Loading...
HomeMy WebLinkAbout3303; Agua Hedionda Sewage Pump Station; Cannon Rd, Proposed Undercrossing Carlsbad Ranch; 1995-06-13LEIGHTON AND ASSOCIATES, INC Geotechnicol and Environmental Engineering Consultants June 13,1995 •ay Project No. 4930489-09 c To: Carltas Company 5600 Avenida Encinas, Suite 100 Carlsbad, California 92008-4452 Attention: Mr. Chris Calkins Subject: Proposed Undercrossing, Cannon Road and Armada Drive, Carlsbad Ranch Phase I, Carlsbad, California References: Leighton and Associates, Inc., 1993, Preliminary Geotechnical Investigation, Units I and n (Lots 1 through 7), Carlsbad Ranch Phase I, Carlsbad, California, Project No. 4930489-01, dated July 22, 1993 , 1995, Geotechnical Investigation, Proposed Golf Cart Undercrossing, Cannon Road, Carlsbad, California, Project No. 4930489-09, dated April 26, 1995 Introduction In accordance with the request of the City of Carlsbad (City), we have prepared this letter regarding the proposed undercrossings at the site. Since the preparation of the referenced reports, an additional Undercrossing has been proposed at the site crossing Armada Drive. The purpose of this letter is to provide a review of the geotechnical conditions in that area and to provide supplemental recommendations for both undercrossings. Armada Drive Undercrossing The Armada Drive Undercrossing will be located at approximately Station 3+60 and will be similar in design and construction to the Undercrossing proposed at Cannon Road. The geotechnical conditions in this area consist of a thin veneer of topsoil overlying dense terrace deposits. Trench T-5 excavated near the street centerline in this area encountered 2 feet of topsoil in this location. Proposed grading in this vicinity will involve removal of this potentially compressible topsoil, minor amounts of weathered terrace deposits and only minor cuts and fill. Excavation for the Undercrossing will require a cut into the terrace deposits. The results of chemical testing performed on soils within Phase I indicate the soils are suitable for the installation of the proposed Undercrossing. 3934 MURPHY CANYON ROAD, SUITE B205, SAN DIEGO, CALIFORNIA 92123 (619) 292-8030 • (800) 447-2626 FAX (619) 292-0771 c 4930489-09 Conclusions and Recommendations The Armada Drive undercrossing has essentially the same geotechnical conditions as at the Cannon Road undercrossing, hence the geotechnical recommendations previously presented are also applicable at this location with the following exceptions. • Slurry backfill was previously recommended for trench backfills that extended within 5 feet of the top of an arch. The purpose of the slurry backfill was to eliminate the need for compaction equipment within this zone which has a potential to damage the arch. We understand that others have a concern over the use of this slurry. As an alternative, the trenches in this area can be backfill with soils compacted to a minimum of 95 percent of the soils' maximum dry density. To avoid damage to the arch and utilities, only light weight compaction equipment should be utilized. • The City has also expressed concern over the deflection of the arch that may occur as part of site construction. Therefore, we recommend the implementation of a monitoring program during site construction. This should include monitoring during construction to verify that the observed deflections are within 2 percent of the deflections directions in accordance with ASTM D789-88 (shape control). During installation, the contractor shall implement a deflection monitoring program that can be monitored continuously throughout the construction process by the contractor, civil and geotechnical engineer and representatives of the City of Carlsbad. In addition, the top of the arch should be surveyed at various locations by the project civil engineer prior to and during backfilling operations. • After backfill operations are complete and prior to installation of utilities above the arch, we recommend that load testing of the arch be performed. The arch should be loaded to design loading (H-20) and monitored for deflection by the city inspector, civil and geotechnical engineers. The civil engineer will provide tolerable limits for deflection of the proposed utilities on the project plans. Should these deflections be exceeded, additional recommendations to protect the proposed utilities will be warranted. If measured deflections are within acceptable tolerances, installation of the proposed utilities may proceed after written approval is received. • We also recommend that all construction joints be designed as watertight joints to minimize the potential for future seepage-related problems. • The Cannon Road undercrossing is to be constructed and the ends buried temporarily. The undercrossing will eventually be uncovered and incorporated into future development plans. In order to bury the outlets, we understand that the ends will be sealed with a plywood bulkhead covered with compacted fill. In order to be stable at this vertical gradient the fill soils should be reinforced with a geogrid fabric placed horizontally at 1 foot vertical intervals in the fill. The fabric should wrap and overlie the top of fill lift adjacent to the bulkhead The basal layer of the fabric should extend 15 feet horizontally away from the bulkhead (5 foot on sides). The upper layer of geofabric should overlap the fill lift a minimum of 5 feet The geogrid layer should extend a minimum of 12 inches above the top of the arch. The geogrid fabric should consist of Amoco 2002 or approved equivalent The attached Figure 1 illustrates the installation of the geogrid reinforcement -2- LflGHTONAHDASSOCIATB, IMC 4930489-09 • During construction of the undercrossings, continuous observation and testing of the backfill process should be performed. In addition, prior to backfilling, the chemical characteristics of the proposed backfill soils should be tested prior to use to determine conformance with the project specifications. If you have any questions regarding our report, please contact this office. We appreciate this opportunity to be of service. Respectfully submitted, LEIGHTON AND ASSOCIATES, INC. Michael R. Stewart, CEG1349 (Exp. 12/31/95) Director of Geology G. Franzone, RCE 39552 tor of Engineering MRS/kar Attachments: Figure 1 - Backfill Detail Distribution: (2) Addressee (2) City of Carlsbad Attention: Ms. Sherri Howard (2) O'Day Consultants Attention: Mr. Jerry O'Connell (2) Harrison Company Attention: Mr. Steve Harrison X'V'?.^' -:-^> &• ':/ A ••\ • JOSEPHS. FfUf-iZONE N0.3S552 *y~ :•' -3- UIGHTONAHDASSOCIXTK, IMC PLAN VIEW NO SCALE c Temporary bulkhead' Proposed undercrossing (15' wide X 10' high) \/ v 5'mm 15' SIDE VIEW NO SCALE Proposed roadway \ \-Future slope Soil backfill (95% minimum relative compaction) \ \ ^Proposed undercrossing 5' 15' Geogrid reinforced "backfill Soil backfill -(90% minimum relative compaction) \ ± 1 \\ \ Temporary ^^* bulkhead — ' (designed by others) 0' (r(((r((( - ^« \ Geogrid reinforcement "Amoco 2002 or approved equivalent, 12" vertical spacing t BACKFILL DETAIL ROADWAY UNDERCROSSINGS Project No.: Scale: Engr./Geol.: Drafted By: Date: 4930489-09 NO SCALE JGF/MRS KRD JUNE 13. 1995 11 FIGURE NO. 1