Loading...
HomeMy WebLinkAbout3243; PALOMAR AIRPORT RD EAST OF EL CAMINO REAL; GEOTECHNICAL CONSULTING; 1987-06-04( —J Testing Engineers-San Diego A Division of United States Testing Company, Inc. Testing Engineers—San Diego J% A Division of United States Testing Company, Inc. .. I 3467 KurtzSt., P.O. Box 80985, San Diego, Ca. 92138(619)225-9641 11 2956 Industry Street,-. Obeanside, California 92054.(6'1.9) 757-0248 June, 4, 1987 Job No. 7130 City of Carlsbad .. V Community Development 2075 Las Palmas Drive . . . V Carlsbad,. California 92008 .. .. Attention: MrS. Al Virgilio, . . . . Subject: ,Geotechnical Consulting . V V Palomar Airport Road Widening V East of El Camino Real V Carlsbad, California '. . Gentlemen: The results of our geotechnical and pavement analyses are presented in this report. The accompanying report presents V conclusions and recommendations pertaining to the site, as well as the results.of our field reconnaissance and laboratory V V. results. . V V . •V V V V , • V •_I We appreciate the opportunity to be of service to you on this project and look forward to' a continued association on this andi future projects. If you have any questions, please do not hesitate to contact our office. V V * Respectfully submitted, V V TESTING ENGINEERS-SAN DIEGO Almaz Fesseha . V Thomas H. Chapman, RCE 34228 Project Engineer V Vice President V V V V Addressee (4) . fl • ,.. • / TABLE OF CONTENTS Page . INTRODUCTION .......................................................1 PROJECT DESCRIPTION .................................. 1 .PURPOSE AND SCOPE .......................... ................. FIELD . EXPLORATION.................................................... 2 GROUNDWATER. ............................... GEOTECHNICAL CONDITIONS 4 EXISTING ASPHALTIC CONCRETE PAVEMENT .........•. . LABORATORY TESTING ....................................................6 CLASSIFICATION ......................... - ........ 6 O .DISCUSSION -AND-CONCLUSIONS. ................. ...................... ..7 RECOMMENDATIONS 8 • GENERAL ........................... 0 ••,•• ................. .. ... . .8 NEW ASPHALT CONCRETE PAVEMENT ....................................10 • INVESTIGATION LIMITATIONS 12 ENCLOSURES: BORING LOGS .........................................................PLATES 1-7 -SYMBOLS ANDTERMS-USEDONBORiNG,LOGS .........-PLATE -8 •. . 0 UNIFIED.- SOIL CLASSIFICATION ...............•0 . PLATE 9. - TEST RESULTS AND DESCRIPTIONS APPENDIX A GRADINGSPECIFICATIONS..... ................................APPENDIX B • 0 • --• :. • -.: - ,-,• 0 • 0 0 _; -_0__i . .i;.. :.. - .1I,-- 0 -. • • 0 •,, --- . -- - - 0 • Geotechnical Consulting Page No. 3 Palomar Airport Road :Widening June 4, 1987 Carlsbad, California : Job No. 7130 • ': , Four corings of the existing asphaltic pavement were performed on April '29, 1987 to measure the pavement thicknesses. Bulk samples of the subgrade soil were also retained for "R" value tests in' the laboratory. GROUNDWATER No groundwater was encountered during any of the borings conducted at the subject site. • • .' •• • ' • ' .1 .- • ' ': I .1 ,'. Geotechnical Consulting Page No. 5 Palomar Airport Road Widening June 4, 1987 Carlsbad, California Job No. 7130 EXISTING ASPHALTIC CONCRETE PAVEMENT The thickness of the asphaltic concrete and aggregate base of .the existing pavement were measured during our field exploration by coring at four locations. The results are presented below: Core l: •. . .. . 3.3/4 inches Asphaltic -Concrete 10 1/4 inches Class II Base Core 2: : 6 inches Asphaltic Concrete •' 8 inches. Class 11 Base.. ,. ,. . .Core 3: . .. 5 inches Asphaltic Concrete' . 10 1/2 inches class II Base •- core 4: . • •• • 6 1/2 inches Asphaltic Concrete . 13 1/2 inches Class II Base 0 .,• : • In allte cores the subgrade material consisted of brown silty • clay. Bülksartip'les of the subgrade soil were retained for "R" • ' • value .tests and results are shown in Appendix A. 0 0 ••• • • •• •• 0 • •• . 0 • • 0 • • • Geotechnical Consulting ' Page No. 6 Palomar Airport Road Widening . - June 4, 1987 Carlsbad, California. ' ' ,. '. 'Job No., 7130 LABORATORY TESTING ' FIELD CLASSIFICATION I .. ,, • . Soils were classified visually according to the Unified Soil Classification System. Soil, classifications are shown on the' Boring Logs, attached, on Plates 1 through 7. , '. ' ' Laboratory tests were performed in accordance with generally accepted test methods of the' American Society for Testing and Materials (ASTM). Testing conducted for the project includes: In place Moisture/Density, Proctor Maximum Density and Optimum Moisture Content,, Gradation Analyses, Expansion Potential and "R-value determination.., "R"-value tests were performed on samples taken from test borings at various depths and on subbase materials obtained from coring the existing asphaltic concrete pavement. Test Results and Test-Descriptions are 'presented in Appendix A. , . ,,.. .. . , .,.., ' ,- • V Geotechnical Consulting Page No. 7 Palomar Airport Road Widening June 4, 1987 Carl sbad,California Job No. 7130 V DISCUSSION AND CONCLUSIONS V Based on our field reconnaissance, subsurface exploration, V laboratory and engineering analyses, it is our professional V V opinion that the site is suitable for theproposed project. The V V planned roadway alignment is underlain by natural earth deposits V V of silty and clayey, fine to medium sand with occasional gravel V intrusions. V V V V - •:,:.V_ - * • The existing roadway is located In an area with gentle slopes V and therefore. no major cut or fill operatidn 'is expected to V * V V - - • ' - - V V widen the existing roadway " :- :. V •V•• V V VVV * V. V V V . V V V - V. V VV• V -V ,- -- V V V . S Geotechnical Consulting Page No. 8 Palomar Airport Road Widening June 4, 1987. Carlsbad, California Job No. 7130 RECOMMENDATIONS • The following recommendations have been prepared for use during the design and construction stages of the outlined project: S GENERAL 1 The design, placement and construction of the pavement 7. section should be in conformance with an appropriate specification, such as "Standard Specification for Public Works." 2 The overall design of the pavement should include proper drainage systems Also, proper channeling systems should be designed to prevent ponding of water, causing seepage beneaththe pavement . . . . 4 • S S • Geotechnical Consulting Page No. 10 Palomar Airport Road Widening '., June 4, 1987 Carlsbad, California Job No. 7130 NEW ASPHALTIC CONCRETE PAVEMENT • Results of "R"-value tests, as shown on Appendix A, indicate that site soils have "R"-valües less'than 5. Table I shows ., computation for developing three alternate, structural sections. The City of Carlsbad, design table, Plate 2 was used to • determine traffic index (T.I.) and'minimurn asphaltic concrete thickness. The design assumes the use of Class II processed aggregate base course. Disintegrated granite (D.G.) (minimum :' "R'-value of 50) would only be used as select import for a subbase course. Recommended for the asphaltic pavement section is a 4 inch single lift of Type B, 3/4 'inch medium a.c. base . • .• ..•• course and 2 inch surface course of type "B". • •• •. • :' • .• • • • • • • GeotechnicalCoflsultiflg Page No. 11 Palomar Airport Road Widening . June 4, 1987 Carlsbad, California 'Job No. 7130 TABLE'NO. I . ' RECOMMENDED SECTION DESIGN ALTERNATIVES Basement Soil R-Value . 5 Traffic Index (Prirñe Arterial) . ,". 9.0 Minimum a.c'. Thickness., ft.. (inch) '. 0.5' (611 ), Minimum cover required (GE) ft. (inch) 2.75 (33.11 ) Note: Materials referenced to. Cal Trans Standard,, Specifications for aggregate subbase, aggregate base, and asphaltic concrete. Crushed aggregate could also be used as base material. " Alternative 1: Conventional-3 Layei System: Actual ' ' ' .. ' Gravel , Thickness' ' ' . . ' . Equivalent (GE) Feet Inch ' ' Course , (GF) , Feet 0.50 6 ' Asphaltic Concrete 1.80 . 0.90 0.83, 10 ' Class IIAgg. Base ' 1.10 . ' 0.91 1.00 12 Agg. Subbase (R=50)' 100 ' , 1.00 ' 2.33 28 " '. 0' 2.81 ' Alternative 2:, Conventional 2 Layer System: 0.50 6 Asphaltic Concrete ' 1.80 0.90 V ' , 1.75 21 'Class II Agg. Base 1.10 1.85 2.25 27 " ' 2.75 Alternative 3: Lime treated Subgrade', • 0.50 6 ' Asphaltic Concrete L80. ' ' 0.90 0.75 9 Class It Agg. Base 1.10 0.75 0.92 11 ' Lime treated-Base 1.20 1.' •, ' 1.10 2.17 26 . , , ' ' ' ' , , . 2.75 • ' . . ' .' ' ' ' ' Geotechnical Consulting Page No. 12 Palomar Airport Road Widening June 4, 1987 Carlsbad, California -. Job No. 7130 LIMITATIONS AND UNIFORMITY OF CONDITIONS -: The recommendations presented in this'report are-contingent upon our review of final plans and specifications. It is recommended that Testing Engineers-San Diego, be retained to provide continuous soil engineering services during the earthwork operations. This is to observe compliance with the design concepts, specifications, or recommendations and to allow - design changes in the-event that subsurface conditions differ • from those anticipated prior to the start of construction. - - The recommendations and opinions expressed in this report - reflect our best estimate of the project requirements based on an evaluation of the -subsurface soil conditions encountered at the exploration locations- and the assumption that the soil conditions do not deviate appreciably frOm those encountered. - 'S - S . - .5 S. - - S ..--- - -: .; Geotechnical Consulting Page No. 13 Palomar Airport Road Widening June 4, 1987 Carlsbad, California. . . Job No. 7130 Any unusual conditions, not covered in this report, encountered . .during site development, should be brought to the attention of the soil engineer so that modifications can be made, if necessary. . . This office should be advised of any changes. in the project scope or proposed site grading so that it may be determined if the recommendations contained herein are appropriate. • The client recognizes that subsurface conditions may vary from • .. those encountered at the locations where our explorations are made, and that our data, interpretations, and recommendations are based solely on the information obtained by us. • Our services consist of professional consultation and observation only, and no warranty of any kind whatsover, expressed or implied, is made or intended in connection with the work • performed or to be performed by us, or by our proposal for consulting or other. services, or by our furnishing of. oral Or : • written reports, or findings. • . 4 S •. • ...,. • . Consulting . Page 'No.' No. l4 Palomar Airport Road.Widening June 41 1987 • Carlsbad, California. Job No. 7130 .. : . It is the responsibility of the owners, or their representatives to ensure that the information and recommendations contained herein are brought to the attention of the engineer and . architect for the project and incorporated into the project's plans and specifications. It is further their responsibility to take the necessary measures to ensure that the contractor and his subcontractors carry out such recommendations during construction. . . . Testing Engineers-San Diego BORING LOG 0 Project: Palomar Airport RdDate: 4 /24/87 Boring No: Type of Rig: CME 55 Hole Diameter: _8" H.S.A. Elevation: •+2' above rd. Hammer Weight & Fall: Ground Water: Logged, By: SCG LQ 0 I....LLJ Cl) w J Z U lU .9 0 0 S FIELD DESCRIPTION >- I.... —z (S4 3 ci 0-5' FINE SANDY CLAY, dark-brown 22 DR sc . moist .2 . -. lowexpansion potential. 0 0 0 . . . BulIç mottled. bleeched gray with 66 DR .6 . orange stain .8 . . . -10 . . - . very dense . . . 86 DR for 12 . . 0 10" .14 0 0 16 . . . . . .. :. DR. .18 .20 / 1.925'.CLAYEY SILT ,,.buf. g.reen/ta 76 DR CL . . . . or L. loll' .22 .24 DR blaIr 1 .- Testing Engineers-San Diego I - - - .• . PLATE _1A BORING LOG Project: Palomar Airport Rd Date: 4/24'87 Boring No: 1A Type of Rig: CME 55 Hole Diameter— _8" Elevation: +2' above rd. Hammer Weight & Fall: 125 lb/20" Ground Water: Logged By: SCG Z ae = 0.' a. .e '- .. o a. FIELD DESCRIPTION -o >- —z 3 cs.J 2531.5 SILT, dense, buff orange! 94 DR green, with gypsum crystals for .26 - . .911 .28 .30 BORING TERMINATED AT 31½' .32 .34. - -.36 .. . . .38 .40. .42 -, - .44 .46 .48 - - - - 50- . • .52 • . • .. S - LIM LM c Testing Engineers- San Diego BORING LOG Project: Palomar Airport Rd Date: 4/24/87 Boring No: 2 Type of Rig CME Hole Diameter 611 Fit Auger Elevation:+2' above rd Hammer Weight 8 Fall: Ground Water: LoggedBy: SCG L S U Z . M. -. W o 0 -a_S FIELD DESCRIPTION 0 >- -z 0 'ML 0-2' SILT, brown/tan .. 2 CL 2-15' FINE SANDYCLAY, tan, moist 4 BULK 6 - dense (olive/tan) -8 . 10 - buff tan gray .12- .14 5 - . S • Boring _Terminated _at_15' 16 .18 5 20 22 .24 5 •' 2,6 • - S • S • - 28 5 - S • 5 - PLATE _2 Testing Engineers' Son Diego BORING LOG Project: Palomar Airport Rd Date: 4/241R7 Boring No: Type of Rig: CME 55 Hole Diameter: 8" HS .A. Elevation: -3' below Hammer. Weight a Fall:________________ Ground Water: Logged By: SCG w ZI.L. Q ZM j CL 0 0.. o a. '. FIELD DESCRIPTION 0 ' > S 0 ML 0-1.5' 'SILT, brown , Buk - 2 Sc 2-5 "CLAYE'FINE'SAND, tan/brown , • Bulk 4 0 -72 DR 5-10' :FINE SANDY.-SILT, orange/tan bleeched gray, very silty* - light tan - 8 10 (CL)' - bleeched/tan mottled, very • silty ' •• 12 14 , .• - 16 . - BORING TERMINATED AT -16½" 18 - - - .20 ' "• 0 ' 22 0 0 • 24 ' • 0 0 ' •0 ' • 0 .26 '0 '' .0 •' , 0 , • •• .28 , 0• , 0 PLATE_ _3 Testing Engineers-San Diego PLATE_4 - BORING LOG Project: P alomar Airport. Rd Date: 4/24/87, Boring No: 4 Type of Rig ca ss Hole Diameter 8" H S A Elevation +4' above rd Hammer Weight 8 Fall:______________ Ground Water: Logged By: SCG .1-W Z U.-Cr Z. OR • . . . _I_ Ui ( .- '- o o Q. FIELD DESCRIPTION . > Z 0 o ML 0-2'. SILT, brown I 2 CL 2-5' SILTY CLAY, brown (moderately (ML) plastic\ 4 . ,. 6 SM 5-17' SILTY FINE SAND, tan/yellow-brown, 84 DR bleeched, humid for 10" -8 10 - bleeched white, very dense - with gray layers DR. 12- - . • .- . - . 94 . for 8" -14 :- • 50 . 16 or, 5" - SM- 17-26.5' SILTY CLAYEY FINE SAND, . . • 18 (CL) brown/gray tan 20 - gray tan (olive) 50 DR for 6" 22 . . . • - 24 .26. -. - • . 50 for DR _____ _____ -Boring Terminated at 26½' - 511 28 - • . - Testing Engineers-San Diego BORING LOG ProjectYalomar Airport Rd Date: 4/24/87 Boring No: 5 Type of Rig CME 55 Hole Diameter 6" fit auger Elevation +2' above rd HammerWeight. & Fall: . Ground Water: Logged By: SCG Ui LL.. - _j LaJ U I— Z o 0 Ui FIELD DESCRIPTION 0 >— —Z . 3 0 ML 0-2' • SILT, brown. 2 CL 2-15' SILTY CLAY, dark brown (ML) • Bulk 4 — tan/brown 6 - . ....----'-----r'r • 8 — tan gray 10 12 - 14 •• . Boring Trminated at 15' 16 18 -. .• . . • . . 20 . ••, . 22 24 • •. • - 26 28 . • . • .. . - • . . • PLATE . Testing Engineers-San Diego S S PLATE_6 BORING,LOG ., Project: Palomar Airport Rd Date: 4/24/87 Boring No: 6 Type of Rig: --r s Hole Diameter: 6" Fit. Auger . Elevation: +2' above rd. Hammer Weight & Fall:' Ground Water: Logged By: SCG . . • I- 0 - . :. . U) . Li.J Q Z U. - LAJ 0 0 CL . . DESCRIPTION 01FIELD '0 • >-Z 8 . S • 0 ML 0-2 SILT, brown . 2 CL 2-15' SILTY CLAY, orange brown, moist medium 'expansion potential Bulk 6 - bleeched tan, mottled moist with dark brown layer 2' thick -8 . - orange/grayrnottled --10. 12 14 16 ' Boring Terminated at 15' 18 ' S 20 5 '• -22 .- • - -24 '. 26 '. S • S • 28. Testing Engineers_San Diego BORING LOG . Project: Palomar Airport Rd Date 4/24/87. Boring No; Type of Rig: CME 55 Hole Diameter: 8" 14.s-A. Elévation:+3'_above rd. Hammer Weight & Fall: ' , ' Ground Water: Logged By: SCG - W Z U. Z j Lii L) CL 0 .0 cJ FIELD. DESCRIPTION. . Co • 8 o SM .. 0-20' SILTY'FINESM'Th, brown 2 - orange/tan, 'moist . .4 .. ' DR -. abundant shell fragments " , 80 6 (.C1"dia.) -8 -10 -' tan/brown with shell 'fragments , . 61 ' , DR ' ' . ' for 6" 12 14 - . bleeched white/gray ' ' ' . DR 16 . '• ' ' •' ' -.18 ' , ' •. .. • 20 CL 20-25' SILTY CLAY, orange/tan. 50, DR (41) ' ' ' for ' -22" -24 . DR 50ML .26 (CL) 25-26.5' "CLAYEY"SI'LT, bleeched tan/gray for Boring Terminated at. 26½' • ' ' -28 - PLATE _7 Testing Engineers-San Diego SYMBOLS AND TERMS USED ON BORING LOGS SAMPLER TYPES (Shown in SAMPLEcolumn). DRIVEN RING DRIVEN BULK SHELBY ROCK SPLIT. NO SAMPLE BAG SAMPLE SAMPLE TUBE CORE SPOON RECOVERY DISTURBED . • . TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE GRAINED SOILS (major.portion retained on No. 200 sieve) Includes (1) clean gravels and sands, and (2) silty or clayey gravels and sands. Condition in the following table is based on our interpretation of, blow Counts using a hammer as noted on the boring log DESCRIPTIVE TERM - • SPT VALUES, N blows per 12 in. (After Terzaghi a Peck, 1968) Very loose 0 to 4 Loose 4 to 10 Medium-dense 10 to 30 Dense 30 to 50 Very dense >50 FINE GRAINED SOILS (major portion passing No 200 sieve): Includes (1) inorganic and organic silts and clays, (2) gravelly, sandy, or silty clays, and (3) clayey Silts Consistency is rated according to shearing strength, as indicated by penetrometer readings or by unconfined compression tests UNDRAINED. DESCRIPTIVE I TERM ;. SHEAR STRENGTH KIPS/SO FT Very soft less than 0.25 Soft 0.25 to 0.50 . . •1 Firm • 0.50 to 1.00 . 0 . 'Stiff .• .• •' 1.00. to . 2.00 Very stiff 2.00 to 4.00 Hard . . . 4.00 od higher • . NOTE Fissured clays may have lower unconfined compressive strengths than shown above, because of planes of weakness or crocks in the soil The consistency ratings of such soils are based on penetrometer readings TERMS CHARACTERIZING SOIL STRUCTURE Fissired - containing shrinkage crocks, ,freqiently filled with fine sand or silt, usually more or less vertical Interbedded - composed of alternate layers of different soil types. Calcareous - containing 12 to 50 percent calcium carbonate . Carbonate - containing more than 50 percent Calcium carbonate Well graded - having wide range in grain sizes and substantial amounts of all intermediate particle, sizes Poorly graded - predominately of one grain size, .or havingo range of sizes with some intermediate, . • size missing . 0 • •• . - • Terms used in this report for describing soils according to their texture or groin size distribution are in accordance - with the UNIFIED SOIL CLASSIFICATION SYSTEM, as described in Technical Memorandum No 3-357, Waterways Exp Star3/53 - PLATE_____ . ,Testing,,Engineers-San Diego 'UNIFI .ED SOIL CLASSIFICATION' V ' 'V-V. ' * - PLASTICITY CHART C 0 .5 a. VO a- GROUP . V TYPICAL NAMES • SYMBOL ' Well-gróded grovels, V GW . gravel -sand mixtures, little or no fines Poorly graded grovels; GP grovel-sand mixtures, o little ou no fines CU Z, V , Silty grovels, gravel_* V g GM sand-silt, mixtures Cloyey grovels, gravel V sand-clay, mixtures . , 'V Well-graded sandsCr SW gravelly sands, little' , or no fines Poorly graded sands, .2 SP V gravelly sands, little or no fines 'Silty sondss&id-silt S mixture V Cloyey sands, sand-. SC ' .clay mixtures GROUP SYMBOL TYPICAL NAMES V Inorganic silts and very' fine 'snds, rock flour .._• ML silty or.cloyey fine - ' V sands, or clayey silts . V with slight plasticity 0 V ('4 -a V Inorganic - clays of low to * V medium plasticity, V J CL gravelly clays, sandy . ' ' clays, silty clays, lean . V Clays Organic silts and organic ' OL. silty clays of low- plasticity -- !' Inorganic silts, micaceous - MH or diatomaceous fine V sandy or silty soils, elastic silts CH Inorganic clays of high' V .-plasticity, fat clays Organic clays of medium OH to high plasticity, organic silts pt Peat and other highly organic soils V Liquid Limit V p V -NOTE: ;)Group symbol presented in SYMBOL column on BOR!NG'LOG. 2)The 4 line is on empirical relationship established by A. Cosagrand. V 'V ' '', ••, PLATE • '. Geotechnical Consultinq.,., . ,Page No. 16 Palomar Airport Road Widening June 4, 1987 • Carlsbad, California Job No.7130 LABORATORY RESULTS '. . • 1. Moisture Content and In-Place Density Tests Field Field . Maximum Dry Moisture Dry Relative Sample No.! Density Content Density Compaction Location (pcf) .. Percent •. (pcf) Percent BH1 @ 0-1.5 ft. 112.4 . 14.4 118.0 953 BH1 @ 5-6.5 ft. 105.4 15.4 118.0 89.3 BH3 @ 6 ft.. 102.4 16.0 ,- 118.0 - 86.8 BH4 @ 6 ft. 94.9. 21.7 BH4 @ 10 ft. 104.9 14.5 BH7 @ 6 ft. 106 ..5 . 11.1 118.00 90.3 107.9 BH7 @ 10 ft. 11.4 . ---- 2. Maximum Density Tests . • . Maximum Dry Optimum Sample No./ . Density . Moisture Location (pc f) . . (Percent) BH1 @ 4 ft. 118.0 11.0 "- • . .. . .-..- - - . . I -.---,-.. • ,- .. - -- - . .. . Geotechnical Consulting Page No. 17 Palomar Airport Road Widening June 4, 1987 • Carlsbad, California . Job No. 7130 Grain Size Distribution . • Test Hole . BH2 4-feet r Sieve No. - Percent finer than size indicated #30 100 • . 40 . . S 60 97.9 80 . . 944 . • 100 200 7.8 . Atterburg Limit Test • . Test Liquid Plastic Plasticity Location Limit Limit . Index BH2 @ 4 ft. 48.0 18.7 29.3 BH7 @ 5-6.5 ft. '30.1 1 25.8 4.3 • . . . S. S . .. • S 'S Geotechnical Consulting Page No. 18 Palomar Airport -Road Widening June 4, 1987 • Carlsbad, California Job No. 7130 5 -200 Wash Test Sample No./ 200 Wash Location : (Percent) BH1 @ 0-1.5 ft. 52.0 • BH2 @ 4-ft. 78.8' * BH4 @. 6 ft. 37.1 BH4 @ 10 ft. 22.0 - L j • BH4 @ 20-21.5 ft. 29.7 BH7@6 ft. 358 6 Expansion Test - Sample Location Expansion Potential and Depth Index Expansion BHI @ 4 ft. 25 Low • BH6 @ 4 ft 58.8 Medium 7 "R" - Value Results • Core or Bore Hole Depth No Feet "R"-value BH1 2-4 ft 4 • BH5 2-4ft 4 Cl 2-A ft. 4 C4 2-4 ft 4 • Geotechnical Consulting Page No. 19 Palomar Airport Road Widening June 4, 1987 Carlsbad, California Job No. 7130 TEST DESCRIPTIONS H: MOISTURE DENSITY TESTS The field moisture content and dry density tests were performed on ring drive samples retained from the bore holes. The field moisture content was determined as a percentage of the dry unit weight. MAXIMUM DENSITY TESTS (LABORATORY STANDARD) Maximum dry density and optimum moisture contents were * determined for representative samples. ..The purpose of.these • tests was to determine the relative compaction of the soils * encountered. The results of the tests, performed in accordance with ASTM Test Method D-1557, are shown in the Appendix. * * • : 0 Geotechnical Consulting Page No. 20 Palomar Airport Road Widening •0 June 4, 1987 Carlsbad, California . Job No. 7130 0 GRAIN SIZE DISTRIBUTION 0 . 0 The grain size distribution of a soil sample covers the 0 0 0 quantitative determination of the distribution of particle sizes in soils. The distribution of particle sizes in soils retained on the No.. 200 sieve is determined by sieving, while the distribution of particles passing sieve No. 0200 is determined by 0 0 a sedimentation process, using a hydrometer. . This test was 0 conducted in. accordance with ASTM Test Method D-422-72.- EXPANSION TEST: The expansion potential of selected samples was evaluated using •. . 0 . a swell test (U.B.C. Test .Standard No. 29.2). A sample of soil was molded to a saturation content of approximately 50 percent. 0 A surcharge load of. 144 pounds per square foot was applied to 0• .. 0 the sample, which was then. inundated. The expansion index 0. (E.I.) was recorded as the increase in the thickness of the soil sample relative to the original 1-inch-sample. The sample was allowed to swell.for at least 24 hours. . 0 Geotechnical Consulting • Page No. 23 Palomar Airport Road Widening June 4, 1987 Carlsbad, California Job No. 7130 RECOMMENDED GRADING SPECIFICATIONS • 1 General Description 1.1 These specifications have been prepared for general grading and site development of the project Testing Engineers in San Diego, herein after, described as the Soil Engineer, should be consulted prior to any site development to ensure compliance with these specifications These specifications shall be used in conjunction with the soil report of which they are a part 1.2 This item shall include all site work consisting of all clearing and grubbing preparation of land to be filled, filling of the land, spreading, • compacting, density testing of the fill and all subsidiary work necessary to complete the grading of the filled areas to conform with the lines, • grades and slopes as shown, and specified on the accepted plans • • Geotechnical Consulting Page No. 24 Palomar Airport Road Widening June 4, 1987 Carlsbad, California Job No. 7130 1 3 The Soil Engineer shall be the Owner's representative to inspect the construction of fills Excavation and placing of fill shall be under the direct inspection of the Soil Engineer In the event that any unusual conditions, not covered by these specifications are encountered during grading operations, the Soil Engineer shall be immediately notified 2 Preparing Areas to be Filled • 2'.1 All existing unnecessary materials such as timber, logs, trees, bush, abandoned buildings, debris and other rubbish shall be removed, burned or disposed of so as the area will be left neat And with finished appearance 2.2 All loose soil and vegetation shall be removed from surface upon which the fill is to be placed The surface shall then be plowed or scarified to the recommend depth, and until the surface is free from ruts, hummocks or other uneven features which would tend to prevent 0 uniform compaction by the equipment to be used 0 0 0 0•0 V' Geotechnical Consulting Page No. 25 Palomar Airport Road Widening June 4, 1987 Carlsbad, California . Job No. 7130 2.3 The area, after being cleared should be disced of. V bladed until it is uniform and free from large clods. Proper moisture content must be maintained by adding water or aerating, and compacted to a relative compaction of not less than 90 percent of the maximum dry density as determined by ASTM Test Procedure No. D-1557. .. 2.4 Septic tanks, if encountered, must be removed from the site prior to any building, grading or V fill operations. Septic tanks., including all connecting drain fields and other lines, should be totally removed and the resulting depressions V • • properly backfilled and compacted. V. -. 2.5 Water wells on the site should be capped • • V V • according to the requirements of the San Diego County Health Department. The strength of the cap should be at least equal to the adjacent soil. -The final elevation of the top of the well - casing ..shoild be at least three feet below .• V • adjacent gradeprior to grading of fill V V • • operations.: - •V V .V - V. Geotechnical Consulting Page No. 26 Palomar Airport Road Widening June 4, 1987 Carlsbad, California . Job No. 71.30 2.6 Buried tanks, if encountered, should be removed and the resulting depressions-properly backfilled and compacted. '. 3. Materials 3.1, Materials for compacted fill shall consist of any material imported or excavated fromt he cut areas that, in the opinion of the Soil Engineer, is suitable for use in constructing fills. The materials used should be free of all vegetation and other deleterious 'substances. . It shall contain no rocks or hard lumps greater than 6-inches in size'. 3.2 No materials of' a perishable, spongy or improper nature shall be used in filling. ' 3.3 . Any potentially expansive soil encountered shall be used as fill only. below 3 feet of the design finished'grades. The upper 3 feet of fill shall • , be comprised of.' non-expansive sandy fill material. Any expansive soil encountered at the ' finished subgrade elevations in cut areas shall ' '.' I Geotechnical Consulting Page No. 27 Palomar Airport Road Widening June 4, 1987 Carlsbad, California Job No. 7130 be under cut and replaced with compacted non-expansive sandy fill material The depths and real extent of any required expansive soil removal shall be determined by the Soil Engineer at the time of construction. 3.4 Fills constructed on natural slopes having an inclination steeper than 5 (horizontal) to 1 (vertical) shall be keyed and benched into firm natural ground below any loose surface soils at the direction of the Soil Engineer . 3.5 The contractor shall notify the Soil Engineer in advance of his intention to import soil from any source outside the project areas, and shall permit the Soil Engineer to sample as necessary • for the purpose of making tests to establish the qualities of these materials 3.6_, During operations, soil types other than those analyzed in the report of the soil investigation may be encountered by the contractor The Soil • Engineer shall be consulted to determine the suitability of these soils • I Geotechnical Consulting 0 Page No. 28 Palomar Airport Road Widening 0 June 4, 1987 Carlsbad, California 0 Job No. 7130 4. Placing, Spreading, and Compacting Fill Materials • 4.1 Fill materials should be placed in layers, which, when compacted, would permit adequate bonding and compaction Each layer shall be spread evenly and shall be thoroughly blade-mixed during the spreading to provide uniformity of material in each layer. 4.2 After each layer has been placed, mixed and spread evenly, it should be thoroughly compacted to a relative compaction of not less than 90 percent of the maximum dry density as determined by ASTM Test Method D-1557-78, unless otherwise specified : 4.3 Compaction shall be continuous over the entire area and the equipment shall make sufficient trips to ensure that the desired density has been obtained throughout the entire fill : 0 Geotechnical Consulting Page No. 29 Palomar Airport Road Widening June 4, 1987 Carlsbad, California . Job No. 7130 . 5. Inspection • 5.1 Observations and compaction tests shall be made by • the Soil Engineer during the filling and compaction operations. 5.2 The standard test used to define maximum densities of the soild will be ASTM Method D-1557. Compaction of the fill shall be expressed as the percent of the field density to the maximum density. When the compaction of the fill is below the specified value, the particular layer or portion shall be recompacted. The. number and kind of tests shall be determined by the Soil Engineer. 5.3 During construction, the contractor shall properly grade all excavated surfaces to provide positive • •, drainage and prevent ponding of water. He shall control surface water to avoid damage to adjoining • properties or to finished work on the site. • • . •• •