Loading...
HomeMy WebLinkAbout3391-2; SIDEWALK PROGRAM; REPORT OF IN-PLACE DENISTY TEST RESULTS; 1995-01-25k"KLE1 N FELDER January 25, 1995 Project No. 51-1791-00-013 Mr. Richard E. Cook Principal Construction Inspectoi City of Carlsbad Engineering Department 2075 Las Palmas Drive Carlsbad, CA 92009-1519 RECEIVED JAN26 1995 CITY OF CARLSBAD IGINEERING DEPARTMEN Subject: Report of In-Place Density Test Results Subgrade and Aggregate Base Project: El Camino Real Sidewalk. Carlsbad, California Dear Mr. Cook: In accordance with your authorization,w e-hdVe performed in-place density testing services associated with the subgrade compaction and aggregate base placement for the El Camino Real Sidewalk in Carlsbad, California The scope of our services consisted of in-place density testing of subgrade and aggregate base, laboratory tests for moisture-density curves of the subgrade and aggregate base material, and preparation of this summary of compaction test results. -. In-place density testing was performed on a part-time, "as-called" basis at the direction of the City's resident project inspector. Our services were performed from October 13, 1994 through October 24, 1994., T.D. Hays was the: .contractor, for the project. ............ The maximum dry density and optimum moisture content of subgrade soils and a representative sample of aggregate base was evaluated in our laboratory in general accordance with ASTM test procedure D-1557. The results of the tests are presented in Table 1 entitled "Maximum Density Test Results." In-place density tests of subgrade and aggregate base were performed-in general accordance with ASTM test procedures D-2922 and D-3017 (nuclear method of determination of density and moisture, respectively). The results of the tests at the specified locations tested are 'presented in Table 2 entitled "Compaction Test Summary." 75ML945.WRD Copyright 1995 Kleinfelder, Inc. Page 1 of 2 51-1791-00-013 KLEINFELDER 9555 Chesapeake Drive, Suite 101, San Diego, CA 92123 (619) 541-1145 Testing was performed at the direction of the project inspector, and results of the in-place density tests were reported to the project inspector either in the field at the time of testing or shortly thereafter once the maximum density test was complete. Since our services were provided. on'. a part-time, "as-called" basis, we did not observe placement of aggregate base and paving operations on a near-continuous basis. Therefore, we cannot comment that all subgrade and aggregate base have been placed and compacted in accordance with the project specifications. Our tests have been performed in accordance with the generally accepted pavement testing practices in the Carlsbad area at this time. No warranty, express or implied, is made. We appreciate the opportunity to be of service. If you have any questions or need additional information, please contact the undersigned. Sincerely, •. S KLEINFELDER, INC. •. • c- - Ronald C. Thomson • • Operations Manager RCT/mlf' Attachments: Table L- Maximum Density Test Results Table 2 - Compaction Test Summary 75ML9-95.WRD Copyright 1995 Kleinfelder, Inc. • Page 2 of 2 51-1791-00-013 KLEINFELDER 9555 Chesapeake Drive, Suite 101, San Diego, CA 92123 (619) 541-1145 KLEINFEIDER : ,TABLE 1 MAXIMUM DRY DENSITY TEST RESULTS Project Name: . . - . Project No.: El Camino Real Sidewalk . . 51-1791-00-013 Carlsbad, California . . .4 Class 2 Aggregate Base 5.9 . . . 138' - . 4 ..: -' - •., % -14 . .• . 11,. ... -- - I ' - Accepted engineering and testing procedures were used for thes tests.' Tti'e above data are presented for information purposes only. In the absence of continuous observation by our personnel at the site, we cannot express an opinion as to the adequacy of site preparation or overall site compaction. We do not undertake the guarantee of construction, nor - do we relieve the contractor of his responsibility to produce a completed project conforming to the project plans and specifications. 75ML9-95.WRD -• - . . -. - Copyright 1995 Kleinfelder, Inc. - . - - • 51-1791-00-013 I9 KLEIN FELDER TABLE.2 S COMPACTION TEST SUMMARY Project Name: El Camino Real Sidewalk Project #: 51-1791-00-013 Carlsbad, California 10/14/94 1 El Camino Real STA 0+75 -3.5 114.4 14.1 91 1 Pass 1 (90% req.) 10/14/94 2 El Camino Real STA 1+00 -3.0 121.8 10.2 91 2 Pass (90% req/) 10/14/94 3 El Camino Real STA 0+90 -2.0 124.5 10.7. 93 2 Pass (90% req.) 10/14/94 4 El Camino Real STA 1+00 -2.5: 124.5 9.1 93 2 5 Pàss - . . . . . (95% req.) 10/12/94 5 4 El Camino Real STA 1+00 -2.5 127.8 10.9 96 2 Pass (95% req) 10/12/94 6 El Camino Real STA 0+50 . 2.5 127.0 11.5 95 2 Pass (95% req.) 10/19/94 7 El Camino Real STA 1+25 -2.5 110.6. 15.9 88 3 Failed* 10/20/94 8 El Camino Real STA 0+50 . -2,5 115.4 16.1 91 3 Failed' 10/20/94 9 El Camino Real -STA 1+00 -2.5 115.7 15.7 91 3 . Failed.' 10/20/94 10 , El Camino Real STA 1+00 -2.5 113.4 17.6 90 3 Failed* 10/24/94 11 El Camino Real STA 1+50 F.G. 137.5. 4.1 98 4 Pass (95% req.) 10/24/94 12 El Camino Real STA 0+60 .' E.G. 135.3 5.6 99 4 Pass (95% req.) * Material for failed tests NOs. 7, 8, 9, and 10 was removed and replaced with aggregate base per the direction of the City inspector' E.G. =Finish Grade Accepted engineering and testing procedures were used for these tests. The above data are presented for information purposes only. In the absence of continuous observation by our personnel at the site, we cannot express an opinion as'to the adequacy of site preparation or overall site compaction. We do not undertake the guarantee of construction, nor do we relieve the contractor of his responsibility to produce a completed project conforming to the project plans and specifications. S , 75ML9-95.WRD Copyright 1995 Kleinfelder, Inc. S . 51-1791-00-013