water District Access Roads. The limits of compaction testing for these roads are summarized in Table I below. Table 1 Begin End Road Improvements Improvements (Station) (Station) — Rancho Santa Fe Road 244+00 295+00 San Elijo Road 97+76 99+40 La Costa Meadows Drive 10+00 14+00 m Melrose Drive 207+86 214+00 Corintia Street 10+00 12+15 VWD #1 1+00 3+15 m VWD #2 10+00 13+76 Summaries of laboratory and field compaction test results are provided in Appendix A, Tables 2 and 3. respectively. On site and import materials were used as fill. The fill was placed, compacted, and tested for compliance with a minimum 90% and 95% relative compaction requiremenL as applicable. Testing Engineers San Diego, Inc. A Bureau Veritas Company 7895 Convoy Court, Suite 18 San Diego, CA 92111 Main: (858) 715-5800 Fax; (858 715-5810 www. us. b ureau Veritas. com Dukek & Associates, Inc. Rancho Santa Fe Road North-Phase 2 Contract No.:65808 It should be noted that the precision of the field and laboratory maximum dry density test results are subject to variation inherent with testing procedures and heterogeneous material characteristics. Quantitative values of testing precision have been documented by the American Society of Testing and Materials. For example, results indicate the accuracy of the ASTM D-1557 test to be plus or minus 4 percent ofthe mean density. Based on this information, relative compaction results should be interpreted as approximate values subject to variations in lateral and vertical directions. Survey lines and elevations relative to grade modifications, final design grades, locations of various elements, etc., were established by others. Field Monitoring services provided by this office, consisting of visual observation of compaction operations and random in-place density test, are intended as assistance to the owner/client in monitoring apparent reasonable compliance with the project earthwork specifications. The presence of our field representative during the work progress did not involve any direct supervision of the contractor/subcontractor. Technical advice and suggestions were provided upon request based upon the results of the tests and observations. In any case, no warranty or responsibility for the contractor's performance is intended or implied. Based on the observations and testing made during construction by TESD representatives, it is our opinion that the roadway earthwork was constructed in general conformance with the approved project plans and specifications. If you should have any questions after reviewing this report, please do not hesitate to contact the undersigned at (858) 715-5800. Sincerely, Testing Engineers - US Labs. Nick Tracy, EIT Staff Engineer Van W. Olin, GE 2 Principal Geotechnical ^figfnccf' NTWOiimm Attachments: Figure 1: Site Location Map Appendix A: Table 2 and Table 3 Distribution : (6) Addressee •Includes copies for Caltrans submittal. SCHEMATIC ONLY - NOT A CONSTRUCTION DRAWING 1" = 800' (Approx) Ref: Google Earth NOTE: This figure may contain areas of color. TE-U.S. Labs cannot be responsible for any subsequent misinterpretation of the information resuH- ing from black and white reproductions of this figure. Testing Engineers - U.S. Labs, Inc. 7895 Convoy Court, Suite 18 San Diego, CA 92111 Tel: (858) 715-5800 Fax: (858) 715-5810 Title Site Location Map Project: Rancho Santa Fe Road North, Phase 2 Drwn: NJT Contract No: 65808 Date September, 2006 Figure: 1 m mm m Dudek & Associates Inc. Rancho Santa Fe Road North, Phase 2 Connect No.: 65808 TABLE2 RESULTS OF MAXIMUM DENSITY TESTS (ASTM-D-1557) m m SAMPLE # DESCRIPTION MAXIMUM DRY DENSITY (PCF) OPTIMUM MOISTURE CONTENT (%) 1 On-site: Orange brown silty SAND 133.5 2 On-site: Yellow-brown silty clayey 134.5 SAND w/gravel 3 On-site: Brown sandy CLAY 123.0 4 On-site: Brown silty SAND ] 31.0 5 On-site: Clayey SAND/Silty SAND 137.5 8 Import: Lt brown Med. Coarse SAND 132.5 9 Field Mix: SAND 133.5 10 Import: Yellow Brown SAND 134.0 11 Import: Light Brown SAND 116.0 12 Import: Medium Coarse SAND 132.5 14 On-site: Clayey SAND/Silty SAND 137.0 16 On-site: Brown Clayey SAND w/gravel 129.0 17 On-site: Olive Brown Clayey SAND 128.0 w/gravel 25 On-site: Brown Silty Sandy CLAY 121.5 26 On-site: Light Brown Silly SAND 121.5 27 Import: Silty SAND 125.5 30 On-site: Clayey GRAVEL 140.0 31 On-site: Silty SAND 132.0 32 Import: Poorly Graded SAND 135.0 33 On-site: Well Graded SAND 134.0 8.5 9.0 11.0 8.5 7.0 8.5 8.0 7.5 6.5 8.0 8.0 9.0 9.5 10.5 11.0 11.0 6.0 8.5 9.0 7.5 Dudek & Associates Inc. Rancho Santa Fe Road North, Phase 2 Contt-actNo.: 65808 m 34 On-site: Well Graded SAND 132.5 8.0 m m 35 Import: y/'CMB 122.0 11.5 m 38 Import: Class II AG 134.5 8.0 m 39 Import: Class 11 AG 143.0 6.5 m 46 Import: Class II AG 137.0 9.5 m 50 Import: Misc. Aggregate Base 134.0 6.0 m m 51 Import: Misc. Aggregate Base 135.0 7.0 m 61 On-site: Well Graded SAND 134.0 8.5 m 74 Import: BASE 138.0 6.5 m 75 Import: BASE 108.5 16.5 76 Import: BASE 140.5 7.0 -81 Import: BASE 121.5 11.0 96 Import: Rock Base 122.5 11.0 mm 97 Import: Clayey SAND w/gravel 124.0 U.O IMI 98 On-site: Clayey SAND 132.5 9.0 99 Import: Rock Base 143.5 6.5 m 100 On-site: Silty SAND/Clayey SAND 131.5 9.0 102 Import: Clayey SAND 130.5 9.5 i03 Import: Clayey SAND 134.0 8.0 m 104 On-site: Silty SAND 140.0 7.0 -105 On-site: Clayey SAND 137.0 7.5 m 107 On-site: Silty SAND 133.5 6.5 •1 108 On-site: Clayey SAND 139.5 6.5 m 109 On-site: Clayey SAND 138.5 7.0 m 110 Import: Clayey SAND 136.0 7.0 m Dudek & Associates Inc. Rancho Santa Fe Road North, Phase 2 Contract No. m 111 Import: Rock Base 118.5 12.0 119 On-site: Reddish/Dark Brown Silty SAND 123.5 10.5 m m 120 Import; Brovra Well-graded GRAVEL w/ silt and sand 137.0 6.0 m 123 Import: Brown Well-graded GRAVEL with sand 131.5 6.0 m m 125 Import: Brown Well-graded GRAVEL with sand 120.5 12.5 m m 126 On-site: Olive-Brown Silty SAND w/gravel 133.5 8.0 m 127 Import: Light Brown Silty SAND 133.0 9.5 m m 135 Import: Grayish-Brown well-graded GRAVEL w/silt 128.0 8.0 m m 136 Import: Grayish-Brown well-graded GRAVEL w/sand 129.5 8.0 m 137 Import: Dark Grayish-Brown well-graded GRAVEL w/silt and sand 129.5 8.5 m m 138 Import: Dark Gray well-graded GRAVEL w/ silt and sand 129.0 8.5 m m 144 Import: Brown poorly graded GRAVEL w/ silt and sand 138.0 4.5 m m 145 Import: Grayish-Brown well-graded GRAVEL w/ sih and sand 122.5 8.0 m 146 Import: AC Grinds 126.5 5.5 m m m m m m m m m m m TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 66808 Rancho Santa Fe Road North, Phase 2 Carlsbad. Califomia Test Jl Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks w 1 # Date R/orano^ Test Location Elev. (ft) Field Opt. Field IMax. Obt. Req. Non-Conform Remarks 2 1 6/2/2004 RSF S. bound, sta. 265+70, 60'W of CL 358 9.3% 8.5% 3 1 6/2/2004 RSF S. bound, sta. 265+80, 75'W of CL 360 10.1% 8,5% 4 1 6/3/2004 Sta. 269+80,84" E of CL 322 10.3% 8.5% 5 1 6/3/2004 Sta. 270+00,40' E of CL 324 9.8% 8.5% 6 1 6/3/2004 Sta. 270+10,20'E of CL 326 10 5% 8 5% 7 1 6/4/2004 Sta. 270+00 at CL 528 18.0% 8.5% 8 1 6/7/2004 Sta. 271+00,40'Wof CL 530 10.1% 8.5% 9 1 6/7/2004 Sta. 270+60,10'Wof CL 532 10.5% 8.5% 10 1 6/8/2004 Sta. 270+80,20'Wof CL 334 10.5% 8 5% 11 1 6/8/2004 Sta. 270+30 at CL 335 9.8% 8.5% 12 5 6/21/2004 RSF S. bound, Sta. 275+40, 40'Wof CL 334 9.1% 7.0% 13 5 6/21/2004 RSF S. bound, Sta. 275+60, 20" W of CL 336 8.8% 7 0% 14 2 6/22/2004 RSF Sta. 274+80,60'N of CL 322 9.2% 9.0% 15 2 6/22/2004 RSF Sta. 274+75,60' N of CL 324 9.4% 9.0% 16 5 6/22/2004 RSF S. bound, 275+00,40' W of CL 326 9.1% 7.5% 17 5 6/22/2004 RSF S. bound, 274+80,20'Wof CL 328 8.8% 7.5% 18 5 6/22/2004 RSF N. bound, Sta. 274+80, 20'Eof CL 326 10.1% 7.5% 19 5 6/23/2004 RSF N. bound, Sta. 275+00, 20' E of CL 328 10.4% 8.5% 20 5 6/23/2004 RSF N. bound, Sta. 275+10, 40'E of CL 330 10.0% 8.5% 21 2 6/23/2004 RSF Sta. 274+40,30'W of CL 324 9.1% 9.0% 22 2 6/23/2004 RSF Sta. 273+80, 10'Eof CL 326 9.9% 9.0% 23 5 6/23/2004 RSF N. bound 326 8.3% 7.5% 24 5 6/23/2004 RSF N. bound 328 8.7% 7.5% 25 5 6/23/2004 RSF N. bound 330 9.1% 7.5% 26 5 6/23/2004 RSF N. bound 332 9.5% 7.5% 27 5 6/23/2004 RSF N. bound 334 9.5% 7.5% 124.2 123.3 130.8 129.3 131.3 130.8 128.9 129.9 128.9 130.1 131.6 131.3 127.8 129.3 131.2 130.2 130.3 131.0 130.5 130.1 130.0 132.2 131.3 130.5 130.9 130.8 133.5 133.5 133.5 133.5 133.5 133.5 133.5 133.5 133.5 133.5 137.5 137.5 134.5 134.5 137.5 137.5 137.5 137.5 137.5 134.5 134.5 137.5 137.5 137.5 137.5 137.5 94% 93% 92% 98% 97% 98% 98% 97% 97% 97% 97% 96% 95% 95% 96% 95% 95% 95% 95% 95% 97% 97% 96% 95% 95% 95% 95% 90% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Confomn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Confomi grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading ff fffiititffVffi llllll 11 tiiiiaiiri ffl 111 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test it Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarlts fr 28 If 5 Date 6/24/2004 R.<5F Ria 97A+fin at r^i Elev. (ft) Field Opt. Field Max. Otrt. Req. Non-Conform Remarlts 29 30 30A 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 5 6/25/2004 RSF Sta. 275+00 at CL 338 8.7% 5 6/29/2004 RSF Sta. 274+50, 20' W of CL 329.5 9.5% 5 6/29/2004 RSF Sta. 274+50,20'Wof CL 329.5 8.7% 5 6/29/2004 RSF Sta. 274+10, 20' E of CL 331.5 91% 5 6/29/2004 RSF Sta. 274+20, 10' E of CL 333.5 9 5% 5 6/29/2004 RSF Sta. 274+30 at CL 335.5 9.5% 7/6/2004 Abbut. #1, Sta. 269+40, 50' E of CL 325.5 9.9% 7/6/2004 Abbut. #1, Sta. 269+50, 50' E of CL 327,5 9,5% 7/6/2004 Abbut. #1, Sta. 269+60, 50'Eof CL 329.5 10,3% 7/6/2004 Abbut. #1, Sta. 269+55, 45' E of CL 331.5 11.1% 7/6/2004 Abbut.#1, Sta. 269+55,45'E of CL 333.5 9,1% 7/7/2004 Abbut. #1, Sta. 269+80, 50'Eof CL 335.0 10,3% 7/7/2004 Abbut. #1, Sta. 270+60, 30'Wof CL 335,0 9.5% 7/13/2004 Abbut. #4(R), Sta. 273+00, 75' E of CL 325.0 10.3% 7/13/2004 Abbut. #4(R), Sta. 273+40, 60' E of CL 325.0 9.9% 7/14/2004 Abbut #4{R), Sta. 273+20, 40'E of CL 325,0 11.1% 7/14/2004 Abbut, #4(R), Sta. 273+60, 30' E of CL 327,0 10.7% 7/19/2004 RSF, Sla. 269+00, 10' W of CL 350.0 9,9% 7/19/2004 RSF, Sla. 269+50. 30'Wof CL 352.0 10,3% 7/19/2004 RSF. Sta. 268+50 at CL 354.0 9.9% 7/19/2004 RSF, Sta. 268+00, 10'WofCL 356,0 10,7% 7/19/2004 RSF, Sta. 267+50, 10' W of CL 358.0 10.3% 7/20/2004 RSF, Sta. 270+00 348,0 9,9% 7/20/2004 RSF, Sta. 270+25 350.0 10.7% 8/3/2004 RSF, Sta, 270+40, 22' E of CL 337.0 11,1% 8/3/2004 RSF, Sta. 271+00, 20' E of CL 337.O 10.7% 7.5% 7.9% 7.9% 7.5% 7.9% 7.5% 8.5% 8,5% 8.5% 8.5% 8.5% 8,5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 130.3 125.1 130.5 130.1 130.1 130.3 127.8 127,5 132,0 129.0 126.7 128.1 129,6 128.6 127.4 130.2 130.2 127,2 128.2 127.8 128.8 126.8 128,7 127.7 127.4 130,5 137.5 137.5 137.5 137.5 137.5 137.5 133.5 133,5 133.5 133.5 133.5 133,5 133.5 133.5 133.5 133,5 133.5 133,5 133.5 133.5 133,5 133.5 133.5 133.5 133.3 133.5 96% 95% 91% 95% 95% 95% 95% 96% 96% 99% 97% 95% 96% 97% 96% 95% 98% 98% 95% 96% 96% 96% 95% 96% 96% 96% 98% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 95% 95% 95% 95% Conform Conform Nonconform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading i9Firiiiff«iiff«ff«ff9iiiJiitiiiiiiifffiiii TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Test Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # c Oate Test Localion Elev. (ft) Field Opt. Field Max. Obt Req. Non-Conform Remarks 55 5 8/13/2004 RSF. Abbut #4®, Sta at' Wof CL 531.0 8.3% 7,0% 133,8 137.5 56 5 8/16/2004 RSF, Sta. 274+00,30'E of CL 329.0 7.1% 7,0% 132.5 137.5 57 5 8/16/2004 RSF. Sta. 273+90,40'E of CL 331.0 7.9% 7,0% 134.5 137.5 60 5 8/20/2004 RSF S. bound. STA 275+50 328,0 9.1% 7.0% 131.8 137.5 61 5 8/20/2004 RSF S. bound. STA 276+00 330.0 9.9% 7.0% 132.0 137,5 62 5 8/20/2004 RSF S, bound. STA 275+75 332,0 10.3% 7,0% 132,7 137,5 63 5 8/20/2004 RSF S, bound. STA 276+00 334,0 9,1% 7.0% 135.0 137,5 64 5 8/20/2004 RSF S. bound, STA 276+20 . 336.0 10.3% 7,0% 132.2 137.5 65 1 8/25/2004 RSF S. bound, STA 265+00,40'W of CL 365.0 10.7% 8,5% 124.9 133.5 66 1 8/24/2004 RSF S. bound, STA 264+75,60'Wof CL 367.0 9.5% 8.5% 125.5 133.5 67 1 8/24/2004 RSF S. bound, STA 265+00,60'W of CL 369.0 9.9% 8.5% 124,1 133.5 68 1 6/24/2004 RSFS. bound, STA 265+75,60'Wof CL 366.0 11,1% 8,5% 125,2 133.5 69 1 8/24/2004 RSF S. bound, STA 266+00,60' W of CL 367,5 10,3% 8.5% 124.2 133.5 70 2 9/1/2004 RSF Sta 275+50 20'E. of CL 332.0 10,7% 8.5% 129,7 135.5 71 2 9/1/2004 RSF Sta 275+75 20'E. of CL 334.0 9,9% 8.5% 131.2 135.5 72 2 9/1/2004 RSF Sta 275+50 20' E. of CL 336,0 10.3% 8,5% 131,5 135.5 73 2 9/1/2004 RSF Sta 276+50 10'E. of CL 338.0 9,5% 8.5% 130,6 135,5 74 2 9/1/2004 RSF Sta 265+30 10' W. of CL 366,0 9,1% 8,5% 130.3 135.5 75 2 9/1/2004 RSF Sta 267+00 40' W. ofCL 363,0 10.7% 8,5% 131,3 135,5 76 2 9/1/2004 RSF Sta 268+00 40* W. of CL 362,5 11,1% 8,5% 132,1 135,5 77 2 9/2/2004 RSF Sta 275+75 40'W. of CL 340.0 9,9% 8.5% 129.4 135.5 78 5 9/2/2004 RSF Sta 277+00 20' W, of CL 338.0 9.1% 7.0% 133.5 137.5 79 5 9/2/2004 RSF Sta 276+00 @ CL 342,0 9.5% 7.0% 132.5 137,5 80 2 9/2/2004 RSF Sta 277+00 40 W. OfCL 340,0 10.3% 8,5% 130,1 135,5 81 5 9/2/2004 RSF W. Choker Sta 276+00 344.0 9.9% 7,0% 133.9 137,5 82 2 9/2/2004 RSF Sta 278+00 20'W. of CL 338.0 11,1% 8.5% 130.1 135.5 96% 97% 96% 98% 96% 96% 97% 98% 96% 94% 94% 93% 94% 93% 96% 97% 97% 96% 96% 97% 97% 95% 97% 96% 96% 97% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 90% 90% 90% 95% 95% 95% 95% 90% 90% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading fl II 11 II II 11 II II 11 II II II II 11 ffl fl VI it TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Jl Sample Jl Test Test Localion Elev. (ft) Moisture Dry Densrty (pcf) Relative Comp. Conform Remarks ff 83 ff 2 Date Test Localion Elev. (ft) Field Opt. Field Max. Obt Req. Non-Conform Remarks 84 2 9/3/2004 RSF Sta 267+00 10' W. of CL 85 2 9/9/2004 RSF Sta 269+00 10'E, of CL 86 2 9/9/2004 RSF Sta 268+00 @ CL 87 2 9/9/2004 RSF Sta 267+00 @ CL 88 2 9/9/2004 RSF Sta 269+00 15'E. of CL 89 2 9/9/2004 RSF W. Choker Sta 265+50 90 2 9/9/2004 RSF W. Choker Sta 267+00 91 2 9/9/2004 RSF W. Choker Sta 268+00 92 5 9/13/2004 VWD Access Rd. 1 Sta 1+60 ^ 93 16 9/13/2004 RSF Sta 270+00 @ CL 94 16 9/13/2004 RSF Sta 270+00 @ CL 95 17 9/14/2004 Melrose Dr, Sta 210+00 96 17 9/14/2004 Melrose Dr. Sta 211 +00 97 17 9/14/2004 Melrose Dr. Sta 212+00 _ 98 17 9/14/2004 Melrose Dr. Sta 209+00 @ CL 99 2 9/21/2004 Abbut #1 L W. Wingwall BF 100 2 9/21/2004 Abbut #1 L W, Wingwall BF 101 2 9/21/2004 Abbut #1 L W. Wingwall BF 102 2 9/21/2004 Abbut #1 LW. Wingwall BF 103 16 9/23/2004 Abbut #1 L wall BF 104 16 9/23/2004 Abbut #1 L wall BF 105 16 9/23/2004 Abbut #1 L wall BF 106 16 9/23/2004 Abbut #1 L wall BF 107 16 9/23/2004 Abbut. #1 L wati BF 108 16 9/24/2004 Abbut. #4 L wall BF 109 16 9/24/2004 Abbut #4 L wall BF CL CL CL !CL 362.0 355.5 363,0 363.0 357,5 37.0 364.0 359.5 340.0 352.0 354.0 349.5 350,5 351,5 352.5 341,0 343,0 345.0 348.0 340.0 342.0 344.0 346,0 348,0 330,0 332.0 8.7% 9.9% 9,1% 10.7% 9.9% 10.7% 11.1% 10.3% 9,5% 10,3% 9.9% 11.1% 10.3% 9,9% 9.5% 9.1% 11,1% 9.9% 10.7% 10,7% 9,1% 8.7% 11,1% 10.3% 11,1% 10,3% 8,5% 8.5% 8.5% 8.5% 8.5% 8,5% 8,5% 8.5% 7,0% 8,0% 8.0% 8.5% 8.5% 8,5% 8.5% 8.5% 8.5% 8.5% 8,5% 9.0% 9,0% 9,0% 9.0% 9,0% 9.0% 9,0% 129.8 131,0 130,9 130.9 132.8 131.7 132.4 130.0 130.9 124.2 127,7 123.2 122,7 125.1 124.4 129.1 130.5 133.6 129.4 124,3 128.5 127.4 125.4 124.2 128,2 127.0 135.5 135,5 135.5 135.5 135,5 135,5 135.5 135.5 137,5 130.5 130.5 128.0 128,0 128,0 128.0 135.5 135,5 135,5 135,5 129.0 129.0 129,0 129.0 129.0 129.0 129,0 96% 97% 97% 97% 98% 97% 98% 96% 95% 96% 98% 96% 96% 98% 97% 95% 96% 99% 95% 96% 100% 99% 97% 96% 99% 98% 90% 90% 95% 95% 90% 95% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading <iiiitiifiiiffifliliiiiiiiifiilffiiiffiffi TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Sanla Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Tost Test Localion AUU..t JIA 1 II nr- Elev. (fl) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff # IR Dale onAnnnA Test Localion AUU..t JIA 1 II nr- Elev. (fl) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 111 16 9/24/2004 Abbut #4 L wall BF 336.0 9,9% 112 16 9/24/2004 RSF Sta 264+50 10'W. of CL 365.5 9.1% 113 16 9/24/2004 RSF Sta 264+7510' W. of CL 367.5 9.5% 114 16 9/27/2004 Abbut #1 L W. Wingwall BF 346.0 11.9% 115 16 9/27/2004 Abbut #1 L W. Wingwall BF 348,0 10.3% 116 16 9/27/2004 Abbut #1 L W, Wingwall BF 350.0 10,7% 117 16 9/27/2004 Abbut #1 L W. Wingwall BF 352.0 11.1% 118 16 9/27/2004 RSF Sta 264+7510' W. of CL 370,0 10.3% 119 16 9/27/2004 RSF Sta 264+5010' W, of CL 372,0 9.9% 120 16 9/27/2004 RSF Sta 264+5010'W. of CL 374,0 10,7% 121 5 9/28/2004 Abbut #4R wall BF 10'N. of N, wall face 332.0 8.3% 122 5 9/28/2004 Abbut #4R wall BF 15'N. of N, wall face 334.0 9.5% 123 5 9/28/2004 Abbut #4R wall BF 10'N. of N. wall face 336,0 9,9% 124 5 9/28/2004 Abbut #4R wall BF 20'N, of N, wall face 338,0 9,1% 125 16 10/1/2004 RSF Sta 275+00 30'E. ofCL 340,0 10.7% 126 16 10/4/2004 Abbut #4R wall BF 331.0 10.7% 127 16 10/4/2004 Abbut. #4R wall BF 333.0 10.3% 128 16 10/4/2004 Abbut #4R wall BF 335.O 11.1% 129 16 10/4/2004 Abbut #4R wail BF 337.O 9.5% 130 16 10/4/2004 RSF W. Choker Sta 263+50 366,5 9,9% 131 16 10/5/2004 Abbut #4R wall BF 339.O 11.1% 132 16 10/5/2004 Abbut. #4R wall BF 341.0 10,7% 133 16 10/5/2004 RSF W. Choker Sta 263+50 378,0 9,9% 134 16 10/5/2004 RSF W. Choker Sta 263+50 380.0 9.1% 135 16 10/5/2004 RSFW. Choker Sta 263+50 382.0 10,3% 136 16 10/5/2004 RSF W. Choker Sta 263+50 384,0 11.1% 9.0% 9.0% 9,0% 9.0% 9.0% 9.0% 9,0% 9.0% 9.0% 9.0% 7,0% 7,0% 7,0% 7,0% 9.0% 9.0% 9.0% 9.0% 9,0% 9.0% 9.0% 9,0% 9.0% 9.0% 9.0% 9,0% 126,6 120.5 121.7 123.2 127.0 125.2 124.2 121,5 124,9 122.5 132.3 131.9 133,0 132,0 125.7 124,6 123.8 123.4 126.8 122,9 124.3 123.4 122.7 121.3 117.9 122,6 129,0 129,0 129,0 129.0 129.0 129.0 129,0 129.0 129,0 129,0 129.0 137.5 137.5 137,5 137,5 129,0 129.0 129.0 129.0 129.0 129.0 129.0 129.0 129.0 129.0 129.0 129,0 98% 98% 93% 94% 96% 98% 97% 96% 94% 97% 95% 96% 96% 97% 96% 97% 97% 96% 96% 98% 95% 96% 96% 95% 94% 91% 95% 95% 95% 90% 90% 95% 95% 95% 95% 90% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 95% 95% 90% 90% 90% 90% Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Confonn Confomn Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Confonn Confonn Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading t I 1 c] r? ffl 11 II II IJ II il 11 fl II 11 ffl ffl 11 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Sampie # Test Date Test Location Elev. (ft) Moisture Dry Densiiy (pcf) Relative Comp. Conform Remarks Remarks Fleld Opt. Field Max. Obt. Req. Non-Conform 137 16 10/5/2004 Abbut #4R wall BF 343.0 138 16 10/6/2004 RSF Sta 263+00 @ CL 378.5 139 16 10/6/2004 RSF Sta 263+50 @ CL 380,5 140 16 10/6/2004 RSF Sta 263+50 @ CL 381,0 141 16 10/6/2004 RSF Sta 264+00 @ CL 380.0 142 16 10/7/2004 RSF Sta 263+00 20' W, of CL 380,0 143 16 10/7/2004 RSF Sta 263+00 20' W, of CL 382.0 144 16 10/7/2004 RSF Sta 262+80 20' W, of CL 383.0 145 16 10/13/2004 RSF Sta 277+00 15'E. OfCL 339,5 146 16 10/13/2004 RSF Sta 278+50 15'E. ofCL 336,0 147 16 10/14/2004 RSF Sta 262+50 30' W.. of CL 382,0 148 16 10/14/2004 RSF Sta 262+75 @ CL 384.0 149 16 10/15/2004 RSF Sta 262+25 @ CL 382,5 150 16 10/15/2004 RSF Sta 262+25 35' W. of CL 383.5 151 16 10/25/2004 RSF Sta 262+00 @ CL 384.0 152 16 10/25/2004 RSF Sta 261+75 35' W. of CL 386.0 153 30 10/26/2004 RSF W, Choker Sta 261+75 384.0 154 30 10/26/2004 RSF W. Choker Sta 262+00 386,0 155 30 10/26/2004 RSF W. Choker Sta 261 +75 388,0 156 30 10/26/2004 RSF W. Choker Sta 262+00 390.0 157 30 11/2/2004 RSF Sta 262+50 @ CL 385.0 158 30 11/2/2004 RSF Sta 262+00 @ CL 387.0 159 30 11/2/2004 RSF Sta 261+50 @CL 389.0 160 30 11/2/2004 RSF Sta 261+20 35' E. ofCL 391.0 161 30 11/3/2004 RSF Sta 262+00 35' E, of CL 388.5 162 30 11/3/2004 RSF Sta 261+50 35' E. ofCL 393.5 163 30 11/3/2004 RSF Sta 262+50 35' E. of CL 385.0 9.5% 10,3% 11.1% 9.9% 10,7% 9.1% 10.7% 10,3% 9.5% 10.7% 9,1% 9.9% 11,1% 10.7% 11.5% 11,1% 8.3% 9.1% 8.7% 7,9% 8,3% 9,1% 8.7% 8,7% 7,5% 9,5% 9,1% 9.0% 9,0% 9,0% 9,0% 9.0% 9.0% 9.0% 9.0% 9.0% 9,0% 9,0% 9.0% 9.0% 9.0% 9.0% 9.0% 6.0% 6.0% 6.0% 6,0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 125,7 120.6 122.4 123,5 120,1 121.1 120,3 117.8 119.6 120.3 119,3 119.9 120.6 120,1 122,4 121,4 129,5 130.2 128.4 130.9 128.3 128.7 130.7 128,3 133.1 133.6 132,6 129.0 129.0 129.0 129,0 129.0 129,0 129,0 129.0 129.0 129,0 129.0 129.0 129.0 129.0 129,0 129.0 140.0 140.0 140.0 140.0 140.0 140.0 140,0 140.0 140.0 140,0 140,0 97% 93% 95% 96% 93% 94% 93% 91% 93% 93% 92% 93% 93% 93% 95% 94% 93% 93% 92% 94% 92% 92% 93% 92% 95% 95% 95% 95% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% Conform Conform Conform Conform Confomi Conform Conform Conform Confonn Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Confonn Conform Confomi Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading fl li II II II fl II II II II fl fl II ffl ff ffl ffl 11 ff« TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test JI Sample Jl Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff ff 7n Date 11 nnnnA Test Location Elev. (ft) Field Opt. Field 1 Max. Obt. Req. Non-Conform Remarks 165 30 11/4/2004 RSF Sta 261+50 20' W. of CL 166 30 11 /4/2004 RSF Sta 262+50 20' W, of CL 167 30 11/4/2004 RSF Sta 262+00 20' W, of CL 168 30 11/5/2004 RSF Sta 261+00 25' W. of CL 169 30 11/5/2004 RSF Sta 260+75 30' W. of CL 170 30 11/5/2004 RSF Sta 261+00 @ CL 171 30 11/10/2004 RSF Sta 261+25 @CL 172 30 11/10/2004 RSF Sta 261+00 30' W. of CL 173 30 11/10/2004 RSF Sta 261+50 @ CL 174 30 11/12/2004 Abbutment #1 R wall BF 175 30 11/12/2004 Abbutment #1 R wall BF 176 30 11/12/2004 Abbutment #1 R wall BF 177 30 11/12/2004 Abbutment #1 R wall BF 178 30 11/12/2004 Abbutment #1 R wall BF 179 30 11/12/2004 Abbutment #1 R wall BF 180 30 11/15/2004 Abbutment #1 R wall BF 181 30 11/15/2004 RSF Sta 260+25 20' E, of CL 182 30 11/15/2004 RSF Sta 260+30 @ CL 183 30 11/16/2004 RSF Sla 260+25 35'E. of CL 184 30 11/18/2004 RSF Sta 260+00 @ CL 185 30 11/18/2004 RSF W. choker Sta 260 186 30 11 /22/2004 RSF W. choker Sta 260 187 30 11/24/2004 RSF Sta 259+75 35' E. of CL 188 30 11/24/2004 RSF Sta 260+00 30'E. Of CL 189 30 11 /24/2004 RSF Sta 259+75 @ CL 190 30 11/29/2004 Abbutment #1 L approach 392,0 385.0 387.0 390.0 392.0 392.0 392.0 394,0 392.5 340.0 342.0 344.0 346.0 348.0 350,0 351,0 394.5 396,5 398.5 397.0 399.0 400.0 398,0 400.0 400.0 348,0 7.9% 8,7% 9,1% 9.1% 7.5% 8.3% 9,5% 9,1% 9.5% 8.3% 9.9% 9.5% 9.1% 8.3% 7,9% 9,1% 8.7% 7.9% 9.1% 9,9% 9.1% 10,3% 8.7% 9.9% 8.3% 9,1% 6.0% 6.0% 6,0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6,0% 6.0% 6.0% 6,0% 6,0% 6,0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 128.5 131.0 132.5 132.4 132.1 132.5 129.9 129.1 128.4 135.1 134.8 134.3 133.9 134.7 134.5 133.4 134.0 130.7 130.8 134.8 134.8 133.9 134.4 134,5 134.9 135.2 140.0 140.0 140,0 140.0 140.0 140,0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 94% 92% 94% 95% 95% 94% 95% 93% 92% 92% 97% 96% 96% 96% 96% 96% 95% 96% 93% 93% 96% 96% 96% 96% 96% 96% 97% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 95% 95% 95% 95% 95% 95% 90% 90% 90% 90% 90% 90% 95% 90% 90% 90% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Confonn Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading 19 II il II li II 11 ffl 11 ffl ffl ffl (1 ffl ffl 11 11 11 ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Test Localion Elev. (ft) 191 30 11/29/2004 Abbutment #1 L approach 350.0 192 30 11/29/2004 Abbutment #1 L approach 352.0 193 30 11/30/2004 Abbutment #4 L approach 340.0 194 30 11/30/2004 Abbutment #4 L approach 342.0 195 30 11/30/2004 Abbutment #1 L approach 350.0 196 30 11/30/2004 RSF Sta 259+50 35' E. of CL 402.0 197 30 11/30/2004 RSF Sta 259+25 30' E. of CL 404.0 198 30 12/1/2004 Abbutment #1 L approach 353,0 199 30 12/1/2004 Abbutment #4 L approach 343.0 200 30 12/9/2004 RSF W, Choker Sta 260+00 402.0 201 30 12/9/2004 RSF Sta 259+50,20W. CL 401.0 202 30 12/9/2004 RSF W. Choker Sta 259+50 402.0 203 30 12^/2004 RSF W. Choker Sta 259+50 404.0 204 30 12/9/2004 RSF Sta 259+00 @ CL 405.0 205 30 12/9/2004 RSF Sta 260+00 20' W. of CL 399.5 206 30 12/9/2004 RSF Sta 260+50 20' W. of CL 396.0 207 30 12/10/2004 RSF Sta 258+50 20' E. of CL 403,0 208 30 12/10/2004 RSF Sta 258+50 20" W. of CL 403,0 209 30 12/10/2004 RSF Sta 258+25 20' E. of CL 405.0 210 30 12/10/2004 RSF Sta 258+25 20' W. of CL 405.0 211 30 12/10/2004 RSF W. Choker Sta 258+50 406,0 212 30 12/13/2004 RSF W. Choker Sta 258+00 406,0 213 30 12/14/2004 RSF W. Choker Sta 258+50 407.5 213a 30 12/14/2004 RSF W. Choker Sta 258+50 407.5 214 30 12/14/2004 RSF Sta 258+00 @ CL 407,0 215 30 12/14/2004 RSF Sta 257+75 30' W. of CL 408.0 216 30 12/16/2004 RSF Sta 258+00 50' E. ofCL 408,0 fl li 11 11 il il ffl ffl Mois ture Dry Density (pcf) Relative Comp. Conform Non-Conform Field Opt Field 1 Max. Obt Req. Conform Non-Conform 8,3% 6,0% 135.5 140,0 97% 95% Conform 8,7% 6,0% 133,5 140.0 95% 95% Conform 9.9% 6,0% 135.0 140.0 96% 95% Conform 9.1% 6,0% 135.4 140.0 97% 95% Conform 9.5% 6.0% 133.5 140,0 95% 95% Conform 9.9% 6.0% 132.0 140.0 94% 90% Conform 10.3% 6.0% 134.9 140.0 96% 95% Conform 9.1% 6.0% 135.9 140.0 97% 95% Conform 9,5% 6.0% 134.5 140.0 96% 95% Conform 10,3% 6,0% 135.1 140.0 97% 95% Conform 9,1% 6,0% 135,5 140.0 97% 95% Conform 10.3% 6-0% 134,1 140.0 96% 95% Conform 9.9% 6.0% 133.8 140.0 96% 95% Conform 10.7% 6,0% 133.8 140.0 96% 95% Conform 8.7% 6,0% 135,1 140.0 97% 95% Conform 9,1% 6.0% 135,3 140.0 97% 95% Conform 9,9% 6,0% 133,5 140.0 95% 90% Conform 10.3% 6,0% 130.8 140.0 93% 90% Conform 9.5% 6.0% 135.4 140.0 97% 90% Conform 8.7% 6,0% 137.2 140,0 98% 90% Confonn 8,3% 6.0% 132.7 140,0 95% 90% Conform 7.9% 6.0% 134.8 140.0 96% 90% Conform 8.3% 6.0% 124.2 140.0 89% 95% Nonconform 9,1% 6.0% 136.8 140.0 98% 95% Conform 9.5% 6.0% 133.6 140.0 95% 90% Conform 9,1% 6.0% 132.6 140,0 95% 90% Conform 8,3% 6.0% 135.8 140,0 97% 90% Conform 1 1 1 1 1 1 1 i 1 1 1 111 Remarks grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading retest #213 grading grading grading i 1 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: PnDject Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Tost Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Confor Test # Sample # Test Date Tost Location Elev. (ft) Field Opt. Field Max. Obt. Req. Conform Non-Confor 217 30 12/16/2004 RSF Sta 257+75 @ CL 408.0 9,1% 6.0% 134.2 140.0 96% 90% Conform 218 30 12/16/2004 RSF Sta 257+75 40' E,, of CL 410.0 9.9% 6.0% 132.0 140.0 94% 90% Conform 219 30 12/16/2004 RSF W. Choker Sta 258+00 408,0 8.7% 6.0% 135,1 140,0 97% 90% Conform 220 30 12/16/2004 RSF W. Choker Sta 258+00 410,0 10.3% 6.0% 134.3 140.0 96% 90% Conform 221 30 12/16/2004 RSF Sta 258+00 60' E. ofCL 410.0 9,9% 6.0% 134.9 140.0 96% 90% Conform 222 30 12/27/2004 RSF Sta 257+00 @ CL 413.0 10,7% 6.0% 134.7 140.0 96% 90% Conform 223 30 12/27/2004 RSF Sta 257+25 25' E. of CL 415.0 9.1% 6.0% 134.8 140.0 96% 95% Conform 224 30 12/27/2004 RSF Sta 257+50 40' E. ofCL 415,0 8.7% 6.0% 133.6 140.0 95% 95% Conform 225 30 12/27/2004 RSF Sta 257+00 35' E. of CL 417.0 10.3% 6.0% 133,8 140,0 96% 95% Confonn 226 30 2/2/2005 RSF Sta 260+00,30^ CL 399,0 9.1% 6.0% 135,1 140.0 97% 95% Conform 227 30 2/2/2005 RSF Sta 261+25 30'W, CL 391,5 8.7% 6.0% 133.7 140.0 96% 95% Conform 228 30 2/2/2005 RSF Sta 259+75 20'W, CL 400.0 10,3% 6.0% 133.0 140.0 95% 95% Conform 229 30 2/2/2005 RSF Sta 258+75 40'W, CL 404.5 9,5% 6.0% 134.9 140,0 96% 95% Conform 230 30 2/2/2005 RSF Sta 262+00 40'W. CL 386,5 8,3% 6.0% 137.1 140.0 98% 95% Conform 231 30 2/4/2005 RSF SB LT Choker Sta 257+00 408,0 8.3% 6,0% 134.8 140.0 96% 90% Conform 232 30 2/4/2005 RSF SB LT Choker Sta 257+50 408.5 9.9% 6.0% 133.7 140,0 96% 95% Conform 233 30 2/4/2005 RSF SB Sta 261+50 30'LT of CL 390.5 9,1% 6.0% 135,7 140,0 97% 95% Conform 234 30 2/9/2005 RSF SB Sta 263+50 45' LT of CL 377.0 8,7% 6.0% 134,5 140,0 96% 95% Conform 235 30 2/9/2005 RSF SB Sta 263+75 20' LT of CL 378.0 7,9% 6.0%, 133.8 140,0 96% 95% Conform 236 30 3/14/2005 RSF SB Sta 257+50 50' LT of CL 408,0 7,9% 6.0% 132,1 140,0 94% 90% Conform 237 30 3/14/2005 RSF SB Sta 257+00 20' LT of CL 410.0 8.7% 6,0% 132.1 140.0 94% 90% Conform 238 30 3/15/2005 RSF Sta 269+00 27' LT, of CL 342.0 9.1% 6.0% 135.6 140.0 97% 95% Conform 239 30 3/15/2005 RSF Sta 269+00 27' LT, of CL 344.0 7.9% 6.0% 135.0 140.0 96% 95% Conform 240 30 3/15/2005 RSF Sta 269+00 27' LT. of CL 346.0 8,7% 6.0% 134.9 140.0 96% 95% Conform 241 30 3/15/2005 RSF Sta 269+00 27' LT. of CL 348.0 8.3% 6.0% 135.8 140.0 97% 95% Conform 242 30 3/15/2005 RSF Sta 269+00 27' LT. of CL 350.0 9.1% 6.0% 133.6 140.0 95% 95% Confonn 243 30 3/15/2005 RSF Sta 269+00 27' LT. of CL 352.0 8,7% 6.0% 136.4 140.0 97% 95% Conform i. 1 1 1 1 1 1 1 f a 1 ff f 1 1 1 1 1 i i 1 1 ff 1 ff 1 1 i 1 1 Remarks grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Sanla Fe Road North, Phase 2 Carlsbad, California Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Confonn Remarks # # Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 245 30 3/15/2005 RSF Sta 269+00 27'LT. of CL 354.0 7,5% 6,0% 246 30 3/16/2005 RSF Sta 256+00 25' LTofCL 416.5 10.3% 6,0% 246a 30 3/16/2005 RSF Sta 256+00 25' LTofCL 416.5 9.9% 6.0% 247 30 3/16/2005 RSF Sta 257+00 @ CL 412.5 8.3% 6.0% 248 30 3/16/2005 RSF Sta 256+50 @ CL 415,5 7,9% 6.0% 249 30 3/22/2005 RSF Sta 255+50 30' LT of CL 419.0 8.7% 6.0% 250 30 3/24/2005 RSF Sta 255+50 50' ofCL 421.0 8.7% 6.0% 251 30 3/29/2005 RSF Sta254+75 40'LT of CL 426.0 9.5% 6.0% 252 30 3/30/2005 RSF Sta 256+50 20'RT of CL 418.5 8.7% 6.0% 253 30 3/30/2005 RSF Sta 255+50 @ CL 422.5 9,1% 6.0% 254 30 3/31/2005 RSF Sta 254+00 50'LT CL 429.5 8,7% 6,0% 255 30 3/31/2005 RSF Sta 254+50 25'of CL 431.5 9.5% 6.0% 256 30 3/31/2005 RSF Sta 253+75 60' LT ofCL 432.0 9,1% 6,0% 257 30 4/1/2005 RSF Sta 253+00 40'LT Of CL 434.5 7.9% 6,0% 258 30 4/1/2005 RSF Sta 253+50 50'LT of CL 436,5 9.1% 6.0% 259 39 4/15/2005 Melrose NB Sta 212+50 45' RT of CL 1 st AB 8.3% 6.5% 260 39 4/15/2005 Melrose NB Sta 211+00 25' RT of CL 1 st AB 8.7% 6.5% 261 39 4/15/2005 Melrose NB Sta 209+50 50'RT of CL IstAB 8.3% 6.5% 262 39 4/15/2005 Melrose SB Sta 209+0015'RT of CL IstAB 7.9% 6.5% 263 39 4/15/2005 Melrose SB Sta 210+50 20'LT of CL IstAB 7.5% 6.5% 264 39 4/15/2005 Melrose SB Sta 211+00 50' LT of CL IstAB 9.1% 6.5% 265 39 4/15/2005 Melrose SB Sta 212+00 @ CL 1st AB 8.7% 6.5% 266 39 4/18/2005 Melrose NB Sta 209+50 30' RT of CL 2ND AB 9.5% 6.5% 267 39 4/18/2005 Melrose NB Sta 211+00 50' RT of CL 2ND AB 7.9% 6.5% 268 39 4/18/2005 Melrose NB Sta 212+50 30' RT of CL 2ND AB 8.3% 6.5% 269 39 4/18/2005 Melrose SB Sta 210+00 @ CL 2ND AB 9.1% 6.5% 135.8 135.8 125,0 131.5 133.8 132.6 132.4 132.8 132.8 133.5 135.1 134.9 133.6 134.6 135.5 134.1 138.2 137,1 138.7 137,8 137,8 136.5 136.9 138.4 137.9 136.7 139.6 140.0 140.0 140.0 140.0 140.0 140,0 140,0 140.0 140.0 140.0 140.0 140,0 140.0 140.0 140.0 140.0 143.0 143.0 143.0 143,0 143.0 143.0 143.0 143.0 143.0 143.0 143.0 97% 97% 89% 94% 96% 95% 95% 95% 95% 95% 97% 96% 95% 96% 97% 96% 97% 96% 97% 96% 96% 95% 96% 97% 96% 96% 98% 90% 90% 90% 90% 90% 90% 90% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Confomi Nonconform Confonn Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading retest of 246 grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading II 11 il 11 11 II II il II II II 11 li ffl fl fl ffi (1 il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. Caljfornia Test Sample Test Test Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Confonn Remarks # # Date Test Localion Elev. (ft) Field Opt Fleld Max. Obt. Req. Non-Conform Remarks 6.5% 137.1 271 39 4/19/2005 Melrose NB Sta 209+50 RT CG BG 8.7% 6.5% 136.8 272 39 4/19/2005 Melrose NB Sta 210+00 Med. CG BG 9.1% 6.5% 138.3 273 39 4/19/2005 Melrose NB Sta 210+80 RT CG BG 9.5% 6.5% 136.4 274 39 4/19/2005 Melrose NB Sta 211+50 Med. CG BG 8.3% 6.5% 139.3 275 39 4/19/2005 Metrose NB Sta 212+50 RT CG BG 7.9% 6,5% 137,7 276 39 4/19/2005 Melrose SB Sta 210+00 Med. CG BG 8.7% 6,5% 136,7 277 39 4/19/2005 Melrose SB Sta 211+50 Med, CG BG 9,1% 6.5% 137.6 278 30 3/29/2005 Melrose SB Sta 209+00 LT CG BG 7.9% 6.5% 137.3 279 39 4/20/2005 Melrose SB Sta 210+50 LT CG BG 8.7% 6.5% 136.2 280 31 4/21/2005 Melrose detour Sta 210+00 85'LT of CL SG 10.7% 8.5% 128.3 281 39 4/22/2005 Melrose SB Sta 211 +00 40'LT of CL 2ND AB 9.1 % 6.5% 137,8 282 39 4/25/2005 Melrose SB Sta 211 +00 30'LT of CL BG 9.5% 6.5% 139.6 283 39 4/25/2005 Melrose detour Sta 212+0010'RT Of CL BG 9.5% 6.5% 138.6 284 39 4/25/2005 Melrose NB Sta 213+50 30' RT of CL BG 9.5% 6.5% 137.8 285 AC 4/29/2005 Melrose short term detour Sta 214+00 AC 141.6 286 AC 4/29/2005 Melrose short term detour Sta 213+00 AC 142.8 287 AC 4/29/2005 Melrose short term detour Sta 212+00 AC 143.0 288 AC 4/29/2005 Melrose short term detour Sta 211 +00 AC 145.0 289 AC 4/29/2005 Melrose short term detour Sta 210+00 AC 142.3 290 AC 4/29/2005 Melrose short term detour Sta 209+00 AC 144.0 291 AC 4/29/2005 Melrose short term detour Sta 210+50 AC 143.5 292 AC 4/29/2005 Melrose short term detour Sta 211+50 AC 144.6 293 AC 4/29/2005 Melrose short term detour Sta 212+50 AC 142.9 294 AC 4/29/2005 Mefrose short term detour Sta 213+50 AC 143.0 295 50 5/20/2005 Retaining wall bf at Melrose Sta 10+10 354.5 7.9% 6,0% 126,3 296 50 5/20/2005 Retaining wall bf at Melrose Sta 11+50 364,5 8,7% 6.0% 126.9 143.0 143.0 143.0 143.0 143,0 143,0 143.0 143.0 143.0 143.0 132,0 143,0 143,0 143.0 143.0 146.6 146.6 146.6 146.6 146.6 146.6 146,6 146.6 146.6 146.6 134,0 134,0 96% 96% 97% 95% 97% 96% 96% 96% 96% 95% 97% 96% 98% 97% 96% 97% 97% 98% 99% 97% 98% 98% 99% 97% 98% 94% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading f i II ri II II fl li 11 II II fi (1 ffl ffl 11 11 11 il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Jl Sample Test Test Location Dataininn ia(4tl i* RJiAl^A«A A f\ • cr% Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 997 ff •^^ Dale Test Location Dataininn ia(4tl i* RJiAl^A«A A f\ • cr% Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 31 38 38 39 39 39 39 39 39 38 39 39 30 30 30 51 30 51 51 31 31 39 39 39 39 39 5/20/2005 Retaining wall bf at Melrose Sta 11+50 FG 10.7% 5/24/2005 Melrose NB median curb/gutter Sta 213+50 BG 9.9% 5/24/2005 Melrose SB median curb/gutter Sta 213+50 BG 8.3% 5/24/2005 Melrose NB median curti/gutter Sta 212+75 BG 9.1% 5/24/2005 Melrose NB median curtj/gutter Sta 212+75 BG 7.9% 5/24/2005 Melrose NB median curtj/gutter Sta 212+50 BG 9.5% 5/24/2005 Melrose NB median curb/gutter Sta 210+50 BG 7.1 % 5/24/2005 Melrose NB median curb/gutter Sta 210+50 BG 8.3% 5/24/2005 Melrose NB median curia/gutter Sta 210+50 BG 7.5% 5/24/2005 Melrose NB median curb/gutter Sta 210+00 BG 9.9% 5/24/2005 Melrose NB median curb/gutter Sta 213+80 BG 8,5% 5/24/2005 Melrose NB median curb/gutter Sta 213+50 BG 6.7% 5/25/2005 RSF Southboud LT Choker Sta 268+50 359.0 9.1% 5/25/2005 RSF Southboud LT Choker Sta 265+50 370.0 8.3% 5/25/2005 RSF Southboud LT Choker Sta 262+50 387,0 7.5% 5/26/2005 RSF SB LT Choker Sta 269+00 FSG 8,3% 5/26/2005 RSF SB LT Choker Sta 267+00 FSG 9.1 % 5/26/2005 RSF SB LT Choker Sta 266+00 FSG 8,6% 5/26/2005 RSF SB LT Choker Sta 264+00 FSG 9.1 % 5/27/2005 Melrose SB Sta 210+00 80'W of CL 347,5 10,7% 5/27/2005 Melrose SB Sta 209+50 80'W of CL 349,5 10.3% 5/31/2005 Melrose Sta 213+00, 20'Wof CL SG 8.3% 5/31/2005 MetroseSta212+00.20'WofCL SG 7.9% 5/31/2005 Melrose Sta 213+00,40'W OfCL SG 8,7% 6/1/2005 Melrose NB Sta 213+00 BG 9.1% 6/1/2005 Melrose NB Sta 211+00 BG 8,3% 8.5% 8.0% 8.0% 6.5% 6.5% 6,5% 6.5% 6.5% 6.5% 8,0% 6.5% 6.5% 6.0% 6.0% 6.0% 6.5% 6.0% 6.5% 6.5% 8.5% 8.5% 6.5% 6.5% 6.5% 6,5% 6.5% 125.6 130.3 129.5 137.1 137.4 137.3 136,9 139.2 137.2 130.0 138.2 137.0 135.1 134.9 135.1 128.5 133.8 128.2 129.2 126.1 126.7 137.3 137.3 137.2 138.4 136.9 132.0 134.5 134.5 143.0 143.0 143.0 143,0 143.0 143.0 134.5 143.0 143.0 140,0 140.0 140.0 134.5 140,0 134.5 134.5 132.0 132.0 143.0 143.0 143,0 143.0 143.0 95% 95% 97% 96% 96% 96% 96% 96% 97% 96% 97% 97% 96% 97% 96% 97% 96% 96% 95% 96% 96% 96% 96% 96% 96% 97% 96% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading fl fl 11 fi 11 Iff 11 11 tl (1 El II 11 ffl ffl fi fi TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # •JQ Date CM MArtC Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 325 31 6/1/2005 Melrose SB Sta 209+00 326 37 6/1/2005 Melrose SB Sta 210+50 327 39 6/1/2005 Melrose SB Sta 210+00 328 39 6/1/2005 Melrose SB Sta 211 +50 329 39 6/2/2005 Melrose SB Sta 212+00 329a 39 6/2/2005 Melrose SB Sta 212+00 330 39 6/2/2005 Melrose SB Sta 212+50 331 39 6/2/2005 Melrose SB Sta 213+50 332 39 6/2/2005 Melrose SB Sta 213+00 333 1 6/2/2005 Melrose NB sidewalk Sta 212+50 334 1 6/3/2005 Melrose NB sidewalk Sta 210+50 335 1 6/3/2005 Melrose SB sidewalk Sta 210+00 336 1 6/3/2005 Melrose SB skjewalk Sta 210+50 337 1 6/6/2005 Melrose Median Sta 210+00 338 30 6/6/2005 RSF SB Choker Sta 259+50 339 39 6/7/2005 Melrose SB Sta 211 +05 340 39 6/7/2005 Melrose SB Sta 211 +35 341 39 6/7/2005 Melrase SB Sta 211+10 342 39 6/7/2005 Melrose SB Sta 211 +20 343 AC 6/8/2005 Melrose SB Sta 211+10 344 AC 6/8/2005 Melrose SB Sta 210+10 345 AC 6/8/2005 Melrose SB Sta 209+10 346 AC 6/8/2005 Melrose SB Sta 211+25 347 AC 6/8/2005 Melrose SB Sta 210+25 348 AC 6/8/2005 Melrose SB Sta 209+25 349 AC 6/8/2005 Melrose SB Sta 209+00 BG BG BG BG BG BG BG BG BG SG SG SG SG SG SG BG BG BG BG ACG ACG ACG ACG ACG ACG ACG 10,3% 7.9% 8,7% 7,5% 8,3% 8.3% 9.1% 8.7% 8,3% 10,7% 10,3% 9,5% 8,7% 9.9% 6.8% 8.3% 9.1% 9,1% 8.7% 8,5% 6.5% 6.5% 6.5% 6.5% 6.5% 6.5% 6.5% 6.5% 8,5% 8.5% 8.5% 8.5% 8.5% 6.0% 6,5% 6.5% 6.5% 6.5% 126,3 137,9 137,5 136.7 133.9 136,0 135.8 138.6 137.8 127.3 128,7 127,8 127.2 127.9 133.1 137.2 137.7 138.2 137,1 143.1 144.4 143.3 146.3 142.9 143.8 143,1 143.0 132.0 143,0 143,0 143.0 143.0 143,0 143.0 143.0 143.0 133,5 133,5 133.5 133.5 133.5 140.0 143,0 143,0 143.0 143.0 146.6 146,6 146.6 146.6 146.6 146.6 146.6 97% 96% 96% 96% 96% 94% 95% 95% 97% 96% 95% 96% 96% 95% 96% 95% 96% 96% 97% 96% 98% 98% 98% 100% 97% 98% 98% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Nonconform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading ri II II II II fi Iff II li li 11 il 11 If 11 il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test JI Sample JI Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 3fin ff AP. Date Test Location Elev. (ft) Field Opt Field 1 Max. Obt. Req. Non-Conform Remarks 351 AC 6/8/2005 Melrose SB Sta 211+00 352 AC 6/8/2005 Melrose SB Sta 213+50 353 AC 6/8/2005 Melrose SB Sta 213+50 354 AC 6/8/2005 Melrose SB Sta 212+00 355 AC 6/8/2005 Melrose SB Sta 211+50 356 AC 6/8/2005 Melrose SB Sta 213+00 357 AC 6/8/2005 Melrose SB Sta 211+10 358 AC 6/8/2005 Melrose SB Sta 210+10 359 AC 6/8/2005 Melrose SB Sta 209+10 360 AC 6/8/2005 Melrose SB Sta 211 +25 361 AC 6/8/2005 Melrose SB Sta 210+25 362 AC 6/8/2005 Melrose SB Sta 209+25 363 AC 6/8/2005 Melrose SB Sta 209+00 364 AC 6/8/2005 Melrose SB Sta 210+00 365 AC 6/8/2005 Melrose SB Sta 211+00 366 AC 6/8/2005 Melrose SB Sta 213+50 367 AC 6/8/2005 Melrose SB Sta 213+50 368 AC 6/8/2005 Melrose SB Sta 212+00 369 AC 6/8/2005 Melrose SB Sta 211 +50 370 AC 6/8/2005 Melrose SB Sta 213+00 371 30 6/17/2005 Abutment #4 bf Sta 274+25 372 30 6/17/2005 Abutment #4 bf Sta 274+25 373 30 6/17/2005 Abutment #4 bf Sta 274+50 374 30 6/17/2005 Abutment #4 LT approach slab 375 30 6/20/2005 Abutment #1 bf Sta 270+25 @ CL 376 51 6/20/2005 Abutment #1 bf Sta 270+15 @ CL ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG ACG 335.5 337.5 339,5 340.5 345.0 347,0 7.9% 7.1% 8,7% 8,3% 9,1% 8,3% 6.0% 6.0% 6.0% 6.0% 6,0% 6.5% 144.5 142.6 141.9 143,6 145,8 141,9 145.6 143.5 142.1 145.1 141.5 140.6 142.2 145.4 141,9 144,7 143.2 142,8 145.1 141.5 135.4 135,9 134.8 135,7 133.7 129.6 146.6 146.6 146.6 146,6 146.6 146.6 146.6 146.6 146.6 146,6 146,6 146,6 146.6 146.6 146.6 146.6 146.6 146.6 146.6 146.6 140,0 140.0 140.0 140.0 140,0 134.5 100% 99% 97% 97% 98% 99% 97% 99% 98% 97% 99% 97% 96% 97% 99% 97% 99% 98% 97% 99% 97% 96,7% 97,1% 96.3% 96.9% 95,5% 96.4% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading f I If 11 11 II II II 11 II 11 fl li 11 11 11 li 11 il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name; Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Calrfornia Test # Sample # Test Date Test Location Elev. (ft) Moisture Field Opt. Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Conform Remarks 377 51 6/20/2005 Abutment #1 bf Sta 270+00 @ CL 349.0 7.9% 6.5% 131.5 134.5 97.8% 95% Conform 378 51 6/20/2005 Abutment #1 bf Sta 270+00 @ CL 351.0 7.1% 6.5% 130.8 134.5 97.2% 95% Confomi 379 30 6/22/2005 Abutment #4 RT Wingwall 336.0 7.5% 6.0% 134.0 140.0 95,7% 95% Conform 380 30 6/22/2005 /Abutment #4 RT Wingwall 338.0 7.9% 6.0% 134.8 140.0 96,3% 95% Conform 381 30 6/22/2005 Abutment #4 RT Wingwall 340.0 8,7% 6.0% 135.3 140.0 96.6% 95% Conform 382 30 6/22/2005 Abutment #4 RT Wingwall 342.0 7.9% 6.0% 135,7 140,0 96.9% 95% Conform 383 30 6/22/2005 Abutment #1 RT Wingwall 339.5 9.1% 6.0% 133.6 140.0 95.4% 95% Conform 384 30 6/22/2005 Abutment #1 RT Wingwall 341.5 8.3% 6.0% 135.7 140.0 96.9% 95% Conform 385 30 6/22/2005 Abutment #1 RTWngwall 343.5 8.7% 6.0% 134.9 140.0 96.4% 95% Conform 386 30 6/22/2005 Abutment #1 RT Wingwall 345.5 6.8% 6.0% 135,7 140,0 96,9% 95% Conform 387 30 6/22/2005 Abutment #1 RT Wingwall 347.5 7.9% 6.0% 134.7 140.0 96.2% 95% Conform 388 30 6/22/2005 Abutment #1 RT Wingwall 349.5 8.7% 6.0% 134,4 140.0 96.0% 95% Conform 389 30 6/22/2005 Abutment #1 RT Wingwall 351.5 8.3% 6.0% 134.5 140.0 96.1% 95% Conform 390 30 6/23/2005 Abutment #1 LT Approach slab SG 7.9% 6,0% 137.3 140.0 98,1% 95% Confomi 391 30 6/23/2005 Abutment #1 LT /Approach slab SG 8,3% 6.0% 135.8 140.0 97.0% 95% Conform 392 30 7/19/2005 RSF NB Sta 274+90 342.5 8.7% 6,0% 136.1 140,0 97,2% 95% Conform 393 30 7/19/2005 RSF NB Sta 275+20 339,5 9.1% 6.0% 133.8 140,0 95,6% 95% Conform 394 30 7/19/2005 RSF NB Sta 275+30 341,5 7.5% 6.0% 135.3 140.0 96.6% 95% Conform 395 30 7/19/2005 RSF NB Sta 275+40 342,5 8.7% 6.0% 133.9 140.0 95.6% 95% Conform 396 30 7/19/2005 RSF NB Sta 276+00 338.0 8.7% 6.0% 135.1 140.0 96.5% 95% Conform 397 30 7/19/2005 RSF NB Sta 276+50 340.0 7.9% 6.0% 135.1 140.0 96.5% 95% Conform 398 31 7/19/2005 Contour Area LT of Melrose/RSF, Melrose 348,0 9.9% 8.5% 127.3 132.0 96,4% 90% Conform 399 31 7/19/2005 Contour Area LT of Melrose/RSF. Melrose 350,0 10.7% 8.5% 125.1 132.0 94,8% 90% Conform 400 31 7/20/2005 Contour Area LT of Melrose/RSF. Melrose 45,5 10.7% 8,5% 123.4 132.0 93.5% 90% Conform 401 31 7/20/2005 Contour Area LT of Melrose/RSF, Melrose 47,5 9.1% 8,5% 123.3 132.0 93.4% 90% Conform 402 31 7/20/2005 Contour Area LT of Melrose/RSF, Melrose 49.5 8.7% 8.5% 122.4 132,0 92.7% 90% Conform 403 31 7/20/2005 Contour Area LT of Melrose/RSF. Melrose 49.5 8.7% 8.5% 122.4 132.0 92.7% 90% Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading ff tl (1 ffl li II tl II tl (I 19 fi fl ii II 11 ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Sanla Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Tost Test Location Elev. (ft) Moisture Dry [density (pcf) Relative Comp. Conform Remarks Ar\A # Date 7/01 nnnR Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 405 5 7/21/2005 RSF SB Choker Sta 277+50 341,0 9,1% 7.0% 406 5 7/21/2005 RSF SB Choker Sta 277+75 343,0 7,9% 7,0% 407 5 7/21/2005 RSF SB Choker Sta 276+75 344,0 9,5% 7.0% 408 4 7/22/2005 RSF SB Choker Sta 278+50 338.0 10.3% 8.5% 409 4 7/22/2005 RSF SB Choker Sta 280+00 340.0 9.5% 8.5% 410 30 7/22/2005 RSF Sta 270+25 @ CL 350.0 9.1% 6.0% 411 30 7/22/2005 RSF Sta 269+75 @ CL 352,0 8.3% 6.0% 412 30 7/22/2005 RSF Sta 269+50 @ CL 354,0 8,7% 6,0% 413 30 7/22/2005 RSF Sta 268+80 @ CL 356,0 7,9% 6.0% 414 30 7/26/2005 RSF SB LT Choker Sta 258+00 411,5 7.1% 6,0% 415 30 7/26/2005 RSF SB LT Choker Sta 256+50 420.0 8.3% 6.0% 416 30 7/26/2005 RSF SB LT Choker Sta 255+00 428.5 7.5% 6.0% 417 30 7/27/2005 RSF SB LT Choker Sta 253+50 436,5 7.5% 6.0% 418 30 7/27/2005 RSF SB LT Choker Sta 255+00 429.0 9 1% 6.0% 419 30 7/27/2005 RSF SB LT Choker Sta 256+50 421,0 8,3% 6.0% 420 30 7/27/2005 RSF SB LT Choker Sta 258+00 412.5 8.7% 6.0% 421 30 8/1/2005 Abutment #1 RT 352.0 9.1% 6.0% 422 30 8/1/2005 Abutment #1 RT 354.0 8.7% 6.0% 423 31 8/2/2005 Contour Area LT Melrose/RSF, Melrose Sta 351.5 11.1% 8.5% 424 31 8/2/2005 Contour Area LT Melrose/RSF, Melrose Sta 353.5 10.3% 8.5% 425 1 8/8/2005 RSF SB LT Choker Sta 252+90 443.0 10.3% 8.5% 426 5 8/9/2005 RSF SB Sta 278+50,20' W of CL 336.0 9.1 % 7.0% 427 4 8/9/2005 RSF SB Sta 280+50,20' W of CL 337.0 9.9% 8.5% 428 5 8/10/2005 RSF SB Sta 278+25,20'W of CL 337.5 8.3% 7.0% 429 51 8/16/2005 RSF SB LT Choker Sta 283+50 FSG 9.1% 7.0% 430 51 8/16/2005 RSF SB LT Choker Sta 282+00 FSG 8.3% 7.0% 130.9 131.9 131.6 126.8 125.7 135.7 135.9 134.4 135.0 138,5 135.4 135.1 133,8 134.1 135.2 135.1 135,4 134.5 122.9 122.0 128.6 133.2 127.0 131,8 129.9 130.4 137.5 137.5 137.5 131.0 131.0 140,0 140.0 140,0 140.0 140.0 140.0 140.0 140,0 140,0 140,0 140.0 140,0 140.0 132.0 132.0 133.5 137,5 131.0 137.5 135.0 135.0 95.2% 959% 95,7% 96.8% 96.0% 96,9% 97,1% 96.0% 96.4% 98.9% 96.7% 96.5% 95,6% 95.8% 96,6% 96.5% 96.7% 96.1% 93,1% 92.4% 96.3% 96.9% 96.9% 95.9% 96.2% 96,6% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading I II II fl ffi 11 II fl II (I fi fi fl fl fl fi f TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test JI Sample JI Test Test Location RSF RR 1 T r.hnlter <:»a •^ftnj.Rfl Elev. (ft) CO/-! Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 431 ff 5 Date 8/16/2005 Test Location RSF RR 1 T r.hnlter <:»a •^ftnj.Rfl Elev. (ft) CO/-! Field Opt. Field Max. Obt. Req. Non-Conform Remarks 432 30 8/18/2005 RSF SB LT Choker Sta 263+00 FSG 433 30 8/18/2005 RSF SB LT Choker Sta 261 +50 FSG 434 30 8/18/2005 RSF SB LT Choker Sta 260+00 FSG 435 30 8/18/2005 RSF SB LT Choker Sta 258+50 FSG 436 30 8/18/2005 RSF SB LT Choker Sta 257+00 FSG 437 30 8/18/2005 RSF SB LT Choker Sta 255+50 FSG 438 30 8/18/2005 RSF SB LT Choker Sta 254+00 FSG 439 30 8/18/2005 RSF SB LT Choker Sta 252+50 FSG 440 30 8/18/2005 RSF SB LT Curt)/Gutler STA 252+25 FSG 441 30 8/19/2005 RSF SB LT CG STA 253+75 EL-SG 442 30 8/19/2005 RSF SB STA 252+00,20'LT of CL EL-SG 443 30 8/19/2005 RSF SB STA 253+50,40'LT of CL EL-SG 444 30 8/19/2005 RSF SB Median LT CG STA 253+00 EL-SG 445 30 8/19/2005 RSF SB STA 255+00, 30' LT of CL EL-SG 446 30 8/19/2005 RSF SB Median LT CG STA 254+50 EL-SG 447 30 8/19/2005 RSF SB LT CG STA 255+50 EL-SG 448 30 8/19/2005 RSF SB STA 256+00,30' LT of CL EL-SG 449 30 8/19/2005 RSF SB LT CG STA 256+50 EL-SG 450 30 8/19/2005 RSF SB STA 257+00 EL-SG 451 30 8/19/2005 RSF SB LT CG STA 258+00 EL-SG 452 30 8/19/2005 RSF SB STA 258+00,30' LT of CL EL-SG 453 30 8/19/2005 RSF SB LT CG STA 259+50 EL-SG 454 30 8/22/2005 RSF SB STA 260+00.30'LT of CL EL-SG 455 30 8/22/2005 RSF LT CG STA 261+25 EL-SG 456 30 8/22/2005 RSF SB LT CG STA 261+00, 5'LT of CL EL-SG 457 30 8/22/2005 RSF SB LT CG STA 262+00, 25'LT of CL EL-SG 7.1% 7.9% 6.8% 6.0% 8.3% 9.5% 7.5% 8.7% 7.5% 8,7% 8.3% 7.1% 9.1% 8,3% 7.5% 7.1% 8.3% 9,1% 7,9% 8.7% 7.1% 8.3% 7.1% 9.1% 6.8% 7.9% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6,0% 6.0% 6.0% 6.0% 6,0% 6,0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 137.4 137.1 136.6 135,6 134.3 136,9 133,9 133.5 135,2 134,5 133.9 136.0 134.8 133.9 136.2 135.2 134.4 135,6 136,4 134.5 135,8 135.4 135.4 134.1 134.5 134,0 140.0 140,0 140.0 140.0 140.0 140,0 140.0 140.0 140.0 140.0 140,0 140,0 140.0 140.0 140.0 140,0 140.0 140.0 140.0 140,0 140.0 140,0 140.0 140.0 140.0 140.0 98.1% 97.9% 97,6% 96.9% 95.9% 97.8% 95.6% 95.4% 96.6% 96.1% 95.6% 97.1% 96.3% 95.6% 97.3% 96,6% 96,0% 96,9% 97.4% 96.1% 97.0% 96.7% 96.7% 95.8% 96.1% 95.7% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Confonn Confonn Conform Conform Confomi Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading f S liiiiffititiiiiiii iiiiififiiiiiii TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test # Sample # Test Dato Test Location Elev. (ft) Moisture Dry Densiiy (pcf) Relative Comp. Conform Non-Conform Test # Sample # Test Dato Test Location Elev. (ft) Field Opt Field Max. Obt. Req. Conform Non-Conform 458 30 8/22/2005 RSF SB LT CG STA 263+00, 15' LT of CL EL-SG 8.7% 6.0% 135,1 140.0 96.5% 95% Conform 459 30 8/22/2005 RSF SB LT CG STA 264+00, 30' LT of CL EL-SG 7.9% 6.0% 136,7 140.0 97.6% 95% Conform 460 30 8/22/2005 RSF SB LT CG STA 265+00, 5' LT of CL EL-SG 8.3% 6.0% 134.6 140.0 96.1% 95% Conform 461 30 8/22/2005 RSF SB LT CG STA 264+00 EL-SG 8.3% 6.0% 134,9 140.0 96.4% 95% Conform 462 30 8/22/2005 RSF SB LT CG STA 265+50 EL-SG 9.1% 6,0% 135.0 140.0 96.4% 95% Conform 463 30 8/22/2005 RSF SB LT CG STA 266+00, 30' LT of CL EL-SG 8.3% 6.0% 134.1 140,0 95,8% 95% Conform 464 30 8/23/2005 RSF SB LT Median CG STA 264+00 EL-SG 7,1% 6.0% 133.6 140.0 95,4% 95% Conform 465 30 8/23/2005 RSF SB LT Median CG STA 265+50 EL-SG 7.9% 6.0% 132.8 140.0 94.9% 95% Conform 466 30 8/23/2005 RSF SB LT Median CG STA 267+00 EL-SG 8.3% 6.0% 134.7 140,0 96,2% 95% Conform 467 30 8/23/2005 RSF SB LT Median STA 267+00, 30' LT of CL EL-SG 7.5% 6.0% 137.2 140.0 98,0% 95% Conform 468 30 8/23/2005 RSF SB LT CG STA 266+50 EL-SG 6.8% 6,0% 135.4 140,0 96,7% 95% Confonn 469 30 8/23/2005 RSF SB LT CG STA 268+00 EL-SG 9.1% 6.0% 134.6 140.0 96,1% 95% Conform 470 30 8/23/2005 RSF SB LT CG STA 268+00, 25' LT of CL EL-SG 8.3% 6,0% 134.1 140.0 95.8% 95% Conform 471 30 8/23/2005 RSF SB LT Median CG STA 268+50 EL-SG 7.1% 6.0% 135.9 140.0 97.1% 95% Conform 472 30 8/23/2005 RSF SB LT CG STA 269+00 EL-SG 8.7% 6.0% 134.6 140.0 96.1% 95% Conform 473 30 8/23/2005 RSF SB LT CG STA 269+00, 15' LT of CL EL-SG 7,1% 6.0% 135,3 140.0 96,6% 95% Conform 474 30 8/23/2005 RSF SB LT CG STA 269+50, 30' LT of CL EL-SG 7.9% 6.0% 136.1 140,0 97,2% 95% Conform 475 4 8/31/2005 RSF SB LT CG STA 282+50 EL-SG 10.3% 8.5% 127.1 131,0 97,0% 95% Conform 476 4 8/31/2005 RSF SB LT CG STA 283+50 EL-SG 9,9% 8.5% 126.9 131.0 96.9% 95% Conform 477 4 8/31/2005 RSF STA 283+75, 20' LT of CL EL-SG 10,7% 8.5% 127.5 131.0 97.3% 95% Conform 478 4 8/31/2005 RSF STA 282+75, 40' LT of CL EL-SG 9,1% 8,5% 128.8 131.0 98.3% 95% Conform 479 5 8/31/2005 RSF STA 282+50, @ CL EL-SG 8.7% 8.5% 132.8 131.0 101.4% 95% Conform 480 4 8/31/2005 RSF STA 281+50, @CL EL-SG 9.5% 8.5% 127.0 131,0 96.9% 95% Conform 481 4 8/31/2005 RSF STA 281 +50. 40' LT of CL EL-SG 10.3% 8.5% 128.7 131,0 98,2% 95% Conform 482 4 9/1/2005 RSF SB LT CG STA 281 +00 EL-SG 9.9% 8.5% 127.0 131.0 96.9% 95% Conform 483 4 9/1/2005 RSF STA 280+50, 30' LT of CL EL-SG 8.3% 8.5% 129.1 131.0 98.5% 95% Conform 484 4 9/1/2005 RSF STA 280+25, 10' RT of CL EL-SG 9.1% 8.5% 126.6 131.0 96.6% 95% Conform f f i 1 f 1 IIIIIIII 1 1 i i 1 1 ( 1 ff i ff 1 ff 1 1 1 Remarks grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Jf Sample JI Test Test Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Ramarks ff 485 ff 5 Date 9/1 /9nn.«i Test Localion Elev. (ft) Fiold 1 Opt. Fiold 1 Max. Obt Req. Non-Confonn Ramarks 486 5 9/1/2005 RSF STA 279+25,30' LT of CL EL-SG 487 5 9/1/2005 RSF SB LT Median CG STA 279+00 EL-SG 488 5 9/1/2005 RSF SB LT CG STA 278+50 EL-SG 489 5 9/1/2005 RSF SB STA 278+25,30' LT of CL EL-SG 490 5 9/1/2005 RSF SB LT Median CG STA 277+50 EL-SG 491 30 9/2/2005 Abbut. #4 RT EL-343 492 5 9/2/2005 Abbut. #4 RT EL-345 493 61 9/2/2005 RSF SB LT CG STA 277+40 EL-SG 494 5 9/2/2005 RSF SB STA 276+75,30' LT of CL EL-SG 495 5 9/2/2005 RSF SB LT Median CGS TA 276+00 EL-SG 496 61 9/2/2005 RSF SB LT CG STA 275+90 EL-SG 497 75 9/7/2005 RSF SB LT CG STA 269+00 EL-.5BG 498 75 9/7/2005 RSF SB LT CG STA 267+50 EL-.5BG 499 75 9/7/2005 RSF SB LT CG STA 266+00 EL-.5BG 500 75 9/7/2005 RSF SB LT CG STA 264+50 EL-.5BG 501 75 9/7/2005 RSF SB LT CG STA 263+00 EL-.5BG 502 75 9/7/2005 RSF SB LT CG STA 261+50 EL-.5BG 503 75 9/7/2005 RSF SB LT CG STA 260+00 EL-.5BG 504 75 9/7/2005 RSF SB LT CG STA 258+50 EL-.5BG 505 75 9/7/2005 RSF SB LT CG STA 257+50 EL-.5BG 506 75 9/7/2005 RSF SB LT CG STA 255+00 EL-.5BG 507 75 9/7/2005 RSF SB LT CG STA 253+50 EL-.5BG 508 75 9/8/2005 RSF SB LT Median CG STA 269+40 EL-.5BG 509 75 9/8/2005 RSF SB LT Median CG STA 268+00 EL-.5BG 510 75 9/8/2005 RSF SB LT Median CG STA 266+50 EL-.5BG 511 75 9/8/2005 RSF SB LT Median CG STA 265+00 El^.5BG 7.5% 7.9% 7.1% 8,7% 7.5% 8.3% 7.9% 10.7% 7.5% 8.3% 7.9% 8.3% 7.5% 7.9% 6.8% 7.1% 7.5% 8.3% 7.9% 6.4% 8.7% 7,5% 6.8% 7.9% 7.1% 8.3% 7.5% 7.5% 7.5% 7.5% 7.5% 6.0% 7.5% 8.5% 7.5% 7.5% 8.5% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 134.4 133.8 131.7 133,2 133.2 135.9 132.6 130.7 132.2 131.9 127.9 138.5 138.6 138.6 138.5 137.3 137.1 136.7 138.6 138.3 136.7 137.8 136.3 135.8 137.2 137.5 137.5 137,5 137.5 137.5 137.5 140.0 137.5 134.0 137.5 137.5 134,0 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140,5 140,5 140.5 97.7% 97.3% 95.8% 96.9% 96.9% 97.1% 96,4% 97,5% 96,1% 95.9% 95.4% 98.6% 98.6% 98.6% 98,6% 97.7% 97.6% 97.3% 98.6% 98.4% 97,3% 98.1% 97,0% 96.7% 97.7% 97,9% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading ri ffl fl tl fl 11 tl li Ilffi ffl il 11 ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test j> Sample JI Test Test Location Elev. (ft) Moisture Dry Dons rty (pcf) Relative Comp. Conform Remarks 512 ff 75 Dale 9/8/2nnfi Test Location Elev. (ft) Field 1 Opt Fleld Max. Obt Req. Non-Conform Remarks 513 75 9/9/2005 RSF SB STA 262+00, 10' LT of CL 514 75 9/9/2005 RSF SB STA 260+00, 15' LT of CL 515 75 9/9/2005 RSF SB STA 238+00, 15' LT of CL 516 75 9/9/2005 RSF SB STA 256+00, 15' LT of CL 517 75 9/9/2005 RSF SB STA 254+00, 5' LT of CL 518 80 9/9/2005 RSF SB LT CG STA 277+00 519 80 9/9/2005 RSF SB LT CG STA 278+01 520 75 9/9/2005 RSF SB STA 269+00, 30'LT of CL 521 80 9/9/2005 RSF SB LT CG 280+00 522 80 9/9/2005 RSF SB STA 277+50, 30' LT of CL 523 80 9/9/2005 RSF SB STA 278+50, 30'LTofCL 524 80 9/9/2005 RSF SB STA 279+50, 30'LT of CL 525 80 9/9/2005 RSF SB STA 280+25, 30' LT of CL 526 75 9/9/2005 RSF SB STA 267+50, 30' LT of CL 527 75 9/9/2005 RSF SB STA 266+00, 40'LT of CL 528 75 9/9/2005 RSF SB STA 264+50, 30' LT of CL 529 75 9/9/2005 RSF SB STA 263+00, 40'LT of CL 530 75 9/9/2005 RSF SB STA 261 +50, 40' LT of CL 531 75 9/9/2005 RSF SB STA 260+00, 25'LT of CL 532 75 9/9/2005 RSF SB STA 258+50, 40' LT of CL 533 75 9/9/2005 RSF SB STA 257+00, 25' LT of CL 534 75 9/12/2005 RSF SB STA 255+50, 23' LT of CL 535 75 9/12/2005 RSF SB STA 254+00, 40' LT of CL 536 75 9/12/2005 RSF SB STA 252+50, 20' LT of CL 537 75 9/12/2005 RSF LT Median CG STA 270+00 538 75 9/12/2005 RSF LT Median CG STA 268+50 EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-,5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-.5BG EL-,5BG EL-.5BG EL-.5BG EL-BG EL-BG 8,7% 7,9% 6,8% 7.9% 6.4% 12,4% 13.2% 7.1% 11.9% 12.8% 11,5% 12.4% 11.1% 8.3% 8.7% 7,9% 7.1% 6.8% 7.5% 8.3% 6.8% 7.1% 8.7% 7.9% 8.3% 9.1% 7.0% 7.0% 7.0% 7.0% 7.0% 11.0% 11.0% 7.0% 11.0% 11.0% 11.0% 11.0% 11.0% 7,0% 7,0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 135.0 137.1 138.9 136.2 138.2 117.7 117.7 139.9 117.2 118.1 118.5 119.0 118.7 137.1 137.9 137.8 136.6 137.6 137.9 137.9 137.4 137.7 136.2 135.6 134.9 135.2 140.5 140.5 140.5 140.5 140.5 121.5 121.5 140.5 121.5 121.5 121.5 121.5 121,5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140,5 140.5 140.5 96.1% 97.6% 98.9% 96.9% 98.4% 96.9% 96,9% 99.6% 96.5% 97.2% 97.5% 97.9% 97.7% 97.6% 98.1% 98.1% 97.2% 97.9% 98.1% 98,1% 97.8% 98.0% 96.9% 96,5% 96,0% 96.2% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading 19 fifl 11 11 flfl II fifl ffl ffl fflil ffl ffl 11 ffl il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test # Sample # Test Date Test Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Conform Test # Sample # Test Date Test Localion Elev. (ft) Field Opt. Field Max. Obt. Req. Conform Non-Conform 539 75 9/12/2005 RSF LT Median CG STA 267+00 EL-BG 6.8% 7.0% 137.2 140.5 97.7% 95% Conform 540 75 9/12/2005 RSF LT Median CG STA 265+50 EL-BG 9.1% 7.0% 136.5 140.5 97.2% 95% Conform 541 75 9/12/2005 RSF LT Median CG STA 264+00 EL-BG 8.3% 7,0% 136.9 140.5 97.4% 95% Conform 542 75 9/12/2005 RSF LT Median CG STA 262+50 EL-BG 8.7% 7.0% 134.9 140.5 96.0% 95% Conform 543 75 9/12/2005 RSF LT CG STA 252+00 EL-BG 7.1% 7.0% 137.7 140.5 98.0% 95% Conform 544 75 9/12/2005 RSF LT CG STA 253+50 EL-BG 9.1% 7.0% 134.3 140.5 95,6% 95% Conform 545 75 9/12/2005 RSF LT CG STA 255+00 EL-BG 8.3% 7.0% 136.7 140.5 97,3% 95% Conform 546 75 9/12/2005 RSF LT CG STA 256+50 EL-BG 7.9% 7.0% 137.9 140.5 98.1% 95% Conform 547 75 9/12/2005 RSF LT CG STA 258+00 EL-BG 7.1% 7.0% 138.9 140.5 98.9% 95% Conform 548 75 9/12/2005 RSF LT CG STA 259+50 EL-BG 7.5% 7.0% 135.6 140.5 96.5% 95% Conform 549 75 9/12/2005 RSFLT CG STA 261+00 EL-BG 8.7% 7.0% 134.7 140.5 95.9% 95% Conform 550 75 9/12/2005 RSF LT CG STA 262+50 EL-BG 7,5% 7.0% 135.2 140.5 96.2% 95% Conform 551 75 9/12/2005 RSF LT CG STA 264+00 EL-BG 9,1% 7.0% 135.5 140.5 96.4% 95% Conform 552 75 9/12/2005 RSF LT CG STA 265+50 EL-BG 7,1% 7.0% 138.5 140.5 98.6% 95% Conform 553 75 9/12/2005 RSF LT CG STA 267+00 EL-BG 6.8% 7.0% 135.8 140.5 96.7% 95% Conform 554 75 9/12/2005 RSF LT CG STA 268+50 EL-BG 7.5% 7.0% 137.5 140.5 97.9% 95% Conform 555 80 9/13/2005 RSF SB LT CG STA 275+25 EL-.5BG 11.5% 11.0% 117.7 121.5 96.9% 95% Conform 556 80 9/13/2005 RSF SB LT Median CG STA 275+00 EL-.5BG 13.6% 11.0% 117.6 121.5 96.8% 95% Conform 557 80 9/13/2005 RSF SBLTCG STA 281+50 EL-.5BG 12.4% 11,0% 117.8 121.5 97.0% 95% Conform 558 80 9/13/2005 RSF SB LT CG STA 283+00 EL-.5BG 12.8% 11.0% 115.9 121.5 95.4% 95% Conform 559 80 9/13/2005 RSF SB LT CG STA 281 +75, 30' LT of CL EL-.5BG 11.5% 11.0% 116.6 121.5 96.0% 95% Conform 560 80 9/13/2005 RSF SB LT CG STA 283+25, 15' LT of CL EL-.5BG 12.4% 11.0% 118.3 121.5 97.4% 95% Conform 561 5 9/13/2005 VWD Access Rd. STA 1+70 EL-SG 8.3% 7.0% 132.5 137.5 96.4% 95% Conform 562 80 9/13/2005 VWD Access Rd. STA 1+70 EL-.5BG 11.9% 11.0% 116.6 121.5 96.0% 95% Conform 563 80 9/13/2005 RSF SB LT CG STA 275 + 50 EL-BG 12.8% 11.0% 118.5 121.5 97.5% 95% Conform 564 80 9/13/2005 RSF SB LT CG STA 277 + 25 EL-BG 12.4% 11.0% 116.7 121.5 96.0% 95% Conform 565 80 9/13/2005 RSF SB LT CG STA 278 + 75 EL-BG 13.2% 11,0% 117.1 121.5 96.4% 95% Conform r 1 (If] IIIIIIII f 1 f 1 f i ff 1 1 1 ff 1 f Iffl Remarks grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test 11 Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff <>RR ff fin Date Q/17./0rif\ti Test Location Elev. (ft) Field Opt. Field 1 Max. Obt. Req. Non-Conform Remarks 567 568 569 570 571 572 573 574 575 576 577 578 579 580 581 582 583 80 80 80 80 39 31 39 75 31 38 39 39 39 80 80 75 75 9/13/2005 RSF SB LT Median STA 276 + 20 9/13/2005 RSF SB LT CG STA 280 + 25 9/13/2005 RSF SB LT CG STA 281+75 9/13/2005 RSF SB LT CG STA 283+25 9/14/2005 Melrose SBLTCG STA 211+50 9/14/2005 Melrose SBLTCG STA 213+51 9/14/2005 Corinthia RT CG STA 10 + 80 9/14/2005 Melrose SB LT CG STA 213 + 25 9/14/2005 Corinthia LT CG STA 11 + 00 9/14/2005 Corinthia LT CG STA 11 + 75 9/14/2005 Melrose LTCG STA 213+25 9/15/2005 Melrose RT Median CG STA 212+25 9/15/2005 Melrose LT Median CG 9/15/2005 RSF SB LT Bus Turnout STA 283+00, 4' RT of LTFC 9/15/2005 VWD Access Rd STA 1 +75 CL 9/16/2005 RSF STA 254+00. @ CL 9/16/2005 584 80 9/19/2005 585 80 9/19/2005 586 75 9/20/2005 587 75 9/20/2005 588 75 9/20/2005 RSF SB Bus Turn Out STA 254+00 60' LT of CL VWD Access Rd LT CG STA 1 +75 VWD Access Rd RT CG STA 1+76 RSF STA 269+50, 45' LT of CL RSF STA 268+00, 30' LT of CL RSF STA 266+50, 20' LT of CL EL-BG EL-BG EL-BG EL-BG EL-BG EL-SG EL-BG EL-.5BG EL-SG EL-BG EL-BG EL-BG EL-BG EL-BG 11.1% 12.4% 11,5% 12,4% 7.1% 10.3% 8.3% 7.5% 10.7% 9.9% 6.8% 7.9% 7.1% 11.1% 11.0% 11.0% 11.0% 11.0% 6.5% 8.5% 6.5% 7.0% 8.5% 8.0% 6.0% 6.0% 6.0% 11.0% 117.1 117.3 118.3 118.6 137.8 128.1 137.4 137.6 127.7 131.6 139.0 138.9 141.5 117.6 121.5 121.5 121.5 121.5 143.0 132.0 143.0 140.5 132.0 134.5 143.0 143.5 143.5 121.5 96,4% 96.5% 97.4% 97,6% 96.4% 97.0% 96.1% 97.9% 96.7% 97.8% 97.2% 96.8% 98.6% 96.8% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading EL-BG 13.2% 11.0% 118.3 121.5 97.4% 95% Conform grading EL-.5BG 8.7% 7.0% 136.2 140.5 96.9% 95% Conform grading EL-BG 7.5% 7.0% 137.6 140.5 97.9% 95% Conform grading EL-BG 12.4% 11.0% 117.1 121.5 96.4% 95% Conform grading EL-BG 13.2% 11.0% 117.7 121.5 96.9% 95% Conform grading EL-BG 8.3% 7.0% 136.7 140.5 97.3% 95% Conform grading EL-BG 9.1% 7.0% 135.1 140.5 96.2% 95% Conform grading EL-BG 7.9% 7.0% 135.7 140.5 96.6% 95% Conform grading II II i I I I II 11 11 fi fl ffl fl II ffl ffl ffl 11 11 ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Sanla Fe Road North, Phase 2 Carlsbad, Catifornia Test Sample Test Test Location DCC exa ocKj-nn Ar\> i T —< j->i Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # 7f. Date oran/onne; Test Location DCC exa ocKj-nn Ar\> i T —< j->i Elev. (ft) Field Opt. Fiold Max. Obt. Req. Non-Conform Remarks 590 75 9/20/2005 RSF STA 263+50,25' LT of CL EL-BG 7.5% 7.0% 591 75 9/20/2005 RSF STA 262+00.40' LT of CL EL-BG 8.3% 7.0% 592 75 9/20/2005 RSF STA 260+50, 10'LTofCL EL-BG 7.1% 7.0% 593 75 9/20/2005 RSF STA 259+00,60' LT of CL EL-BG 6.8% 7.0% 594 75 9/20/2005 RSF STA 257+50, 30' LTofCL EL-BG 8.7% 7.0% 595 75 9/20/2005 RSF STA 256+00, 10'LT of CL EL-BG 9.1% 7.0% 596 75 9/20/2005 RSF STA 254+50,30'LT of CL EL-BG 8.3% 7.0% 597 75 9/21/2005 RSF STA 253+00,40'LT of CL EL-BG 8.3% 7.0% 598 75 9/21/2005 RSF STA 252+00,20' LT of CL EL-BG 6.8% 7.0% 599 80 9/21/2005 RSF STA 274+75,20'LT Of CL EL-BG 13.2% 11.0% 600 80 9/21/2005 RSF STA 276+25,40'LT of CL EL-BG 11.5% 11.0% 601 39 9/22/2005 Melrose SB STA 11+25.60'LT of CL EL-BG 7.9% 6.0% 602 39 9/22/2005 Melrose SB STA 12+75.53'LT of CL EL-BG 6.8% 6.0% 603 80 9/22/2005 VWD Access Rd RT CG STA 1+65 EL-BG 11.5% 11.0% 604 5 9/22/2005 RSF SB LT Sidewalk STA 277+75 EL-FSG 8.7% 7.0% 605 5 9/22/2005 RSF SB LT Sidewalk STA 279+00 EL-FSG 9.1% 7.0% 606 4 9/22/2005 RSF SB LT Sidewalk STA 280+50 EL-FSG 9.5% 8,5% 607 51 9/23/2005 RSF SB LT Sidewalk STA 282+25 EL-FSG 8.7% 7.0% 608 51 9/23/2005 RSF SB LT Sidewalk STA 283+50 EL-FSG 6.8% 7.0% 609 AC 9/27/2005 RSF SB STA 269+00 Outside Strip AC Grade 610 AC 9/27/2005 RSF SB STA 267+00 Outside Strip AC Grade 611 AC 9/27/2005 RSF SB STA 265+00 Outside Strip AC Grade 612 AC 9/27/2005 RSF SB STA 263+00 Outskfe Strip AC Grade 613 AC 9/27/2005 RSF SB STA 261+00 Outside Strip AC Grade 614 AC 9/27/2005 RSF SB STA 259+00 Outside Strip AC Grade 615 AC 9/27/2005 RSF SB STA 257+00 Outside Strip AC'Grade 137.8 136.2 139.1 137.5 136.9 135.1 135.4 136.5 137.4 116.4 118.3 139.0 139.9 118.3 134.1 132.4 125.6 132.4 128.9 145.5 144.0 144.4 143.9 143.7 143.6 145.0 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 140.5 121.5 121.5 143.5 143.5 121.5 137.5 137.5 131.0 135.0 135,0 146.9 146.9 146.9 146.9 146.9 146.9 146.9 98.1% 96.9% 99.0% 97.9% 97.4% 96.2% 96.4% 97.2% 97.8% 95.8% 97.4% 96.9% 97.5% 97.4% 97.5% 96.3% 95.9% 98.1% 95.5% 99.0% 98.0% 98.3% 98.0% 97.8% 97.8% 98.7% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading rififiiifififiiiiiEi ifirifiiiiiiififfi TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad. California Test JC Sample Tost Test Location DCC CD CTA ICEj-i-in oi-;_ Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff R1R # AP. Date Test Location DCC CD CTA ICEj-i-in oi-;_ Elev. (ft) Fiold Opt. Field Max. Obt. Req. Non-Conform Remarks 617 AC 9/27/2005 RSF SB STA 253+00 Outskle Strip AC Grade 618 AC 9/27/2005 RSF SB STA 268+00 2nd CTR Strip AC Grade 619 AC 9/27/2005 RSF SB STA 266+00 2nd CTR Strip AC Grade 620 AC 9/27/2005 RSF SB STA 264+00 2nd CTR Strip AC Grade 621 AC 9/27/2005 RSF SB STA 262+00 2nd CTR Strip AC Grade 622 AC 9/27/2005 RSF SB STA 260+00 2nd CTR Strip AC Grade 623 AC 9/27/2005 RSF SB STA 258+00 2nd CTR Strip AC Grade 624 AC 9/27/2005 RSF SB STA 256+00 2nd CTR Strip AC Grade 625 AC 9/27/2005 RSF SB STA 254+00 2nd CTR Strip AC Grade 626 AC 9/27/2005 RSF SB STA 252+00 2nd CTR Strip AC Grade 627 AC 9/27/2005 RSF SB STA 269+501st CTR Strip AC Grade 628 AC 9/27/2005 RSF SB STA 267+50 1st CTR Strip AC Grade 629 AC 9/27/2005 RSF SB STA 265+50 1 st CTR Strip AC Grade 630 AC 9/27/2005 RSF SB STA 263+50 1st CTR Strip AC Grade 631 AC 9/27/2005 RSF SB STA 268+50 Inside Strip AC Grade 632 AC 9/27/2005 RSF SB STA 266+50 Inside Strip AC Grade 633 AC 9/27/2005 RSF SB STA 264+50 Inside Strip AC Grade 634 AC 9/27/2005 RSF SB STA 262+50 Inside Strip AC Grade 635 AC 9/27/2005 RSF SB STA 260+50 Inside Strip AC Grade 636 AC 9/27/2005 RSF SB STA 258+50 Inskie Strip AC Grade 637 AC 9/27/2005 RSF SB STA 256+50 Inside Strip AC Grade 638 AC 9/27/2005 RSF SB STA 261+501st CTR Strip AC Grade 639 AC 9/27/2005 RSF SB STA 259+50 1st CTR Strip AC Grade 640 AC 9/27/2005 RSF SB STA 257+50 1 st CTR Strip AC Grade 641 AC 9/27/2005 RSF SB STA 253+50 1 st CTR Strip ACGrade 143.9 146.0 142.8 144.3 145.2 143.0 146.2 144.2 143.5 145.8 143.0 145.1 145.7 145.9 143.5 144.6 144.9 146.3 145.0 144.4 145.8 146.4 142.9 144.6 143,1 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 98.0% 99,4% 97,2% 98.2% 98.8% 97.3% 99.5% 98.2% 97.7% 99.3% 97.3% 98.8% 99.2% 99.3% 97.7% 98.4% 98.6% 99.6% 98.7% 98.3% 99.3% 99.7% 97.3% 98.4% 97.4% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Confomn Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading llffiilllllll iEillfififlfiffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Test Localion Elev. (ft) 642 AC 9/27/2005 RSF SB STA 253+50 1st CTR Strip AC Grade 643 AC 9/27/2005 RSF SB STA 252+00 1st CTR Strip AC Grade 644 AC 9/27/2005 RSF SB STA 254+50 1st CTR Strip AC Grade 645 AC 9/27/2005 RSF SB STA 253+00 1st CTR Strip AC Grade 646 AC 9/28/2005 RSF SB STA 275+00 Inside Strip AC Grade 647 AC 9/28/2005 RSF SB STA 275+25 1st CTR Strip AC Grade 648 AC 9/28/2005 RSF SB STA 275+50 2nd CTR Strip AC Grade 649 AC 9/28/2005 RSF SB STA 276+00 Outside Strip AC Grade 650 AC 9/28/2005 RSF SB STA 270+00 Outside Strip AC Grade 651 AC 9/28/2005 RSF SB STA 268+00 Outside Strip AC Grade 652 AC 9/28/2005 RSF SB STA 266+00 Outside Strip AC Grade 653 AC 9/28/2005 RSF SB STA 264+00 Outside Strip AC Grade 654 AC 9/28/2005 RSF SB STA 262+00 Outside Strip AC Grade 655 AC 9/28/2005 RSF SB STA 260+00 Outside Strip AC Grade 656 AC 9/28/2005 RSF SB STA 258+00 Outside Strip AC Grade 657 AC 9/28/2005 RSF SB STA 256+00 Outside Strip AC Grade 658 AC 9/28/2005 RSF SB STA 254+00 Outside Strip AC Grade 659 AC 9/28/2005 RSF SB STA 252+00 Outside Strip AC Grade 660 AC 9/28/2005 RSF SB STA 269+50 Inside Strip AC Grade 661 AC 9/28/2005 RSF SB STA 267+50 Inside Strip AC Grade 662 AC 9/28/2005 RSF SB STA 265+50 Inside Strip AC Grade 663 AC 9/28/2005 RSF SB STA 263+50 Inside Strip AC Grade 664 AC 9/28/2005 RSF SB STA 261+50 Inside Strip AC Grade 665 AC 9/28/2005 RSF SB STA 259+50 Inskle Strip AC Grade 666 AC 9/28/2005 RSF SB STA 257+50 Inside Strip AC Grade 667 AC 9/28/2005 RSF SB STA 255+50 Inside Strip AC Grade i 1 f 1 f 1 11 ffl ffl II 1 1 Moisture Dry Density (pcf) Relative Comp. Confonn Non-Conform Remarks Fletd Opt. Field Max. Obt. Req. Confonn Non-Conform Remarks 144.6 146.9 98.4% 95% Conform grading 145.6 146.9 99.1% 95% Conform grading 144.8 146.9 98.6% 95% Conform grading 146.3 146.9 99.6% 95% Conform grading 143.1 146.9 97.4% 95% Conform grading 146.0 146.9 99.4% 95% Conform grading 145.2 146.9 98.8% 95% Conform grading 144.5 146.9 98.4% 95% Conform grading 138.8 146.9 94.5% 95% Conform grading 141.6 146.9 96,4% 95% Conform grading 139.5 146.9 95.0% 95% Conform grading 143.0 146.9 97.3% 95% Conform grading 140.6 146.9 95.7% 95% Conform grading 141.5 146.9 96.3% 95% Conform grading 140.9 146.9 95.9% 95% Conform grading 142.2 146.9 96.8% 95% Conform grading 139.9 146.9 95.2% 95% Conform grading 141.8 146.9 96.5% 95% Conform grading 138.9 146.9 94.6% 95% Conform grading 139.1 146.9 94.7% 95% Conform grading 140.6 146.9 95.7% 95% Conform grading 138.7 146.9 94.4% 95% Nonconform grading 141.0 146.9 96.0% 95% Conform grading 138.6 146.9 94.3% 95% Nonconform grading 140.3 146.9 95.5% 95% Conform grading 141.2 146.9 96.1% 95% Conform grading 1 1 t 1 i 1 i 1 1 i f 1 ff 1 S 1 ff TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Tost Test Localion • cc CB f>TA nei . en i !j_ oi..:_ Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # AP Date anannns Test Localion • cc CB f>TA nei . en i !j_ oi..:_ Elev. (ft) Fiold Opt Field Max. Obt. Req. Non-Conform Remarks 669 AC 9/28/2005 RSF SB STA 268+50 CTR Strip AC Grade 670 AC 9/28/2005 RSF SB STA 266+50 CTR Strip AC Grade 671 AC 9/28/2005 RSF SB STA 264+50 CTR Strip AC Grade 672 AC 9/28/2005 RSF SB STA 262+50 CTR Strip ACGrade 673 AC 9/28/2005 RSF SB STA 260+50 CTR Strip AC Grade 674 AC 9/28/2005 RSF SB STA 258+50 CTR Strip AC Grade 675 AC 9/28/2005 RSF SB STA 256+50 CTR Strip AC Grade 676 AC 9/28/2005 RSF SB STA 254+50 CTR Strip ACGrade 677 AC 9/28/2005 RSF SB STA 252+50 CTR Strip AC Grade 678 AC 9/28/2005 RSF SB STA L75+00 Outside Strip AC Grade 679 AC 9/28/2005 RSF SB STA 275+25 2nd CTR Strip ACGrade 680 AC 9/28/2005 RSF SB STA 275+50 1 st CTR Strip AC Grade 681 AC 9/28/2005 RSF SB STA 276+00 Inside Strip AC Grade 682 AC 9/29/2005 Melrose SB STA 213+75 4' RT of LT FC AC Grade 683 AC 9/29/2005 Melrose SB STA 213+50 5' RT of LT FC AC Grade 684 AC 9/29/2005 Melrose SB STA 213+25 5'RT of LT FC ACGrade 665 AC 9/29/2005 Melrose SB STA 212+75 5'RT of LT FC ACGrade 686 AC 9/29/2005 Melrose SB STA 212+50 10' RT of LT FC AC Grade 687 AC 9/29/2005 Melrose SB STA 212+25 5' RT of LT FC AC Grade 688 AC 9/29/2005 Melrose SB STA 212+00 10' RT of LT FC AC Grade 689 AC 9/29/2005 Melrose SB STA 211+75 ACGrade 690 AC 9/29/2005 Melrose SB STA 211+50 AC Grade 691 AC 9/29/2005 Corinthia SB STA 10+90 AC Grade 692 31 9/29/2005 Melrose SB LT Sidewalk STA 213+50 EL-FSG 693 31 9/29/2005 Melrose SB LT Sidewalk STA 212+00 EL-FSG 694 31 9/29/2005 Corinthia SB LT Sidewalk STA 10+90 EL-FSG 10.3% 8.5% 9.9% 8.5% 10.7% 8.5% 140.6 141.5 142.0 139.5 140.6 140.5 139.3 141.2 138.9 138.5 140.9 142.0 141.6 140.9 142.9 143.5 143.0 145,6 144.1 142.5 143.5 145.9 142.7 127.7 127.0 127,7 146,9 146.9 146.9 146.9 146.9 146,9 146.9 146.9 146.9 146.9 146.9 146.9 146.9 145.3 145.3 145.3 145.3 145.3 145.3 145.3 145.3 145.3 145.3 132.0 132.0 132.0 95.7% 96.3% 96.7% 95.0% 95.7% 95.6% 94.8% 96.1% 94.6% 94.3% 95.9% 96.7% 96.4% 97.0% 98.3% 98.8% 98.4% 100.2% 99.2% 98.1% 98.8% 100.4% 98.2% 96.7% 96.2% 96.7% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Nonconform Conform Conform Conform Conform Conform Conform Conform Conform Conform Nonconform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Confomi Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading I I i^fllflflfililiflflflflfflfflfflfflfflfl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fo Road North, Phase 2 Carlsbad, California Test Test Sample Test # # Date 695 5 9/29/2005 696 5 9/29/2005 697 35 10/5/2005 698 35 10/5/2005 699 35 10/5/2005 700 35 10/5/2005 701 35 10/5/2005 702 35 10/5/2005 703 35 10/5/2005 704 35 10/5/2005 705 35 10/5/2005 706 35 10/5/2005 703A 35 10/5/2005 707 AC 10/6/2005 708 AC 10/6/2005 709 AC 10/6/2005 710 AC 10/6/2005 711 AC 10/6/2005 712 AC 10/6/2005 713 AC 10/6/2005 714 AC 10/6/2005 715 AC 10/6/2005 716 AC 10/6/2005 717 AC 10/6/2005 718 AC 10/6/2005 719 AC 10/6/2005 720 AC 10/6/2005 Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Conform Rem Elev. (ft) Field Opt Field Max. Obt. Req. Conform Non-Conform Rem EL-FSG 9.1% 7.0% 130.7 137.5 95.1% 95% Conform grading EL-FSG 8.3% 7.0% 131.6 137.5 95.7% 95% Conform grading EL-BG 11.5% 11.0% 117.2 122.0 96.1% 95% Conform grading EL-BG 11.1% 11.0% 119.6 122.0 98.0% 95% Conform grading EL-BG 13.2% 11.0% 116.7 122.0 95.7% 95% Conform grading EL-BG 12.8% 11.0% 118.7 122.0 97.3% 95% Conform grading EL-BG 11.9% 11.0% 119.4 122.0 97.9% 95% Conform grading EL-BG 12.4% 11.0% 116.4 122.0 95.4% 95% Confomi grading EL-BG 13.6% 11.0% 114.7 122.0 94.0% 95% Nonconform grading EL-BG 12.4% 11.0% 118.3 122,0 97,0% 95% Conform grading EL-BG 11.5% 11.0% 120.4 122.0 98,7% 95% Conform grading EL-BG 11.1% 11.0% 120.1 122.0 98.4% 95% Conform grading EL-BG 11.5% 11.0% 120.4 122.0 98.7% 95% Conform grading AC Grade 141.4 143.7 98.4% 95% Conform grading AC Grade 142.3 143.7 99.0% 95% Conform grading AC Grade 138.9 143.7 96.7% 95% Conform grading AC Grade 142.9 143.7 99.4% 95% Conform grading AC Grade 144.3 143.7 100.4% 95% Conform grading AC Grade 140.8 143.7 98.0% 95% Conform grading AC Grade 144.1 143.7 100.3% 95% Conform grading AC Grade 142.6 143.7 99.2% 95% Conform grading AC Grade 143.9 143.7 100.1% 95% Conform grading AC Grade 140.5 143.7 97.8% 95% Conform grading AC Grade 141.1 143.7 98.2% 95% Conform grading AC Grade 139.9 143.7 97.4% 95% Conform grading AC Grade 144.0 143.7 100.2% 95% Conform grading AC Grade 142.3 143.7 99.0% 95% Conform grading RSF SB LT Sidewalk STA 277+40 RSF SB LT Sidewalk STA 276+00 RSF STA 276+50, 20' LT of CL RSF STA 277+50. 40' LT of CL RSF STA 278+50. 40' LT of CL RSF STA 279+50, 10' LT of CL RSF STA 280+00, 50' LT of CL RSF STA 280+50, @ CL RSF STA 281 +00, 40' LT of CL RSF STA 281+50. @CL RSF STA 282+00, 50' LT of CL RSF STA 282+50, @ CL RSF STA 281 +00, 40' LT of CL RSF SB STA 282+50 Inside Strip RSF SB STA 231+50 Inside Strip RSF SB STA 280+50 Inside Strip RSF SB STA 279+50 Inside Strip RSF SB STA 277+50 inside Strip RSF SB STA 276+50 Inside Strip RSF SB STA 282+00 CTR Strip RSF SB STA 280+50 CTR Strip RSF SB STA 279+00 CTR Strip RSF SB STA 277+50 CTR Strip RSF SB STA 276+75 CTR Strip RSF SB STA 281+00 CTR Strip RSF SB STA 279+25 CTR Strip RSF SB STA 277+75 CTR Strip fl li fi fl tl ffl ffl fi fi 11 II 11 ffi 11 11 ffl 11 ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test Sample Test Test Location DCC CO CTA OOl.ie .-I..I_:J_ *II_:_ Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Ramarks # Tit # AP Date Test Location DCC CO CTA OOl.ie .-I..I_:J_ *II_:_ Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Ramarks 722 AC 10/6/2005 RSF SB STA 280+25 Outside Strip AC Grade 723 AC 10/6/2005 RSF SB STA 279+25 Outside Strip AC Grade 724 AC 10/6/2005 RSF SB STA 278+25 Outskle Strip AC Grade 725 AC 10/6/2005 RSF SB STA 277+25 Outskle Strip ACGrade 726 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip AC Grade 727 AC 10/6/2005 Melrose SB STA 210+75 Inside Strip ACGrade 728 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip AC Grade 729 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip AC Grade 730 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip AC Grade 731 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip AC Grade 732 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip ACGrade 733 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip ACGrade 734 AC 10/6/2005 Melrose SB STA 209+75 Inside Strip AC Grade 735 AC 10/6/2005 RSF SB STA 283+00 Inside Strip ACGrade 736 AC 10/6/2005 RSF SB STA 282+00 Inside Strip AC Grade 737 AC 10/6/2005 RSF SB STA 281+00 Inside Strip AC Grade 738 AC 10/6/2005 RSF SB STA 280+00 Inside Strip AC Grade 739 AC 10/6/2005 RSF SB STA 279+00 Inskle Strip ACGrade 740 AC 10/6/2005 RSF SB STA 278+00 Inskle Strip AC Grade 741 AC 10/6/2005 RSF SB STA 277+00 Inside Strip AC Grade 742 AC 10/6/2005 RSF SB STA 282+50 CTR Strip AC Grade 743 AC 10/6/2005 RSF SB STA 281+50 CTR Strip ACGrade 744 AC 10/6/2005 RSF SB STA 280+50 CTR Strip AC Grade 745 AC 10/6/2005 RSF SB STA 279+50 CTR Strip AC Grade 746 AC 10/6/2005 RSF SB STA 278+50 CTR Strip ACGrade 144.3 140.6 142.8 145.0 138.5 140.2 139.1 141.6 138.3 141.1 139,5 140.8 141.5 138.5 140.2 139.1 141.6 143.6 142.1 141.6 140.5 141.6 142.3 140.4 139.7 143.7 143.7 143.7 143.7 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143.1 143,1 143,1 143,1 143,1 100.4% 97.8% 99.4% 100.9% 96.8% 98.0% 97.2% 99.0% 96.6% 98.6% 97.5% 98.4% 98,9% 96,8% 98.0% 97.2% 99.0% 100.3% 99.3% 99.0% 98.2% 99.0% 99.4% 98.1% 97.6% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading f V 1 11 11 II II II li 11 ffl ffl ffl il il ffl ffl ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Test # Sample # Test Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. 747 AC 10/6/2005 RSF SB STA 277+50 CTR Strip AC Grade 142.0 143.1 99.2% 95% 748 AC 10/6/2005 RSF SB STA 276+50 CTR Strip AC Grade 140.7 143.1 98,3% 95% 749 AC 10/6/2005 Melrose NB STA 213+25 Outside Strip AC Grade 140.0 145.0 96.6% 95% 750 AC 10/6/2005 Melrose NB STA 212+25 Outside Strip AC Grade 142.2 145.0 98.1% 95% 751 AC 10/6/2005 Melrose NB STA 211 +25 Outside Strip AC Grade 143.8 145.0 99.2% 95% 752 AC 10/6/2005 Melrose NB STA 210+25 Outside Strip AC Grade 142.7 145.0 98.4% 95% 753 AC 10/6/2005 RSF SB STA 276+25 Outside Strip AC Grade 139.4 145.0 96.1% 95% 754 AC 10/6/2005 RSF SB STA 277+25 Outside Strip AC Grade 140.0 145.0 96.6% 95% 755 AC 10/6/2005 RSF SB STA 278+25 Outside Strip AC Grade 142.6 145.0 98.3% 95% 756 AC 10/6/2005 RSF SB STA 279+25 Outside Strip AC Grade 143.4 145.0 98.9% 95% 757 AC 10/6/2005 RSF SB STA 280+25 Outside Strip AC Grade 144.1 145.0 99.4% 95% 758 AC 10/6/2005 RSF SB STA 281 +25 Outside Strip AC Grade 141.8 145.0 97.8% 95% 759 39 10/6/2005 Corinthia STA 10+70, 15' RT of CL EL-BG 9.5% 6.5% 140.0 143.0 97.9% 95% 760 30 10/7/2005 RSF Median STA 263+00, 5' RT of LT FC EL-FSG 6.8% 6.5% 133.9 140.0 95.6% 95% 761 30 10/7/2005 RSF Median STA 264+50, 5' RT of LT FC EL-FSG 7.5% 6.5% 133.9 140.0 95.6% 95% 762 39 10/25/2005 Melrose Median STA 212+50 EL-FSG 10.7% 8.5% 128.2 134.0 95.7% 95% 763 97 10/25/2005 RW-2 3' Footing OX BF STA 12+00 EL-2 10,7% 9.0% 129.4 134.0 96.6% 95% 764 97 10/25/2005 RW-2 3' Footing OX BF STA 11 +00 EL-2 9.9% 9.0% 129.7 134.0 96.8% 95% 765 97 10/25/2005 RW-2 3' Footing OX BF STA 12+25 EL-1 10.3% 9.0% 125.2 134.0 93.4% 95% 765A 97 10/25/2005 RW-2 3' Footing OX BF STA 12+25 EL-2 9.9% 9.0% 131.0 134.0 97.8% 95% 766 97 10/25/2005 RW-2 3' Footing OX BF STA 11+25 EL-3 10.7% 9.0% 129,1 134.0 96.3% 95% 767 97 10/28/2005 RW-2 3' Footing OX BS STA 11 +50 EL-FSG 9.5% 9.0% 128.3 134.0 95.7% 95% 768 30 11/3/2005 Abbut. 4 RT 5'N of Backwall EL-331 8.3% 6.0% 133.4 140.0 95.3% 95% 769 30 11/3/2005 Abbut 4 RT 10'N of Backwall EL-333 8.7% 6.0% 134.5 140.0 96.1% 95% 770 30 11/3/2005 Abbut. 4 RT 20'N of Backwall EL-335 7.5% 6.0% 133.5 140.0 95.4% 95% 771 30 11/3/2005 Abbut. 4 RT 25'N of Backwall EL-337 6.8% 6.0% 135.6 140.0 96.9% 95% 772 30 11/3/2005 Abbut 1 RT 30' S of Backwall EL-335 8.7% 6.0% 135.1 140.0 96.5% 95% 1 1 1 1 1 1 IIIIIIII f 1 1 i 1 1 1 1 1 i 1 1 Conform Non-Conform Remarks Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Nonconform Conform Confonn Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fo Road North, Phase 2 Carlsbad, California Tost Sample Test # # Date 773 30 11/3/2005 774 30 11/3/2005 775 30 11/3/2005 776 30 11/4/2005 777 30 11/4/2005 778 30 11/4/2005 779 97 11/7/2005 780 97 11/7/2005 781 30 11/8/2005 782 30 11/8/2005 783 30 11/8/2005 784 30 11/8/2005 785 30 11/8/2005 786 30 11/8/2005 787 30 11/9/2005 768 30 11/9/2005 789 30 11/10/2005 790 30 11/10/2005 Test Location Abbut 1 RT 30' S of Backwall Abbut. 1 RT 30' S of Backwall Abbut. 1 RT 30' S of Backwall Abbut. 1 RT 30' S of Backwall Abbut. 1 RT 30' S of Backwall Abbut. 1 RT 30' S of Backwall Keyway BF RSF NB STA 266+25 70*RT of CL Keyway BF RSF NB STA 268+25 100'RT of CL Abbut. 1 RT 30' S of Backwall, 10' LT of RT Wingwall Abbut 1 RT 30' S of Backwall, 10' LT of RT Wingwall Abbut. 1 RT 30' S of Backwall, 10' LT of RT Wingwall RSF NB RT Slope FiH STA 266+00, 100' RT of CL RSF NB RT Slope Fill STA 267+00, 95' RT of CL RSF NB RT Slope Fill STA 266+00, 95' RT of CL RSF NB RT Slope Fill STA 266+00, 95' RT of CL RSF NB RT Slope Fill STA 266+00, 95' RT of CL RSF NB RT 2:1 Slope Fill STA 266+00 RSF NB RT 2:1 Slope Fill STA 265+01 f i f 1 I i f 1 f llllll Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Conform Rem Elev. (ft) Field Opt. Field Max. Obt. Req. Conform Non-Conform Rem EL-337 7.1% 6.0% 136.0 140.0 97,1% 95% Conform grading EL-339 9 1% 6.0% 133.9 140.0 95.6% 95% Conform grading EL-341 7.5% 6.0% 135.4 140.0 96.7% 95% Conform grading EL-343 8.3% 6.0% 134.2 140.0 95.9% 95% Conform grading EL-345 7.1% 6.0% 136.3 140.0 97.4% 95% Conform grading EL-345 6.8% 6.0% 135.5 140.0 96.8% 95% Conform grading EL-346 9.1% 9.0% 126.7 134.0 94.6% 90% Conform grading EL-341 10.3% 9.0% 126.0 134.0 94.0% 90% Conform grading EL-349 6.8% 6.0% 135.0 140.0 96.4% 95% Conform grading EL-351 8.3% 6.0% 137.2 140.0 98.0% 95% Conform grading EL-353 7.5% 6.0% 137.1 140.0 97.9% 95% Conform grading EL-353 8.7% 6.0% 134.4 140.0 96.0% 90% Conform grading EL-345 9.1% 6.0% 131.6 140.0 94.0% 90% Conform grading EL-347 7.5% 6.0% 131.9 140.0 94.2% 90% Conform grading EL-374 8.3% 6.0% 130.7 140.0 93.4% 90% Conform grading EL-349 7.1% 6.0% 133.9 140.0 95.6% 90% Conform grading EL-354 6.8% 6.0% 132.6 140.0 94.7% 90% Conform grading EL-359 7.9% 6.0% 132.4 140.0 94.6%.. 90% Conform grading ff 1 1 1 1 1 1 1 1 1 1 1 1 lil 1 1 11 i 1 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test JI Sample JI Tost Test Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff ff Oate Test Localion Elev. (ft) Field Opt. Fiold Max. Obt. 1 Req. Non-Conform Remarks 791 30 11/10/2005 RSF NB RT 2:1 Slope Fill STA 264+02 EL-364 8.7% 6.0% 132,4 140.0 94.6% 90% Conform grading 792 102 11/14/2005 RSF NB RT 2:1 Stope Fill STA 267+50. 70' RT of CL EL-351 9.1% 8.0% 1274 134.0 95.1% 90% Conform grading 793 102 11/14/2005 RSF NB RT 2:1 Slope Fill STA 267+00, 80' RT of CL EL-353 10.3% 8.0% 125,0 134.0 93.3% 90% Conform grading 794 102 11/14/2005 RSF NB RT 2:1 Slope Fill STA 269+00, 60'RT OfCL EL-355 8.7% 8.0% 127.0 134.0 94.8% 90% Conform grading 795 30 11/15/2005 RSF NB RT2:1 Slope Fill STA 269+50, 60'RT OfCL EL-343 8.7% 6.0% 134.7 140.0 96.2% 95% Conform grading 796 30 11/15/2005 RSF NB RT 2:1 Slope Fill STA 268+50, 40'RT OfCL EL-346 6.8% 6.0% 135.7 140.0 96.9% 95% Conform grading 797 30 11/15/2005 RSF NB RT 2:1 Slope Fill STA 269+00. 40'RT OfCL EL-347 7.5% 6.0% 136.6 140.0 97.6% 95% Conform grading f 1 798 61 11/15/2005 Abbut 1 RT RT Wingwall BF EL-345 10.7% 8.5% 128.9 134.0 96.2% 799 61 11/15/2005 Abbut 1 RT RT Wingwall BF EL-347 9.1% 8.5% 129,1 134,0 96.3% 800 30 11/15/2005 San Elijo STA 99+00 @ CL EL-315 7.9% 6.0% 133.2 140.0 95.1% 801 30 11/15/2005 San Elijo STA 99+00 20' RT of CL EL-317 8.3% 6.0% 130.5 140.0 93.2% 802 30 11/16/2005 San Elijo STA 99+10, 30' LT of CL EL-319 6.8% 6.0% 135.7 140.0 96.9% 803 30 11/16/2005 San Etijo STA 99+20, @ CL EL-321 8.3% 6.0% 135.2 140.0 96.6% 804 30 11/16/2005 San Elijo STA 98+90, 40' RT of CL EL-323 7.1% 6,0% 137.3 140.0 98.1% 805 30 11/16/2005 San Elijo STA 98+50, 30' RT of CL EL-418 9 1% 6,0% 135,4 140.0 96.7% 806 30 11/16/2005 San Elijo STA 98+75, 40' RT of CL EL^20 6.8% 6.0% 135.9 140.0 97.1% 807 30 11/16/2005 San Elijo STA 98+50, 30' RT of CL EL-422 8.3% 6.0% 134.9 140.0 96.4% 808 30 11/16/2005 RSF NB/RSF NB RT 2:1 Slope Fill STA EL-345 7.5% 6.0% 135.7 140.0 96.9% 269+25 60' RT of CL 140.0 96.9% 809 102 11/16/2005 RSF NB/RSF NB RT 2:1 Slope Fill STA EL-366 9.9% 8.0% 127.9 134.0 95.4% 264+00 50' RT of CL 134.0 95.4% 810 102 11/16/2005 RSF NB STA 264+50, 60' RT of CL EL-368 9.9% 8.0% 127.6 134.0 95.2% i f 111 11 ffl i 1 f 1 1 1 f 1 1 1 1 1 1 1 1 95% 95% 90% 90% 95% 95% 95% 90% 95% 95% 95% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Jl Sample Jl Tost Test Location RJ5F MR .QTA 9R1J.7K iin' DT «f Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 811 ff 102 Date ii/ifi/9nnfi Test Location RJ5F MR .QTA 9R1J.7K iin' DT «f Elev. (ft) Field Opt Field Max. Obt. 1 Req. Non-Conform Remarks 812 813 814 815 816 817 818 819 102 102 102 102 30 30 30 30 11/17/2005 11/17/2005 11/17/2005 11/17/2005 11/18/2005 11/18/2005 11/18/2005 11/18/2005 820 30 11/21/2005 821 30 11/21/2005 822 30 11/21/2005 823 30 11/21/2005 824 30 11/22/2005 825 30 11/22/2005 826 30 11/22/2005 827 30 11/22/2005 828 30 11/22/2005 829 30 11/22/2005 830 30 11/29/2005 831 30 11/29/2005 RSF NB/RSF NB RT2:1 Slope Fill STA 265+50 80' RT of CL RSF NB/RSF NB RT 2:1 Slope Fill STA 265+00 80' RT of CL RSF NB/RSF NB RT 2:1 Stope Fill STA 268+00 75' RT of CL RSF NB/RSF NB RT 2:1 Slope Fill STA 268+50 90' RT of CL RSF NB/RSF NB RT 2:1 Stope Fill STA 266+00 45' RT of CL RSF NB/RSF NB RT 2:1 Slope Fill STA 265+00 60'RT OfCL RSF NB/RSF NB RT 2:1 Slope Fill STA 264+00 50'RT OfCL RSF NB/RSF NB RT 2:1 Slope Fill STA 268+00 35' RT of CL RSF NB STA 263+50 40' RT Of CL RSF NB STA 265+50 30' RT of CL RSF NB STA 267+00 20' RT of CL RSF NB STA 268+00, 30' RT of CL RSF NB Fill STA 269+00, 30' RT of CL RSF NB Fill STA 269+00, 30' RT of CL RSF NB Fill STA 269+00, 30' RT of CL Abbut. #4 RT RT Wingwall BF Abbut #4 RT RT Wingwall BF RSF NB Fill STA 269+00, 40' RT of CL Abbut. 4 RT Abbut. 4 RT EL-360 8.3% 8.0% 136.9 134.0 102.2% 90% EL-363 9.1% 8.0% 127.2 134.0 94.9% 90% Conform Conform Conform EL-355 9.9% 8.0% 128.6 134.0 96.0% 95% Conform EL-352 8.7% 8.0% 131.7 134.0 98.3% 95% Conform EL-366 7.9% 6.0% 128.6 140.0 91.9% 90% Conform EL-370 6.8% 6.0% 131.6 140.0 94.0% 90% Conform EL-374 8.3% 6.0% 133.2 140.0 95.1% 90% Conform EL-357 7.5% 6.0% 135.7 140.0 96.9% 95% Conform EL-380 7.5% 6.0% 135.9 140.0 97.1% 95% Conform EL-370 6.4% 6.0% 136.2 140,0 97.3% 95% Conform EL-362 8.7% 6.0% 135.1 140.0 96.5% 95% Conform EL-358 7.9% 6.0% 134.8 140.0 96.3% 95% Conform EL-345 8.3% 6.0% 136.3 140.0 97.4% 95% Conform EL-348 8.7% 6.0% 133.9 140.0 95.6% 95% Conform EL-352 7.5% 6.0% 134.8 140.0 96.3% 95% Conform EL-335 6.8% 6.0% 136.8 140.0 97.7% 95% Conform EL-337 6.0% 6.0% 136.2 140.0 97.3% 95% Conform EL-354 8.3% 6.0% 133.9 140.0 95.6% 95% Confonn EL-339 8.3% 6.0% 136.1 140,0 97.2% 95% Conform EL-341 7.5% 6.0% 135.3 140.0 96.6% 95% Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading fl II ft ffl il il li fel ik 11 11 fi ffi 11 ffl il 11 ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Tost Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Conform Test # Sample # Test Date Tost Location Elev. (ft) Field Opt. Field Max. Obt Req. Conform Non-Conform 832 30 12/6/2005 Abbut 1 RT BF EL-344 8.7% 6.0% 135.7 140.0 96.9% 95% Conform 833 30 12/6/2005 Abbut. 1 RT BF EL-346 6.8% 6.0% 135.8 140.0 97.0% 95% Conform 834 30 12/6/2005 Abbut. 1 RT BF EL-348 7.5% 6.0% 134.3 140.0 95.9% 95% Conform 835 30 12/6/2005 Abbut 1 RT BF EL-350 8.7% 6.0% 134.7 140.0 96.2% 95% Conform 836 30 12/6/2005 Abbut. 1 RT BF EL-352 7.9% 6.0% 136.1 140.0 97.2% 95% Conform 837 103 12/7/2005 Abbut. 1 RT, RT Wingwall EL-354 9.1% 7.0% 135.7 140.0 96.9% 95% Conform 838 103 12/7/2005 Abbut. 1 RT, LT Wingwall EL-354 7.1% 7.0% 136.9 140.0 97.8% 95% Conform 839 30 12/8/2005 Abbut. 4 RT LT Wingwall EL-332 8.7% 6.0% 135.9 140.0 97.1% 95% Conform 840 30 12/8/2005 Abbut. 4 RT LT Wingwall EL-334 7.9% 6.0% 135.3 140.0 96.6% 95% Conform 841 30 12/8/2005 Abbut 4 RT LT Wingwall EL-336 7,1% 6.0% 134.9 140.0 96.4% 95% Conform 842 103 12/9/2005 Abbut. 4 RT RT Wingwall EL-343 7.1% 7.0% 136.1 140.0 97.2% 95% Conform 843 103 12/9/2005 Abbut. 1 RT RT Wingwall EL-352 8.3% 7.0% 133.6 140.0 95.4% 95% Conform 844 103 12/9/2005 Abbut 1 RTRT Wingwall EL-354 9.1% 7.0% 133.8 140.0 95.6% 95% Conform 845 103 12/12/2005 RW-2 STA 10+20 EL-345 8.3% 7.0% 132.9 140.0 94.9% 90% Confonn 846 103 12/12/2005 RW-2 STA 11+0-0 EL-342 9.1% 7.0% 132.4 140.0 94.6% 90% Conform 847 103 12/12/2005 RW-2 STA 10+80 EL-344 7.5% 7.0% 131.7 140.0 94.1% 90% Conform 848 103 12/13/2005 RW-2 STA 12+20 EL-334 8.3% 7.0% 132.9 140.0 94.9% 90% Conform 849 103 12/13/2005 RW-2 STA 12+20 EL-336 7.5% 7.0% 132.7 140.0 94.8% 90% Conform 850 103 12/13/2005 RW-2 STA 10+50 EL-346 6.8% 7.0% 131.9 140.0 94.2% 90% Conform 851 103 12/13/2005 RW-2 STA 10+50 EL-348 7.5% 7.0% 129.8 140.0 92.7% 90% Conform 852 103 12/14/2005 RW-2 STA 12+00 EL-338 9.5% 7.0% 129.2 140.0 92.3% 90% Conform 853 104 12/13/2005 RW-2 STA 12+00 EL-340 8.7% 7.0% 130.9 140.0 93.5% 90% Conform 854 104 12/16/2005 RW-2 RT Face STA 10+20 EL-346 8.3% 7.0% 128.6 140.0 91.9% 90% Conform 855 104 12/16/2005 RW-2 RT Face STA 11 +50 EL-340 9,1% 7.0% 128.5 140.0 91.8% 90% Conform 856 30 12/19/2005 Abbut. RT LT Wingwall EL-338 7.1% 6.0% 136.2 140.0 97.3% 95% Conform 857 30 12/19/2005 Abbut RTLT Wingwall EL-340 9.1% 6.0% 134.4 140.0 96.0% 95% Conform 858 30 12/19/2005 Abbut. RT LT Wingwall EL-342 7.5% 6.0% 134.7 140.0 96.2% 95% Confonn Remarks grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading 1^ f| 19 fi ffi 11 ffi 11 fl tl 11 fi fl li 11 11 11 11 Vl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road Nortii, Phase 2 Carlsbad, Califomia Tost jji Sample Jl Test Test Location Ahhllt DT 1 T \Af!nn>.i-iM Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 859 ff 3D Dato i9/iQ/?nnR Test Location Ahhllt DT 1 T \Af!nn>.i-iM Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 860 30 12/20/2005 Abbut 4 RT EL-FSG 861 104 12/20/2005 Abbut 1 RT EL-FSG 862 104 12/20/2005 RW-2 RT Face STA 12+20 EL-334 863 104 12/22/2005 RW-2 LT Face STA 12+00 EL-342 864 104 12/23/2005 RSF NB STA 273+90 75' RT of CL EL-337 865 104 12/23/2005 RSF NB STA 273+80 80 'RT of CL EL-339 866 104 12/23/2005 RSF NB STA 273+85 70 'RT of CL EL-341 867 104 12/23/2005 RSF NB STA 273+95 80'RT of CL EL-343 868 104 12/23/2005 RSF NB STA 273+95 80'RT of CL EL-345 869 30 12/28/2005 RSF NB STA 274+20 80'RT of CL EL-336 870 98 12/28/2005 RSF NB STA 273+95 80'RT of CL EL-338 871 104 1/4/2006 RSF NB STA 267+50 30'RT of CL EL-361 872 104 1/4/2006 RSF NB STA 266+00 30'RT of CL EL-368 873 104 1/4/2006 RSF NB STA 264+50 30'RT of CL EL-375 874 104 1/4/2006 RSF NB STA 263+00 30'RT of CL EL-383 875 104 1/4/2006 RSF NB STA 261+50 30' RTof CL EL-385 876 104 1/4/2006 RSF NB STA 260+00 30' RT of CL EL-400 877 100 1/5/2006 RSF NB STA 275+00 25' RT of CL EL-341 878 104 1/9/2006 RSF NB STA 263+50 60'RT of CL EL-382 879 104 1/9/2006 RSF NB STA 263+00 60'RT of CL EL-384 880 104 1/9/2006 RSF NB STA 266+50 60'RT of CL EL-366 881 104 1/9/2006 RSF NB STA 266+00 60'RT of CL EL-369 882 104 1 /9/2006 RSF NB STA 268+50 65'RT of CL EL-357 883 104 1/10/2006 RSF NB RT Choker STA 261 +50 65'RT of CL EL-392 8.7% 7.5% 8.7% 7.9% 8.3% 7.1% 8.7% 9.1% 8.3% 7.4% 8,5% 8.7% 9.5% 9,9% 8.3% 9.9% 8.3% 11.5% 7.9% 9.1% 8.3% 8.7% 7.9% 8.7% 6.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 6.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 7.0% 9.0% 7.0% 7.0% 7.0% 7.0% 7,0% 7.0% 134,9 134,8 132.1 131.8 135.2 135.7 134.0 134.8 133.8 135.7 128.2 133.7 133.9 134.3 134.8 128.2 134.1 125.6 130.2 131.8 132.1 130.3 134.1 131.4 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140,0 140.0 134.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 884 104 1/11/2006 RSF NB RT Choker STA 259+00 70'RT of CL EL-408 7 1% 7.0% 130.8 140.0 96.4% 96.3% 94.4% 94.1% 96.6% 96.9% 95.7% 96.3% 95.6% 96.9% 95.7% 95.5% 95.6% 95.9% 96.3% 91.6% 95.8% 89,7% 93,0% 94.1% 94.4% 93.1% 95.8% 93.9% 93.4% 95% 95% 90% 90% 95% 95% 95% 90% 90% 95% 95% 95% 95% 95% 95% 90% 90% 90% 90% 90% 90% 90% 95% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading Conform grading f » r 1 1 fi ft 11 li li 11 fi 11 ii li il 11 ffi li 11 iV TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Caiifomia Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # OOC Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 130.6 140.0 93.3% 90% 886 104 1/11/2006 RSF NB RT Choker STA 257+50 70'RT of CL EL-417 8.7% 7.0% 133.7 140.0 95.5% 95% Conform 887 104 1/16/2006 RSF STA 274+10 @ CL EL-336 9,1% 7.0% 133.7 140.0 95.5% 95% Conform 888 104 1/16/2006 RSF STA 274+15 @CL EL-338 7.9% 7.0% 135.8 140.0 97.0% 95% Conform 889 104 1/16/2006 RSF STA 274+25 @ CL EL-340 8.7% 7,0% 135.1 140.0 96.5% 95% Conform 890 104 1/16/2006 RSF STA 274+30 @ CL EL-342 8.3% 7,0% 133.9 140.0 95.6% 95% Conform 891 105 1/17/2006 VWD 1 Access Rd STA 250 @ CL EL-331 9.5% 7.5% 131.9 137.0 96.3% 95% Conform 892 104 1/18/2006 RW-2 STA 11+25 EL-347 7.1% 7.6% 133.9 140.0 95.6% 95% Conform 893 104 1/19/2006 Abbut. 1 RT LT Wingwall LT Face EL-343 9.1% 7.0% 134.6 140.0 96.1% 95% Conform 894 104 1/19/2006 Abbut 1 RT LT Wingwall LT Face EL-345 7.9% 7.0% 135.2 140.0 96.6% 95% Conform 895 104 1/19/2006 Abbut. 1 RT & LT Wing Wall BF EL-347 8.7% 7.0% 133.6 140.0 95.4% 95% Conform 896 104 1/19/2006 Abbut. 1 RT & LT Wing Wall BF EL-349 8.3% 7.0% 135.3 140.0 96.6% 95% Conform 897 104 1/19/2006 Abbut. 1 RT & LT Wing Wall BF EL-351 8.3% 7.0% 133.9 140.0 95.6% 95% Conform 898 104 1/25/2006 RSF NB STA 274+00 80'RT of CL EL-337 8.3% 7.0% 133.9 140.0 95.6% 95% Conform 899 104 1/25/2006 RSF NB STA 274+00 80'RT of CL EL-339 9.1% 7.0% 134.2 140.0 95.9% 95% Conform 900 104 1/25/2006 Abbut. 4 RT RT Wingwall RT Face EL-335 7.9% 7.0% 134.2 140.0 95.9% 95% Conform 901 104 1/25/2006 Abbut. 4 RT RT Wingwall RT Face EL-337 8.7% 7.0% 134.9 140.0 96.4% 95% Conform 902 105 1/25/2006 RSF STA 274+10 @ CL EL-344 9.5% 7.5% 130.9 137.0 95.5% 95% Conform 903 105 1/25/2006 RSF STA 274+10 @CL EL-346 10.3% 7.5% 131.7 137.0 96.1% 95% Conform 904 104 1/26/2006 RSF STA 274+00 60'RT of CL EL-341 9.1% 7.0% 133.7 140.0 95.5% 95% Conform 905 105 1/26/2006 RSF STA 273+00 80'RT of CL EL-337 10.3% 7.5% 131.4 137.0 95.9% 95% Conform 906 105 1/26/2006 RSF STA 273+00 80'RT of CL EL-339 9.5% 7.5% 130.9 137.0 95.5% 95% Conform 907 105 1/27/2006 RSF STA 274+00 65' RT of CL EL-343 9.1% 7.5% 134.4 137.0 98.1% 95% Conform 908 104 2/1/2006 RSF STA 270+00 @ CL EL-353 8.7% 7.0% 134.4 140.0 96.0% 95% Conform 909 104 2/1/2006 RSF STA 270+00 @ CL EL-355 8.3% 7.0% 133.6 140.0 95.4% 95% Conform 910 105 2/1/2006 RSF STA 274+25 50'RT of CL EL-345 9.5% 7.5% 131.2 137.0 95.8% 95% Conform 911 98 2/3/2006 RSF NB RT Choker STA 277+25 EL-339 11.1% 9.0% 126.6 132.5 95.5% 95% Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading I » t li fi fl ffl ffi ft fl II 31 f I 11 11 ffl ffl ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Sanla Fe Road North, Phase 2 Carisbad, California Test Test Sample Test # # Oate 912 107 2/9/2006 913 110 2/13/2006 914 104 2/21/2006 915 5 2/22/2006 916 4 2/22/2006 917 5 2/23/2006 918 111 2/24/2006 919 104 2/27/2006 920 104 2/27/2006 921 98 3/3/2006 922 104 3/6/2006 923 111 3/13/2006 924 111 3/15/2006 925 111 3/15/2006 926 111 3/15/2006 927 111 3/15/2006 928 110 3/16/2006 929 110 3/16/2006 930 104 3/16/2006 931 110 3/16/2006 932 111 3/16/2006 933 111 3/17/2006 934 104 3/17/2006 935 104 3/17/2006 936 104 3/17/2006 937 AC 3/24/2006 Test Location Elev. (ft) Moisture Field Opt. Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Conform Remarks RW-2 Brow Ditch STA 11+50 La Costa Meadows STA 12+00 of CL RSF NB RT Choker STA 261+50 RSF SB STA 282+75 30'LT of CL RSF SB STA 283+75 45'LT of CL VWD-1 Access RD STA 2+75 RSF SB STA 283+25 30'LT of CL RSF STA 261+50 Median RSF STA 259+00 Median La Costa Meadows STA 11 +45 15' LT of CL San Elijo STA 99+00 RT Choker VWD-1 Access Rd STA 2+50 @ CL VWD-1 Access Rd STA 3+15 VWD-1 Access Rd STA 3+16 VWD-1 Access Rd STA 3+15 VWD-1 Access Rd STA 3+15 RSF STA 275+00 85'RT of CL La Costa Meadows STA 11+50 20'RT of CL RSF STA 255+00 35'RT of CL La Costa Meadows STA 10+50 @ CL RSF SB STA 283+25 30'LT of CL VWD-1 Access Rd STA 3+05 @ CL RSF STA 257+75 RT of CL RSF STA 258+75 RT CG RSF STA 259+75 RTofCL Melrose SB Inside Strip STA 209+50 EL-FGG EL-339 EL-394 EL-SG EL-SG EL-SG EL-7BG EL-SG EL-SG EL-338 7.5% 9.1% 9.1% 7.9% 10.3% 7.9% 13.2% 5.6% 6.8% 11.1% 6.5% 7.0% 8.5% 8.5% 8.5% 7.0% 12.0% 7.0% 7.0% 9.0% 127.3 129.1 127.3 131.2 126,0 134.0 115.5 133.0 134.6 122.3 133.5 136.0 140.0 137.5 131.0 137.5 118,5 140.0 140.0 132.5 95.4% 94.9% 90.9% 95.4% 96.2% 97.5% 97.5% 95.0% 96.1% 92.3% 95% 95% 90% 95% 95% 95% 95% 95% 95% 90% Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading EL-422 8.7% 7.0% 134.3 140.0 95.9% 95% Confomi grading EL-7" 13.2% 12.0% 116.2 118.5 98.1% 95% Conform grading Below grading EL-327 13.2% 12.0% 113.5 118.5 95.8% 95% Conform grading EL-327 12.7% 12.0% 115.1 118.5 97.1% 95% Conform grading EL-328 13.6% 12.0% 113.9 118.5 96.1% 95% Conform grading EL-328 12.4% 12.0% 114.0 118.5 96.2% 95% Conform grading EL-340 10.3% 7.0% 128.8 136.0 94.7% 90% Conform grading EL-340 9.5% 7.0% 127.4 136.0 93.7% 90% Conform grading EL-426 9.1% 7.0% 135.2 140.0 96.6% 90% Conform grading EL-342 9.9% 7.0% 128.2 136.0 94.3% 90% Confomi grading EL-BG 13.2% 12.0% 115.5 118.5 97.5% 95% Conform grading EL-BG 12.7% 12.0% 136.7 118.5 115.4% 95% Conform grading EL-SG 9.1% 7.0% 134.6 140.0 96.1% 95% Confomi grading EL-SG 8.3% 7.0% 134.6 140.0 96.1% 95% Conform grading EL-SG 7.9% 7.0% 136.5 140.0 97.5% 95% Conform grading AC Grade 142.3 149.1 95.4% 95% Conform grading fl f» li ffi fi 11 fi II 11 II I I II fl 11 fl ii ii 11 il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name; Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Confonn Remarks # # AP Date "i/OA/onnfi Test Location Elev. (ft) Field Opt. Field Max. Obt Req. Non-Conform Remarks 939 AC 3/24/2006 Melrose SB Inside Strip STA 214+00 AC Grade 940 AC 3/24/2006 Melrose 2nd Inside STA 211+00 AC Grade 941 AC 3/24/2006 Melrose 2nd Inside STA 213+00 ACGrade 942 AC 3/24/2006 Melrose SB Center Strip STA 210+50 ACGrade 943 AC 3/24/2006 Melrose SB Center Strip STA 213+50 AC Grade 944 AC 3/24/2006 Corintia RT Strip STA 11 +50 AC Grade 945 AC 3/24/2006 Corintia Center Strip STA 11+75 ACGrade 946 AC 3/24/2006 RSF SB Inside Strip STA 283+75 AC Grade 947 AC 3/24/2006 RSF SB Center Strip STA STA 283+25 AC Grade 948 AC 3/24/2006 RSF SB Outskle Strip STA 282+75 AC Grade 949 AC 3/24/2006 VWD-7 Access Rd LT Strip STA 2+00 AC Grade 950 AC 3/24/2006 VWD-7 Access Rd RT Strip STA 2+50 AC Grade 951 AC 3/24/2006 Melrose SB Outside Strip STA 14+50 AC Grade 952 AC 3/24/2006 Melrose SB Outside Strip STA 12+00 AC Grade 953 AC 3/24/2006 Corintia LT Strip STA 11+00 ACGrade 954 AC 3/24/2006 Corintia Center Strip STA 12+00 AC Grade 955 AC 3/24/2006 Corintia RT Strip STA 11+50 ACGrade 956 AC 3/24/2006 Melrose SB Outside Strip STA 209+00 AC Grade 957 AC 3/24/2006 SDG&E Pothote RSF SB ACGrade 958 AC 3/24/2006 RSF SB Outside Strip 283+75 ACGrade 959 AC 3/24/2006 RSF SB Center Strip 282+75 ACGrade 960 AC 3/24/2006 RSF SB Inside Strip 283+25 AC Grade 961 AC 3/24/2006 RSF SB Inside Strip 283+75 ACGrade 962 AC 3/24/2006 RSF SB Center Strip 283+50 AC Grade 963 AC 3/24/2006 RSF SB Outside Strip 282+75 ACGrade 141.9 143.6 144.5 142.8 141.5 145.0 143.6 144.5 145.6 142.9 144.8 143.0 145.2 143.9 144.6 142.3 146.0 143.7 145.5 144.2 141.6 145.8 140.9 143,7 145.0 149.1 149.1 149.1 149.1 149.1 148.3 148.3 148.3 148.3 148.3 149.1 149.1 149,1 149,1 149,1 149,1 149.1 149.1 149.1 149.1 149.1 149.1 149.1 149.1 149 1 95.2% 96.3% 96.9% 95.8% 94.9% 97.8% 96,8% 97,4% 98.2% 96.4% 97.1% 95.9% 97.4% 96.5% 97.0% 95.4% 97.9% 96.4% 97.6% 96.7% 95.0% 97.8% 94.5% 96.4% 97.3% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading f) I? i % ffi li li 11 fl fl il II ii ffl ffl ffl ffl fl fl 11 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. Califomia Test Sample Test Test Location DCC CD rtiiteiWa C*nn oooj.nn Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # QRA # AP Date Test Location DCC CD rtiiteiWa C*nn oooj.nn Elev. (ft) Field Opt. Fiold 1 Max. Obt. Req. Non-Conform Remarks 965 51 4/7/2006 La Costa Meadows STA 11 +40 20' RT of CL EL-340 9.5% 7.0% 128.5 135.0 95.2% 95% 95% f * 966 4 4/12/2006 RSF NB STA 274+75 RT Choker EL-343 10.3% 8.5% 124.5 131.0 95.0% 95% 967 4 4/12/2006 La Costa Meadows STA 10+80 LT Choker EL-341 9.5% 8.5% 126.8 131.0 96.8% 95% 968 104 4/13/2006 RSF NB STA 261+25 30'RT of CL EL-392 8.7% 7.0% 134.4 140.0 96.0% 90% 969 104 4/13/2006 RSF NB STA 262+75 45'RT of CL EL-384 7.5% 7.0% 135.3 140.0 96.6% 90% 970 104 4/13/2006 RSF NB STA 264+75 25'RT of CL EL-373 8.3% 7.0% 135.6 140.0 96.9% 90% 971 104 4/13/2006 RSF NB STA 266+25 40'RT of CL EL-366 8.7% 7.0% 136.2 140.0 97.3% 90% 972 104 4/13/2006 RSF NB STA 268+00 40'RT of CL EL-356 7.1% 7.0% 135.7 140,0 96.9% 90% 973 104 4/13/2006 RSF NB STA 268+75 25'RT of CL EL-356 9.1% 7.0% 134.6 140.0 96.1% 90% 974 104 4/13/2006 RSF NB STA 266+75 25'RT of CL EL-364 7.5% 7.0% 134.4 140.0 96.0% 95% 975 104 4/13/2006 RSF NB STA 265+00 25'RT of CL EL-371 8.7% 7.0% 134.0 140.0 95.7% 95% 976 104 4/13/2006 RSF NB STA 263+00 25'RT of CL EL-383 9.1% 7.0% 134.2 140.0 95.9% 95% 977 104 4/13/2006 RSF NB STA 261+50 25'RT of CL EL-391 8.3% 7.0% 136.3 140.0 97.4% 95% 978 104 4/14/2006 RSF NB STA 264+50 RT CG EL-SG 8.3% 7.0% 135.7 140.0 96.9% 95% 979 104 4/14/2006 RSF NB STA 262+50 30'RT of CL EL-SG 7.9% 7.0% 135.7 140.0 96.9% 95% 980 104 4/14/2006 RSF NB STA 263+00 RT CG EL-SG 8.7% 7.0% 133.9 140.0 95.6% 95% 981 104 4/14/2006 RSF NB STA 263+50 40'RT of CL EL-SG 9.1% 7.0% 134.3 140,0 95.9% 95% 982 104 4/17/2006 RSF NB STA 264+50 RT CG EL-SG 8.7% 7.0% 134.4 140,0 96.0% 95% 983 104 4/17/2006 RSF NB STA 265+00 45'RT of CL EL-SG 8.3% 7.0% 134.2 140.0 95.9% 95% 984 104 4/17/2006 RSF NB STA 266+00 RT CG EL-SG 7.5% 7.0% 134.7 140.0 96.2% 95% 985 104 4/17/2006 RSF NB STA 266+50 40'RT of CL EL-SG 9.1% 7.0% 136.5 140.0 97.5% 95% 986 104 4/17/2006 RSF NB STA 267+50 RT CG EL-SG 7.5% 7.0% 134.1 140,0 95.8% 95% 987 104 4/17/2006 RSF NB STA 268+00 LT CG EL-SG 8,7% 7.0% 135.7 140.0 96.9% 95% 988 104 4/17/2006 RSF NB STA 269+00 40'RT of CL EL-SG 7.9% 7.0% 136.1 140.0 97.2% 95% 989 120 4/17/2006 RSF NB STA 269+00 40'RT of CL EL-SG 7.5% 6.5% 133.2 137.5 96,9% 95% 990 120 4/17/2006 RSF NB STA 269+00 40'RT of CL EL-SG 7.1% 6.5% 131.4 137.5 95.6% 95% f 1 1 i f 1 1 1 1 i f 1 1 1 1 1 t 1 t i 1 i i 1 Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading Iiiiiiiiii TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. California Test Sample Tost Test Location DCC MD CTA oarij_nii Amw^-r _c i^i Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # QQ1 # Date Test Location DCC MD CTA oarij_nii Amw^-r _c i^i Elev. (ft) Field Opt. Field j Max. Obt Req. Non-Conform Remarks 992 120 4/17/2006 RSF NB STA 269+00 40'RT of CL 993 120 4/17/2006 RSF NB STA 269+00 40'RT of CL 994 120 4/18/2006 RSF NB STA 264+00 RT of CL 995 120 4/18/2006 RSF NB STA 266+00 RT of CL 996 120 4/18/2006 RSF NB STA 268+00 RT of CL 997 120 4/18/2006 RSF NB STA 268+00 LT of CL 998 104 4/19/2006 RSF NB STA 255+40 RT CG 999 104 4/19/2006 San Elijo SB STA 98+77 LT CG 1000 104 4/19/2006 San Elijo SB STA 99+00 10'LT of CL 1001 104 4/19/2006 San Elijo NB STA 99+00 LT CG 1002 104 4/19/2006 RSF NB STA 255+20 10'RT of CL 1003 104 4/19/2006 San Elijo NB STA 99+00 RT CG 1004 104 4/20/2006 San Elijo STA 98+00 @ CL 1005 120 4/20/2006 RSF NB STA 269+00 1006 120 4/21/2006 RSF NB STA 258+50 RT LG 1007 120 4/22/2006 RSF NB STA 260+00 RT LG 1008 120 4/23/2006 RSF NB STA 264+50 RT LG 1 [ ifi r 9 t 1 f i EL-SG EL-SG EL-7" Below BG 8.3% 7.9% 6.8% 6.5% 6.5% 6.5% 131.3 132.6 132.1 137.5 137.5 137,5 95.5% 96.4% 96.1% 95% 95% 95% 95% Conform Conform Conform Conform grading grading grading grading EL-7" 7.9% 6.5% 131.7 137.5 95.8% 95% Conform grading Below BG grading EL-7" 8.3% 6.5% 132.9 137,5 96.7% 95% Conform grading Betow BG grading EL-7" 6.4% 6.5% 132.3 137,5 96.2% 95% Conform grading Below BG grading EL-SG 8.7% 7.0% 133.6 140.0 95.4% 95% Conform grading EL-SG 7.5% 7.0% 133.9 140.0 95.6% 95% Conform grading EL-SG 8.3% 7.0% 137.5 140.0 98.2% 95% Conform grading EL-SG 7.9% 7.0% 134.3 140.0 95.9% 95% Conform grading EL-SG 8.7% 7.0% 134.6 140.0 96.1% 95% Conform grading EL-SG 7.5% 7.0% 136.2 140.0 97.3% 95% Conform grading EL-SG 7.1% 6.5% 135.5 140.0 96.8% 95% Confonn grading EL-7" 7,5% 6.5% 131.3 137,5 95.5% 95% Conform grading Below BG grading EL-BG 8.3% 6.5% 131,4 137.5 95.6% 95% Conform grading EL-BG 7.1% 6.5% 132.7 137.5 96.5% 95% Confonn grading EL-BG 7.9% 6.5% 132.6 137.5 96.4% 95% Conform grading 1 1 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test # 1009 Sample Jl Test Test Location R.QC MR CTA ORtj-nn DT 1 n Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks Test # 1009 ff i?n Date d/?4/9nnR Test Location R.QC MR CTA ORtj-nn DT 1 n Elev. (ft) Field ll -#(-1/ Opt. Field Max. Obt. Req. Non-Conform Remarks 1010 120 4/25/2006 RSF NB STA 264+50 RT LG 1011 120 4/26/2006 RSF NB STA 266+00 RT LG 1012 120 4/27/2006 RSF NB STA 267+50 RT LG 1013 120 4/21/2006 RSF NB STA 269+00 RT CG 1014 120 4/21/2006 RSF NB STA 269+50 RT Median CG 1015 120 4/21/2006 RSF NB STA 268+00 RT Median CG 1016 120 4/21/2006 RSF NB STA 266+50 3'RT of RT Med. FC 1017 120 4/21/2006 RSF NB STA 265+00 3'RT of RT Med. FC 1018 125 4/22/2006 San Elijo STA 98+75 RT Median CG 1019 125 4/22/2006 RSF NB STA 257+50 RT CG 1020 1021 1022 1023 1024 125 125 125 125 125 4/22/2006 4/22/2006 4/22/2006 4/22/2006 4/22/2006 1025 125 4/22/2006 1026 125 4/22/2006 1027 120 4/22/2006 1028 120 4/24/2006 1029 120 4/24/2006 RSF NB STA 255+50 RT CG RSF NB STA 256+50 30'RT of CL San Elijo NB STA 99+00 15'RT of CL San Elijo SB STA 99+00 .5'LT of CL San Elijo SB STA 99+25 LT of CL San Elijo NB STA 98+65 RT CG RSF NB STA 257+50 RT CG RSF NB STA 263+50 8'RT Median FC RSF NB STA 262+00 8'RT Median FC RSF NB STA 260+50 8'RT Median FC EL-BG EL-BG EL-BG EL-BG EL-BG EL-BG EL-BG EL-BG 6" Below BG 7.9% 7.1% 7.5% 6.8% 7.5% 7.9% 6.8% 8.3% 12.4% 6.5% 6.5% 6.5% 6.5% 6.5% 6.5% 6.5% 6.5% 12.5% 133.2 133.1 133.2 134.6 134,3 134.5 133.8 133.7 117.7 137.5 137,5 137.5 137.5 137.5 137.5 137.5 137.5 120.5 96.9% 96.8% 96.9% 97.9% 97.7% 97.8% 97.3% 97.2% 97.7% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading 7" Below 13.6% 12.5% 116,9 120.5 97.0% 95% Conform grading BG grading 7" Below 12.8% 12.5% 116.8 120.5 96.9% 95% Conform grading BG grading 7" Below 12.4% 12.5% 116.3 120.5 96.5% 95% Conform grading BG grading 6" Below 13.6% 12.5% 116,6 120.5 96.8% 95% Conform grading BG grading 6" Betow 12.4% 12.5% 115.8 120.5 96.1% 95% Conform grading BG grading 7" Below 12.8% 12.5% 115.2 120.5 95.6% 95% Conform grading BG grading EL-BG 13.6% 12.5% 115.4 120.5 95.8% 95% Conform grading EL-BG 12.8% 12.5% 115.2 120.5 95.6% 95% Conform grading EL-BG 7.5% 6.5% 130.8 137.5 95.1% 95% Conform grading EL-BG 7.3% 6.5% 132.6 137.5 96.4% 95% Conform grading EL-BG 7.1% 6.5% 131.6 137.5 95.7% 95% Conform grading 11 II fill li ffl ffl fi fl tl tl li iiil li i»ti 11 11 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Tost Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # 1030 # i9n Date AJOArynriR Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 1031 125 4/24/2006 RSF NB STA 257+50 8'RT Median FC 1032 125 4/24/2006 RSF NB STA 253+50 8'RT Median RT CG 1033 125 4/24/2006 San Elijo SB STA 98+75 LT CG 1034 125 4/24/2006 San Elijo SB STA 98+70 LT Median CG 1035 125 4/24/2006 San Elijo NB STA 99+00 RT Median CG 1036 104 4/24/2006 RSF NB STA 273+75 RT CG 1037 104 4/24/2006 RSF NB STA 275+00 Median RT CG 1038 104 4/24/2006 RSF NB STA 274+50 45'RT of CL 1039 120 4/24/2006 RSF NB STA 273+50 RT CG 1040 120 4/24/2006 RSF NB STA 274+25 Median RT CG 1041 120 4/24/2006 RSF NB STA 274+75 35' RT of CL 1042 120 4/24/2006 RSF NB STA 274+75 35' RT CG 1043 120 4/24/2006 RSF NB STA 274+50 Median RT CG 1044 125 4/26/2006 RSF NB STA 258+00 Bus Tumout 1045 125 4/27/2006 San Elijo SB STA 99+00 10' LT of CL 1046 125 4/28/2006 RSF NB STA 257+50 30' RT of CL 1047 120 4/28/2006 RSF NB STA 259+00 50' RT of CL 1048 120 4/28/2006 RSF NB STA 261 +00 50' RT of CL 1049 120 4/28/2006 RSF NB STA 263+00 45' RT of CL 1050 120 4/28/2006 RSF NB STA 265+00 25' RT of CL 1051 120 4/28/2006 RSF NB STA 267+00 45' RT of CL 1052 120 4/28/2006 RSF NB STA 269+00 30' RT of CL 1053 120 4/28/2006 RSF NB STA 274+50 40' RT of CL 1054 125 4/28/2006 RSF NB STA 255+50 40' RT of CL EL-BG EL-BG EL-BG EL-BG BG SG SG SG 7" Below BG 7" Below BG 7" Below BG BG BG BG BG BG BG BG BG BG BG BG BG BG 13.6% 12,4% 13.2% 12.8% 12.8% 8.3% 7.5% 7.9% 8.3% 12.5% 12.5% 12.5% 12.5% 12.5% 6.5% 6.5% 6.5% 6.5% 115.3 117.1 114.5 115.5 115.3 136.1 135.0 135.2 136.2 120.5 120.5 120.5 120.5 120.5 140.0 140.0 140,0 137.5 95.7% 97.2% 95.0% 95.9% 95.7% 97.2% 96.4% 96.6% 99.1% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading 8.7% 6.5% 135.1 137.5 98.3% 95% Conform grading 8.3% 6.5% 134.5 137.5 97.8% 95% Conform grading 7.1% 6.5% 133.7 137.5 97.2% 95% Conform grading 7.9% 6.5% 133.7 137.5 97.2% 95% Conform grading 13.6% 12.5% 114.8 120.5 95.3% 95% Conform grading 11.1% 12.5% 115.6 120.5 95.9% 95% Conform grading 13.6% 12.5% 116.0 120.5 96.3% 95% Conform grading 7.1% 6.5% 131.8 137.5 95.9% 95% Conform grading 7.5% 6.5% 132.2 137.5 96.1% 95% Conform grading 7.9% 6.5% 132.4 137.5 96.3% 95% Conform grading 6,8% 6.5% 131.9 137.5 95.9% 95% Confonn grading 8.3% 6.5% 131.9 137.5 95.9% 95% Conform grading 7.9% 6.5% 133.6 137.5 97.2% 95% Conform grading 7.5% 6.5% 132.7 137.5 96.5% 95% Conform grading 13.2% 12.5% 114.8 120.5 95.3% 95% Conform grading f« fl li 11 fi ffl li fi li I I (I fl ft fi ii il fl 11 ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test JC Sample # Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff Sample # Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 1055 1056 1057 125 125 AC 4/28/2006 4/28/2006 5/1/2006 San Elijo SB STA 99+00 20' LT of CL San Elijo NB STA 98+75 20' RT of CL RSF NB Outside Strip STA 273+50 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 12.8% 13.2% 12.5% 12.5% 119.6 116.2 142.8 120.5 120.5 146.8 99.3% 96,4% 97.3% 95% 95% 95% Conform Conform Conform grading grading grading 1058 AC 5/1/2006 RSF NB Outside Strip STA 274+50 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 143.1 146.8 97.5% 95% Conform grading 1059 AC 5/1/2006 RSF NB Center Strip STA 274+00 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 144.5 146.8 98.4% 95% Conform grading 1060 AC 5/1/2006 RSF NB Outside Strip STA 268+50 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 142.5 146.8 97.1% 95% Conform grading 1061 AC 5/1/2006 RSF NB Outside Strip STA 267+00 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 144.0 146.8 98.1% 95% Conform grading 1062 AC 5/1/2006 RSF NB Outside Strip STA 265+50 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 143.6 146.8 97.8% 95% Conform grading 1063 AC 5/1/2006 RSF NB Outside Strip STA 264+00 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 142.5 146,8 97.1% 95% Conform grading 1064 AC 5/1/2006 RSF NB Outside Strip STA 262+50 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 145.0 146.8 98.8% 95% Conform grading 1065 AC 5/1/2006 RSF NB Outside Strip STA 261+00 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 142.9 146.8 97.3% 95% Conform grading 1066 AC 5/1/2006 RSF NB Outside Strip STA 259+50 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 143.1 146.8 97.5% 95% Conform grading 1067 AC 5/1/2006 RSF NB Outside Strip STA 258+00 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 142.7 146.8 97.2% 95% Conform grading 1068 AC 5/1/2006 RSF NB Center Strip STA 274+25 BG BG 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 143.6 146.8 97.8% 95% Conform grading 1069 AC 5/1/2006 RSF NB Inside Strip STA 274+00 4" Below AC 145.1 146.8 98.8% 95% Conform grading f 1 1 1 ff 1 ff 1 ( i 1 i f 1 t 1 1 1 1 1 f V 1 1 f i f lfl flf TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # Date Test Location Elev. (ft) Field Opt Field Max. Obt. Req. Non-Conform Remarks 1070 AC 5/1/2006 RSF NB Inside Strip STA 274+50 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 144.3 146.8 98.3% 95% Conform grading 1071 AC 5/1/2006 RSF NB Center Strip STA 269+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 142.0 146.8 96.7% 95% Conform grading 1072 AC 5/1/2006 RSF NB Center Strip STA 267+50 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 145.5 146.8 99.1% 95% Conform grading 1073 AC 5/1/2006 RSF NB Center Strip STA 266+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 144.2 146.8 98.2% 95% Conform grading 1074 AC 5/1/2006 RSF NB Center Strip STA 264+50 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 143.8 146.8 98.0% 95% Conform grading 1075 AC 5/1/2006 RSF NB Center Strip STA 263+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 143.4 146.8 97.7% 95% Conform grading 1076 AC 5/1/2006 RSF NB Center Strip STA 261+50 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 142.6 146.8 97.1% 95% Conform grading 1077 AC 5/1/2006 RSF NB Center Strip STA 260+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 145.0 146.8 98.8% 95% Conform grading 1078 AC 5/1/2006 RSF NB Center Strip STA 258+50 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 144,3 146.8 98.3% 95% Conform grading 1079 AC 5/1/2006 RSF NB Inside Strip STA 268+75 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 142.4 146.8 97,0% 95% Conform grading 1080 AC 5/1/2006 RSF NB Inside Strip STA 267+25 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 143.6 146.8 97.8% 95% Conform grading 1081 AC 5/1/2006 RSF NB Inside Strip STA 265+75 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 143.1 146.8 97.5% 95% Conform grading 1082 AC 5/1/2006 RSF NB Inside Strip STA 264+25 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 144.0 146.8 98.1% 95% Conform grading 1083 AC 5/1/2006 RSF NB Inside Strip STA 262+75 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 142.8 146.8 97.3% 95% Conform grading 1084 AC 5/1/2006 RSF NB Inside Strip STA 261+25 4" Below AC 144.3 146.8 98.3% 95% Conform grading fl II II fi fi fi 11 11 f I i 1 11 tl fi fi fi fl fl il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test # Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks Test # # Date Test Location Elev. (ft) Field Opt. Field Max. Obt Req. Non-Conform Remarks 1085 AC 5/1/2006 RSF NB Inside Strip STA 259+75 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 143.0 146.8 97.4% 95% Conform grading 1086 AC 5/1/2006 RSF NB Inside Strip STA 258+25 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 142.5 146.8 97.1% 95% Conform grading 1087 AC 5/1/2006 RSF NB Inside Strip STA 256+75 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 144.2 146,8 98,2% 95% Conform grading 1088 AC 5/1/2006 RSF NB Inside Strip STA 255+25 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 145.0 146.8 98.8% 95% Conform grading 1089 AC 5/1/2006 San Elijo SB Outside Strip STA 98+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 142.9 146.8 97.3% 95% Conform grading 1090 AC 5/1/2006 San Elijo SB Outside Strip STA 99+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 144.6 146.8 98.5% 95% Conform grading 1091 AC 5/1/2006 San Elijo SB Inside Strip STA 98+75 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 143.3 146.8 97.6% 95% Conform grading 1092 AC 5/1/2006 San Elijo SB Inside Strip STA 98+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 146.0 146.8 99.5% 95% Conform grading 1093 AC 5/1/2006 San Elijo SB Inside Strip STA 99+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 144.5 146.8 98.4% 95% Confomn grading 1094 AC 5/1/2006 San Elijo SB Outside Strip STA 98+75 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 143.2 146.8 97.5% 95% Conform grading 1095 AC 5/1/2006 RSF NB Outside Strip STA 273+45 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 142.2 144.1 98.7% 95% Conform grading 1096 AC 5/1/2006 RSF NB Outside Strip STA 274+25 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 143.5 144.1 99.6% 95% Conform grading 1097 AC 5/1/2006 RSF NB Center Strip STA 274+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 143.9 144.1 99.9% 95% Conform grading 1098 AC 5/1/2006 RSF NB Inside Strip STA 274+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 144.6 144.1 100.3% 95% Conform grading 1099 AC 5/1/2006 RSF NB Inside Strip STA 268+00 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Betow AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC AC-Grade 143.6 144.1 9g7% 95% Conform grading i 1 flll 1 1 f 1 f 1 1 9 f i 1 1 f • f 1 f 1 f 1 ff iffl ff 1 ff TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name; Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. Califomia Test Jf Sample Jl Test Tost Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 1100 ff AC Date *i/i/?nnR Tost Location Elev. (ft) Field Opt. Field 1 Max. Obt. Req. Non-Conform Remarks 1101 AC 5/1/2006 RSF NB Inside Strip STA 265+00 AC Grade 1102 AC 5/1/2006 RSF NB Inside Strip STA 263+50 AC Grade 1103 AC 5/1/2006 RSF NB Inside Strip STA 263+00 AC Grade 1104 AC 5/1/2006 RSF NB Inside Strip STA 261+50 ACGrade 1105 AC 5/1/2006 RSF NB Inside Strip STA260+00 ACGrade 1106 AC 5/1/2006 RSF NB Inside Strip STA 258+50 AC Grade 1107 AC 5/1/2006 RSF NB Inside Strip STA257+00 ACGrade 1108 126 5/1/2006 La Costa Meadows STA 11+15 341 1109 126 5/1 /2006 La Costa Meadows STA 11 +00 343 1110 AC 5/2/2006 RSF NB Inside Strip STA 237+50 ACGrade 1111 AC 5/2/2006 RSF NB Outside Strip STA 256+00 ACGrade 1112 AC 5/2/2006 San Elijo SB Outside Strip STA 98+50 ACGrade 1113 AC 5/2/2006 San Elijo NB Inside Strip STA 99+00 AC Grade 1114 AC 5/2/2006 San Elijo NB Inside Strip STA98+76 ACGrade 1115 AC 5/2/2006 San Elijo NB Outside Strip STA 99+77 ACGrade 1116 AC 5/2/2006 RSF NB Outside Strip STA 257+50 AC Grade 1117 AC 5/2/2006 RSF NB Outside Strip STA 259+00 AC Grade 1118 AC 5/2/2006 RSF NB Outside Strip STA 260+50 ACGrade 1119 AC 5/2/2006 RSF NB Outside Strip STA 262+00 AC Grade 1120 AC 5/2/2006 RSF NB Outside Strip STA 263+50 ACGrade 1121 AC 5/2/2006 RSF NB Outside Strip STA 265+00 AC Grade 1122 AC 5/2/2006 RSF NB Outside Strip STA 266+50 AC Grade 1123 AC 5/2/2006 RSF NB Outside Strip STA 268+00 AC Grade 1124 AC 5/2/2006 RSF NB Center Strip STA 255+75 AC Grade 1125 AC 5/2/2006 RSF NB Center Strip STA 257+25 ACGrade 10.3% 9.1% 8.0% 8.0% 142.7 141.8 144.0 142.3 144.6 145.0 143.1 126.7 126.9 141.9 142.6 143.0 141.5 144.2 143.3 142.0 143.5 143.9 142.4 142.8 141.7 142.5 142.9 140.9 143.5 144.1 144.1 144.1 144.1 144.1 144.1 144.1 133.5 133.5 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 143.7 99.0% 98.4% 99.9% 98.8% 100.3% 100.6% 99.3% 94.9% 95.1% 98.7% 99.2% 99.5% 98.5% 100.3% 99.7% 98.8% 99.9% 100.1% 99.1% 99.4% 98.6% 99.2% 99.4% 98.1% 99.9% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading [ I fl fl fl fl fl fi ti 11 fi fl fi ffi ffi ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name; Location; 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Test Localion DCC hID r^AHlA. Cli»_ f-TA OEO.-ir Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # 119R # AP Date Test Localion DCC hID r^AHlA. Cli»_ f-TA OEO.-ir Elev. (ft) Field Opt. Fiold Max. Obt Req. Non-Conform Remarks 1127 AC 5/2/2006 RSF NB Center Strip STA 260+25 AC Grade 1128 AC 5/2/2006 RSF NB Center Strip STA 261 +75 AC Grade 1129 AC 5/2/2006 RSF NB Center Strip STA 263+25 AC Grade 1130 AC 5/2/2006 RSF NB Center Strip STA 264+75 AC Grade 1131 AC 5/2/2006 RSF NB Center Strip STA 266+25 ACGrade 1132 AC 5/2/2006 RSF NB Center Strip STA 267+75 AC Grade 1133 AC 5/2/2006 RSF NB Center Strip STA 268+73 AC Grade 1134 126 5/2/2006 La Costa Meadows STA 11+50 LT Choker 340 1135 126 5/2/2006 La Costa Meadows STA 11+25 LT Choker 342 1136 127 5/3/2006 VWD-2 Access RD STA 10+65 352 10.3% 8.5% 1137 127 5/3/2006 VWD-2 Access RD STA 10+75 354 9.9% 8.5% 1138 127 5/3/2006 VWD-2 Access RD STA 10+90 356 10.7% 8.5% 1139 110 5/4/2006 VWD-2 Access RD STA 11 +50 @ CL 359 9.1 % 7.0% 1140 110 5/4/2006 RSF NB RT 2:1 Slope STA 269+25 351 9.5% 7.0% 1141 110 5/4/2006 RSF NBRT 2:1 Slope STA 269+25 353 7.9% 7.0% 1142 110 5/4/2006 RSF NB RT 2:1 Slope STA 269+25 355 8.3% 7.0% 1143 110 5/4/2006 VWD-2 Access Rd. STA 13+00 @ CL 353 8.7% 7.0% 1144 126 5/8/2006 La Costa Meadows STA 11+75 LT Choker 341 9.5% 8.0% 1145 127 5/9/2006 La Costa Meadows STA 11+75 RT Choker 340 9.1% 8.0% 1146 126 5/15/2006 RSF STA 277+50 Median Choker 339 9.9% 8.0% 1147 126 5/16/2006 RSF STA 275+50 Median Choker 343 8.7% 8.0% 1148 104 5/16/2006 RSF NB STA 265+50 RT Sidewalk FSG 8.7% 6.0% 1149 104 5/16/2006 RSF NB STA 267+50 RT Sidewalk FSG 7.9% 6.0% 1150 126 5/17/2006 RSF NB STA 283+00 RT CG SG 9.1 % 8.0% 1151 126 5/17/2006 RSF NB STA 283+00 20' RT of CL SG 8.7% 8.0% 1152 126 5/17/2006 RSF NB STA 282+00 40'RT of CL SG 8.3% 8.0% 142.5 143.8 144.2 145.0 141.6 142.4 142.0 125.2 125.9 127.7 128.6 128.5 128.0 130.8 132.2 131.0 131.7 128.3 127.8 129.4 130.7 134.8 135.1 127.5 130.2 129.8 143.7 143.7 143.7 143.7 143.7 143.7 143.7 133.5 133.5 135.0 135,0 135.0 136.0 136.0 136.0 136.0 136.0 133.5 133.5 133.5 133.5 140.0 140.0 133.5 133.5 133.5 99.2% 100.1% 100.3% 100.9% 98.5% 99.1% 98.8% 93.8% 94.3% 94.6% 95.3% 95.2% 94.1% 96.2% 97.2% 96.3% 96.8% 96.1% 95.7% 96.9% 97.9% 96.3% 96.5% 95.5% 97,5% 97.2% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 95% 95% 95% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading fffiffiffiflflfll II fl fi 11 ffl ffl ffl ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test JC Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff # i9n Date Test Location Elev. (ft) Field 1 Opt. Fieid Max. Obt. Req. Non-Conform Remarks 1154 104 5/17/2006 RSF NB STA 275+50 Median RT CG 1155 104 5/17/2006 RSF NB STA 277+50 Median RT CG 1156 104 5/17/2006 RSF NB STA 276+00 Median RT CG 1157 104 5/17/2006 RSF NB STA 277+50 RT CG 1158 104 5/17/2006 RSF NB STA 276+50 40'RT of CL 1159 104 5/17/2006 RSF NB STA 275+00 30' RT of CL 1160 126 5/17/2006 RSF NB STA 279+00 RT CG 1161 126 5/17/2006 RSF NB STA 280+50 RT CG 1162 126 5/18/2006 RSF NB STA 278+00 20' RT of CL 1163 98 5/18/2006 La Costa Meadows STA 12+00 RT CG 1164 105 5/18/2006 La Costa Meadows STA 11+75 @ CL 1165 105 5/18/2006 La Costa Meadows STA 12+00 LT CG 1166 126 5/18/2006 RSF NB STA 280+50' RT of CL 1167 135 5/18/2006 La Costa Meadows STA 13+00 RT CG 1168 135 5/18/2006 La Costa Meadows STA 11+50 @ CL 1169 135 5/18/2006 La Costa Meadows STA 11 +75 LT CG 1170 138 5/18/2006 RSF NB STA 276+00 Median RT CG 1171 138 5/18/2006 RSF NB STA 277+50 Median RT CG 1172 138 5/18/2006 RSF NB STA 279+50 Median RT CG 1173 135 5/18/2006 RSF NB STA 275+50 40'RT of CL SG SG SG SG SG SG SG SG SG SG SG SG SG 6" Below BG 6" Below BG 6" Below BG 6" Below BG 6" Below BG 6" Below BG 6" Below BG 7.5% 8.3% 6.8% 7.5% 8.3% 8.7% 10.7% 8.3% 9.1% 9.5% 8.3% 8.7% 8.7% 9.1% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 8.0% 8.0% 8.0% 9.0% 7.5% 7.5% 8.0% 8.0% 9.5% 8.0% 8.7% 8.0% 9.1% 8.5% 9.5% 8.5% 9,9% 8,5% 10.3% 8.0% 136.3 134.5 133.8 135,9 134.4 134.3 128,5 129.7 128.4 126.3 131.0 131.6 129.6 124.2 123.8 124.1 124.2 123.1 125.4 122.3 140.0 140.0 140.0 140.0 140.0 140.0 133.5 133.5 133.5 132.5 137.0 137.0 133.5 128,0 128.0 128.0 129.0 129.0 129.0 128.0 97.4% 96.1% 95.6% 97.1% 96.0% 95.9% 96.3% 97.2% 96.2% 95.3% 95.6% 96.1% 97.1% 97.0% 96.7% 97.0% 96.3% 95.4% 97.2% 95.5% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading Ci fi fi 11 fi 11 llli fill fflffl ffl ffl fl fill Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS 65808 Rancho Santa Fe Road North, Phase 2 Carisbad. Califomia Test Sampie Test Test Lcx:atlon Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Confonn Remarks # # Oate Test Lcx:atlon Elev. (ft) Fiold Opt Field Max. Obt. Req. Non-Conform Remarks 1175 138 5/18/2006 RSF NB STA 277+50 RT CG 1176 138 5/18/2006 RSF NB STA 280+50 RT CG 1177 138 5/18/2006 RSF NB STA 282+00 RT CG 1178 138 5/18/2006 RSF NB STA 283+50 RT CG 1179 138 5/18/2006 RSF NB STA 283+00 20'RT of CL 1180 138 5/18/2006 RSF NB STA 280+00 30'RT of CL 1181 138 5/18/2006 RSF NB STA 278+50 40' RT of CL 1182 135 5/19/2006 La Costa Meadows STA 12+25 RT CG 1183 135 5/19/2006 La Costa Meadows STA 12+00 LT CG 1184 135 5/19/2006 RSF NB STA 275+50 RT CG 1185 137 5/19/2006 RSF NB STA 276+00 RT CG 1186 137 5/19/2006 RSF NB STA 277+00 Median 1187 137 5/19/2006 RSF NB STA 277+50 Median 1188 137 5/19/2006 RSF NB STA 279+00 Median 1189 137 5/19/2006 RSF NB STA 280+50 RT CG 1190 137 5/19/2006 RSF NB STA 282+00 RT CG 1191 137 5/19/2006 RSF NB STA 283+50 RT CG 1192 137 5/22/2006 RSF NB STA 277+25 Bus Tumout 1193 135 5/22/2006 RSF NB STA 254+50 RT CG 1194 135 5/22/2006 RSF NB STA 253+00 RT CG 6' Below BG 9.9% 8.5% 125.2 129.0 97.1% 95% Conform grading 6' Below BG 8.7% 8.5% 125.0 129.0 96,9% 95% Conform grading 6' Betow BG 9.1% 8.5% 125.4 129.0 97.2% 95% Conform grading 6' Below BG 10.3% 8.5% 123.1 129.0 95.4% 95% Conform grading 6' Below BG 9.9% 8.5% 124.3 129.0 96.4% 95% Conform grading 6' Below BG 9.1% 8.5% 125.8 129.0 97.5% 95% Conform grading 6' Below BG 10.3% 8.5% 123.3 129.0 95.6% 95% Conform grading 6' Betow BG 8.7% 8.5% 124.1 129.0 96.2% 95% Conform grading BG 9.1% 8.0% 124.2 128,0 97.0% 95% Conform grading BG 9,9% 8.0% 122.3 128.0 95.5% 95% Conform grading BG 8,7% 8.0% 122.8 128.0 95.9% 95% Conform grading BG 10.3% 8.5% 123.6 129.5 95.4% 95% Conform grading BG 9.5% 8.5% 125.0 129.5 96.5% 95% Conform grading BG 8.7% 8.5% 125.8 129.5 97.1% 95% Conform grading BG 9.1% 8.5% 124.6 129.5 96.2% 95% Conform grading BG 9.9% 8.5% 124.9 129.5 96.4% 95% Conform grading BG 9.5% 8.5% 124.1 129.5 95.8% 95% Conform grading BG 8.7% 8.5% 125.8 129.5 97.1% 95% Conform grading BG 8.7% 8.5% 125.2 129.5 96.7% 95% Conform grading BG 9.9% 8.0% 123.0 128.0 96.1% 95% Conform grading BG 9.1% 8.0% 122.3 128.0 95.5% 95% Conform grading f 1 1 1 i 1 f 1 f 1 f 1 ff Iffl ff 1 f 1 Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Jl Sample Test Test Locsation Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # 11QR # 177 Date Test Locsation Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 1196 135 5/24/2006 Driveway 164 S RSF 1197 135 5/24/2006 RSF NB STA 253+00 30' RT of CL 1198 135 5/24/2006 RSF NB STA 253+50 30' RT of CL 1199 135 5/24/2006 RSF NB STA 252+50 45' RT of CL 1200 137 5/25/2006 RSF NB STA 282+50 40' RT of CL 1201 137 5/25/2006 RSF NB STA 284+00 20'RT of CL 1202 137 5/25/2006 RSF NB STA 281+00 15'RTofCL 1203 137 5/25/2006 RSF NB STA 279+50 35' RT of CL 1204 137 5/26/2006 RSF NB STA 278+00 @ CL 1205 137 5/26/2006 RSF NB STA 276+50 40'RT of CL 1206 135 5/26/2006 La Costa Meadows STA 10+50 @ CL 1207 135 5/26/2006 La Costa Meadows STA 12+00 10'LT of CL 1208 135 5/26/2006 La Costa Meadows STA 12+75 10' RT of CL 1209 AC 5/30/2006 RSF NB Inside Strip STA 253+25 1210 AC 5/30/2006 RSF NB Inside Strip STA 253+26 1211 AC 5/30/2006 RSF NB Inside Strip STA 251+75 1212 AC 5/30/2006 RSF NB Center Strip STA 254+00 1213 AC 5/30/2006 RSF NB Center Strip STA 252+50 1214 AC 5/30/2006 RSF NB Outside Strip STA 252+00 BG BG BG BG BG BG BG BG BG BG BG BG BG 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 9.9% 8.7% 10.7% 9.5% 10.3% 8.7% 9.1% 9.5% 9.1% 10.3% 9.9% 10.3% 8.0% 8.0% 8.0% 8.0% 8.5% 8.5% 8.5% 8.5% 8,5% 8.5% 8.0% 8.0% 122.2 123.1 123.4 124.3 127.7 128.3 127.7 128.7 126.9 125.4 123.9 124.2 128.0 128.0 128.0 128.0 129.5 129.5 129.5 129,5 129,5 129.5 128.0 128.0 95.5% 96.2% 96,4% 97,1% 98.6% 99.1% 98.6% 99.4% 98.0% 96.8% 96.8% 97.0% 9.5% 8.0% 123.5 128.0 96.5% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 141.6 144.8 97,8% 95% 144.9 144.8 100.1% 95% 142.3 144.8 98.3% 95% 141.9 144.8 98.0% 95% 139.8 144.8 96.5% 95% 143.0 144.8 98.8% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading ri 11 ffl fi ffl fl II I I fi fl fl il ft fl fl fl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Roq. Non-Conform Remarks 1215 AC 5/30/2006 RSF NB Outside Strip STA 253+00 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 144.1 144.8 99.5% 95% Conform grading 1216 AC 5/30/2006 RSF NB Inside Strip STA 275+00 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 143.9 144.8 99.4% 95% Conform grading 1217 AC 5/30/2006 RSF NB Inside Strip STA 276+50 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 141.3 144.8 97.6% 95% Conform grading 1218 AC 5/30/2006 RSF NB Inside Strip STA 278+00 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 140.8 144.8 97.2% 95% Conform grading 1219 AC 5/30/2006 RSF NB Inside Strip STA 279+50 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 139.0 144.8 96.0% 95% Conform grading 1220 AC 5/30/2006 RSF NB Inside Strip STA 281+00 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 142.7 144,8 98.5% 95% Conform grading 1221 AC 5/30/2006 RSF NB Inside Strip STA 282+50 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 143.5 144.8 99.1% 95% Conform grading 1222 AC 5/30/2006 RSF NB Inside Strip STA 284+00 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 144.6 144.8 99.9% 95% Confonn grading 1223 AC 5/30/2006 RSF NB Inside Center Strip STA 275+75 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 141.0 144.8 97.4% 95% Conform grading 1224 AC 5/30/2006 RSF NB Inside Center Strip STA 277+25 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 142.5 144.8 98.4% 95% Conform grading 1225 AC 5/30/2006 RSF NB Inside Center Strip STA 278+75 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 141.5 144.8 97.7% 95% Conform grading 1226 AC 5/30/2006 RSF NB Inside Center Strip STA 280+25 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 144.6 144.8 99.9% 95% Conform grading 1227 AC 5/30/2006 RSF NB Inside Center Strip STA 281+75 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 143.3 144.8 99.0% 95% Conform grading 1228 AC 5/30/2006 RSF NB Inside Center Strip STA 283+25 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 141.9 144.8 98.0% 95% Conform grading 1229 AC 5/30/2006 RSF NB Outside Center Strip STA 283+75 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2"-Below AC 145.0 144.8 100.1% 95% Conform grading £ 9 f f fi fi ffi fi f 1 1 1 1 1 1 1 ! 1 f i f 1 f i fii Contract Number: Project Name: Location; TABLE 3 REPORT OF FIELD DENSITY TESTS 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. Califomia Tost JC Sample Test Test Locatton Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff i!?!in # AP. Date nnnnnnet Test Locatton Elev. (ft) Fleld Opt. Field Max. Obt. Req. Non-Conform Remarks 1231 AC 5/30/2006 RSF NB Outside Center Strip STA 280+75 1232 AC 5/30/2006 RSF NB Outside Center Strip STA 279+25 1233 AC 5/30/2006 RSF NB Outside Center Strip STA 277+75 1234 AC 5/30/2006 RSF NB Outside Center Strip STA 276+25 1235 AC 5/30/2006 RSF NB Outside Strip STA 275+50 1236 AC 5/30/2006 RSF NB Outside Strip STA 277+00 1237 AC 5/30/2006 RSF NB Outside Strip STA 278+50 1238 AC 5/30/2006 RSF NB Outside Strip STA 280+00 1239 AC 5/30/2006 RSF NB Outside Strip STA 281+50 1240 AC 5/30/2006 RSF NB Outside Strip STA 283+00 1241 AC 5/30/2006 La Costa Meadows RT Strip STA 11+00 1242 AC 5/30/2006 La Costa Meadows RT Strip STA 12+50 1243 AC 5/30/2006 La Costa Meadows Center Strip STA 11 +25 1244 AC 5/30/2006 La Costa Meadows Center Strip STA 12+75 AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 2" Below AC 2" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 4" Below AC 2" Below AC 140.9 142.8 143.7 144.0 145.2 142.7 143.8 142.1 144.5 142.7 143.6 141.8 144.0 145.2 144.8 144.8 144.8 144.8 144.8 144.8 144.8 144.8 144.8 144.8 144.8 144.8 144.8 144.8 97.3% 98.6% 99.2% 99.4% 100.3% 98.5% 99.3% 98.1% 99.8% 98.5% 99.2% 97.9% 99.4% 100.3% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading fi fi fi fi fl f 1 r I ( I (1 fi ti fl ti fi 11 ffl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location; 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. California Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # Date Test Location Elev. (ft) Field Opt Field Max. Obt. Req. Non-Conform Remarks 1246 AC 5/30/2006 La Costa LT Strip STA 13+00 1247 AC 5/30/2006 RSF NB Decel LN STA 263+00 1248 AC 5/30/2006 RSF NB Decel LN STA 261+75 1249 AC 5/31/2006 RSF NB Inside Strip STA 275+50 1250 AC 5/31/2006 RSF NB Inside Strip STA 277+00 1251 AC 5/31/2006 RSF NB Inside Strip STA 278+50 1252 AC 5/31/2006 RSF NB Inside Strip STA 280+00 1253 AC 5/31/2006 RSF NB Inside Strip STA 281+50 1254 AC 5/31/2006 RSF NB Inside Strip STA 283+00 1255 AC 5/31/2006 RSF NB Center Strip STA 284+00 1256 AC 5/31/2006 RSF NB Center Strip STA 282+50 1257 AC 5/31/2006 RSF NB Center Strip STA 281 +00 1258 AC 5/31/2006 RSF NB Center Strip STA 279+50 1259 AC 5/31/2006 RSF NB Center Strip STA 278+00 1260 AC 5/31/2006 RSF NB Center Strip STA 276+50 1261 AC 5/31/2006 RSF NB Center Strip STA 275+00 1262 AC 5/31/2006 RSF NB Outside Strip STA 246+50 1263 AC 5/31/2006 RSF NB Outside Strip STA 248+00 1264 AC 5/31/2006 RSF NB Outside Strip STA 249+50 1265 AC 5/31/2006 RSF NB Outside Strip STA 251+00 1266 AC 5/31/2006 RSF NB Outside Strip STA 252+50 1267 AC 5/31/2006 RSF NB Outside Strip STA 254+00 AC 2" Below AC 2" Below AC 2" Below AC AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade ACGrade 142.7 144.8 97.7% 95% Conform grading 144.8 98.5% 95% Conform grading 141.1 144.8 97.4% 95% Conform grading 141.6 144.8 97.8% 95% Conform grading 140.8 140.1 100.5% 95% Conform grading 138.2 140.1 98.6% 95% Conform grading 135.6 140.1 96.8% 95% Conform grading 140.0 140.1 99.9% 95% Conform grading 139.1 140.1 99.3% 95% Conform grading 137.6 140.1 98.2% 95% Conform grading 136.5 140.1 97.4% 95% Conform grading 137.0 140.1 97.8% 95% Conform grading 138.2 140.1 98.6% 95% Conform grading 141.0 140.1 100.6% 95% Conform grading 135.9 140.1 97.0% 95% Conform grading 136.5 140.1 97.4% 95% Conform grading 140.2 140.1 100.1% 95% Conform grading 138.4 140.1 98.8% 95% Conform grading 140.5 140.1 100.3% 95% Conform grading 134.9 140.1 96.3% 95% Conform grading 138.5 140.1 98.9% 95% Conform grading 139.9 140.1 99.9% 95% Conform grading 136.2 140.1 97.2% 95% Conform grading fVflfflfifififlflfll fiflfififflflfl TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number; Project Name: Locsation: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test # Sample Test Date Test Locsation Elev. (ft) Moisture Field Opt. Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Conform 1268 AC 5/31/2006 RSF NB Outside Center Strip STA 255+25 AC Grade 137,9 140.1 98.4% 95% Conform 1269 AC 5/31/2006 RSF NB Outside Center Strip STA 253+75 AC Grade 135.0 140.1 96.4% 95% Conform 1270 AC 5/31/2006 RSF NB Outside Center Strip STA 252+25 AC Grade 135.3 140.1 96.6% 95% Conform 1271 AC 5/31/2006 RSF NB Outside Center Strip STA 250+75 AC Grade 140.0 140.1 99.9% 95% Conform 1272 AC 5/31/2006 RSF NB Outside Center Strip STA 249+25 AC Grade 136.7 140.1 97.6% 95% Conform 1273 AC 5/31/2006 RSF NB Outside Center Strip STA 247+75 AC Grade 138.1 140.1 98.6% 95% Conform 1274 AC 5/31/2006 RSF NB Outside Center Strip STA 246+25 AC Grade 135.9 140.1 97.0% 95% Conform 1275 AC 5/31/2006 RSF NB Inside Center Strip STA 251+75 AC Grade 140.4 140.1 100.2% 95% Conform 1276 AC 5/31/2006 RSF NB Inside Center Strip STA 253+25 AC Grade 137.1 140.1 97.9% 95% Conform 1277 AC 5/31/2006 RSF NB Inside Center Strip STA 253+25 AC Grade 138.1 140.1 98.6% 95% Conform 1278 AC 5/31/2006 RSF NB Inside Strip STA 255+00 AC Grade 140.2 140.1 100.1% 95% Conform 1279 AC 5/31/2006 RSF NB Inside Strip STA 253+50 AC Grade 135.5 140.1 96.7% 95% Conform 1280 AC 5/31/2006 RSF NB Inside Strip STA 252+00 AC Grade 137.6 140.1 98.2% 95% Conform 1281 AC 5/31/2006 RSF NB Decel. LN STA 261+50 AC Grade 139.2 140.1 99.4% 95% Conform 1282 AC 5/31/2006 RSF NB Decel. LN STA 262+00 AC Grade 136.4 140.1 97.4% 95% Conform 1283 AC 5/31/2006 RSF NB Decel. LN STA 263+00 AC Grade 139.9 140.1 99.9% 95% Conform 1284 AC 5/31/2006 RSF NB Outskle Strip STA 284+25 AC Grade 139.8 140.1 99.8% 95% Conform 1285 AC 5/31/2006 RSF NB Outside Strip STA 282+75 AC Grade 136.0 140.1 97.1% 95% Conform 1286 AC 5/31/2006 RSF NB Outside Strip STA 281+25 AC Grade 141 1 140.1 100.7% 95% Conform 1287 AC 5/31/2006 RSF NB Outside Strip STA 279+75 AC Grade 136.8 140,1 97.6% 95% Conform 1288 AC 5/31/2006 RSF NB Outside Strip STA 278+25 AC Grade 138.8 140.1 99.1% 95% Conform 1289 AC 5/31/2006 RSF NB Outside Strip STA 276+75 AC Grade 135.5 140.1 96.7% 95% Conform 1290 AC 5/31/2006 RSF NB Outskle Strip STA 275+25 AC Grade 140.4 140.1 100.2% 95% Conform 1291 AC 5/31/2006 La Costa Meadows LT Strip STA 11 +00 AC Grade 139.1 140.1 99.3% 95% Conform 1292 AC 5/31/2006 La Costa Meadows LT Strip STA 12+50 AC Grade 136.7 140.1 97.6% 95% Conform 1293 AC 5/31/2006 La Costa Meadows Center Strip STA 13+00 ACGrade 137.4 140.1 98.1% 95% Conform f 1 ifi » 1 f i P i » 1 1 1 ' V « 1 f i t i f i f i f i Remarks grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading ffl f 1 f 1 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number; Project Name: Location: 65808 Rancho Sanla Fe Road North, Phase 2 Carlsbad, California f 1 I Test Sample Test # # Date 1294 AC 5/31/2006 1295 AC 5/31/2006 1296 AC 5/31/2006 1297 31 6/1/2006 1298 126 6/1/2006 1299 126 6/1/2006 1300 126 6/1/2006 1301 126 6/1/2006 1302 126 6/1/2006 1303 104 6/1/2006 1304 104 6/1/2006 1305 125 6/1/2006 1306 137 6/1/2006 1307 104 6/2/2006 1308 137 6/5/2006 1309 104 6/9/2006 1310 145 6/9/2006 1311 145 6/12/2006 1312 145 6/12/2006 1313 145 6/12/2006 1314 25 6/12/2006 1315 80 6/13/2006 1316 80 6/13/2006 1317 137 6/14/2006 1318 137 6/14/2006 1 f 1 ff 1 Test Location La Costa Meadows Center Strip STA 11+50 La Costa Meadows RT Strip STA 11 +25 La Costa Meadows RT Strip STA 12+75 Corinthia STA 11+25 RT Sidewalk RSF NB STA 284+00 RT Sidewalk RSF NB STA 281 +00 RT Sidewalk RSF NB STA 278+00 RT Sidewalk La Costa Meadows STA 12+00 RT Sidewalk Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Conform Rem Elev. (ft) Field Opt. Field Max. Obt. Req. Conform Non-Conform Rem AC Grade 140.3 140.1 100.1% 95% Conform grading AC Grade 139.1 140.1 99.3% 95% Conform grading AC Grade 136.3 140.1 97.3% 95% Conform grading FSG 9.9% 8.5% 127.8 132.0 96.8% 95% Conform grading FSG 10.3% 8.0% 127.2 133.5 95.3% 95% Conform grading FSG 9.5% 8.0% 128.4 133.5 96.2% 95% Conform grading FSG 9.1% 8.0% 127.5 133.5 95.5% 95% Conform grading FSG 8.7% 8.0% 128.1 133.5 96.0% 95% Conform grading La Costa Meadows STA 12+00 LT Sidewalk FSG 9.9% 8.0% 128.6 133.5 96.3% 95% Conform grading RSF NB STA 274+25 RT Sidewalk FSG 7.1% 6.0% 135.5 140.0 96.8% 95% Conform grading RSF NB STA 258+00 RT Sidewalk FSG 7.9% 6.0% 133.7 140.0 95.5% 95% Conform grading San Elijo STA 98+75 FSG 13.2% 12.5% 115.2 120,5 95.6% 95% Conform grading 1945 RSF Driveway BG 9.9% 8.5% 123.3 129.5 95.2% 95% Conform grading San Elijo STA 98+85 LT Sidewalk FSG 7,1% 6.0% 133.9 140.0 95.6% 95% Conform grading 1945 RSF Driveway BG 9.5% 8.5% 125.7 129.5 97.1% 95% Conform grading RSF SB RT CG STA 262+50 SG 9.1% 6.0% 133.6 140.0 95.4% 95% Conform grading RSF SB RT CG STA 262+50 6" Below BG 9.3% 8.0% 117.4 122.5 95.8% 95% Conform grading RSF SB STA 261+50 Median CG BG 9.5% 8.0% 118.1 122.5 96.4% 95% Conform grading RSF SB STA 260+00 Median CG BG 10.3% 8.0% 117.9 122.5 96.2% 95% Conform grading RSF SB STA 258+50 Median CG BG 9.1% 8.0% 116.9 122.5 95.4% 95% Conform grading RSF SB STA 247+50 Median CG BG 7.5% 7.0% 137.0 143.0 95.8% 95% Conform grading RSF NB STA 280+00 Median CG BG 12.4% 11.0% 118.3 121.5 97.4% 95% Conform grading RSF NB STA 281+50 Median CG BG 11.5% 11.0% 117.0 121.5 96.3% 95% Conform grading RSF NB STA 283+00 Median CG .BG 9.9% 8.5% 123.2 129.5 95.1% 95% Conform grading RSF NB STA 283+50 Median CG BG 9.1% 8.5% 125.1 129.5 96.6% 95% Conform grading ffl ffl f 1 ffi f 1 1 1 [ 1 1 1 ff 1 1 1 1 lil ff 1 i 1 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name; Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, Califomia Test Sample Test Test Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # IAA Dato CHA I'lnnc Test Localion Elev. (ft) Field Opt. Field Max. Obt Req. Non-Conform Remarks 1320 144 6/14/2006 RSF NB STA 290+50 Median CG 1321 144 6/14/2006 RSF NB STA 289+00 Median CG 1322 144 6/14/2006 RSF NB STA 287+00 Median CG 1323 144 6/14/2006 RSF NB STA 286+00 Median CG 1324 144 6/14/2006 RSF NB STA 288+00 Median CG 1325 144 6/14/2006 RSF NB STA 290+00 Median CG 1326 144 6/14/2006 RSF NB STA 292+00 Median CG 1327 144 6/14/2006 RSF NB STA 293+40 Median CG 1328 137 6/14/2006 RSF NB STA 278+50 Median CG 1329 125 6/15/2006 RSF SB STA 257+00 Median CG 1330 25 6/15/2006 RSF SB STA 249+00 Median CG 1331 25 6/15/2006 RSF SB STA 251 +00 Median CG 1332 75 6/15/2006 RSF SB STA 253+00 Median CG 1333 75 6/15/2006 RSF SB STA 255+00 Median CG 1334 104 6/16/2006 RSF NB STA 267+00 Sidewalk 1335 104 6/16/2006 RSF NB STA 265+00 Sidewalk 1336 110 6/19/2006 VWD 2 Access Rd STA 13+00 1337 110 6/19/2006 VWD 2 Access Rd STA 11 +50 1338 80 6/20/2006 RSF NB STA 281+00 3'LT of CL 1339 137 6/20/2006 RSF NB STA 283+00 3' LT of CL 1340 110 6/20/2006 VMD - 2 Access Rd STA 10+50 @ 1341 145 6/21/2006 VMD - 2 Access Rd STA 12+50 @ CL CL 1342 145 6/21/2006 VMD - 2 Access Rd STA 11+50 @ CL 1343 145 6/21/2006 RSF SB STA 258+00 Left Turn Pocket 1344 145 6/21/2006 RSF SB STA 260+00 Left Turn Pocket BG BG BG BG BG BG BG BG BG BG BG BG BG BG FSG FSG SG SG BG BG SG 5" Below BG 5" Below BG BG BG 7.1% 6.4% 7.1% 6.8% 7.5% 7.1% 7.9% 6.8% 9.1% 12.4% 8.3% 7.9% 6.8% 7.5% 8.3% 7.9% 8.3% 9.1% 12.4% 9.1% 9.1% 9.5% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 5.0% 8.5% 12.5% 7.0% 7.0% 7.0% 7.0% 6.0% 6.0% 7.0% 7.0% 11.0% 8.5% 7.0% 8.0% 134.6 134.6 135.3 134.3 135.8 135.9 134.0 136.2 124.3 115.5 136.6 138.6 134.2 134.9 135.5 134.9 129.9 129.8 117.9 125.9 130.0 118.7 9.9% 8.0% 117.8 9.9% 9.1% 8.0% 8.0% 117.4 118.9 140.0 140.0 140.0 140,0 140.0 140,0 140.0 140.0 129,5 120,5 143.0 143.0 140.5 140.5 140.0 140.0 136.0 136.0 121.5 129.5 136.0 122.5 122.5 122.5 122.5 95.4% 96.1% 96.1% 96.6% 95.9% 97.0% 97,1% 95.7% 97.3% 96.0% 95.9% 95.5% 96.9% 95.5% 96.0% 96.8% 96.4% 95.5% 95.4% 97.0% 97.2% 95.6% 96.9% 96.2% 95.8% 97.1% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Confomi Conform Conform Conform Conform Confonn Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading Conform grading Conform Conform grading grading llflflllllfflfllilllllltlllfiliilllfflil Contract Number; Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS 65808 Rancho Santa Fe Road North, Phase 2 Cartsbad, Califomia Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # lAK Date Test Location Elev. (ft) Fiold Opt Field Max. Obt Req. Non-Conform Remarks 1346 145 6/21 /2006 VMD - 2 Access Rd STA 10+75 1347 AC 6/23/2006 RSF NB STA 280+00 2'RT of LT FC 1348 AC 6/23/2006 RSF NB STA 281+00 3' RT of LT FC 1349 AC 6/23/2006 RSF NB STA 282+00 2' RT of LT FC 1350 AC 6/23/2006 RSF NB STA 283+00 3' RT of LT FC 1351 AC 6/23/2006 RSF SB STA 261+00 3' LT of RT FC 1352 AC 6/23/2006 RSF SB STA 260+00 3' LT of RT FC 1353 AC 6/23/2006 RSF SB STA 258+00 3' LT of RT FC 1354 AC 6/23/2006 RSF SB STA 258+00 3' LT of RT FC 1355 AC 6/23/2006 RSF SB STA 252+50 3' RT of LT FC 1356 AC 6/23/2006 RSF SB STA 252+50 3' RT of LT FC 1357 AC 6/23/2006 RSF SB STA 254+50 3' RT of LT FC 1358 AC 6/23/2006 RSF NB STA 247+00 Inside Strip 1359 AC 6/23/2006 RSF NB STA 249+00 Inside Strip 1360 AC 6/23/2006 RSF NB STA 251+00 Inside Strip BG 2" Betow AC 2" Betow AC 2" Below AC 2" Betow AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC AC-Grade 8.7% 8.0% 118.1 140.9 142.7 141.1 144.0 142.9 140,7 141.5 142.6 141.0 143.2 144.5 142.2 143.9 144.7 122.5 143.8 143.8 143.8 143.8 143.8 143.8 143.8 143.8 143.8 143.8 143.8 142.3 142.3 142.3 96.1% 96.4% 98.0% 99.2% 98.1% 100.1% 99.4% 97.8% 98.4% 99.2% 98.1% 99.6% 100.5% 99.9% 101.1% 101.7% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading f 1 IIIIIIII II fl fi 11 ffl ffl ffl ffl 11 11 ffl il TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number; Project Name; Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Tost Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # Date Tost Localion Elev. (ft) Field Opt. Field Max. Obt Req. Non-Conform Remarks 1362 AC 6/23/2006 RSF NB STA 255+00 Inside Strip 1363 AC 6/23/2006 RSF NB STA 262+00 Inside Strip 1364 AC 6/23/2006 RSF NB STA 260+00 Inskle Strip 1365 AC 6/23/2006 RSF NB STA 258+00 Inside Strip 1366 AC 6/23/2006 RSF NB STA 257+00 Inside Strip 1367 145 6/27/2006 RSF Median STA 254+00 1368 145 6/27/2006 RSF Median STA 260+00 1369 80 6/27/2006 RSF Median STA 282+00 1370 104 6/27/2006 RSF Median STA 269+00 1371 146 6/29/2006 RSF Median STA 275+45 1372 146 6/29/2006 RSF Median STA 288+00 1373 146 6/29/2006 RSF Median STA 291+00-5 LT of RT BC 1374 146 6/29/2006 RSF Median STA 292+00 -5 LT BC 1375 AC 7/5/2006 Dig Out #1 1376 AC 7/5/2006 Dig Out #1 1377 AC 7/5/2006 Dig Out #2 1378 AC 7/5/2006 Dig Out #2 1379 AC 7/5/2006 Dig Out #3 1380 AC 7/5/2006 Dig Out #3 1381 AC 7/5/2006 Dig Out #4 AC Grade AC Grade AC Grade AC Grade AC Grade FSG FSG FSG FSG FSG FSG FSG FSG 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Below AC 2" Betow AC 10.3% 8.3% 12.4% 6.8% 7.9% 7.1% 6.8% 7.5% 8.0% 8.0% 11.0% 6.5% 5.5% 5.5% 5.5% 5,5% 142,5 141.5 144.3 143.5 140.9 117.9 117.2 117.5 133.7 121.9 123.4 122.6 121.0 143.0 142.1 139.6 144,7 143.0 140.6 141.5 142.3 142.3 142.3 142.3 142.3 142.3 122.5 122.5 121.5 140.0 126.5 126.5 126.5 126.5 144.5 144.5 144.5 144.5 144.5 144.5 144.5 99.6% 100.1% 99.4% 101.4% 100.8% 99.0% 96.2% 95.7% 96.7% 95.5% 96.4% 97.5% 96.9% 95.7% 99.0% 98.3% 96.6% 100.1% 99,0% 97,3% 97,9% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Confonn Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading 11 fi fi fi 11 11 tl fl II fill 11 ffl il ffl 11 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Tost Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # # Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 1382 AC 7/5/2006 Dig Out #4 2" Below AC 140.2 144.5 97.0% 95% Conform grading 1383 AC 7/5/2006 Dig Out #5 2" Below AP 143.9 144.5 99.6% 95% Conform grading 1384 AC 7/5/2006 Dig Out #5 2" Below AP 142.1 144.5 98.3% 95% Conform grading 1385 AC 7/5/2006 Dig Out #6 2" Below AP 144.0 144.5 99.7% 95% Conform grading 1386 AC 7/5/2006 Dig Out #6 2" Below AC 141.8 144.5 98.1% 95% Conform grading 1387 AC 7/6/2006 RSF NB LN 3 STA 223+00 AC Grade 135.9 140.9 96.5% 95% Conform grading 1388 AC 7/6/2006 RSF NB LN 3 STA 224+50 AC Grade 139.6 140.9 99.1% 95% Conform grading 1389 AC 7/6/2006 RSF NB LN 3 STA 226+00 AC Grade 141.0 140.9 100.1% 95% Conform grading 1390 AC 7/6/2006 RSF NB LN 3 STA 226+01 AC Grade 140.2 140.9 99.5% 95% Conform grading 1391 AC 7/6/2006 RSF NB LN 3 STA 229+00 AC Grade 138.7 140.9 98.4% 95% Conform grading 1392 AC 7/6/2006 RSF NBLN 3 STA 231+00 AC Grade 136.5 140.9 96.9% 95% Conform grading 1393 AC 7/6/2006 RSF NB LN 3 STA 233+00 AC Grade 139.9 140.9 99.3% 95% Conform grading 1394 AC 7/6/2006 RSF NB LN 3 STA 235+00 AC Grade 140.0 140.9 99.4% 95% Conform grading 1395 AC 7/6/2006 RSF NB LN 3 STA 237+00 AC Grade 135.0 140.9 95.8% 95% Conform grading 1396 AC 7/6/2006 RSF NB LN 3 STA 239+00 AC Grade 136.4 140.9 96.8% 95% Conform grading 1397 AC 7/6/2006 RSF NB LN 3 STA 241+00 AC Grade 138.9 140.9 98.6% 95% Conform grading 1398 AC 7/6/2006 RSF NB LN 2 STA 224+00 AC Grade 134.8 140.9 95.7% 95% Conform grading 1399 AC 7/6/2006 RSF NB LN 2 STA 226+00 AC Grade 140.2 140.9 99,5% 95% Conform grading 1400 AC 7/6/2006 RSF NB LN 2 STA 228+00 AC Grade 137.5 140.9 97.6% 95% Conform grading 1401 AC 7/6/2006 RSF NB LN 2 STA 230+00 AC Grade 136.2 140.9 96,7% 95% Conform grading 1402 AC 7/6/2006 RSF NB LN 2 STA 232+00 AC Grade 139.5 140.9 99.0% 95% Conform grading 1403 AC 7/6/2006 RSF NB LN 2 STA 234+00 ACGrade 135.0 140.9 95.8% 95% Conform grading fl fl fi fi 11 II 11 11 II 11 I I fi 11 li ffl ffl ffl ffl 11 TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location; 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Confonn Remarks Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 1405 AC 7/6/2006 RSF NB LN 2 STA 238+00 1406 AC 7/6/2006 RSF NB LN 2 STA 240+00 1407 AC 7/6/2006 Avenida Soledad @ CL 1408 AC 7/6/2006 RSF SB LN 3 STA 252+00 1409 AC 7/6/2006 RSF SB LN 3 STA 250+00 1410 AC 7/6/2006 RSF SB LN 3 STA 248+00 1411 AC 7/6/2006 RSF SB LN 3 STA 246+50 1412 AC 7/7/2006 RSF SB LN 1 STA 223+50 1413 AC 7/7/2006 RSF SB LN 1 STA 225+50 1414 AC 7/7/2006 RSF SB LN 1 STA 225+50 1415 AC 7/7/2006 RSF SB LN 1 STA 229+50 1416 AC 7/7/2006 RSF SB LN 1 STA 231+50 1417 AC 7/7/2006 RSF SB LN 1 STA 233+50 1418 AC 7/7/2006 RSF SB LN 1 STA 235+50 1419 AC 7/7/2006 RSF SB LN 1 STA 237+50 1420 AC 7/7/2006 RSF SB LN 1 STA 239+50 1421 AC 7/7/2006 RSF SB LN 1 STA 251+00 1422 AC 7/7/2006 RSF SB LN 1 STA 249+00 1423 AC 7/7/2006 RSF SB LN 1 STA 247+00 1424 AC 7/7/2006 RSF SB LN 1 STA 246+50 1425 AC 7/7/2006 RSF SB LN 1 STA 244+50 1426 AC 7/7/2006 RSF SB LN 2 STA 250+50 1427 AC 7/11/2006 RSF NB LT TP STA 278+50 1428 AC 7/11/2006 RSF NB LT TP STA 280+50 1429 AC 7/11/2006 RSF NB LT TP STA 282+50 AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC Grade AC-Grade 140.3 138.0 136.1 141.0 1135.4 140.5 139.1 136.7 137.3 141.3 140.5 139.7 136.2 135.9 140.0 135.8 138.2 137.0 140.1 136.5 139.4 141.0 138.2 143.7 148.9 144,6 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 140.9 150.1 150.1 150.1 99.6% 97.9% 96.6% 100.1% 805.8% 99.7% 98.7% 97.0% 97.4% 100.3% 100.3% 99,7% 99,1% 96.7% 96,5% 99.4% 96,4% 98.1% 97.2% 99.4% 96.9% 100.1% 98.1% 95.7% 99.2% 96.3% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading grading 11 li ffi ffl 11 fi 11 11 li 11 11 li 11 11 II II 11 f TABLE 3 REPORT OF FIELD DENSITY TESTS Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Test Location Elev. (ft) Moisture Ory Density (pcf) Relative Comp. Conform Non-Conform Remarks Test # Sample # Test Date Test Location Elev. (ft) Field Opt Field Max. Obt. Req. Conform Non-Conform Remarks 1430 AC 7/11/2006 RSF NB LT TP STA 284+25 AC Grade 147.5 150.1 98.3% 95% Conform grading 1431 AC 7/11/2006 RSFSBLN 1 STA 284+20 AC Grade 150.0 150.1 99.9% 95% Conform grading 1432 AC 7/11/2006 VWD-2 Access RD STA 10+50 AC Grade 148.3 150.1 98.8% 95% Conform grading 1433 AC 7/11/2006 VWD-2 Access RD STA 11+00 AC Grade 144.0 150.1 95.9% 95% Conform grading 1434 AC 7/11/2006 VWD-2 Access RD STA 211 +50 AC Grade 151.0 150.1 100.6% 95% Conform grading 1435 AC 7/11/2006 VWD-2 Access RD STA 212+00 AC Grade 146.2 150.1 97.4% 95% Conform grading 1436 AC 7/11/2006 VV\rt3-2 Access RD STA 213+00 AC Grade 144.3 150.1 96.1% 95% Conform grading ffpifiiififiiiiiil iiififfifiiii i 1 11 t 1 TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test Sample Test Date Test Locratlon Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # 1 # A mnnnA Test Locratlon Elev. (ft) Fleld Opt. Field Max. Obt. Roq. Non-Conform Remarks 2 4 7/2/2004 Existing 12" RCW re-route trench B.F. STA 273+75 322.0 10.7% 8.5% 3 4 7/2/2004 Existing12"RCWre-routetrenchB.F.STA273+75 324.0 9.9% 8.5% 4 4 7/2/2004 Existing 12" RCW re-route trench B.F. STA 273+75 326.0 10.3% 8.5% 5 4 7/2/2004 Existing 12" RCW re-route trench B.F. STA 273+75 328.0 10.3% 8.5% 6 2 7/2/2004 Existing 12" RCW re-route trench B.F. STA 269+60 338.0 9.9% 9.0% 7 2 7/2/2004 Existing 12" RCW re-route trench B.F. STA 269+60 340.0 10.3% 9.0% 8 8 7/6/2004 SD Line F trench BF STA 29+70 338.0 9.1% 8.0% 9 8 7/6/2004 SD Line F trench BF STA 28+20 342.0 10.3% 8.0% 10 8 7/7/2004 SD Line F trench BF STA 27+00 349.0 9.9% 8.0% 11 8 7/7/2004 SD Line F trench BF STA 26+50 354.0 10.3% 8.0% 12 8 7/7/2004 SD Line F trench BF STA 29+20 341.0 9.5% 8.0% 13 8 7/7/2004 SD Line F trench BF STA 27+80 350.0 10.7% 8.0% 14 8 7/7/2004 SD Line F trench BF STA 28+80 346.0 10.3% 8.0% 15 8 7/12/2004 SD Line F trench BF STA 24+80 364.0 9.9% 8.0% 16 8 7/12/2004 SD Line F trench BF STA 25+30 366.0 10.3% 8.0% 17 8 7/12/2004 SD Line F trench BF STA 26+50 356.0 10.3% 8.0% 18 8 7/12/2004 SD Line F trench BF STA 28+50 348.0 11.1% 8.5% 19 8 7/26/2004 Stomi Drain BF Line F-17 STA 10+05 350.5 9.9% 8.5% 20 2 7/26/2004 Storm Drain BF Line F-17 STA 10+00 352.5 10.7% 8.5% 21 2 7/26/2004 Stomi Drain BF Line F STA 27+28 354.5 9.9% 8.5% 22 2 7/26/2004 Storm Drain BF Line F STA 27+35 356.5 9.5% 8.5% 23 8 7/26/2004 Stomn Drain Line F-16 STA 10+10 361.0 10.7% 8.5% 24 2 7/26/2004 Storni Drain Line F-16 STA 10+20 363.0 10.3% 8.5% 25 8 7/26/2004 Stomi Drain Line F STA 27+90 345.5 9.5% 8.5% 26 2 7/26/2004 Stomi Drain Line F Trench BF STA 28+05 347.5 10.3% 8.5% 27 2 7/26/2004 Storm Drain Line F Trench BF STA 28+10 349.5 10.7% 8.5% 127.0 126.8 126.0 125.1 129.5 128.6 130.5 127.4 125.5 124.1 126.1 123.5 125.7 125.9 123.5 124.3 127.8 121.7 127.2 127.5 125.8 121.9 126.1 121.6 127.9 127.2 131.0 131.0 131.0 131.0 134.5 134.5 132.5 132.5 132.5 132.5 132.5 132.5 132.5 132.5 132.5 132.5 133.5 132.5 135,5 135,5 135.5 132.5 135.5 132.5 135.5 135.5 97% 97% 96% 95% 96% 96% 98% 96% 95% 94% 95% 93% 95% 95% 93% 94% 96% 92% 94% 94% 93% 92% 93% 92% 94% 94% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 95% 90% 95% 90% 90% 90% 95% 90% 90% 90% 90% 90% 90% 90% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utirty backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utirty backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill f 1 ff i f I f I Pifififiiifiilffi TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number; Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Date Test Locsation Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks oo # 9 Test Locsation Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks Storm Drain Line F Trench BF STA 28+00 Storm Drain Line F Trench BF STA 27+90 Storm Drain Line F Trench BF STA 28+00 Stomn Drain Line G trench BF STA 10+50 Storm Drain Line G trench BF STA 10+25 SD Line G Trench BF STA 10+65 SD Line G Trench BF STA 10+50 SD Line G Trench BF STA 11+10 SD Line G Trench BF STA 11+10 SD Line G Trench BF STA 11+15 SD Line G Trench BF STA 11+15 SD Line G Trench BF STA 11+10 Sewer Line A BF STA 36+00 Sewer Line A BF STA 35+50 Sewer Line D BF STA 10+50 SD Line GBF STA 11+20 Retest of 44 SD Line G BF STA 11 +25 SD Line GBF STA 11+20 Sewer Line D STA 10+40 Sewer Line D STA 10+30 SD Line G BF STA 10+02 SD Line GBF STA 10+05 Sewer Line A BF STA 34+90 Sewer Line A BF STA 35+05 Sewer Line A BF STA 34+90 29 2 7/26/2004 30 2 7/26/2004 31 2 7/26/2004 32 8 8/3/2004 33 8 8/3/2004 34 5 8/3/2004 35 5 8/3/2004 36 8 8/9/2004 37 8 8/9/2004 38 5 8/9/2004 39 5 8/9/2004 40 5 8/9/2004 41 1 8/18/2004 42 9 8/18/2004 43 9 8/18/2004 44 8 8/19/2004 44a 8 8/19/2004 45 8 8/19/2004 46 8 8/19/2004 47 1 8/19/2004 48 1 8/19/2004 49 8 8/20/2004 50 8 8/20/2004 51 1 8/30/2004 52 1 8/30/2004 53 1 8/30/2004 54 31 11/15/2004 30" RCW Line B Sta 220+80 353.5 355.5 357.5 330.0 332.0 334.0 336.0 329.0 331.0 333.0 335.0 337.0 356.0 358.0 356.0 330.0 330.0 332.0 334.0 358.0 360.0 330.0 332.0 359.0 361.0 363.0 339.5 10.7% 9.9% 11.1% 10.7% 9.9% 9.1% 9.5% 10.7% 9.9% 9.1% 8.7% 9.1% 9.9% 10.7% 9.5% 7.5% 9.1% 7.9% 10.7% 11.1% 10.7% 9.1% 10.3% 10.7% 10.3% 10.7% 11.5% 8.5% 8.5% 8.5% 8.5% 8.5% 7.0% 7.0% 8.5% 8.5% 7.0% 7.0% 7.0% 8.5% 8.5% 8.5% 8.3% 8.5% 8.5% 8.5% 8.5% 8.5% 7.0% 7,0% 8.5% 8.5% 8.5% 8,5% 126,4 126,3 122.2 128.2 129.6 131.2 132.0 126.8 128.4 132.3 132.3 132.9 126.2 126.4 126.1 118.5 127.3 127.5 126.6 127.0 124.8 135.0 132.2 125.7 124.4 125.0 120.3 135.5 135.5 135,5 129.6 132.5 137.5 137.5 132.5 132.5 137.5 137.5 137.5 133.5 133.5 133.5 132.5 132.5 132.5 132.5 133.5 133.5 137.5 137.5 133.5 133.5 133.5 132.0 93% 93% 90% 99% 98% 95% 96% 96% 97% 96% 96% 97% 95% 95% 94% 89% 96% 96% 96% 95% 93% 98% 96% 94% 93% 94% 91% 90% 90% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 90% 95% 95% 95% 95% 90% 90% 95% 95% 90% 90% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Non confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti flll iiifiiiiifiiifififi « 9 I i f 1 Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Dato Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Test # Sample # Test Dato Test Location Elev. (ft) Field Opt Field Max. Obt. Req. 55 31 11/15/2004 30 RCW Line B Sta 220+80 341.5 10.7% 8.5% 120.2 132.0 91% 90% 56 31 11/15/2004 30' RCW Line B Sta 220+80 343.5 10.3% 8.5% 122.5 132.0 93% 90% 57 31 11/15/2004 30' RCW Line B Sta 220+80 345.5 11.5% 8.5% 122.5 132.0 93% 90% 58 31 11/16/2004 30' RCW Line B Sta 20+50 339.0 9.9% 8.5% 122.9 132.0 93% 90% 59 31 11/16/2004 30' RCW Line B Sta 20+60 341.0 11.1% 8.5% 123.2 132,0 93% 90% 60 31 11/16/2004 30" RCW Line B Sta 20+50 343.0 9.9% 8.5% 124.2 132.0 94% 90% 61 31 11/16/2004 30' RCW Line B Sta 20+60 343.5 9.1% 8.5% 123.6 132.0 94% 90% 62 31 11/16/2004 30' RCW Line B Sta 20+50 345.5 10.3% 8.5% 124.3 132.0 94% 90% 63 31 11/18/2004 30' RCW Line B Sta 20+30 340.0 9.9% 8.5% 123.6 132.0 94% 90% 64 31 11/18/2004 30' RCW Line B Sta 20+30 342.0 10.3% 8.5% 121.6 132.0 92% 90% 65 31 11/18/2004 30' RCW Line B Sta 20+00 344.0 10.7% 8.5% 123.1 132.0 93% 90% 66 31 11/18/2004 30' RCW Line B Sta 19+50 352.0 9.1% 8.5% 126.7 132.0 96% 95% 67 8 11/19/2004 30' RCW Line B Sta 18+85 348.0 9.9% 8.5% 127.0 132.5 96% 95% 68 8 11/19/2004 30' RCW Line B Sta 18+35 348.5 10.7% 8.5% 127.5 132.5 96% 95% 69 8 11/19/2004 30" RCW Line B Biowoff Sta 20+05 340.0 9.1% 8.5% 127.6 132.5 96% 95% 70 31 11/19/2004 30' RCW Line B Biowoff Sta 20+05 342.0 9.5% 8.5% 125.7 132.0 95% 90% 71 31 11/19/2004 30' RCW Line B Biowoff Sta 20+05 344.0 11.1% 8.5% 124.3 132,0 94% 90% 72 31 11/19/2004 30' RCW Line B Biowoff Sta 20+05 346,0 10.3% 8.5% 123.8 132,0 94% 90% 73 31 11/19/2004 SO-RCW Line B Biowoff Sta 20+05 348,0 9.9% 8.5% 122.7 132.0 93% 90% 74 31 11/22/2004 SO' RCW Line B Biowoff Sta 20+05 350.0 10.7% 8.5% 127.5 132.0 97% 95% 75 8 11/22/2004 30' RCW Line B Sta 18+90 349.0 111% 8.5% 128.9 132.5 97% 95% 76 8 11/22/2004 30' RCW Line B Sta 18+60 351.0 9.5% 8.5% 129.9 132.5 98% 95% 77 8 11/30/2004 30' RCW Line B Sta 18+00 350.0 10.7% 8.5% 127.6 132.5 96% 95% 78 8 11/30/2004 30" RCW Line B Sta 17+75 351.0 9.1% 8.5% 128.8 132.5 97% 95% 79 30 12/1/2004 Sewer Pipe Line A STA 33+50 369.0 8.7% 6.0% 131.7 140.0 94% 90% 80 30 12/1/2004 Sewer Pipe Line A STA 33+25 372.0 9.1% 6.0% 132,7 140.0 95% 91% 81 30 12/1/2004 Sewer Pipe Line A STA 32+50 376.0 9.9% 6.0% 133.7 140.0 96% 90% Conform Non-Conform Remarks Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill f 1 f i f i I I fill flli fifl II TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Sanla Fo Road North, Phase 2 Carlsbad, California Test # Sample Test Date Test Locatton Elev. (ft) Moisture Field Opt. Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Conform Remailts 82 30 12/1/2004 Sewer Pipe Line A STA 32+25 380.0 8.7% 6.0% 135.2 140.0 97% 90% Conform 83 30 12/1/2004 Sewer Pipe Line A STA 31+50 384.0 9.1% 6.0% 136.4 140.0 97% 95% Conform 84 31 12/2/2004 30' RCW Line-B STA 18+00 352.0 10.7% 8.5% 125.9 132.0 95% 95% Conform 85 31 12/2/2004 30' RCW Line-B STA 17+50 351.0 11.1% 8.5% 127.8 132.0 97% 95% Conform 86 8 12/2/2004 30' RCW Line-B STA 16+80 342.0 10.3% 8.5% 127.1 132.5 96% 95% Conform 87 8 12/2/2004 30" RCW Line-B STA 16+70 344.0 9.5% 8.5% 129.3 132.5 98% 95% Conform 88 31 12/2/2004 30' RCW Line-B STA 16+80 346.0 10.7% 8.5% 126.4 132.0 96% 90% Conform 89 31 12/2/2004 30' RCW Line-B STA 16+70 348.0 11.1% 8.5% 127 1 132.0 96% 95% Conform 90 31 12/2/2004 30' RCW Line-B STA 17+00 349.0 10.3% 8.5% 127.9 132.0 97% 95% Conform 91 31 12/3/2004 30' RCW Line-B STA 21+50 344.0 10.7% 8.5% 126.6 132.5 96% 95% Conform 92 31 12/3/2004 30' RCW Line-B STA 21+50 346.0 9.9% 8.5% 130.4 132.5 98% 95% Conform 93 31 12/3/2004 30' RCW Line-B STA 21+50 348.0 10.3% 8.5% 128.8 132.5 97% 95% Conform 94 31 12/8/2004 30" RCW Line-B STA 21+20 341.0 11.9% 8.5% 124.6 132.0 94% 90% Conform 95 31 12/8/2004 30' RCW Line-B STA 21+35 343.0 11.5% 8.5% 126.7 132.0 96% 90% Conform 96 31 12/8/2004 30' RCW Line-B STA 21+20 345.0 10.3% 8.5% 125.5 132.0 95% 90% Conform 97 31 12/8/2004 30' RCW Line-B STA 21+35 348.0 11.1% 8.5% 128.8 132.0 98% 95% Conform 98 31 12/8/2004 30' RCW Line-B STA 21+20 350.0 11,9% 8.5% 127.3 132.0 96% 95% Confomi 99 33 12/9/2004 30' RCW Line-B STA 21+75 340.0 10.3% 7.5% 127.7 134.0 95% 90% Conform 100 33 12/9/2004 30' RCW Line-B STA 21+70 342.0 9.1% 7.5% 127.7 134.0 95% 90% Conform 101 33 12/9/2004 30' RCW Line-B STA 21+75 344.0 8,7% 7.5% 129.7 134.0 97% 90% Conform 102 33 12/9/2004 30' RCW Line-B STA 21+70 346,0 9.1% 7.5% 127.2 134.0 95% 90% Conform 103 33 12/9/2004 30" RCW Line-B STA 21+75 348.0 9.9% 7.5% 129.3 134.0 96% 95% Conform 104 33 12/9/2004 30' RCW Line-B STA 21+70 350.0 8.7% 7.5% 129.6 134.0 97% 95% Conform 105 33 12/10/2004 30' RCW Line-B STA 21+80 340.0 10.3% 7.5% 126.9 134.0 95% 90% Conform 106 33 12/10/2004 30' RCW Line-B STA 21+80 342.0 9.1% 7.5% 125.6 134.0 94% 90% Conform 107 33 12/10/2004 30' RCW Line-B STA 21+80 344.0 8.7% 7.5% 125.2 134.0 93% 90% Conform 108 33 12/10/2004 30" RCW Line-B STA 21+80 346.0 9.5% 7.5% 128.9 134.0 96% 90% Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfiti utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill * ^ ?l fl fi ffi ffl fl fl »i 11 ffi ffi ffi fi ffl fi 11 ffl TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test # Sample # Test Date Test Location Elev. (ft) Moisture Field Opt Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Confomi Remarks 109 33 12/10/2004 30" RCW Line-B STA 21 +80 348.0 9.9% 7.5% 129.2 134.0 96% 95% Conform 110 33 12/10/2004 30" RCW Line-B STA 21 +80 350.0 8.7% 7.5% 130.4 134.0 97% 95% Conform 111 33 12/13/2004 30" RCW Line-B STA 21 +90 340.0 9.7% 7.5% 122.9 134.0 92% 90% Conform 112 33 12/13/2004 30" RCW Line-B STA 21+90 342.0 8.7% 7.5% 127.9 134.0 95% 90% Conform 113 33 12/13/2004 30" RCW Line-B STA 21+90 344.0 9.5% 7.5% 128.2 134.0 96% 90% Conform 114 33 12/13/2004 30" RCW Line-B STA 21+90 346.0 7.9% 7.5% 128.7 134.0 96% 90% Conform 115 33 12/13/2004 30" RCW Line-B STA 21+90 348.0 9.1% 7.5% 129.6 134.0 97% 95% Conform 116 33 12/13/2004 30" RCW Line-B STA 21+90 350.0 9.5% 7.5% 130.1 134.0 97% 95% Conform 117 33 12/14/2004 30" RCW Line-B STA 22+00 341.0 9.9% 7.5% 127.4 134.0 95% 90% Conform 118 33 12/14/2004 30" RCW Line-B STA 22+00 343.0 9.1% 7.5% 127,4 134.0 95% 90% Conform 119 33 12/14/2004 30" RCW Line-B STA 22+00 345.0 10.7% 7.5% 125.7 134.0 94% 90% Conform 120 33 12/14/2004 30" RCW Line-B STA 22+20 347.0 9.9% 7.5% 130.9 134.0 98% 95% Conform 121 33 12/14/2004 30" RCW Line-B STA 22+20 349.0 9,1% 7.5% 130.4 134.0 97% 95% Conform 122 33 12/14/2004 30" RCW Line-B STA 22+20 351.0 10,3% 7.5% 129.1 134.0 96% 95% Conform 123 33 12/15/2004 30" RCW Line-B STA 22+40 350.0 8,7% 7.5% 131.6 134.0 98% 95% Conform 124 33 12/15/2004 30" RCW Line-B STA 22+40 352.0 7,9% 7.5% 131.8 134.0 98% 95% Conform 125 33 12/15/2004 30" RCW Line-B STA 23+00 352.0 10,7% 7.5% 129.8 134.0 97% 95% Conform 126 33 12/15/2004 30" RCW Line-B STA 23+00 354.0 9.9% 7.5% 132.2 134.0 99% 95% Conform 127 33 12/16/2004 SD Line 1-4 STA 10+20 347.0 10.7% 7.5% 127.5 134.0 95% 90% Conform 128 33 12/16/2004 SD Line 1-4 STA 10+20 349.0 9.1% 7.5% 131.3 134.0 98% 95% Conform 129 33 12/16/2004 SD Line (-4 STA 10+20 351.0 9.1% 7.5% 130,8 134.0 98% 95% Conform 130 8 12/16/2004 30" RW Line B STA 23+90 352.0 10.7% 8.5% 126.4 132.5 95% 95% Conform 131 33 12/16/2004 30" RW Line B STA 23+90 354.0 10.3% 7.5% 130.5 134.0 97% 95% Conform 132 8 12/16/2004 30" RW Line B STA 23+35 351.0 9.1% 8.5% 130.4 132.5 98% 95% Confomi 133 33 12/16/2004 30" RW Line B STA 23+35 353.0 9.9% 8.5% 129.5 134.0 97% 95% Conform 134 33 12/17/2004 SD Line t-4 Inlet B-2 345.0 9.1% 7.5% 127.8 134.0 95% 95% Conform 135 33 12/17/2004 SD Line 1-4 Inlet B-2 347.0 8.7% 7.5% 129.6 134.0 97% 95% Conform utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill ffifivifflfiri irififififififififfi TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 6S808 Rancho Santa Fe Road North, Phase 2 Carisbad, Califomia Test Sample Test Date Test Location Elev. (ft) Moisture Dry Densiiy (pcf) Relative Comp. Conform Remarks # 1 # Test Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 137 33 12/17/2004 SD Line 1-4 STA 10+25 351.0 138 8 12/17/2004 SD Line F STA 23+80 371.0 139 8 12/17/2004 SD Line F STA 22+80 376.0 140 8 12/17/2004 SD Line F STA 23+00 379.0 141 30 12/17/2004 SD Line F STA 23+00 382.0 142 8 12/17/2004 30" RCW Line B STA 24+20 352.0 143 33 12/17/2004 30" RCW Line B STA 24+20 354.0 144 33 12/17/2004 30" RCW Line B STA 24+37 354.0 145 33 12/20/2004 RCW Line - B 4" Blow of STA 21+60 348.0 146 33 12/20/2004 RCW Line - B 4" Blow of STA 21 +60 350.0 147 30 12/21/2004 Sewer Line - A STA 30+50 385.0 148 30 12/21/2004 Sewer Line - A STA 30+00 390.0 149 8 12/21/2004 SD Line F STA 22+45 378.0 150 30 12/21/2004 Sewer Line - A STA 29+50 394.0 151 33 12/21/2004 RCW Line - B 4" Blow off STA 21+60 348.0 152 33 12/21/2004 RCW Line - B 4" Blow off STA 21 +60 350.0 153 8 12/22/2004 SD Line F STA 22+40 380.0 154 33 12/22/2004 16" RCW Line B North Leg For Metering STA STA 348.0 21+43 155 33 12/22/2004 16" RCW Line B North Leg For Metering STA STA 350.0 21+43 10.7% 10.7% 9.1% 10.3% 9.1% 10.3% 9.9% 10.7% 10.3% 11.1% 9,9% 9,1% 10,7% 10,3% 9.9% 10.3% 11.1% 10.7% 7.5% 8.5% 8.5% 8.5% 6.0% 8.5% 7.5% 7.5% 7.5% 7.5% 6.0% 6.0% 8.5% 6.0% 7.5% 7.5% 8.5% 7.5% 128.9 127.6 129.2 127.2 136.8 127.7 130.5 128.5 130.0 126.9 133.1 136.5 126.6 133.6 129.3 129.8 128.3 130.1 10.3% 7.5% 129.7 134.0 134,0 132,5 132.5 132.5 140.0 132.5 134.0 134.0 134.0 134.0 140.0 140.0 132.5 140.0 134.0 134.0 132.5 1340 134.0 96% 96% 96% 98% 96% 98% 96% 97% 96% 97% 95% 95% 98% 96% 95% 96% 97% 97% 97% 97% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Confonn Conform Confonn Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill utiity backftit uttity backfill utiity backfill utiity backfill utiity backfill utitty backfill utiity backfill utiity backfill utiity backfill utiity backfill Confonn utiity backfill 156 33 12/23/2004 RCW Line-B Air Vac. STA 21+38 340,0 10.7% 7,5% 128,4 134.0 96% 90% Conform utiity backfiti 157 33 12/23/2004 RCW Line-B Air Vac. STA 21+38 342.0 11.1% 7.5% 129.3 134.0 96% 90% Conform utiity backfiti 158 33 12/23/2004 RCW Line-B Air Vac. STA 21+38 344.0 9.1% 7.5% 128.4 134.0 96% 90% Conform utiity backfill 159 33 12/23/2004 RCW Line-B Air Vac. STA 21+38 346.0 9.9% 7.5% 128.9 134.0 96% 90% Conform utiity backfill 160 33 12/23/2004 RCW Line-B Air Vac. STA 21+38 348.0 10.7% 7.5% 129.2 134.0 96% 95% Conform utiity backfill 161 33 12/23/2004 RCW Line-B Air Vac. STA 21+38 350.0 9.9% 7.5% 129.6 134.0 97% 95% Confonn utiity backfill f 1 fl ffi ffi fi fl fl II ffi ffi ffi fl ffl ffl ffl ffl ffi TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number; Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample Test Date Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # Test Date Test Location Elev. (ft) Fiold Opt. Field Max. Obt. Req. Non-Conform Remarks 163 164 165 166 167 168 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 215 33 33 33 33 33 33 8 8 30 8 8 30 30 30 30 30 30 30 30 30 30 30 30 30 30 8 1/5/2005 1/5/2005 1/5/2005 1/5/2005 1/5/2005 1/5/2005 2/8/2005 2/8/2005 2/8/2005 2/8/2005 2/8/2005 2/8/2005 2/8/2005 2/9/2005 2/9/2005 2/10/2005 2/10/2005 2/10/2005 2/10/2005 2/10/2005 2/10/2005 2/10/2005 2/10/2005 2/10/2005 2/10/2005 2/15/2005 Sewer Line A STA 39+80 RCW Line A STA 28 + 40 RCW Line A STA 28 + 40 Sewer Line A STA 43+90 Sewer Line A STA 43+90 RCW Line A STA 32 + 60 SD Line "F" STA 17+85 SD Line "F" STA 17+95 SD Line "F" STA 17+05 SD Line "F 186" STA 10+40 SD Line 'F 186" STA 10+15 SD Line "F186" STA 10+10 SD Line 'F 186" STA 10+15 SD Line "F" STA 24+30 SD Line "F" STA 24+30 SD Line "F" Type BG STA 27+94 (appoc.) SD Line "F" Type BG STA 27+94 (appnc SD Line "F" Type BG STA 27+94 (apprx SD Line "F" Type BG STA 27+94 (apprx SD Line "F" Type BG STA 27+94 (apprx SD Line "F" Type BG STA 27+94 (appot SD Line F-186 STA 10+50 (apprx) SD Line F-186 STA 10+50 (apprx) SD Line F-186 STA 10+50 (apprx) SD Line F-186 STA 10+50 (apprx) SD Line "F-19" STA 10+90 353.0 351.0 353.0 341.0 343.0 341.0 406.0 407.0 408.0 340.0 348.0 350.0 352.0 372.0 374.0 348.0 350.0 352.0 354.0 356.0 358.0 340.0 344.0 346.0 348.0 341.0 9.1% 8.7% 9.5% 8.1% 8.1% 9.9% 10.7% 11,1% 9.1% 11.1% 10.3% 8.7% 95% 9.1% 8.7% 9.5% 7.9% 8.7% 8.3% 9.1% 8.7% 9.1% 8.7% 9.1% 9.9% 11.1% 7.5% 7.5% 7.5% 7.5% 7.5% 7.5% 8.5% 8.5% 6.0% 8.5% 8.5% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 8.5% 129.5 128.6 127.6 130.9 128.2 129.2 127.1 127.9 134.0 128.4 128.9 135.1 134.9 133.4 135.7 135.4 135.9 134.0 137.3 133.9 135.8 136.6 135.8 134.3 133.6 126.3 134.0 134.0 134.0 134.0 134.0 134,0 134.0 132.5 132.5 140.0 132.5 132.5 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 132.5 96% 97% 96% 95% 98% 96% 96% 96% 97% 96% 97% 97% 97% 96% 95% 97% 97% 97% 96% 98% 96% 97% 98% 97% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfilt utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfiti utiity backfill utiity backfill utiity backfilt utiity backfilt utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill f I ? I I I I I I E I f I I fi fi ffl ffl ffl ffl ffl ffl ffl ffl 11 Contract Number: Project Name; Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. California Tost # Sample # Test Date Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Tost # Sample # Test Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. 216 8 2/15/2005 SD Line "F-19" STA11+10 337.0 9.9% 8.5% 127.1 132.5 96% 95% 217 8 2/15/2005 SD Line "F-19" STA 11+10 339.0 10.3% 8.5% 127.7 132.6 96% 95% 218 8 2/15/2005 SD Line "F" STA 30+20 336.0 11.1% 8.5% 127.2 132.5 96% 95% 219 8 2/15/2005 SD Line "F" STA 30+10 341.0 9.1% 8.5% 128.2 132.5 97% 95% 220 30 2/15/2005 SD Line "F" STA 29+80 344.0 8.7% 6.0% 135.9 140.0 97% 95% 221 8 2/15/2005 SD Line F-19 STA 10+25 349.0 11.1% 8.5% 127.9 132.5 97% 95% 222 8 2/15/2005 SDLine F-15 STA 10+20 369.0 9.5% 8.5% 128,7 132.5 97% 95% 223 30 2/15/2005 SD Line F-15 STA 10+20 371.0 8.3% 6.0% 137.5 140.0 98% 95% 224 30 2/15/2005 SD Line F-19 STA 10+25 351.0 9.5% 6.0% 135.9 140.0 97% 95% 225 30 2/16/2005 SD Line "F" STA 30+20 344.0 8,7% 6.0% 136.7 140.0 98% 95% 226 30 2/16/2005 SO Line "F" STA 29+90 346.0 7.9% 6.0% 136.9 140.0 98% 95% 227 30 2/16/2005 SD Line "F" STA 30+10 348.0 9.5% 6.0% 135.6 140.0 97% 95% 228 30 2/16/2005 SD Line F-19 STA 10+80 346.0 9.5% 6.0% 134.8 140.0 96% 95% 229 30 2/16/2005 SD Line F-19 STA 10+80 348.0 9.1% 6.0% 134.7 140.0 96% 95% 230 30 2/17/2005 SD Line F-19 STA 10+90 350.0 9.5% 6.0% 135.5 140.0 97% 95% 231 30 2/17/2005 SD Line F-19 STA 10+70 352.0 9.1% 6.0% 134.5 140.0 96% 95% 232 8 2/17/2005 SD Line F-14 STA 10+40 388.0 11.1% 8.5% 127.7 132.5 96% 95% 233 30 2/17/2005 SD Line F-14 STA 10+40 390.0 9.1% 6.0% 133.7 140.0 96% 95% 234 30 2/17/2005 SD Line F-14 STA 10+50 392.0 8.7% 6.0% 134.8 140.0 96% 95% 235 30 2/24/2005 SD Line F-15 STA 10+15 373.0 9.9% 6.0% 135.8 140.0 97% 95% 236 30 2/24/2005 SD Line F-15 STA 10+10 375.0 9.1% 6.0% 136.1 140.0 97% 95% 237 30 2/24/2005 SD Line F-15 STA 10+05 377.0 10.3% 6.0% 133.9 140.0 96% 95% 238 8 2/25/2005 SD Une F-15 STA 10+80 374.0 11.1% 8.5% 129.4 132.5 98% 95% 239 8 2/25/2005 SD Line F-13 STA 10+20 405.0 10.3% 8.5% 127.1 132.5 96% 95% 240 30 2/25/2005 SD Line F-15 STA 10+60 372.0 9.1% 6.0% 134.9 140.0 96% 95% 241 30 2/25/2005 SD Line F-15 STA 10+80 376.0 9.9% 6.0% 135.3 140.0 97% 95% 242 30 2/25/2005 SDLine F-13 STA 10+30 406.0 9.1% 6.0% 136.7 140.0 98% 95% ' 1 SIII r 1 1 i f 1 1 1 1 1 1 1 f i f 1 ff 1 ff i ff 1 Conform Non-Conform Remarks Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utitty backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name; Location; 65808 Rancho Sanla Fe Road North, Phase 2 Cartsbad, California Test Jl Sample Jl Test Date Test Localion Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff ff Test Localion Elev. (ft) Remarks 243 8 ;i/;^/9onR 1 ina cm R CTA i nj.in Fiold Opt Field Max. Obt. Req. Non-Conform 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 8 30 30 30 30 30 8 8 33 8 8 30 30 30 30 30 30 30 30 30 30 30 30 30 3/3/2005 SD Line F-18 B STA 10+20 3/3/2005 SD Line F-18 6 STA 10+20 3/3/2005 SD Line F-18 B STA 10+10 3/4/2005 SD Line F-18 B STA 10+10 3/4/2005 SD Line F-18 B STA 10+20 3/4/2005 SD Line F-18 B STA 10+15 3/7/2005 H20 Line -1 STA 11 +50 3/7/2005 H20 Line -1 STA 10+25 3/7/2005 H20 Line -1 STA 11 +00 3/7/2005 H20 Line -1 STA 12+30 3/7/2005 H20 Line -1 STA 12+30 3/7/2005 H20 Line -1 STA 12+20 3/7/2005 SD Line F-18 B STA 10+40 3/7/2005 SD Line F-18 B STA 10+40 3/7/2005 SD Line F-18 B STA 10+35 3/7/2005 SD Line F-18 B STA 10+40 3/7/2005 SD Line F-18 B STA 10+35 3/7/2005 SD Line F-18 B STA 10+35 3/8/2005 SD Line F-18 B STA 10+35 3/8/2005 SD Line F-18 B STA 10+55 3/8/2005 SD Line F-18 B STA 10+55 3/8/2005 SD Line F-18 B STA 10+55 3/8/2005 SD Line F-18 B STA 10+55 3/8/2005 SD Line F-18 B STA 10+55 3/9/2005 SD Line F-13 @ Type "B" Inlet STA 10+55 3/9/2005 SD Line F-13 @ Type "B" Inlet STA 10+55 346.0 348.0 350.0 352.0 354.0 355.0 350.0 351.0 352.0 344.0 346.0 348.0 342.0 344.0 346.0 348.0 350.0 352.0 354.0 344.0 346.0 348.0 350.0 352.0 405.0 407.0 10.3% 8.7% 9.1% 9.1% 9.5% 8.7% 11.1% 9.9% 8.7% 10.3% 10.7% 9,1% 11.1% 8.3% 9.1% 7,9% 9,5% 9,1% 9.5% 8.3% 9.9% 8.7% 9.1% 8.7% 9,1% 9.9% 8.5% 6.0% 6.0% 6.0% 6.0% 6.0% 8.5% 8.5% 7.5% 8.5% 8.5% 8.5% 8.5% 6.0% 6.0% 6.0% 6,0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 127.7 135.9 134.2 135.9 134.7 134.8 126.0 128.7 129.6 129,0 127.6 128.1 127.5 136.2 134.5 135.1 134.2 136.4 133.9 136.7 134.3 136.8 135.9 135.3 135.0 134.8 132.5 140.0 140.0 140.0 140.0 140.0 132.5 132.5 134.0 132.5 132.5 132.5 132.5 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 96% 97% 96% 97% 96% 96% 95% 97% 97% 97% 96% 97% 96% 97% 96% 97% 96% 97% 96% 98% 96% 98% 97% 97% 96% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfilt utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill t I fl 'I II fl fi fi fi ffi ffi ffi ffi ffl fl ffi Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test # Sample # Test Date Test Location Elev. (ft) Moisture Dry Density (pcf) Test # Sample # Test Date Test Location Elev. (ft) Field 1 Opt. Field Max. 270 30 3/9/2005 SD Line F-14 @ Type "B" Inlet STA 10+65 392.0 8.3% 6.0% 135.5 140.0 271 30 3/9/2005 SD Line F-14 @ Type "B" Inlet STA 10+70 393.0 9.1% 6.0% 134.5 140.0 272 30 3/9/2005 SD Line F-15 @ Type "B" Inlet STA 10+98 376.0 9.1% 6.0% 136.3 140.0 273 30 3/9/2005 SD Line F-15 @ Type "B" Inlet STA 10+98 378.0 7.9% 6.0% 135.8 140.0 274 30 3/14/2005 RCW Line - B Metering Statton STA STA 21+25 340.0 9.1% 6.0% 132.3 140.0 275 30 3/14/2005 RCW Line - B Metering Station STA STA 21+25 342.0 7.9% 6.0% 135.4 140.0 276 30 3/14/2005 RCW Line - B Metering Station STA STA 21 +25 344.0 8,7% 6.0% 130.5 140.0 277 30 3/14/2005 RCW Line - B Metering Statton STA STA 21+25 346.0 7.5% 6.0% 135.9 140.0 278 30 3/14/2005 RCW Line - B Metering Station STA STA 21+25 348.0 8.3% 6.0% 136.1 140.0 279 30 3/15/2005 RCW Line - B 2" Senrice STA 21 +75 342.0 9.1% 6.0% 133.1 140.0 280 30 3/15/2005 RCW Line - B 2" Service STA 21+75 344.0 8.3% 6.0% 132.8 140.0 281 30 3/15/2005 RCW Line - B 2" Service STA 21 +75 346.0 7.5% 6.0% 133.1 140.0 282 30 3/15/2005 RCW Line - B 2" Sen/ice STA 21 +75 348.0 7.9% 6.0% 136.2 140.0 283 30 3/15/2005 RCW Line - B 2" Service STA 21 +75 350.0 9.1% 6.0% 135.5 140.0 284 8 3/17/2005 H20 Line! STA 10+15 352.0 10.3% 8.5% 127.4 132.5 285 30 3/17/2005 H20 Line ISTA 10+05 354.0 8.7% 6.0% 135.1 140.0 286 8 3/18/2005 SD Line F-17 STA 10+40 357.0 10.7% 8.5% 127.1 132.5 287 8 3/18/2005 4" H20 Line Vallecitos STA 21+50 1'AP 9.9% 8.5% 129.5 132.5 288 30 3/22/2005 SD F-19 STA 10+52 354.0 9.1% 6.0% 135.4 140.0 289 30 3/22/2005 SD F-19 STA 10+00 353.0 7.9% 6.0% 136.1 140.0 290 8 3/24/2005 SD Line F-16 Inlet Box STA 10+31 367.0 11.1% 8.5% 129.9 132.5 291 8 3/25/2005 SD Line t Inlet Box STA 10+31 Sklewalk 11.5% 8.5% 129.6 132.5 292 8 3/29/2005 RCW Line-A STA 27+50 353.0 10.7% 8.5% 129.8 132.5 293 8 3/29/2005 RCW Line-A STA 26+00 356.0 11.5% 8.5% 129.4 132.5 294 8 3/29/2005 RCW Line-A STA 24+50 363.0 11.1% 8.5% 128.8 132.5 295 8 3/30/2005 SD Line F-14 Inlet STA 10+00 393.0 11.1% 8.5% 128.9 132.5 296 8 3/31/2005 RCW Line-A STA 23+00 370.0 10.3% 8.5% 128.2 132.5 1 1 flll f 1 f 1 f 1 I 1 t 1 { 1 1 i 1 1 1 1 1 Relative Comp. Obt. Req. Conform Non-Conform Remarks 97% 96% 97% 97% 95% 97% 93% 97% 97% 95% 95% 95% 97% 97% 96% 97% 96% 98% 97% 97% 98% 98% 98% 98% 97% 97% 97% 95% 95% 95% 95% 90% 90% 90% 95% 95% 90% 90% 90% 95% 95% 95% 95% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill uttity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. California Test # Sample # Test Date Test Location Etev. (ft) Moisture Fiold Opt 297 30 3/31/2005 RCW Line-A STA 27+00 354.0 8.7% 6.0% 298 30 3/31/2005 RCW Line-A STA 25+50 356.0 7.9% 6.0% 299 30 4/1/2005 Sewer Line A STA 25+80 414.0 7.5% 6.0% 300 30 4/1/2005 RCW Line A STA 24+50 365.0 8.7% 6.0% 301 30 4/1/2005 RCW Line A STA 23+00 372.0 7.9% 6.0% 302 30 4/1/2005 Sewer Line A STA 25+60 417.0 9.5% 6.0% 303 30 4/1/2005 Sewer Line A STA 25+20 416.0 9.1% 6.0% 304 30 4/1/2005 Sewer Line A STA 25+00 419.0 8.3% 6.0% 305 30 4/1/2005 Sewer Clean Out C STA 10+15 416.0 9.5% 6.0% 306 30 4/1/2005 Sewer Ctean Out C STA 10+15 418.0 8.7% 6.0% 307 8 4/1/2005 RCW Line-A STA 21+50 379.0 11.1% 8.5% 308 8 4/1/2005 RCW Line-A STA 20+05 387.0 10.3% 8.5% 309 30 4/6/2005 Sewer Line A BF MH #7 414.0 9.1% 6.0% 310 30 4/6/2005 Sewer LineABFMH#7 416.0 7.9% 6.0% 311 30 4/6/2005 Sewer Line A BF MH #7 418.0 8.3% 6.0% 312 30 4/8/2005 Sewer Line A STA 24+50 421.0 8.7% 6.0% 313 30 4/8/2005 Sewer Line A STA 24+30 425.0 7.9% 6.0% 314 30 4/8/2005 Sewer Line A STA 24+10 428.0 9.1% 6.0% 315 5 4/8/2005 MH #17 Sewer Line A 327.0 10.3% 7.0% 316 8 4/12/2005 RCW Line BSTA 18+12 353.0 10.3% 8.5% 317 8 4/14/2005 RCW Line-A STA 18+50 397.0 10.3% 8.5% 318 8 4/14/2005 RCW Line-A STA 17+00 405.0 9.9% 8.5% 319 8 4/14/2005 RCW Line-A STA 16+00 411.0 11.1% 8.5% 320 8 4/14/2005 RCWLine-A STA 14+50 414.0 10.7% 8.5% 321 30 4/18/2005 Sewer Line A STA 23+90 423.0 8.7% 6.0% 322 30 4/18/2005 Sewer Line A STA 23+60 426.0 7.9% 6.0% 323 30 4/18/2005 Sewer Line A STA 23+70 428.0 9.1% 6.0% 1 1 1 1 f I f i f 1 f 1 f 1 1 1 f 1 f 1 Dry Density (pcf) Fiold Max. Relative Comp. Obt Req. Conform Non-Conform Remarks 134.4 134.5 134.8 134.2 134.0 135.3 134.6 134.3 134.9 133.9 128.9 129.0 1355 134.9 133.5 133.8 136.1 135.2 132.1 130.4 127.1 128.3 128.9 132.5 135.9 136.3 134.3 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 132.5 132.5 140.0 140.0 140.0 140.0 140.0 140.0 137.5 132.5 132.5 132.5 132.5 132.5 140.0 140.0 140.0 96% 96% 96% 96% 96% 97% 96% 96% 96% 96% 97% 97% 97% 96% 95% 96% 97% 97% 96% 98% 96% 97% 97% 100% 97% 97% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill utiity backflll utiity backfilt utiity backfill uttity backfill utiity backfill utitty backfill utiity backfill utiity backfill utiity backfill uttity backfill utirty backflll utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test Sample JI Test Dale Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 324 ff 30 4/ifi/7nnfi Test Location Elev. (ft) Field Opt. Field IMax. Obt Req. Non-Conform Remarks 325 30 4/18/2005 Sewer Line D STA 10+90 326 30 4/18/2005 Sewer Line D STA 10+95 327 30 4/18/2005 Sewer Line D STA 11+00 328 30 4/18/2005 RCW Line-A STA 14+50 329 30 4/18/2005 RCW Line-A STA 21+50 330 30 4/18/2005 RCW Lina^A STA 20+00 331 30 4/18/2005 RCW Line-A STA 18+50 332 30 4/18/2005 RCW Line-A STA 17+00 333 30 4/18/2005 RCW Line-A STA 15+50 334 30 4/18/2005 RCW Line-A STA 14+50 335 8 4/20/2005 SDG&E Conduit Trench BF STA 211+50 336 17 4/20/2005 H20 Line I STA 10+00 337 17 4/20/2005 RCW Line B STA 18+20 338 38 4/21/2005 RCW Line B STA 18+12 339 30 4/21/2005 SD Line F19 B-1 Inlet STA 10+52 340 8 4/22/2005 RCW Line A STA 13+50 341 8 4/22/2005 VWD H20 Valve Cans Metrose STA 211 +00 342 8 4/22/2005 VWD H20 Valve Cans Melrose STA 211+00 343 8 4/22/2005 VWD H20 Valve Cans Melrose STA 211+00 344 30 4/25/2005 RCW Line A STA 13+20 345 30 4/25/2005 RCW Line A STA 13+50 346 8 4/25/2005 H20 Line J STA 10+05 347 8 4/25/2005 H20 Line J STA 10+50 348 30 4/25/2005 H20 Line J STA 10+50 349 30 4/25/2005 H20 Line J STA 10+25 350 30 4/25/2005 H20 Line J STA 10+05 424.0 426.0 428.0 416.0 381.0 389.0 399.0 407.0 415.0 418.0 351 0 SG SG BG SG 420.0 SG 12" Below 6" Below 428.0 422.0 358.0 359.0 361.0 361.0 363,0 7.9% 6.8% 8.7% 9.5% 9.1% 7.5% 7.1% 8.3% 7.1% 8.3% 11.1% 9.5% 10.3% 10.3% 9.5% 11.1% 8.7% 7.5% 8.7% 9.5% 8.7% 10.7% 11.1% 8.4% 8.3% 9.5% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6,0% 8,5% 9.5% 9.5% 8.0% 6.0% 8.5% 6.5% 6.5% 6.5% 6.0% 6,0% 8.5% 8.5% 6.0% 6.0% 6.0% 135.8 136.2 135.2 134.9 135.9 136.1 135.9 134.6 135.3 134.1 128.8 123.4 125.0 128.2 135.3 128.7 139.1 139.2 137.5 134,3 135.9 129.4 128,5 136.4 134.9 134.8 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 140.0 132.5 128.0 128.0 134.5 140.0 132.5 143.0 143.0 143.0 140.0 140.0 132.5 132.5 140.0 140.0 140.0 97% 97% 97% 96% 97% 97% 97% 96% 97% 96% 97% 96% 98% 95% 97% 97% 97% 97% 96% 96% 97% 98% 97% 97% 96% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt uttity backfilt utiity backfill uttity backfiti utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backftit utiity backfill I I fl fl 11 11 fi fi fl II II fl fi fl fl f I 1 I i I 1 ff 1 Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test # Sample Tost Date Test Location Etev. (ft) Moisture Field Opt. Dry Density (pcf) Field Max. 351 30 4/25/2005 RCW Line A STA 14+40 419.0 7.9% 6.0% 135.9 140.0 352 8 4/26/2005 RCW Line A 8" Blow Off STA 14+22 415.0 10.7% 8.5% 126,6 132.5 353 8 4/26/2005 SDG&E Conduit Trench BF Melrose STA 211 +50 348.0 11.1% 8.5% 127,5 132.5 354 39 4/26/2005 SDG&E Conduit Trench BF Melrose STA 211+50 SG 8.3% 6.5% 139.8 143.0 355 39 4/27/2005 SDG&E Conduit Trench BF STA211+50 BG 9.1% 6.5% 138.2 143.0 356 8 4/27/2005 H20 Line-L STA 10+55 417.0 11.1% 8.5% 127.1 132.5 357 8 4/27/2005 2" Irrigatton Lat, RSF STA 266+30 365.0 10.7% 8.5% 126.6 132.5 358 30 4/27/2005 2" tn-igatton Lat RSF STA 266+30 366.0 8.7% 6.0% 134.5 140.0 359 30 4/27/2005 2" Irrigation Lat. RSF STA 266+30 368.0 9.5% 6.0% 134.8 140.0 360 8 4/27/2005 2" Imgation Lat. RSF STA 266+60 363.0 11.1% 8.5% 127.9 132.5 361 30 4/27/2005 2" In-igatton Lat. RSF STA 266+60 364.0 9.1% 6.0% 135.6 140.0 362 30 4/27/2005 2" Irrigation Lat RSF STA 266+60 366.0 7.9% 6.0% 135.9 140.0 363 39 4/29/2005 RCW Line BSTA 18+10 BG 10.2% 6.5% 136.8 143.0 364 39 4/29/2005 H20 Line ISTA 10+05 BG 9.9% 6.5% 136.0 143.0 365 AC 4/29/2005 RCWLine BSTA 18+10 AC Grade 138.9 146.6 366 AC 4/29/2005 H20 Line ISTA 10+10 AC Grade 139.3 146.6 367 30 5/2/2005 RCW Une A 8" LAT STA 14+22 417.0 9.1% 6.0% 137.7 140.0 368 30 5/2/2005 RCW Une A 8" LAT STA 14+22 419.0 8.3% 6.0% 136.5 140.0 369 30 5/2/2005 RCW Une A 8" LAT STA 14+22 421.0 8.7% 6.0% 135.4 140,0 370 8 5/2/2005 H20 Line L STA 10+70 419.0 10.7% 8.5% 126.4 132,5 371 47 5/3/2005 SD Line F STA 17+00 415.0 11.5% 9.5% 131.5 137.0 372 47 5/3/2005 SD Line F STA 17+50 418.0 10.7% 9.5% 132.9 137.0 373 47 5/4/2005 SD Line F STA 17+00 418.0 10.7% 9.5% 133.2 137.0 374 8 5/4/2005 H20 Line L STA 10+35 414.0 11.1% 8.5% 128,2 132.5 375 47 5/4/2005 H20 Line L STA 10+40 416.0 9.9% 9.5% 132.7 137.0 376 47 5/4/2005 H20 Line L STA 10+30 418.0 10.3% 9.5% 132.6 137.0 377 47 5/4/2005 H20 Une L STA 10+30 420.0 11.1% 9.5% 130.4 137.0 r ^ e f 9 f 1 f i ff i t 1 f 1 1 1 1 1 1 1 1 1 1 i Relative Comp. Obt Req. Conform Non-Conform Remarks 97% 96% 96% 98% 97% 96% 96% 96% 96% 97% 97% 97% 96% 95% 95% 95% 98% 98% 97% 95% 96% 97% 97% 97% 97% 97% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill uttity backfill utiity backfill utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill uttity backfiti utiity backfilt utiity backfill utiity backfill uttity backfill utitty backfill utiity backfill utiity backfill uttity backfill fflllllililfl Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Cartsbad, California Test # Sample M Test Date Test Location Elev. (ft) I7n n Moisture Dry Densiiy (pcf) Relative Comp. Conform Remarks 378 IT 8 5/4/2005 2: In- Service STA 265+00 Elev. (ft) I7n n Field in •ao/. Opt. a CO/. Field Max. Obt. Req. Non-Conform Remarks 379 8 5/4/2005 2: Irr Service STA 263+49 380 47 5/4/2005 SD Line F STA 16+50 381 47 5/4/2005 SD Line F STA 16+50 382 30 5/4/2005 2" Irr., Service STA 265+00 383 47 5/4/2005 SD Line F STA 16+00 384 8 5/5/2005 2" Irr. Service STA 264+50 385 47 5/9/2005 CTS STA 257+00 386 30 5/9/2005 CTS STA 257+00 387 47 5/9/2005 SD-F-12 STA 10+30 388 47 5/9/2005 SD-F-12 STA 10+30 389 30 5/9/2005 SD-F-12 STA 10+30 390 47 5/10/2005 SD Line F STA 15+90 391 47 5/10/2005 SD Line F-12 STA 10+10 392 47 5/10/2005 SD Line F-12 STA 10+10 393 47 5/10/2005 SD Une F-11 STA 10+90 394 47 5/10/2005 SD Line F STA 16+00 395 30 5/10/2005 SD Line F STA 16+00 396 47 5/10/2005 SD Line F STA 15+50 397 47 5/10/2005 SD Line F STA 15+00 398 30 5/10/2005 SD Line F STA 15+00 399 47 5/10/2005 SD Line F-12 STA 10+60 400 47 5/10/2005 SD Line F-12 STA 10+70 401 47 5/11/2005 SD Line F-11 STA 10+90 402 30 5/11/2005 SD Line F-11 STA 10+90 403 8 5/16/2005 H20 Line L STA 11 +00 404 30 5/16/2005 H20 Line L STA 11+00 379.0 417.0 419.0 372.0 418.0 373.0 416.0 417,0 418.0 420.0 422.0 421.0 418.0 420.0 423.0 423.0 425.0 422,0 428,0 430.0 419.0 421.0 423.0 425.0 420.0 420.0 11.1% 10.7% 9.5% 8.7% 10.3% 10.3% 10.7% 9.1% 11.1% 11.5% 8.7% 10.7% 11.9% 9.9% 12.4% 10.3% 8.7% 12.4% 11.5% 8.3% 11.9% 10.3% 12.4% 9.1% 11.1% 8.7% 8.5% 9.5% 9.5% 6.0% 9.5% 8.5% 9.5% 6.0% 9.5% 9.5% 6.0% 9.5% 9.5% 9.5% 9.5% 9.5% 6.0% 9.5% 9.5% 6.0% 9.5% 9.5% 9.5% 6.0% 8.5% 6.0% 127.5 130.9 132.1 135.9 131.7 128.2 132.9 134.4 133.5 132.6 135.5 131.9 131.3 132.5 131.0 132.5 136.1 130.9 131.5 135.2 132.1 132.2 130.2 134.6 127.9 134.2 132.5 137.0 137.0 140.0 137.0 132.5 137.0 140,0 137.0 137.0 140.0 137.0 137.0 137.0 137.0 137.0 140.0 137.0 137.0 140.0 137,0 137.0 137.0 140.0 132.5 140.0 96% 96% 96% 97% 96% 97% 97% 96% 97% 97% 97% 96% 96% 97% 96% 97% 97% 96% 96% 97% 96% 96% 95% 96% 97% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill uttity backfilt utiity backfill utitty backfilt utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill uttity backfill ri II II fi 11 II fi fl fl II i I fl II 11 fl ffl 11 11 ffl Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Jl Sample JC Tost Date Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 405 ff 30 Test Location Elev. (ft) Field Opt. Field Max. Obt Req. Non-Conform Remarks 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 30 30 30 30 30 30 30 8 50 8 8 50 50 47 47 51 47 39 39 39 47 47 30 47 8 8 5/16/2005 Sewer Line-A STA 23+00 431.0 5/16/2005 Sewer Line-A STA 22+00 435.0 5/16/2005 Sewer Line-A STA 22+50 434.0 5/16/2005 Sewer Une-A STA 23+25 433.0 5/16/2005 Sewer Une-A STA 22+00 437.0 5/17/2005 Sewer Line-A STA 21+20 442.O 5/17/2005 Sewer Line-A STA 21+10 444.0 5/18/2005 16" RCW Line B Metering Statton STA 21+25 346.0 5/18/2005 16" RCW Une B Metering Station STA 21+25 348.0 5/18/2005 16" RCW Une B Metering Statton STA 21+47 344.0 5/18/2005 16" RCW Une B Metering Statton STA 21+47 346.0 5/19/2005 16" RCW Line B Metering Statton STA 21+47 348.0 5/19/2005 16" RCW Line B Metering Station STA 21 +47 350.0 5/20/2005 SD Line-F STA 14+00 432.O 5/20/2005 SD Line-F STA 14+50 433.0 5/20/2005 SD Line - F STA 13+80 437.0 5/20/2005 SD Line - F STA 12+80 438.0 5/20/2005 SDG&E Conduit Trench BF Melrose RT STA 211 +35 SG 5/20/2005 SDG&E Conduit Trench BF Melrose RT STA 211 +35 8" Below 5/20/2005 SIDG&EConduitTrenchBF Melrose RT STA 211+35 BG 5/23/2005 SD Line F STA 12+30 443,0 5/23/2005 SD Line F-9 STA 10+15 445,0 5/23/2005 SDLine F-9 STA 10+15 448.0 5/26/2005 SD Line F-11 STA 10+40 425.0 5/26/2005 RCW Une-A STA 12+50 435.0 5/26/2005 RCW Line-A STA 11+50 439.0 9.9% 8.7% 7,9% 8.3% 9.1% 8.7% 9.5% 11.5% 9.1% 11.1% 10.7% 8.7% 7.9% 11.9% 10.3% 9.1% 11.1% 9.1% 8.3% 7.5% 11.5% 11.1% 9.1% 11,5% 11.9% 11.1% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 6.0% 8.5% 6.0% 8.5% 8.5% 6.0% 6.0% 9.5% 9.5% 6.5% 9.5% 6.5% 6.5% 6.5% 9.5% 9.5% 6.0% 9.5% 8.5% 8.5% 134.8 134.8 136.5 133.7 135.1 135.1 134.6 128.3 128.6 127.9 127.5 129.4 129.6 131.5 132.3 129.8 133.3 137.8 136.6 137.1 131.2 133.3 134.6 131.1 126.5 128.8 140.0 140.0 140.0 140.0 140.0 140.0 140.0 132.5 134.0 132.5 132.5 134.0 134.0 137.0 137.0 134.5 137.0 143.0 143.0 143.0 137.0 137.0 140.0 137.0 132.5 132.5 96% 96% 98% 96% 97% 97% 96% 97% 96% 97% 96% 97% 97% 96% 97% 97% 97% 96% 96% 96% 96% 97% 96% 96% 95% 97% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfiti uttity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utirty backfill utiity backfill utiity backfilt utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill uttity backfill utiity backfill F 9 I I f 11 11 II fl fl II II fi II 11 11 11 II II ffl ffl Contract Number; Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test # Sample # Test Date Test Location Elev. (ft) Moisture Field Opt. Dry Densiiy (pcf) Field 4JJ: 4/ o/;it(/zoo5 RCW Line-A STA 12+50 437.0 10.3% 9.5% 133.4 433 47 5/26/2005 RCW Line-A STA 11 +50 441.0 11.5% 9.5% 131.4 434 8 5/27/2005 Service Crossing STA 250+67 452.0 11.5% 8.5% 127.1 435 25 5/27/2005 Service Crossing STA 250+67 BG 10.3% 7.0% 137.5 436 8 5/27/2005 Sen/ice Crossing STA 250+60 453.0 11.1% 8.5% 128.3 437 25 5/27/2005 Service Crossing STA 250+60 BG 9.9% 7.0% 137.8 438 30 6/2/2005 SD Line F-11 STA 10+60 425.0 7.1% 6.0% 136.2 439 47 6/2/2005 SD Line F-10 STA 10+10 436.0 11.1% 9.5% 130.7 440 30 6/2/2005 SD Line F-10 STA 10+20 438.0 8,3% 6.0% 136.0 441 47 6/2/2005 SD Line F-9 STA 10+10 442.0 9.5% 9.5% 134.1 442 30 6/2/2005 SDLine F-9 STA 10+10 444.0 9.1% 6.0% 133.3 443 30 6/2/2005 SD Line F-9 STA 10+10 446.0 8.7% 6.0% 134.9 444 26 6/7/2005 RCW Une B STA 17+00 SG 11.5% 11.0% 118.0 445 39 6/7/2005 RCW Line BSTA 17+20 6" Below 7.9% 6.5% 137.9 446 39 6/7/2005 RCW Line BSTA 17+00 BG 8.7% 6.5% 137.5 447 8 6/13/2005 RCW Line A STA 33+50 338.0 10.7% 8.5% 127.6 448 8 6/13/2005 RCW Line A STA 35+00 335.0 9.9% 8.5% 128.2 449 8 6/14/2005 RCW Line A STA 34+80 336.0 11.1% 8.5% 126.8 450 8 6/14/2005 RCW Line A STA 33+50 399.0 10.3% 8.5% 128.5 451 8 6/14/2005 RCW Line A STA 33+50 341.0 10.7% 8.5% 126.7 452 8 6/14/2005 RCW Line A STA 34+80 338.0 9.9% 8.5% 129.2 453 5 6/14/2005 RCW Line A STA 34+00 342.0 9.5% 7.0% 131.8 454 8 6/15/2005 RCW Line A STA 32+99 344.0 10.7% 8.5% 126.6 455 5 6/15/2005 RCW Line A STA 32+99 346.0 8.3% 7.0% 131.9 456 8 6/20/2005 RCW Line A STA 35+60 325.0 11.5% 8.5% 125.7 457 8 6/21/2005 SD Line 1-2 STA 11+00 332.0 11.5% 8.5% 127.2 458 8 6/21/2005 SDLine 1-2 STA 11+00 335.0 10.3% 8.5% 128.1 459 8 6/21/2005 RCW Line A STA 35+80 325.0 11.1% 8.5% 127.9 f 1 1 1 1 1 llllll 1 1 flli 1 1 ff 1 Max. Relative Comp. Obt. Req. Conform Non-Conform Remarks 137.0 137.0 132.5 143.0 132.5 143.0 140.0 137.0 140.0 137.0 140.0 140.0 121.5 143.0 143.0 132.5 132.5 132.5 132.5 132.5 132.5 137.5 132.5 137.5 132.5 132.5 132.5 132.5 97% 96% 96% 96% 97% 96% 97% 95% 97% 98% 95% 96% 97% 96% 96% 96% 97% 96% 97% 96% 98% 96% 96% 96% 95% 96% 97% 97% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 95% 95% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utitty backfilt utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill f I TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. California Tost # Sample Tost Date Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Tost Date Test Location Elev. (ft) Field Opt. Field Max. Obt. Req. 6/23/2005 RCW Une A STA 35+35 331.0 11.5% 8.5% 127.1 132.5 96% 95% 6/23/2005 RCW Une A STA 35+20 339.0 10.7% 8.5% 128.9 132.5 97% 95% 6/23/2005 RCW Line A STA 34+95 340.0 11.1% 8.5% 128.7 132,5 97% 95% 6/24/2005 RCW Line A STA 35+20 341.0 9.5% 7.0% 133.4 137.5 97% 95% 6/24/2005 RCW Line A STA 35+35 335.0 9.1% 7.0% 132.5 137.5 96% 95% 6/24/2005 RCW Line A STA 35+60 327.0 11.5% 8.5% 127.9 132.5 97% 95% 6/24/2005 RCW Une A STA 35+75 329.0 10.7% 8.5% 128.2 132.5 97% 95% 6/24/2005 RCW Line A STA 35+60 331.0 8.3% 7.0% 133.9 137.5 97% 95% 6/24/2005 RCW Line A STA 35+50 336.0 9.5% 7.0% 131 9 137.5 96% 95% 6/24/2005 RCW Line A STA 35+35 338.0 8.7% 7.0% 132.6 137.5 96% 95% 6/27/2005 RCW Line A STA 36+25 325.0 11.3% 8.5%, 128.5 132.5 97% 95% 6/27/2005 RCW Une A STA 36+25 327.0 9.9% 8.5% 128.8 132.5 97% 95% 6/27/2005 RCW Une A STA 36+25 329.0 9.5% 7.5% 133.9 137.5 97% 95% 6/27/2005 RCW Une A STA 36+00 331.0 7.9% 7.5% 134.3 137.5 98% 95% 6/27/2005 RCW Line A STA 35+60 333.0 8.7% 7.5% 131.6 137.5 96% 95% 6/27/2005 RCW Line A STA 35+60 335.0 7.5% 7.5% 133.0 137.5 97% 95% 6/27/2005 RCW Line A STA 35+40 340.0 8.3% 7.5% 131.7 137.5 96% 95% 6/28/2005 BF oto SD Line 1 -2 11+00 332.0 10.3% 8.5% 124.2 131.0 95% 90% 6/28/2005 BF oto SD Line 1-2 11+00 335.0 9.1% 8.5% 125.3 131.0 96% 90% 6/28/2005 SD Linel-2 STA 10+97 333.0 11.5% 8.5% 126.9 132.5 96% 90% 6/28/2005 SD Une 1-2 STA 10+97 355.0 9.9% 8.5% 126.4 132.5 95% 90% 6/29/2005 SDLinel STA 10+40 333.0 9.1% 8.5% 129.1 134.0 96% 90% 6/29/2005 SDLinel STA 10+60 335.0 11.5% 8.5% 128.4 134.0 96% 90% 6/29/2005 SDLine 1-2 STA 11+20 332.0 10.3% 8.5% 128.3 134.0 96% 90% 6/29/2005 SDLine 1-2 STA 11+30 334.0 9.9% 8.5% 130.0 134.0 97% 90% 6/29/2005 SDLine 1-2 STA 11+40 336.0 10.7% 8.5% 129.7 134.0 97% 90% 6/30/2005 SDLine 1-2 STA 11+70 332.0 10.3% 8.5% 128.1 134.0 96% 90% 6/30/2005 SDLine 1-2 STA 11+80 334.0 11.1% 8.5% 128 3 134.0 96% 90% Conform Non-Conform Remarks 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 8 8 8 5 5 8 8 5 5 5 8 8 5 5 5 5 5 4 4 8 8 61 61 61 61 61 61 61 Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utitty backfill utifty backfill uttity backfiti utiity backfill uttity backfiti utiity backfill utiity backfill utiity backfill utiity backfilt utirty backfill utirty backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utitty backfill utiity backfilt uttity backfill utitty backfill utirty backfill utiity backfiti utiity backfill utiity backfill I ! 1 I I I I I i f i f I I I t ] { f { I E j ( 1 I I f I i TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test Sample Tost Date Test Loc:ation cri 1 ina 1 _0 CTA 1 •) j-On Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks # Afifi # Rl Test Loc:ation cri 1 ina 1 _0 CTA 1 •) j-On Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 489 61 7/1/2005 SD Line I-2 STA 13+10 336.0 490 61 7/1/2005 SD Line I-2 STA 13+20 338.0 491 61 7/1/2005 SD Line I-2 STA 13+15 340.0 492 61 7/1/2005 SD Line I-2 STA 12+90 336.0 493 61 7/1/2005 SD Line I -2 STA 13+00 338.0 494 61 7/1/2005 SD Line t -2 STA 13+45 338.0 495 61 7/1/2005 SD Line I -2 STA 13+55 340.0 496 61 7/1/2005 SD Line 1-2 STA 13+60 342.0 497 51 7/1/2005 SD Line I-2 STA 13+10 342.0 498 61 7/5/2005 SD Line I -2 STA 14+00 338.0 499 61 7/5/2005 SD Line I-2 STA 14+35 340.0 500 61 7/5/2005 SD Line I-2 STA 14+10 342.0 501 61 7/5/2005 VWD 10" RCW 35' LT of SD Line I - 2 STA 12+72 338.0 502 61 7/5/2005 SD Line I-2 STA 14+65 340.0 503 61 7/5/2005 SD Line I-2 STA 14+65 342.0 504 61 7/5/2005 SD Line I-2 STA 14+65 344.0 506 61 7/5/2005 SD Une I-2 STA 12+00 332.0 507 61 7/5/2005 SD Line 1-2 STA 12+10 334.0 508 61 7/5/2005 SD Line I-2 STA 12+00 336.0 509 61 7/6/2005 SD Line I-2 STA 12+15 334.O 510 61 7/6/2005 SD Line I-2 STA 12+75 335.O 511 61 7/6/2005 SD Line I -2 STA 12+75 337.0 512 61 7/6/2005 SD Line t-2 STA 12+75 339.0 513 61 7/6/2005 SD Line I-2 STA 12+00 339,0 514 61 7/6/2005 SD Line I-2 STA 12+80 340.0 515 61 7/8/2005 RCW Une B STA 16+00 341.0 516 61 7/8/2005 RCW Line B STA 15+60 338.0 9.9% 10.3% 11.5% 9.5% 11.1% 9.1% 10.7% 9.1% 8.7% 11.1% 10.3% 10.7% 9.5% 8.7% 8.3% 10.7% 11,1% 9,9% 10.7% 11.5% 9.9% 10.7% 10.3% 9.5% 11.1% 11,1% 10.3% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 6.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 128.8 131.3 128.2 128.7 127.9 128.8 127.6 131.8 131.1 128.8 128.6 128.0 128.0 128.9 130.0 128.2 127.9 128.0 127.3 126.5 127.7 128.4 127.7 129.1 127.9 128.5 128.9 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134,0 134.5 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134,0 134.0 134.0 134.0 1340 134.0 134.0 134.0 134.0 96% 98% 96% 96% 95% 96% 95% 98% 97% 96% 96% 96% 96% 96% 97% 96% 95% 96% 95% 94% 95% 96% 95% 96% 95% 96% 96% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utirty backfiti uttity backfill utiity backfill utiity backfill uttity backfill uttity backfill utiity backfiti utiity backfill uttity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill I i ( i { I lllll iiiiiiifiiiiiiiiiflilll Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Sanla Fe Road North, Phase 2 Carlsbad. California Test # Sample Test Date Test Localion Elev. (ft) Moisture Field Opt. Dry Density (pcf) Fiold 517 61 7/11/2005 SDLine 1-2 STA 14+75 340.0 9.9% 8.5% 128.8 518 61 7/11/2005 SD Line 1 -2 STA 14+75 342.0 11.1% 8.5% 128.9 519 30 7/11/2005 VUT Trench LT RSF S Bound STA 269+90 354.0 8.7% 6.0% 133.6 520 61 7/12/2005 RCW Line B STA 14+99 336.0 9.5% 8.5% 130.9 521 61 7/12/2005 RCWLine BSTA 14+95 338.0 10.3% 8.5% 128.6 522 51 7/12/2005 RCW Line BSTA 14+80 340.0 8.3% 6.5% 128.7 523 51 7/12/2005 RCW Une B STA 14+90 342.0 9.1% 6.5% 129.2 524 61 7/12/2005 RCW Line BSTA 15+25 337.0 10.7% 8.5% 128.5 525 61 7/12/2005 RCW Line BSTA 15+60 340.0 9.5% 8.5% 129.4 526 61 7/12/2005 RCW Line BSTA 14+25 338.0 9.1% 8.5% 132.0 527 51 7/12/2005 RCW Line BSTA 16+00 343.0 7.5% 6.5% 129.0 528 61 7/12/2005 RCW Line B STA 13+75 335.0 8.7% 8.5% 129.4 529 61 7/12/2005 RCW Line BSTA 14+00 338.0 9.5% 8.5% 130.2 530 51 7/12/2005 RCWUne BSTA 13+75 340.0 7.9% 6.5% 129.3 531 61 7/13/2005 SDLine 1-1 STA 10+15 336.0 10.7% 8.5% 128.2 532 4 7/13/2005 72" SD Removal BF STA 280+00 334.0 9.9% 8.5% 125.0 533 4 7/13/2005 72" SD Removal BF STA 276+60 336.0 10.3% 8.5% 125.2 534 61 7/13/2005 RCW Une BSTA 13+00 335.0 10.7% 8.5% 128.6 535 61 7/13/2005 RCW Line BSTA 13+25 337.0 10.3% 8.5% 128.1 536 4 7/13/2005 Drainage Canal Removal BF STA 278+65 332.0 10.3% 8.5% 125.3 537 4 7/13/2005 72" SD Removal BF STA 280+00 338.0 9.5% 8.5% 126.8 539 4 7/13/2005 Drainage Canal Removal BF STA 278+75 334.0 8.7% 8,5% 126.8 540 51 7/13/2005 RCW Line STA STA 13+50 340.0 9.1% 7.0% 131.1 541 61 7/14/2005 SDLine 1 - 2 Headwall BF 332.0 11,1% 8.5% 128.8 542 61 7/14/2005 SD Une 1 /1 - 2 Headwall BF 334.0 9,5% 8.5% 129.2 543 61 7/14/2005 SD Line 1/1-2 Headwall BF 336.0 10.3% 8.5% 128.6 544 61 7/14/2005 SDLine 1 - 2 Headwall BF 334.0 8.7% 8.5% 129.6 545 61 7/14/2005 SDLine 1 - 2 Headwall BF 336.0 10.7% 8.5% 128,5 1 1 t 1 i 1 f 1 1 1 i 1 i 1 i 1 f i { 1 \ 1 Max. Relative Comp. Obt Req. Conform Non-Conform Remarks 134.0 134.0 140.0 134.0 134.0 134.5 134,5 134,0 134.0 134.0 134.5 134.0 134.0 134.5 134.0 131.0 131.0 134.0 134.0 131.0 131.0 131.0 135.0 134.0 134.0 134.0 134.0 134.0 96% 96% 95% 98% 96% 96% 96% 96% 97% 99% 96% 97% 97% 96% 96% 95% 96% 96% 96% 96% 97% 97% 97% 96% 96% 96% 97% 96% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 90% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfilt uttity backfiti utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill utitty backfilt utiity backfilt uttity backfill utiity backfill utiity backfill I I Contract Number; Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad. Catifornia Test # Sample # Test Date Tost Location Elov. (ft) Moisture Field 546 61 7/14/2005 RCW Line-BSTA 12+50 336.0 11.1% 547 61 7/14/2005 RCW Line-BSTA 12+60 338.0 9.1% 548 4 7/14/2005 Drainage Canal Removal BF STA 278+60 336.0 10,3% 549 61 7/15/2005 SD Line 1-2 STA 12+30 334.0 11.1% 550 61 7/15/2005 SD Line t-2 STA 12+30 336.0 10.3% 551 61 7/15/2005 SD Line 1-2 STA 12+30 338.0 10.7% 552 61 7/15/2005 SD Line i-2 STA 12+30 340.0 9.5% 553 61 7/18/2005 SD Line t-2 (Box) STA 12+50 334.0 10.7% 554 61 7/18/2005 SD Une 1-2 (Box) STA 12+50 336.0 9.5% 555 61 7/18/2005 SD Line 1-2 (Box) STA 12+50 338.0 10.3% 556 61 7/18/2005 60" SD Removal BF STA 282+00 337.0 10.7% 557 61 7/18/2005 60" SD Removal BF STA 281 +80 339.0 9.1% 558 61 7/18/2005 60" SD Removal BF STA 281 +70 341.0 10.3% 559 61 7/18/2005 RCW Line BSTA 12+20 330.0 11,1% 560 61 7/18/2005 RCW Line BSTA 12+00 332.0 9.5% 561 4 7/18/2005 RCW Line BSTA 12+00 334.0 10.3% 562 4 7/19/2005 60" SD Removal BF STA 281 +00 334.0 10.7% 563 4 7/19/2005 60" SD Removal BF STA 280+90 336.0 9.1% 564 4 7/19/2005 60" SD Removal BF STA 281+20 338.5 10.3% 565 61 7/19/2005 RCW Line BSTA 10+75 336.0 11.1% 566 61 7/19/2005 RCW Line BSTA 11+00 337.0 9.9% 567 31 7/20/2005 60" SD Removal BF STA 340.0 10.3% 568 61 7/21/2005 SD Line 1 STA 11+00 335.0 11.1% 569 61 7/22/2005 SD Line 1-2 STA 14+35 341.0 11.1% 570 61 7/22/2005 SD Une 1-3 STA 10+05 341.0 10.3% 571 4 7/22/2005 SD Line 1 - 2 Headwall 338.0 8.7% 572 61 7/22/2005 SD Linel-3STA10+10 343.0 9.9% 573 4 7/22/2005 SD Line 1-2 STA 14+75 343.0 9.1% 1 3 t 1 1 IIIIIIII i 1 i Opt Dry Density (pcf) Fleld Max. Relative Comp. Obt. Req. Conform Non-Confomi Remarks 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 128.6 130.3 127.7 128,4 127,7 127.9 130.5 128.9 129.5 127.9 125.0 126.1 126.1 127.7 128.7 125.7 126.4 127.1 126.3 128.3 130.0 124.7 128.4 128.7 129.0 125.8 129.1 125,9 134.0 134.0 131.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 131.0 131.0 131.0 134.0 134.0 131,0 131.0 131.0 131.0 134.0 134.0 132.0 134.0 134.0 1340 131.0 134.0 131.0 96% 97% 97% 96% 95% 95% 97% 96% 97% 95% 95% 96% 96% 95% 96% 96% 96% 97% 96% 96% 97% 94% 96% 96% 96% 96% 96% 96% 95% 95% 95% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 95% 95% 95% 90% 90% 90% 95% 95% 90% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill uttity backfiti uttity backfilt utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfilt uttity backfill uttity backfill utirty backfilt uttity backfill utiity backfilt utiity backfiti utiity backfiti uttity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfilt utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill f I ififiiiffifftiiilii TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Tost # Sample # Test Date Test Lociallon Elev. (ft) Moisture Field Opt. Dry Densiiy (pcf) Field Max. 574 61 7/26/2005 SD Line 1 Type B Inlet STA 10+00 334.0 10.3% 8.5% 129.5 134.0 575 61 7/26/2005 SD Line 1 Type B Inlet STA 10+00 336.0 9.9% 8.5% 129,6 134.0 576 61 7/26/2005 RCW Une B 2" Senrice STA 15+04 335.0 11.1% 8.5% 127,9 134.0 577 4 7/26/2005 RCW Une B 2" Sen/ice STA 15+04 337.0 10.3% 8.5% 127.2 131.0 578 4 7/26/2005 RCW Une B 2" Service STA 15+04 339.0 9.5% 8.5% 125.0 131.0 579 4 7/26/2005 RCW Line B 2" Service STA 15+04 341.0 9.9% 8.5% 125.1 131.0 580 4 7/26/2005 RCW Une B 2" Sen/ice STA 15+04 343.0 8.7% 8.5% 127.3 131.0 581 61 7/28/2005 VUT Trench Bedding STA 278+00 333.0 8.3% 8,5% 127.4 134.0 582 61 7/28/2005 VUT Trench Bedding STA 279+00 332.0 9.9% 8.5% 128.2 134.0 583 61 7/28/2005 VUT Trench Bedding STA 280+00 333.0 9.1% 8.5% 130.1 134.0 584 30 7/29/2005 RCW Une A 2" BO BF Trench Bottom STA 14+22 415.0 7.9% 6.0% 135.2 140.0 585 61 8/1/2005 RCW Une A 2" BO BF Trench Bottom STA 14+22 417 0 10.7% 8,5% 128.5 134.0 586 30 8/1/2005 RCW Une A 2" BO BF Trench Bottom STA 14+22 419.0 8.7% 6.0% 136.4 140.0 587 30 8/1/2005 RCW Line A 2" BO BF Trench Bottom STA 14+22 421.0 9.1% 6.0% 134.5 140.0 588 1 8/1/2005 SD Une F-11 STA 10+10 434.0 10.3% 8.5% 128.4 133.5 589 1 8/1/2005 SD Line F-11 STA 10+00 436.0 9.9% 8.5% 127.8 133.5 590 1 8/1/2005 SD Line F-11 STA 10+00 438.0 8.7% 8.5% 130,7 133.5 591 1 8/1/2005 SD Line F-10 STA 10+00 440.0 10.7% 8.5% 128,9 133.5 592 61 8/2/2005 H20 Line L STA 10+25 416.0 11.1% 8.5% 128.4 134.0 593 30 8/2/2005 H20 Line L STA 10+25 418.0 7.9% 6.0% 135.1 140.0 594 61 8/2/2005 JVT BF STA 279+00 335.0 10.7% 8.5% 128.9 134.0 595 4 8/3/2005 JVT BF STA 279+00 337.0 10.3% 8.5% 125.9 131.0 596 61 8/3/2005 SD Line ISTA 11+10 334.0 11.1% 8.5% 127.9 134.0 597 5 8/4/2005 North SBC Trench BF STA 10+30 340.0 9.1% 7.0% 131.7 137.5 598 5 8/4/2005 North SBC Trench BF STA 10+20 343.0 7.9% 7.0% 132.3 137.5 599 61 8/4/2005 JVT BF STA 270+00 353.0 11.1% 8.5% 129.9 134.0 600 30 8/4/2005 JVT BF STA 270+00 355.0 8.3% 6.0% 133.8 140,0 601 61 8/4/2005 South SBC Trench BF STA 10+30 336.0 10,3% 8.5% 131.0 134.0 ' 1 1 1 1 1 1 1 1 1 1 i > I 1 ' ! 1 1 ff 1 f i Relative Comp. Obt. Req. Conform Non-Conform Remarks 97% 97% 95% 97% 95% 95% 97% 95% 96% 97% 97% 96% 97% 96% 96% 96% 98% 97% 96% 97% 96% 96% 95% 96% 96% 97% 96% 98% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Confomi Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform uttity backfill uttity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utitty backfill utiity backflll utiity backfill uttity backfilt uttity backfilt uttity backfiti uttity backfiti utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt lillllitfflfl Contract Number: Project Name; Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 6S808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Catifornia Test n Sample ft Test Date Test Location Elev. (ft) lio n Moisture Dry Density (pcf) Relative Comp. Conform Remarks tr 602 61 8/4/2005 South SBC Trennh RF STA 1 n+'^R Elev. (ft) lio n Field 4 4 4oy Opt Field 1 Max. Obt Roq. Non-Conform Remarks 603 604 605 606 607 608 609 610 611 612 613 614 615 616 617 618 619 620 621 622 623 624 625 626 627 628 629 61 50 5 5 61 5 1 61 61 61 61 4 4 61 61 51 61 61 61 61 61 61 61 61 39 39 39 8/5/2005 RCW Une B 4" BO BF STA 21+60 350.0 8/5/2005 RCW Line B 4" BO BF STA 21 +60 352.0 8/5/2005 SBC S. Trench BF STA 10+20 340.O 8/5/2005 SBC S. Trench BF STA 10+20 342.O 8/5/2005 JVT BF STA 275+35 342.0 8/5/2005 JVT BF STA 275+35 344,0 8/8/2005 SDLine F-10 STA 10+00 442.0 8/8/2005 JVT BF STA 277+50 339.0 8/8/2005 JVT BF STA 277+00 3410 8/8/2005 RCWLine B4" BO STA 12+19 331,0 8/8/2005 RCW Une B 4" BO STA 12+19 333,0 8/8/2005 RCW Line B 4" BO STA 12+19 335.0 8/9/2005 RCW Line B 4" BO STA 12+19 337.0 8/9/2005 JVT BF STA 281+50 338.0 8/9/2005 JVT BF STA 281+50 340.0 8/9/2005 JVT BF STA 281+50 342.0 8/9/2005 JVT BF STA 276+00 343^0 8/10/2005 SOLineF-11 Type B-1 Inlet STA 10+50 SG 8/10/2005 RCW Une B Pump Metering Station STA 21+35 345,0 8/10/2005 RCW Une B Pump Metering Statton STA 21+35 347.0 8/10/2005 RCW Line B Pump Metering Station STA 21 +35 349.0 8/11/2005 RCW Line B 2" Air. Vac. BF STA 10+07 340.O 8/12/2005 JUT BF STA 283+00 343,0 8/12/2005 JUT BF STA 283+00 345.0 8/15/2005 RCWLine BSTA21+47 1'Betow 8/15/2005 RCW Line BSTA 21+47 ,5'Below 8/15/2005 RCWLine BSTA 21+47 BG 10,3% 9.5% 8.3% 7.5% 10.3% 8.7% 9.1% 11.1% 9.9% 11,1% 10.7% 10.3% 10.3% 11.1% 10.3% 7.9% 9.9% 10.3% 11,1% 10.3% 9.9% 10.7% 9.9% 10.3% 6.8% 7,5% 8.3% 8.5% 6.0% 7.0% 7,0% 8,5% 7,0% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 6.5% 6.5% 6.5% 130.4 130.1 131.4 137.5 134.0 137.5 129.1 128.7 129.5 129.5 128.5 126.8 125,5 128.1 129.6 128.7 129.1 129.6 128.6 129.0 130.4 128.2 127.9 128.6 137.0 137.5 136.6 134.0 134.0 137.5 137.5 134.0 137.5 133.5 134.0 134.0 134.0 134.0 131.0 131.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 143.0 143.0 143.0 97% 97% 96% 100% 100% 100% 97% 96% 97% 97% 96% 97% 96% 96% 97% 96% 96% 97% 96% 96% 97% 96% 95% 96% 96% 96% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform uttity backfill utiity backfiti utiity backfilt utiity backfill utiity backfill utiity backfill uttity backfill utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfilt uttity backfiti uttity backfill uttity backfill uttity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfilt utiity backfill utiity backfill uttity backfill utiity backfilt utiity backfill t t \ i II II fl filial II li It fiffifi fi fflffl ffl Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Tost Localion 630 61 8/16/2005 JUT BF STA 276+05 (Apprx.) 65' LT CL 631 61 8/16/2005 RCW Line A 4" Air Vac STA 35+19 632 61 8/16/2005 RCW Line A 4" BO STA 35+05 633 5 8/16/2005 RCW Une A 4" BO STA 35+05 634 5 8/16/2005 RCW Line A 4" BO STA 35+05 635 61 8/16/2005 RCW Line B Cathodic BF STA 13+00 636 4 8/16/2005 RCW Une B Cathodto BF STA 13+00 637 30 8/18/2005 SD Line F-12 10+00 (Apprx) 638 30 8/18/2005 SD Line F-12 10+00 (Appnc) 639 30 8/18/2005 SD Une F-12 10+00 (Appnt) 640 61 8/19/2005 RCW Une A 2" Sen/ice STA 34+12 641 5 8/19/2005 RCW Une A 2" Service STA 34+12 642 5 8/19/2005 RCW Line A 2" Sen/ice STA 34+12 643 61 8/22/2005 H20 Line H STA 10+10 644 5 8/22/2005 H20 Line H STA 10+10 645 30 8/23/2005 Electric Sen/ice Crossing STA 255+00 (Apprx ) 20' CTofCL 646 30 8/23/2005 Imgation Sen/ice Crossing STA 259+00, 30' RT 647 30 8/23/2005 Etectric Service Crossing STA 260+75, 10' LT of CL 648 30 8/24/2005 Inigafion Service X-ing STA 266+78 35'LT of CL 649 30 8/24/2005 Inigation Sen/ice X-ing STA 267+40 20'LT of CL 650 30 8/24/2005 Electric Service X-ing STA 268+75 651 30 8/24/2005 Imgation Service X-ing STA 269+40, 10' LT of CL 652 5 8/24/2005 Inigatton Sen/ice X-ing STA 276+15, 30' LT of CL 653 51 8/25/2005 In-igation Service X-ing STA 10+75 654 61 8/25/2005 RCWLine B4" BO STA 12+19 655 61 8/25/2005 RCW Une B 4" BO STA 12+19 1 i 1 1 s f 1 1 1 1 1 1 1 f 1 Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Conform Elev. (ft) Field Opt. Field Max. Obt. Req. Conform Non-Conform 344.0 11.1% 8.5% 127.7 134,0 95% 95% Conform 340.0 11.5% 8.5% 127.5 134.0 95% 95% Conform 337.0 10.3% 8.5% 127.7 134.0 95% 95% Conform 339.0 7.5% 7.0% 133.0 137.5 97% 95% Conform 341.0 8.3% 7.0% 132.7 137.5 97% 95% Conform 338.0 10.7% 8.5% 128.6 134.0 96% 95% Conform 340.0 9.1% 8.5% 126.5 131.0 97% 95% Conform 418.0 8.3% 6.0% 134.1 140.0 96% 95% Conform 420.0 7,1% 6.0% 136.1 140.0 97% 95% Conform 422.0 7,9% 6.0% 135.8 140.0 97% 95% Conform 338.0 10.3% 8.5% 128.6 134.0 96% 95% Conform 340.0 9.1% 7.0% 131.7 137.5 96% 95% Conform 342.0 8.3% 7.0% 133.7 137.5 97% 95% Conform 339.0 10.3% 8.5% 128.2 134.0 96% 95% Conform 341.0 7.5% 7.0% 132,2 137.5 96% 95% Conform SG 7,5% 6.0% 136,5 140.0 98% 95% Conform Remarks utiity backfiti utiity backfill uttity backfilt utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill uttity backfill uttity backfill utiity backfilt utiity backfill utiity backfill utiity backfilt utiity backfill SG 8.3% 6.0% 134.7 140.0 96% 95% Conform uttity backfiti SG 7.1% 6.0% 134.6 140.0 96% 95% Conform utiity backfill SG 6.4% 6.0% 134.8 140.0 96% 95% Conform utiity backfill SG 9.1% 6.0% 135.3 140.0 97% 95% Conform utiity backfiti SG 7.9% 6.0% 134.6 140.0 96% 95% Conform utiity backfilt SG 7.1% 6.0% 134.9 140.0 96% 95% Conform utiity backfiti SG 9.1% 7.0% 131.9 137.5 96% 95% Conform utiity backfiti SG 8.7% 7.0% 130,2 135.0 96% 95% Conform utiity backfill 331.0 11,1% 8.5% 128.9 134.0 96% 95% Conform utiity backfill 333.0 11.5% 8.5% 127.8 134.0 95% 95% Conform utiity backfill 1 1 1 1 ( 1 r 1 f 1 f 1 f 1 1 i 1 i Contract Number: Project Name: Location; TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Pe Road North, Phase 2 Carlsbad, California Test # Sample # Test Date Test Location Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Non-Conform Remar Elev. (ft) Field Opt. Field Max. Obt Req. Conform Non-Conform Remar 335.0 10.3% 8.5% 125.4 131.0 96% 95% Conform utiity backfill 337.0 9.5% 8.5% 127.5 131.0 97% 95% Conform utiity backfill 334.0 6.8% 6.0% 136.8 140.0 98% 95% Confoim utiity backfilt 336.0 7.9% 6.0% 135.2 140.0 97% 95% Conform uttity backfiti 338.0 8.7% 6.0% 134.0 140.0 96% 95% Conform utiity backfill 340.0 8.3% 6.0% 135.5 140.0 97% 95% Conform utiity backfill 438.0 11.1% 8.5% 128.9 134.0 96% 95% Conform utiity backfiti 440.0 7.9% 6.0% 133.9 140.0 96% 95% Conform utiity backfill SG 7.5% 6.0% 134.8 140.0 96% 95% Conform utiity backfilt 336.0 10.7% 8.5% 129.9 134.0 97% 95% Conform uttity backfiti 338.0 8.7% 8.5% 126.1 131.0 96% 95% Conform utiity backfill 340.0 9.5% 8.5% 126.1 131.0 96% 95% Conform utiity backfiti SG 9.1% 8.5% 126.0 131.0 96% 95% Conform utiity backfilt 337.0 11.5% 8.5% 128.4 134.0 96% 95% Conform utiity backfill 339.0 7.5% 7.0% 132.1 137.5 96% 95% Conform utiity backfill SG 11.9% 11.0% 117.8 121.5 97% 95% Conform utiity backfilt 5' Below 13.2% 11.0% 117.3 121.5 97% 95% Conform utiity backfill BG 12.4% 11.0% 118.1 121.5 97% 95% Conform utiity backfill BG 7.9% 7.0% 138.3 143.0 97% 95% Conform utiity backfill BG 9.1% 7.0% 140.4 143.0 98% 95% Conform utiity backfilt BG 7.9% 7.0% 139.5 143.0 98% 95% Conform utiity backfiti BG 8.7% 7.0% 137,9 143.0 96% 95% Conform utitty backfill 339.0 11.1% 8.5% 129.5 134.0 97% 95% Conform utiity backfill SG 13.2% 11.0% 117.4 121.5 97% 95% Conform utiity backfill AC Grade 140.9 146.0 97% 95% Conform utiity backfill AC Grade 142.9 146.0 98% 95% Conform utiity backfill AC Grade 143.5 146.0 98% 95% Conform uttity backfill AC Grade 143.0 146.0 98% 95% Conform utiity backfill 1 f 1 1 i i i 1 i f i 1 i 1 1 ff » ( 1 656 657 4 4 8/25/2005 8/25/2005 658 30 9/2/2005 659 30 9/2/2005 660 30 9/2/2005 661 30 9/2/2005 662 61 9/6/2005 663 30 9/6/2005 664 30 9/6/2005 665 61 9/7/2005 666 4 9/7/2005 667 4 9/7/2005 668 4 9/7/2005 669 61 9/12/2005 670 5 9/12/2005 672 80 9/15/2005 673 80 9/15/2005 674 80 9/15/2005 675 RSF i 25 9/27/2005 676 RSF125 9/27/2005 677 RSF125 9/28/2005 678 RSF t 25 9/28/2005 679 61 9/29/2005 680 SG 9/30/2005 682 AC 9/29/2005 683 AC 9/29/2005 684 AC 9/29/2005 685 AC 9/29/2005 RCW Line B 4' BO STA 12+19 RCW Une B 4" BO STA 12+19 Sewer Line - B STA 10+60 Sewer Une - 8 STA 10+70 Sewer Line - B STA 10+70 Sewer Line - B STA 10+60 RCW Line A Service STA 10+90 RCW Line A Service STA 10+90 RCW Line A Service STA 10+90 RCW Une B STA 15+04 RCW Line BSTA 15+04 RCW Line B STA 15+04 RCW Line BSTA 15+04 RCW Une A STA 35+05 RCW Line A STA 35+05 SD Une I Type B tntet STA 11 +00 SD Une I Type B Inlet STA 11+00 SD Line I Type B Inlet STA 11+10 H20 Service X-ing STA 250+65, 15' RT of LT FC H20 Service X-ing STA 250+65, 5' RT of LT FC H20 Sen/ice STA 250+65, 30' RT of LT FC H20 Service STA 250+55, 30' RT of LT FC RCW Une B Trench BF STA 10+00 RCW Line B Trench BF STA 10+00 Melrose SB STA 213+75 4 RT Melrose SB STA 213+50 5' RT of LT FC Melrose SB STA 213+25 5' RT of LT FC Melrose SB STA 212+75 5' RT of LT FC t 1 I i i 1 I I 1 I I i 1 Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Sanla Fe Road North, Phase 2 Carlsbad, Califomta Test # Sample # Test Date Tost Lo<:atlon Elev. (ft) Moisture Fiold Opt. Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Conform Remarks 686 687 AC AC 9/29/2005 9/29/2005 Melrose SB STA 212+50 10'RTof LTFC Melrose SB STA 212+25 5' RT of LT FC AC Grade AC Grade 688 AC 9/29/2005 Melrose SB STA 212+00 10'RTofLTFC AC Grade 689 AC 9/29/2005 Melrose SB STA 211+75 AC Grade 690 AC 9/29/2005 Melrose SB STA 211 +50 AC Grade 691 AC 9/29/2005 Corintha SB STA 10+90 AC Grade 692 AC 10/10/2005 H20 Line K STA 12+60 AC Grade 693 AC 10/10/2005 H20 Une K STA 12+70 AC Grade 694 AC 10/10/2005 H20 Line K STA 12+80 AC Grade 695 AC 10/10/2005 H20 Line K STA 12+90 AC Grade 696 AC 10/10/2005 H20 Line K STA 13+00 AC Grade 697 AC 10/10/2005 H20 Line K STA 13+10 AC Grade 698 61 10/21/2005 JUT Vault RSF SB STA 281+50 5' LT of LT FC 340.0 10.7% 699 61 10/21/2005 JUT Vault RSF SB STA 281 +75 10' LT of LT FC 341.0 11.1% 700 61 10/31/2005 (VWO PR Station) H20 Line A STA 30+35 324.0 10.3% 701 61 11/1/2005 RCW Une B STA 24+55 351.0 11.5% 702 61 11/1/2005 RCW Line B STA 24+55 353.0 10.3% 703 61 11/1/2005 RCW Line BSTA 21+35 348.0 10.7% 704 61 11/1/2005 RCW Une BSTA 21+35 350.0 9.9% 705 61 11/1/2005 RCW Line B STA 20+05 348.0 10.3% 706 61 11/1/2005 RCW Line B STA 20+05 350.0 9.5% 707 61 11/1/2005 RCW Line B STA 24+55 SG 10.3% 708 61 11/1/2005 RCW Line BSTA 21+35 SG 9.1% 709 61 11/1/2005 RCW Une B STA 20+05 SG 10.7% 710 98 11/1/2005 RCW Line B STA 24+55 BG 7.5% 711 98 11/1/2005 RCW Line BSTA 21+55 BG 7.9% 712 98 11/1/2005 RCW Line B STA 20+05 BG 6.8% 713 61 11/1/2005 RCW Une BSTA 24+61 351.0 10.7% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 6.5% 6.5% 6.5% 8.5% 145.6 144.1 142,5 143.5 145.9 142.7 139.9 143.2 140.5 141.3 141.6 142.5 127.8 128.3 128.6 128.6 129.4 128.4 129.8 128.7 129.2 127.8 129.2 128.6 139.3 137.9 138.9 127.8 146.0 146.0 146.0 146.0 146.0 146.0 146.0 146.0 146.0 146.0 146.0 146.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 142,5 142.5 142.5 134.0 100% 99% 98% 98% 100% 98% 96% 98% 96% 97% 97% 98% 95% 96% 96% 96% 97% 96% 97% 96% 96% 95% 96% 96% 98% 97% 97% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 96% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform utiity backfill utiity backfill utiity backfill utiity backfiti utitty backfill utiity backfill utiity backfill uttity backfilt utiity backfilt utiity backfill utiity backfill uttity backfilt uttity backfiti utiity backfilt utiity backfill utiity backfilt utiity backfill uttity backfilt uttity backfiti utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfiti II II 11 11 II II I! II II 11 11 11 fi ffl 11 91 ffl 11 Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Cartsbad, Catifornia Test Sample Test Date Test Location Elev. (ft) Moisture Field Opt Dry Density (pcf) Field / It 01 n/i/^uu5 KUW une B STA 24+62 SG 9.9% 8.5% 129.3 715 98 11/1/2005 RCW Line BSTA 17+90 BG 8.3% 6.5% 137.9 716 61 11/3/2005 SD Line G STA 11+50 328.0 11.9% 8.5% 128.2 717 61 11/3/2005 SD Line G STA 11+60 330.0 11.1% 8.5% 127.9 718 61 11/3/2005 SD Une G STA 11+50 332.0 9.9% 8.5% 128.8 719 99 11/3/2005 SD Line G STA 11+60 334.0 10.7% 8.0% 128.2 720 99 11/3/2005 SD Line G STA 11+50 336.0 10.3% 8,0% 128.3 721 61 11/3/2005 SD Line G2 STA 10+15 331.0 10.7% 8.5% 128.6 722 61 11/3/2005 SD Line G2 STA 10+15 333.0 11.5% 8.5% 126.7 723 99 11/3/2005 SD Line G2 STA 10+15 335.0 9.5% 8.0% 130.0 724 51 11/7/2005 RCW Une BSTA 15+85 344.0 9.1% 7.0% 129.6 725 61 11/7/2005 SD Line G STA 12+85 333.0 11.1% 8.5% 128.8 726 51 11/7/2005 RCW Line BSTA 16+90 346.0 9.5% 7.0% 130.4 727 51 11/7/2005 RCW Line BSTA 16+90 348.0 8.3% 7.0% 131.0 728 98 11/7/2005 SD Line G STA 12+85 335.0 9.5% 7.0% 129.9 729 61 11/9/2005 SD Line G STA 13+10 332.0 11.1% 8.5% 128.3 730 61 11/9/2005 SD Line G STA 13+10 334.0 10.3% 8.5% 129.9 731 99 11/9/2005 SD Line G STA 13+10 336.0 10.7% 8.0% 127.6 732 61 11/10/2005 H20 Une A (VWO PR Station) STA 30+35 325.0 11.1% 8.5% 128,8 733 61 11/10/2005 H20 Une A (VWO PR Station) STA 30+35 327.0 9.9% 8.5% 129.8 734 30 11/16/2005 Sewer Line D STA 10+25 357.0 7.5% 6.0% 135.7 735 30 11/16/2005 Sewer Line D STA 10+76 358.0 6.8% 6.0% 131.8 736 99 11/16/2005 Sewer Line B STA 14+35 328.0 10.7% 7.0% 129.1 737 30 11/17/2005 Sewer Une B MH #1 354.0 7.9% 6.0% 132.3 738 30 11/17/2005 Sewer Line B MH #1 356.0 7.1% 6.0% 134.0 739 103 11/17/2005 Sewer Line B MH #1 STA 14+35 330.0 10.3% 8.0% 128.6 740 103 11/17/2005 Sewer Une B MH #1 STA 14+35 332.0 8.7% 8.0% 128.5 741 103 11/17/2005 Sewer Line B MH #1 STA 14+35 334.0 9.5% 8.0% 130.5 --- ^ 1 f 1 1 1 1 1 1 1 1 f i ff 1 Max. Relative Comp. Obt Req. Conform Non-Conform Remarks 134.0 142.5 128.2 127.9 128.8 128.2 128.3 134.0 134.0 134.0 135.0 134.0 135.0 135.0 134.0 134.5 134.5 134.0 134.0 134.0 140.0 140.0 134.0 140.0 140.0 134.0 134.0 134.0 96% 97% 100% 100% 100% 100% 100% 96% 95% 97% 96% 96% 97% 97% 97% 95% 97% 95% 96% 97% 97% 94% 96% 95% 96% 96% 96% 97% 95% 95% 95% 95% 95% 95% 95% 90% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 90% 90% 95% 90% 90% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform uttity backfill utitty backfill utiity backfill utiity backfilt utiity backfiti utiity backfilt utiity backfiti utiity backfilt uttity backfilt uttity backfill uttity backfill uttity backfill utiity backfill utiity backftit utiity backfill uttity backfill utiity backfill utiity backfilt utiity backfiti utiity backfiti uttity backfilt utiity backfill uttity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfill Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Tost # Sample # Test Date Test Location Elev. (ft) Moisture Field Opt. Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Conform Remarks 742 103 11/17/2005 Sewer Une B MH #1 STA 14+35 336.0 10.7% 8.0% 129.1 743 61 11/17/2005 RCW Line A STA 10+10 444.0 11.1% 8.5% 128.8 744 39 11/17/2005 RCW Line A STA 10+20 446.0 7.1% 6.5% 137.3 745 103 11/18/2005 RCW Line A STA 36+40 328.0 10.7% 8.0% 128.9 746 5+-11/18/2005 RCW Line A STA 36+40 330.0 9.1% 7.0% 131.6 747 61 11/21/2005 H20 Line C STA 14+30 331,0 10.3% 8.5% 129.6 748 61 11/23/2005 H20 LineC STA 12+15 336.0 11.1% 8.5% 128.5 749 61 11/23/2005 H20 LineC STA 12+93 336.0 10.7% 8.5% 126.6 750 61 11/23/2005 H20 Line C STA 13+90 336.0 9.9% 8.5% 128.5 751 103 11/23/2005 H20 LineC STA 13+90 338.0 8.7% 8.0% 130.6 752 61 12/5/2005 SD Line ISTA 11+60 336.0 10.3% 8.5% 128.6 753 103 12/5/2005 SD Line 1 STA 11+60 338.0 9.5% 8.0% 129.1 754 61 12/5/2005 SD Line F-20 STA 10+65 420.0 10.7% 8.5% 127.7 755 30 12/5/2005 SD Line F-20 STA 10+65 422.0 7.5% 6.0% 135.7 756 30 12/5/2005 SD Line F-12 STA 11+40 423.0 8.7% 6.0% 134.7 757 39 12/5/2005 H20 Line K STA 10+50 446.0 6.8% 6.5% 135.9 758 103 12/5/2005 H20 Line K STA 10+50 440.0 11.1% 8.0% 128.0 759 61 12/6/2005 H20 Line BSTA 12+45 40.0 10.7% 8.5% 128.3 760 61 12/6/2005 H20 Line BSTA 12+90 40.0 11.5% 8.5% 129.5 761 61 12/6/2005 H20 Line BSTA 13+75 337,0 10.3% 8.5% 127,8 762 61 12/6/2005 H20 Line BSTA 13+75 339.0 11.1% 8.5% 128.7 763 61 12/8/2005 H20 Une B STA 13+64 2 " Sen/ice X-ing 37.0 11.5% 8.5% 128.2 764 61 12/8/2005 H20 Une B STA 13+64 2 " Service X-ing 39.0 9.9% 8.5% 127.8 765 61 12/8/2005 H20 Line B STA 14+00 2 " Sen/ice X-Ing 338.0 10.3% 8.5% 128.6 766 61 12/8/2005 H20 Line B STA 14+25 2 " Service X-ing 338.0 11.1% 8.5% 128.5 767 103 12/8/2005 H20 Une B STA 14+00 2 " Sen/ice X-ing 339.0 10.7% 8.0% 127.8 768 103 12/8/2005 H20 Une B STA 14+25 2 " Service X-ing 340.0 11.5% 8.0% 128.2 134.0 134.0 142.5 134.0 137.5 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 140.0 140.0 142.5 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 96% 96% 96% 96% 96% 97% 96% 94% 96% 97% 96% 96% 95% 97% 96% 95% 96% 96% 97% 95% 96% 96% 95% 96% 96% 95% 96% 95% 95% 95% 95% 95% 95% 90% 90% 90% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfilt utiity backfill utitty backfiti utiity backfill uttity backfill utiity backfilt utiity backfiti uttity backfill uttity backfill utiity backfiti utiity backfilt utirty backfiti uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfilt utiity backfill utiity backfilt utiity backfiti uttity backfilt utiity backfill I li 11 11 II li II II II fl fifl 11 fi ffi fflll TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test # Sample # Test Dale Test Location Elov. (ft) Moisture Dry Density (pcf) Test # Sample # Test Dale Test Location Elov. (ft) Field Opt. Fteld Max. 769 30 12/8/2005 SD Line F-l 2 C/O STA 11 +52 420.0 10.3% 8.5% 128.7 134.0 770 30 12/8/2005 SD Line F-12 C/O STA 11+52 422.0 7.5% 7.0% 136.9 140.0 771 30 12/8/2005 SD Line F-12 C/O STA 12+04 420.0 10.3% 8.5% 128.2 134.0 772 30 12/8/2005 SD Line F-12 C/O STA 12+04 422.0 8.3% 7.0% 134.4 140.0 773 30 12/12/2005 SD Line F-14 STA 10+90 392.0 10.7% 8.5% 127.3 134.0 774 30 12/12/2005 SDLine F-14 STA 11+00 394.0 7.1% 7.0% 135.3 140.0 775 30 12/12/2005 SD Line F-14 STA 11+10 396.0 8.7% 7.0% 133.8 140.0 776 30 12/12/2005 SDLine F-14STA11+15 398.0 7.9% 7.0% 136.3 140.0 777 30 12/13/2005 VWD PR STA LT Wall 330.0 8.7% 7.0% 131.2 140.0 778 30 12/13/2005 VWD PR STA LT Wall 332.0 7.5% 7.0% 130.8 140.0 779 97 12/13/2005 H20 Line D 331.0 11.5% 8.5% 124.7 134.0 780 97 12/13/2005 VWD PR STA RT Wall 330.0 9.1% 7.0% 127.9 140.0 781 30 12/13/2005 VWD PR START Watt 332.0 8.3% 7.0% 130.9 140.0 782 30 12/13/2005 H20 Line L STA 11 +50 419.0 10.3% 8.5% 125.3 134.0 783 30 12/13/2005 VWD PR Station RT Wall 334.0 7.9% 7.0% 132.1 140.0 784 61 12/13/2005 SD Line G CO STA 13+44 334.0 11,1% 8.5% 128.7 134.0 785 61 12/13/2005 SD Line G CO STA 13+44 336.0 10.3% 8.5% 128.7 134.0 786 30 12/13/2005 SD Line G CO STA 13+44 338.0 7.5% 7.0% 135.7 140.0 787 61 12/13/2005 VWD PR Statton S. Wall 330.0 10.7% 8.5% 126.6 134.0 788 30 12/13/2005 VWD PR Statton S. Wall 332.0 9.1% 7.0% 129.6 140.0 789 30 12/13/2005 H20 Line L STA 11+50 421.0 8.3% 7.0% 135.2 140.0 790 30 12/13/2005 VWD PR Statton S. Walt 334.0 91% 7.0% 129.5 140.0 791 30 12/15/2005 H20 Line B 4" AV STA 12+36 339.0 9.9% 8.5% 127.9 134.0 792 61 12/16/2005 H20 Une G STA 23+00 354.0 9.5% 8.5% 128.7 134.0 793 61 12/16/2005 H20 Line G STA 21+50 360.0 11,1% 8.5% 128.2 134.0 794 61 12/16/2005 H20 Une G STA 20+00 368.0 10.3% 8.5% 129.5 134.0 795 61 12/20/2005 H20 Line G STA 17+75 380.0 9.5% 8.5% 129.5 134.0 796 61 12/20/2005 H20 Line G STA 16+00 390.0 10.3% 8.5% 127.1 134.0 Relative Comp. Obt Req. Conform Non-Conform Remarks 96% 98% 96% 96% 95% 97% 96% 97% 94% 93% 93% 91% 94% 94% 94% 96% 96% 97% 94% 93% 97% 93% 95% 96% 96% 97% 97% 95% 95% 95% 95% 95% 90% 95% 95% 95% 90% 90% 90% 90% 90% 90% 90% 95% 95% 95% 90% 90% 95% 90% 95% 95% 95% 95% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfiti utiity backfiti utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utirty backfiti utiity backfill uttity backfilt uttity backfill I I) ii II II c } i I I 1 li ffi fi fi ffl ffi ffl ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Locatton: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test JI Sample 61 Test Date Tost Location 1 in*> 1 Tuno R9 Inlat CTA Hj.an Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 797 Sample 61 12/20/?nnR Tost Location 1 in*> 1 Tuno R9 Inlat CTA Hj.an Elev. (ft) Field 1 Opt n eft/ n ^r,/ Field Max. Obt Req. Non-Conform Remarks 798 61 12/20/2005 SD Line I Type B2 Inlet STA 11+80 799 61 12/20/2005 H20 Line G STA 23+00 800 61 12/20/2005 H20 Line B 4" AV STA 12+36 801 61 12/20/2005 H20 Line 9 STA 14+50 802 61 12/20/2005 H20 Une 9 STA 13+00 803 61 12/20/2005 H20 Line 9 STA 11+75 804 61 12/22/2005 H20 Line G STA 20+00 805 61 12/22/2005 H20 Une G STA 18+50 806 61 12/23/2005 H20 Line G STA21+50 807 61 12/23/2005 H20 Line G STA 17+50 808 61 12/23/2005 H20 Line G STA 15+50 809 61 12/23/2005 H20 Line G STA 14+00 810 61 12/27/2005 SD Line G3 STA 10+35 811 61 12/27/2005 SD Line G3 STA 10+40 812 61 12/28/2005 H20 Line G STA 12+50 813 30 12/28/2005 SD Line G-3 STA 10+45 814 30 12/28/2005 SD Line G-3 STA 10+35 815 30 12/28/2005 SD Line G-3 STA 10+40 816 104 12/29/2005 H20 Line G STA 23+00 817 104 12/29/2005 H20 Line G STA21+50 818 61 12/29/2005 H20 Line G STA 20+35 819 104 12/29/2005 H20 Line G STA 20+00 820 61 12/29/2005 SD F-14 STA 11+50 821 104 12/29/2005 H20 Line G STA 18+50 822 104 12/29/2005 H20 Line G STA 17+00 823 61 12/29/2005 H20 Line B STA 10+30 824 61 12/29/2005 H20 Line B STA 10+30 238.0 357,0 341.0 400.0 408.0 415.0 370.0 378.0 363.0 386.0 396.0 405.0 334.0 336.0 414.0 338.0 340.0 342.0 358.0 364.0 369.0 371.0 393.0 380.0 388.0 331.0 333.0 10.3% 9.9% 11.1% 10.7% 9.9% 11.1% 8.3% 8.7% 11.1% 9.9% 9.1% 10.3% 11.1% 10.7% 10.9% 7.6% 8.1% 93% 7.5% 8.3% 10.7% 7.1% 9.9% 8.7% 7.5% 11.1% 10.3% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 6.0% 6.0% 6,0% 7,0% 7.0% 8.5% 7.0% 8.5% 7.0% 7.0% 8.5% 8.5% 130.1 129.0 127.5 128.9 127.8 127.6 127.8 128.7 125.9 127.8 126.2 123.8 128.1 127.7 124.6 135.3 134.0 134.2 135.1 131.9 126.6 131.4 127.0 130.9 132.6 128.5 128.5 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 134.0 140.0 140.0 140.0 140.0 140.0 134.0 140.0 134.0 140.0 140.0 134.0 134.0 97% 96% 95% 96% 95% 95% 95% 96% 94% 95% 94% 92% 96% 95% 93% 97% 96% 96% 97% 94% 94% 94% 95% 94% 95% 96% 96% 90% 95% 95% 90% 90% 90% 90% 90% 90% 90% 90% 90% 95% 95% 90% 95% 95% 95% 95% 90% 90% 90% 90% 90% 90% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill uttity backfill uttity backfill uttity backfiti uttity backfill utirty backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfiti utiity backfilt utiity backfiti uttity backfiti utiity backfill utiity backfill utiity backfill utiity backfill utitty backfilt utiity backfill uUity backfill f } fl fl fl fl II li II II ti ffi liiiii fl ffi ffl 11 Conti-act Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Oniy) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Test Date Test Location Elev. (ft) Moisture Field Opt. Dry Density (pcf) Field 825 104 12/29/2005 SD Une F 14 STA 11+30 395.0 91% 7.0% 131.9 826 104 1/4/2006 H20 Line G STA 15+50 398.0 9.5% 7.0% 129.4 827 104 1/4/2006 H20 Une G STA 14+00 406.0 9.9% 7.0% 129.6 828 104 1/4/2006 H20 Line G STA 12+50 415.0 9.1% 7.0% 128.9 829 61 1/4/2006 H20 Line G STA 11+25 416.0 11.5% 8.5% 128.2 830 61 1/5/2006 H20 Line B 4" BO STA 15+07 335.0 11.1% 8.5% 127.9 831 61 1/6/2006 SD Line F 21 STA 10+20 423.0 10.7% 8.0% 129.1 832 104 1/6/2006 H20 Line B 4" BO STA 15+07 337.0 8.7% 7.0% 132.3 833 104 1/6/2006 H20 Une B 4" BO STA 15+07 339.0 9.1% 7.0% 135.1 834 61 1/6/2006 H20 Une A STA 11+00 419.0 11.1% 8.0% 125.9 835 104 1/9/2006 H20 Line G STA 11+00 421.0 8.3% 7.0% 134.6 836 61 1/10/2006 H20 Line K STD 14+89 421.0 10.7% 8.5% 128.6 837 104 1/10/2006 SD Line F 14 STA 11+30 397.0 9.1% 7.0% 131.5 838 104 1/10/2006 SD LineF 14 STA 11+30 390.0 8.3% 7.0% 134.7 839 61 1/11/2006 H20 Une G STA 29+50 342.0 11.1% 8.5% 128.1 840 61 1/12/2006 H20 Line G STA 10+25 421.0 10.7% 8.5% 126.4 841 104 1/12/2006 H20 Line G STA 10+25 423.0 9.1% 7.0% 129.8 842 104 1/13/2006 PR Station SE Comer 332.0 9.1% 7.0% 133.5 843 61 1/18/2006 H20 Une H O/WD-1) STA 1+80 11' RT of RT FC 341.0 9.9% 8.5% 127.6 844 61 1/19/2006 2" H20 Service X-ing STA 264+50 271.0 10.3% 8.5% 126.4 845 104 1/19/2006 2" H20 Service X-ing STA 264+50 273.0 8.7% 7.0% 135.4 846 61 1/20/2006 H20 Une C 2" BO STA 14+08 332.0 11.5% 8.5% 126.4 847 98 1/20/2006 H20 Line C 2" BO STA 14+08 334.0 10.3% 9.0% 122.6 848 104 1/20/2006 SDG&E 4" Gas RSF STA 260+00 402.0 7.1% 7.0% 136.3 849 104 1/20/2006 SDG&E 4" Gas RSF STA 264+00 378.0 7,9% 7.0% 134.4 850 104 1/20/2006 SDG&E 4" Gas RSF STA 268+00 359.0 7,5% 7.0% 134.0 851 61 1/24/2006 Fire Hyd. Retocatton BF STA 279+52 334.0 10.7% 8.5% 125.5 852 61 1/24/2006 Fire Hyd. Retocation BF STA 279+52 336.0 11.1% 8.5% 123.9 t 1 1 1 f 1 f ff f 1 t 1 i } f i f 1 { 1 ; 1 Max. Relative Comp. Obt Req. Confonn Non-Conform Remarks 140.0 140.0 140.0 140.0 134.0 134.0 134.0 140.0 140.0 134.0 140.0 134.0 140.0 140.0 134.0 134,0 140,0 140,0 134.0 134.0 140.0 134.0 132.5 140.0 140.0 140.0 134.0 134.0 94% 92% 93% 92% 96% 95% 96% 95% 97% 94% 96% 96% 94% 96% 96% 94% 93% 95% 95% 94% 97% 94% 93% 97% 96% 96% 94% 92% 90% 90% 90% 90% 90% 90% 95% 90% 95% 90% 95% 90% 90% 95% 95% 90% 90% 95% 95% 90% 90% 90% 90% 95% 95% 95% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfilt utiity backfill utiity backfiti uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfilt uttity backfill uttity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfill TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location; 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Jl Test Date Test Location Elev. (ft) Moisture Dry Densrty (pcf) Relative Comp. Conform Remarks IF 853 ff 100 1/24/2006 Elev. (ft) Field Opt. Field Max. Obt. Req. Non-Conform Remarks 854 855 856 857 858 859 860 861 862 863 864 865 866 867 868 869 870 871 872 873 874 875 876 877 878 879 880 881 104 61 104 104 61 39 61 104 104 104 104 61 61 61 61 61 61 98 98 98 98 61 98 61 61 46 98 61 1124/2006 2" H20 Service X-ing STA 264+50 1/24/2006 2" H20 Service X-ing STA 259+50 1 /24/2006 2" H20 Sen/ice X-ing STA 259+50 1 /24/2006 2" H20 Sen/ice X-ing STA 259+50 1125/2006 RCW Line A STA 10+20 1/25/2006 RCW Line A STA 10+20 1/25/2006 2" H20 Sen/ice X-ing RSF NB STA 259+50 1/25/2006 2" H20 Service X-ing RSF NB STA 259+50 1 /25/2006 2" H20 Service X-ing RSF NB STA 259+50 1/27/2006 Sewer Line D STA 11 +56 1 /27/2006 Sewer Line D STA 11 +56 2/1 /2006 H20 Line L STA 10+30 2/1/2006 H20 Line L STA 10+30 2/1 /2006 H20 Une L STA 10+30 2/1 /2006 H20 Une L STA 10+30 2/2/2006 SD Line G STA 13+05 2/2/2006 SD Line G STA 13+05 2/3/2006 Subdrain BF RSF NB STA 278+18 2/3/2006 Subdrain BF RSF NB STA 277+50 2/3/2006 Subdrain BF RSF NB STA 280+53 2/3/2006 Subdrain BF RSF NB STA 280+00 2/3/2006 H20 Une A STA 22+50 2/6/2006 VWD PR STA 5'S of S Watt 2/6/2006 H20 Line A STA 21+00 2/6/2006 SD Line G STA 13+00 2/6/2006 SD Line G STA 13+00 2/6/2006 VWD PR STA 5'S of S Wall 2/6/2006 SD Line F-17 STA 10+55 274.0 400.0 402.0 404.0 444.0 446.0 400.0 402.0 404.0 356.0 358.0 413.0 415.0 417.0 419.0 334.0 336.0 336.0 337.0 337.0 338.0 55.0 334.0 362.0 334.0 336.0 336.0 358.0 7.1% 10.3% 8.3% 7.5% 10.3% 8.3% 10.7% 8.7% 7.9% 8.7% 8.3% 11.5% 10.3% 11.1% 10.7% 11.5% 11.1% 10.3% 11.5% 10.7% 9.9% 10.3% 10.7% 11.1% 10.3% 9.5% 10.3% 11.1% 7.0% 8.5% 7,0% 7.0% 8.5% 7.0% 8.5% 7.0% 7.0% 7.0% 7.0% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 9.0% 9.0% 9.0% 9.0% 8.5% 9.0% 8.5% 8.5% 7.5% 9.0% 8.5% 135.4 126.7 132.8 135.8 124.8 137.0 123.7 133.9 136.1 130.8 130.1 126.2 125.4 127.1 128.5 125.4 124.8 121.5 127.2 120.4 127.5 125.3 126.6 127.5 125.5 126.9 127.8 127.9 140.0 134.0 140.0 140.0 134.0 143.0 134.0 140.0 140.0 140.0 140.0 134.0 134.0 134.0 134.0 134.0 134.0 132.5 132.5 132.5 132.5 134,0 132,5 134.0 134.0 137.0 132.5 134.0 97% 95% 95% 97% 93% 96% 92% 96% 97% 93% 93% 94% 94% 95% 96% 94% 93% 92% 96% 91% 96% 94% 96% 95% 94% 93% 96% 95% 95% 90% 90% 95% 90% 95% 90% 90% 95% 90% 90% 90% 90% 90% 95% 90% 90% 90% 95% 90% 95% 90% 95% 90% 90% 90% 95% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confonn Conform Conform Conform Conform Conform Conform uttity backfiti utiity backfill utiity backfill utiity backfill utiity backfill utirty backfilt utiity backfill uttity backfill uttity backfill utiity backfill utiity backfill utiity backfilt utiity backfiti utiity backfilt utiity backfill uttity backfill utiity backfilt utiity backfill utiity backfiti utiity backfill uttity backfiti utiity backfiti utiity backfill utiity backfilt utiity backfill utiity backfilt utiity backfiti utiity backfill utiity backfill I I 1 I I I 9 I I {) I I { iiiffififiiifflffi TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number; Project Name; Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test ft Sample Jl Test Dale Test Location Elev. (ft) nar\ n Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 882 ff 61 2/6/2006 SD Lin*? F-17 STA in+«;*; Elev. (ft) nar\ n Field Opt. Field Max. Obt. Req. Non-Conform Remarks 883 884 885 886 887 888 889 890 891 892 893 894 895 896 897 898 899 900 901 902 903 904 905 906 907 908 909 910 61 2/6/2006 SDLine F-17 STA 10+55 61 2/7/2006 H20 Une A STA 19+50 61 2/9/2006 H20 Line A STA 23+00 61 2/9/2006 H20 Line A STA 21+50 104 2/9/2006 H20 Line A STA 22+50 61 2/9/2006 H20 Line A STA 20+00 104 2/9/2006 H20 Line A STA 21+00 61 2/9/2006 H20 Line A STA 18+00 61 2/9/2006 H20 Une A STA 16+50 104 2/10/2006 H20 Line A STA 15+00 104 2/13/2006 H20 Line A STA 19+50 61 2/13/2006 H20 Line A STA 18+50 104 2/13/2006 H20 Line A STA 18+00 61 2/13/2006 H20 Une A STA 17+00 104 2/13/2006 H20 Line A STA 16+50 61 2/13/2006 H20 Line A STA 15+50 61 2/13/2006 H20 Line A STA 13+50 61 2/13/2006 H20 Une A STA 12+00 61 2/14/2006 2" H20 Service X-ing RSF STA 264+40 104 2/14/2006 2" H20 Service X-ing RSF STA 264+40 104 2/14/2006 2" H20 Sen/ice X-ing RSF STA 264+40 61 2/14/2006 H20 Line A STA 10+98 61 2/15/2006 H20 Une A STA 11+00 61 2/15/2006 H20 Une A STA 13+50 104 2/15/2006 H20 Line A STA 11+00 61 2/15/2006 H20 Line A STA 12+50 61 2/15/2006 H20 Line A STA 14+00 104 2/15/2006 H20 Une A STA 12+50 362.0 369.0 357.0 363.0 360.0 369.0 367.0 377.0 386.0 395.0 373.0 377.0 381.0 386.0 390.0 395.0 403.0 411.0 271.0 273.0 275,0 415.0 418.0 406.0 420.0 411.0 404.0 413.0 10.7% 10.3% 10.3% 9.9% 7.5% 10.3% 9.1% 8.7% 10.7% 10.3% 7.9% 9.9% 8.7% 10.7% 8.3% 10.7% 10.3% 9.9% 10.7% 9.1% 8.7% 9.9% 11.1% 10.3% 7.5% 9.9% 10.7% 7.1% 8.5% 8.5% 8,5% 8.5% 7.0% 8.5% 7.0% 8.5% 8.5% 8.5% 7.0% 8.5% 7.0% 8.5% 7.0% 8.5% 8.5% 8.5% 8.5% 7.0% 7.0% 8.5% 8.5% 8.5% 7.0% 8.5% 8.5% 7.0% 128.1 122.1 127.9 126.0 135.7 124.7 134.2 125.9 125.7 125.0 133.4 123.7 133.1 123,9 134,7 125.9 122.6 123.9 122.9 129.1 128.7 125.0 124.0 125.9 132.9 123.7 126.4 135.3 134.0 134.0 134.0 134.0 140.0 134.0 140.0 134.0 134.0 134.0 140.0 134.0 140.0 134.0 140.0 134.0 134.0 134.0 134.0 140.0 140.0 134.0 134.0 134.0 140.0 134.0 134.0 140.0 96% 91% 95% 94% 97% 93% 96% 94% 94% 93% 95% 92% 95% 92% 96% 94% 91% 92% 92% 92% 92% 93% 93% 94% 95% 92% 94% 97% 95% 90% 95% 90% 95% 90% 95% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 90% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform uttity backfill utiity backfill utiity backfiti utiity backfiti utiity backfiti utiity backfill uttity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill uttity backfiti uttity backfill utiity backfiti utiity backfill utiity backfill utiity backfiti utiity backfill utiity backfill uttity backfill utiity backfilt utiity backfill utiity backfill utiity backfilt utiity backfilt uttity backfiti utiity backfill utiity backfill I 1 f I I I I I I 1 I f 1 i 1 I 1 i I i I Contract Number; Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Test # Sample Test Date Test Location 9 1 r 912 61 ^/ lo/zuub 2/15/2006 Line A STA 14+00 VWD Sewer MH BF La Costa Meadows STA 11+15 913 61 2/15/2006 VWD Sewer MH BF La Costa Meadows STA 11+15 914 61 2/21/2006 H20 Line A STA 29+75 915 61 2/22/2006 H20 Une G STA 22+47 2" AV 916 61 2/22/2006 H20 Line K STA 10+00 917 61 2/23/2006 H20 Une A STA 29+75 918 61 2/27/2006 H20 Line A STA 29+15 919 61 2/27/2006 H20 Line A STA 29+15 920 98 3/3/2006 SD Line- Gl STA 10+39 Type C Inlet 921 104 3/3/2006 JUT BF San Etijo STA 98+90 922 61 3/3/2006 JUT BF San Etijo STA 98+90 923 61 3/6/2006 SD Line G STA 13+58 Type C Inlet N Side of Box 924 61 3/6/2006 RCW Une A STA 34+12 2" H20 Service 925 61 3/8/2006 SD Line G STA 11+60 926 61 3/8/2006 H20 Line A Fire Hyd. STA 19+78 927 104 3/8/2006 H20 Une A Fire Hyd. STA 19+78 928 104 3/8/2006 H20 Line A Fire Hyd. STA 19+78 929 98 3/8/2006 SD Line G STA 11+90 930 104 3/8/2006 RCW Line A 2" Service STA 34+12 931 61 3/14/2006 H20 Line D STA 10+25 932 105 3/14/2006 H20 Line D STA 10+40 933 61 3/14/2006 H20 Une D 1" Service STA 10+76 934 61 3/14/2006 H20 Line D 1" Service STA 10+88 935 61 3/14/2006 H20 Une D 2" Sen/ice STA 11 +40 936 61 3/14/2006 H20 Line D 2" Sen/ice STA 11 +46 937 61 3/14/2006 La Costa Meadows 24" Vent @ SD Aband Elev. (ft) Moisture Field Opt Dry Density (pcf) Field Max. Relative Comp. Obt. Req. Conform Non-Conform Remarks 406.0 8.3% 7.0% 135.4 140.0 335.0 10.7% 8.5% 127.7 134.0 97% 95% 95% 90% Conform Conform 337.0 9.9% 8.5% 126.2 134.0 94% 90% Conform 329.0 10.3% 8.5% 125.1 134.0 93% 90% Conform 358.0 10.3% 8.5% 127.8 134.0 95% 95% Conform 447.0 95% 8.5% 123.7 134.0 92% 90% Conform 333.0 10.7% 8.5% 125.9 134.0 94% 90% Conform 341.0 11.1% 8,5% 127.8 134.0 95% 95% Conform 343.0 10.3% 8.5% 128.5 134.0 96% 95% Conform 339.0 10.3% 9.0% 126.7 132.5 96% 95% Conform 422.0 8.3% 7.0% 134.7 140.0 96% 95% Conform 421.0 9.1% 7.0% 134.9 140.0 96% 95% Conform 339.0 9.1% 8.5% 124.7 134.0 93% 90% Conform 340.0 10.7% 8.5% 128.0 134.0 96% 95% Conform 335.0 10.7% 8.5% 128.1 134.0 96% 90% Conform 371.0 11.5% 8.5% 123.9 134.0 92% 90% Conform 373.0 8.7% 7.0% 135.3 140.0 97% 90% Conform 375.0 8.3% 7,0% 134.5 140.0 96% 95% Conform 337.0 10.3% 9.0% 125.7 132.5 95% 90% Conform 342.0 7.9% 7.0% 135.2 140.0 97% 95% Conform 337.0 11.5% 8.5% 125,1 134.0 93% 90% Conform 339.0 9.1% 7.5% 132.7 137.0 97% 90% Conform 338.0 11.1% 8.5% 124.1 134.0 93% 90% Conform 337.0 10.3% 8.5% 124.6 134.0 93% 90% Conform 338.0 10.7% 8.5% 125.1 134.0 93% 90% Conform 338.0 11,1% 8.5% 125.2 1340 93% 90% Conform 338.0 10.3% 8.5% 124.8 134.0 93% 90% Conform utiity backfilt utiity backfill utitty backfiti utiity backfill utitty backfill utiity backfill utiity backfill uttity backfiti utitty backfill utiity backfill utiity backfill utiity backfill utiity backfilt uttity backfilt uttity backfill utiity backfill utiity backfill utiity backfiti utiity backfill uttity backfill utiity backfiti uttity backfill utiity backfiti utiity backfill utiity backfill utiity backfill utiity backfill ff 1 f I I I f I ifl^iiifififlfflf TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number; Project Name; Location; 6S808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Tost Sample # Test Date Test Location Elev. (ft) Moisture Field Opt Dry Density (pcf) Field Max. Relative Comp. Obt Roq. Conform Non-Conform Remarks 938 98 3/15/2006 14" H20 Line Aband. Trench BK RSF STA 276+00 335.0 939 98 3/15/2006 14" H20 Line Aband. Trench BK RSF STA 276+00 337.0 940 61 3/15/2006 Existing 20" H20 Line Connect Trench BF RSF STA 245-30 334.0 941 61 3/15/2006 Existing 20" H20 Line Connect Trench BF RSF STA 245-31 336.0 942 98 3/15/2006 Existing 20" H20 Line Connect Trench BF RSF STA 245-32 338.0 943 61 3/16/2006 H20 Line L STA 12+40 417.0 944 61 3/16/2006 H20 Line L STA 12+40 419.0 945 104 3/16/2006 H20 Une L STA 12+40 421.0 946 61 3/22/2006 SD Line G3 STA 10+50 337.0 947 104 3/22/2006 SD Une G3 STA 10+60 339.0 948 104 3/22/2006 SD Une G3 STA 10+70 341.0 949 61 3/22/2006 H20 Line BSTA 11+60 339.0 950 61 3/22/2006 CTS #6 W H20 Line G STA 15+10 401.0 951 61 3/22/2006 H20 Une BSTA 10+80 330.0 952 61 3/22/2006 CTS #7W H20 Line G STA 18+61 380.0 953 61 3/23/2006 H20 Line B STA 11+10 336.0 954 61 3/24/2006 H20 Line BSTA 10+65 329.0 955 61 3/24/2006 H20 Line BSTA 10+65 331.0 956 61 3/27/2006 H20 Line BSTA 10+65 333.0 957 104 3/27/2006 H20 Line BSTA 10+65 335.0 958 104 3/27/2006 H20 Line BSTA 10+65 337.0 959 104 3/27/2006 H20 Line B STA 29+50 340.0 960 104 3/27/2006 H20 Une B STA 29+50 342.0 961 61 3/30/2006 H20 Line BSTA 11+80 339.0 962 61 3/30/2006 H20 Line G STA 29+90 331.0 963 61 3/30/2006 Fire Sen/ice H20 Line D STA 11+17 3370 11.1% 10.3% 9.5% 10.3% 11.1% 8.7% 10.3% 9.1% 9.5% 11.1% 10.3% 9.9% 10.7% 11.1% 10.7% 11.1% 8.3% 6.8% 8.7% 7.9% 8.7% 11.1% 11.5% 10.7% 9.0% 9.0% 8.5% 8.5% 8.5% 7.0% 8.5% 7.0% 7.0% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 8.5% 7.0% 7.0% 7.0% 7,0% 7.0% 8.5% 8.5% 8.5% 121.9 123.5 127.5 10.7% 9.0% 126.6 9.9% 9.0% 128.3 124.9 124.8 135.2 128.9 134.5 133.9 125.2 127.7 126.3 128.3 125.4 124.6 125.6 131.6 132,0 134.4 136.8 134.1 127.9 125.7 126.3 132.5 132.5 134.0 132.5 132.5 1340 134.0 140.0 134.0 140.0 140.0 1340 134.0 134.0 134.0 134.0 134.0 134.0 140.0 140.0 140.0 140.0 140.0 134.0 134.0 134.0 92% 93% 95% 96% 97% 93% 93% 97% 96% 96% 96% 93% 95% 94% 96% 94% 93% 94% 94% 94% 96% 98% 96% 95% 94% 94% 90% 90% 95% 95% 95% 90% 90% 95% 95% 95% 95% 90% 95% 90% 95% 90% 90% 90% 90% 90% 95% 95% 95% 95% 90% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfiti utiity backfill utiity backfilt utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfiti utiity backfill II II II II I I f I ( I (| fl 19 11 fi ffi ffl ffl ffl TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number: Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carisbad, California Tost JI Sample Jl Test Date Test Localion H9n 1 \na P CTA OQj.Qn Elev. (ft) Moisture Dry Density (pcf) Relative Comp. Conform Remarks ff 964 ff fii 3/^n/5nnR Test Localion H9n 1 \na P CTA OQj.Qn Elev. (ft) Field 1 Opt Field Max. Obt. Req. Non-Conform Remarks 965 966 967 968 969 970 971 972 973 974 975 976 977 978 979 960 981 110 110 110 61 110 61 61 110 61 61 61 104 61 61 104 61 104 3/30/2006 3/30/2006 3/30/2006 3/31/2006 3/31/2006 3/31/2006 3/31/2006 3/31/2006 4/3/2006 4/3/2006 4/3/2006 4/3/2006 4/4/2006 4/4/2006 4/4/2006 4/4/2006 4/4/2006 982 104 4/4/2006 983 61 4/7/2006 984 61 4/7/2006 985 61 4/7/2006 986 104 4/10/2006 987 61 4/10/2006 988 104 4/10/2006 989 61 4/12/2006 990 61 4/12/2006 H20 Line G STA 29+65 H20 Line G STA 29+70 H20 Une G STA 29+50 Fire Service H20 Line D STA 11+17 Fire Service H20 Line D STA 11+17 H20 Line BSTA 10+25 H20 Line BSTA 10+25 H20 Line BSTA 10+25 H20 Line BSTA 11+55 H20 Line BSTA 12+00 H20 Line BSTA 12+00 H20 Une B STA 12+00 H20 Une G STA 29+36 H20 LineC STA 12+00 H20 Line G STA 29+36 H20 Line C STA 11+50 Irrigation Sen/ice RSF NB STA 259+00 13' LT of RT FC tn-igatton Sen/ice RSF NB STA 267+40 13' RT of LT FC H20 Une D 1" AV STA 11 +65 H20 LineC STA 10+50 H20 Une D 1" AV STA 11 +65 SD Une G3 STA 10+95 RT Stoe of Box H20 Line B 4" AV STA 10+50 H20 Line C STA 10+50 H20 Une RSF STA 280+53 H20 Line RSF STA 282+00 338.0 340.0 343.0 339.0 340.0 330.0 332.0 344.0 336.0 338.0 340.0 341.0 341.0 338.0 343.0 336.0 SG 9.9% 8.7% 9.1% 10.3% 9.9% 10.7% 11,1% 10.3% 11.5% 10.3% 9.9% 8.7% 8.7% 10.3% 9.1% 8.3% 6.0% 7.0% 7.0% 7.0% 8.5% 7.0% 8.5% 8.5% 7.0% 8.5% 8.5% 8.5% 7.0% 8.5% 8.5% 7.0% 8.5% 7.0% 130.3 131.4 131.9 129.2 129.8 128.8 127.7 130.4 125.7 129.6 129.3 134.5 127.2 126.2 135.2 125.4 132.5 136.0 136.0 136.0 134.0 136.0 134,0 134.0 136.0 134.0 134.0 134.0 140.0 134,0 1340 140.0 134.0 140.0 96% 97% 97% 96% 95% 96% 95% 96% 94% 97% 96% 96% 95% 94% 97% 94% 95% 90% 95% 95% 95% 95% 95% 95% 95% 95% 90% 95% 95% 95% 95% 90% 95% 90% 95% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform utiity backfill utitty backfill uttity backfill utiity backfill utiity backfill utiity backfill uttity backfilt utiity backfill uttity backfiti utiity backfill utiity backfill utiity backfill uttity backfill utiity backfill utiity backfiti utiity backfill utitty backfilt utiity backfilt SG 6,4% 7.0% 133.4 140.0 95% 95% Conform utiity backfiti 338.0 11,1% 8.5% 127,6 134.0 95% 90% Conform utiity backfill 338.0 10.3% 8.5% 126.6 134.0 94% 90% Conform utiity backfill 339.0 10.7% 8.5% 127.0 134.0 95% 90% Conform utiity backfill 341 0 9.1% 7.0% 135,1 140.0 97% 95% Conform utiity backfill 339.0 9.1% 8.5% 125.4 1340 94% 90% Conform utiity backfiti 339.0 8.3% 7.0% 134.7 140.0 96% 95% Conform utiity backfill 334.0 11.1% 8.5% 126,7 134.0 95% 90% Conform utiity backfill 337.0 99% 8.5% 126.9 134.0 95% 90% Conform utiity backfill iflflflflllfl Ijififififflfltiflflfl TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) Contract Number; Project Name: Location: 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, Califomia Test Sample Test Date Test Location Elov. (ft) Moisture Field Opt Dry Density (pcf) Fleld Max. Relative Comp. Obt. Req. Conform Non-Conform Remarks 991 992 61 61 4/13/2006 4/13/2006 H20 Une RSF STA 284+00 H20 Line RSF STA 284+50 345.0 336.0 993 61 4/13/2006 H20 Line RSF STA 282 339.0 994 61 4/13/2006 H20 Line RSF STA 283+50 344.0 995 98 4/17/2006 H20 Line RSF STA 281+50 340.0 996 98 4/17/2006 H20 Une RSF STA 283+50 346,0 997 61 4/19/2006 H20 Line C Fire Sen/ice STA 17+05 340.0 998 61 4/28/2006 H20 Line G STA 10+10 422.0 999 9 4/28/2006 H20 Une G STA 10+15 SG 1000 9 4/28/2006 H20 Line G STA 10+15 7" Betow 1001 61 5/1/2006 Exist. Fire Serv. Tie In BF H20 Lined STA 10+17 332.0 1002 61 5/1/2006 Exist. Fire Sen/. Tie In BF H20 Uned STA 10+17 334.0 1003 9 5/1/2006 Exist Fire Serv. Tie In BF H20 Uned STA 10+17 336.0 1004 9 5/1/2006 Exist Fire Serv. Tie In BF H20 Lined STA 10+17 338.0 1005 61 5/8/2006 2" Reconnect H20 Uned 19+5 RSF 340.0 1006 61 5/8/2006 H20 Line STA 10+00 337.0 1007 61 5/8/2006 H20 Line STA 10+00 339.0 1008 61 5/9/2006 H20 Une C RSF STA 284+50 349.0 1009 61 5/9/2006 H20 Line C RSF STA 284+50 351.0 1010 61 5/18/2006 H20 Line BSTA 15+40 331.0 1011 98 5/18/2006 H20 Line BSTA 15+40 333.0 1012 98 5/18/2006 H20 Line BSTA 15+40 SG 1013 126 5/19/2006 8" Sewer Une D STA 10+75 424.0 1014 126 5/19/2006 8" Sewer Line D STA 10+50 426.0 1015 126 5/19/2006 8" Sewer Line D STA 10+30 428.0 1016 126 5/19/2006 8" Sewer Line D STA 10+20 430.0 1017 61 6/13/2006 H20 Service X-ing RSF STA 250+GS @ CL r ATP 1018 99 6/13/2006 H20 Sen/ice X-ing RSF STA 250+GS @ CL 2.5' ATP 1019 99 6/22/2006 H20 Sen/ice X-ing RSF STA 250+55 3'ATP 10.3% 10.3% 11.1% 9.9% 10.7% 9.9% 10.7% 11.1% 12.8% 14.1% 10.7% 11.1% 8,7% 9.5% 9.9% 8.7% 10.3% 10.3% 9.1% 11.1% 91% 10.3% 9.9% 10.3% 9.5% 8.7% 10.7% 6.4% 6.8% 6.5% 8.5% 8.5% 8.5% 9.0% 9.0% 8.5% 8.5% 12.5% 12.5% 8.5% 8.5% 8.0% 8.0% 8.5% 8.5% 8.5% 8.5% 8,5% 8.5% 9.0% 9.0% 8.5% 8.5% 8.5% 8.5% 8.5% 5.5% 5.5% 127.9 124.8 126.8 124.5 127.6 128.1 126.0 125.4 115.0 116.0 126.9 128.1 128.9 127.7 129.6 127.4 127.9 128.7 129.1 126.0 125.1 127.7 123.0 125.1 125.9 128.2 126.4 140.9 138.5 134,0 134.0 134.0 134.0 132.5 132.5 134,0 134.0 120.5 120.5 134.0 134.0 133.5 133.5 134.0 134.0 134.0 134.0 134.0 134.0 132.5 132.5 133.5 133.5 133.5 133,5 134.0 146.5 146.5 95% 93% 95% 93% 96% 97% 94% 94% 95% 96% 95% 96% 97% 96% 97% 95% 95% 96% 96% 94% 94% 96% 92% 94% 94% 96% 94% 96% 95% 90% 90% 90% 90% 95% 95% 90% 90% 95% 95% 90% 90% 90% 90% 95% 90% 90% 90% 95% 90% 90% 95% 90% 90% 90% 95% 90% 95% 90% Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Conform Confomi Conform Conform Conform Conform Conform Conform Conform utiity backfill utiity backfilt uttity backfiti uttity backfilt utiity backfilt uttity backfill utiity backfiti utiity backfill uttity backfilt utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfill utiity backfiti utiity backfilt uttity backfill utiity backfill utiity backfill utiity backfill utiity backfilt utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill utiity backfill uttity backfilt utiity backfilt I I f i i 1 f 1 I I I } ) f I f I I I I I f fi ffi ffl ffl ffl Contract Number: Project Name: Location: TABLE 3 REPORT OF FIELD DENSITY TESTS (Utilities Only) 65808 Rancho Santa Fe Road North, Phase 2 Carlsbad, California Test # Sample Test Date Test Loc:atlon Etev. (ft) V ATD Moisture Dry Density (pcf) Relative Comp. Conform Remarks TT 1020 * 99 6/22/2006 H20 Service X-ino RSF STA ?*;n+.«^.«5 Etev. (ft) V ATD Field 1 Opt 7 10/ c cai Fiold Max. Obt. 1 Req. Non-Conform Remarks 95% 95% Conform utiity backfill iiifiiiiiiiiitififirififfiffiriffififi