HomeMy WebLinkAbout3391-6; SIDEWALK PROGRAM; HYDROLOGY AND HYDRAULICS REPORT; 1998-05-28B &0 SB&O, SB&O, INC. L5O Vea' 1967 - 1997 HYDROLOGY & HYDRAULICS REPORT I •. .. •; : I CITY OF CARLSBADT: I SIDEWALK PROGRAM. DESIGN PROJECT NO 33916r / - I Land. 40 Planning - . .._ . . ••r U / Prepared for CITY OF CARLSBAD' •- I . 2075 LAS PALMAS DRIVE. CARL5BADCALIFOR].JJA 92009 Civil - - •.. U Engineering - I • SB&O, INC I. . 3615 KEARNY VILLA ROAD, SUITE 201 •. . SAN DIEGO CALIFORNIA 92123 I Land • / . . (619) 560-114i:; • : Surveying • SB&O JOB NO. 53172.10 _•:•. . •.. •.. • .,. .- I I ALLEN L BUTCHER, RCE 47107 MAY28,19.98 .. • ••' •• REVISED JULY 28, 1998 3615 Kearny Villa Road, Suite 201•San Diego, California 92123•Phone (619)'560-1.141 Fax (619).560'8157 I &0. PROJECT DESCRIPTION ' I The City of Carlsbad Sidewalk Project No 3391-6 consists of adding sidewalk SB&O, INC improvements and related facilities at several locations throughout the City. •. I The sidewalk additions for Cannon Road will include street widening from Carlsbad Boulevard to El Arbol, as well as the installation of storm drain inlets I The drainage basin for the Cannon Road project consists of an established residential neighborhood. Drainage patterns are generally, south to north with extremely mild slopes I along the intersecting streets METHODOLOGY I In accordance with the County of San Diego Flood Control Department's Design and Procedures Manual, rational method hydrology was used to estimate run-off quantities I for a 100-year and 50-year design storms Soil characteristics were assumed to be Type "D" Land use coefficient "C" factors were based upon Appendix I Basin areas were determined using orth-topographic maps (see Exhibit A) and field reconnaissance I Rainfall intensities for 100-year frequency events of 6- and 24-hour durations were estimated from the County of San Diego isopluvial maps (See Appendix II) Adjusted I 6-hour intensities of 24 inches and 2:3 inches per hour were estimated for the 100- and 50-year events respectively. Times of concentration were calculated using the County of San Diego nomographs for urban watershed and the gutter and roadway discharge- velocity chart (See Appendices Ill and IV) Intensities for specific times of concentration were calculated from the County, of San Diego intensity-duration design chart (See I Appendix V) Capacity design of inlet structures was determined usmg the County of San Diego curb inlet capacity chart and formulae (See Appendices VI and VII) I I I . '['H',•.:',. I I SB&O INC.Sidewalk ProRram Design Project No 3391 6 Job No 53172 10 July 28, 1998 1 City of Carlsbad CA i. .: ..: . :.. H..HH,..* •.: :. -- . . , . - - • - - CITY OF CARLSBAD SIDEWALK PROJECT 3391-6 100 & 50 YEAR STORM COUNTY OF SAN DIEGO HYDRAULIC CALCULATIONS - CANNON ROAD C x A CUMM Ti Tc Tt Td I 0 PIPE VELOCITY FRICTION DESIGN LENGTH Cx A (MIN)-.(MIN) (MIN) (MIN) (Tc) (CFS) DIA (FPS) SLOPE (%) SLOPE (%) (FT) CARLBAD BLVD (E) 2.01 -2.01' 1-5:T .15 .7 04 16.1 3:3 6.6.,,' 18 2.1 :,0.08% 1.00%- 50 TO EXISTING STORM DRAIN CANNON ROAD (SW) 013 013 51 51 44 06 TOX-GUTTER LOS ROBLES ('N) 1 95 1 95 19 9 19 9 0..5. 204 2.8 5.5 18 3 1 0.27% 1.00% 91 TO CLEANOUT 4+9725 LOSROBLES(E) 092 092 128 128 01 129 37 34 18 19 0.1100%.00 17 TO CLEANOUT 4+9725 CLEANOUT TO CLEANOUT 2 87 19 9 1 2 211 2 8 8 1 18 4 6 0 59% 5 00% 320 EL ARBOL (W) 4.52 4.-52 186 18.6 0:1 18.7 2.'9 13.3 18 7.5 1 60% 1.00% 52 TO CLEANOUT 8+26.37'. CLEANOUT TOEXISTINLET 739 211 03 21.4...:.,2.7 200 24 64 078% 100% 110 CANNON ROAD(SE) 018 018 43 43 44 08 TO X-GUTTER & EXIST INLET'. I:. • •' • . . •• • . .. . •• . . ... • . •. . •• • ,.... ,•' • ... . '0 . •, .. . •. . . .• . .• . .• . . .• . . APPENDIX I Page lofi TABLE 2 RUNOFF COEFFICIENTS (RATION'L METHOD) DEVELOPED AREAS (URBAN) S - Coefficient, C Soil Group (1) Land Use A B C 0 I Residential Single Family 1+0 1+5 50 55 Multi-Units - 1+5 50 60 70 Mobile homes 45 50 55 65 I Rural (lots greater than 1/2 acre) 30 35 1+0 1+5 I Comercial(2) 8O0Impervious 70 75 80 85 Industrial (2) 80 85 90 95 905/1 Impervious I / NOTES: I Soil Group mars are available at the offices of the Department of Public Works (2)Where actual conditions deviate significantly from the tabulated impervious- I ness values of 80% or 90%, the values given for coefficient C, may be revised by multiplying 80% or, 90% by the ratio of actual imperviousness to the I be tabulated imperviousness However, in no case shall the final coefficient less than 0 50 For example Consider commercial property. on 0 soil group Actual imperviousness 500/. I Tabulated imperviousness 800% Revised C', =50 x 0 85 = 0 53 I 80 I I q. SB&O INC Sidewalk Program Design Project No 3391 6 Job No 53172 10 July 28 1998 City of Carlsbad CA COUNTYOF SAN DIEGO DEPARTMENT OF SANITATION &ONTROL : 100'YEA 6-1U PECI re T 4T 20 IS0P1UV1A14F 100-YEAR 6-I10U C PflECIPiTATI3 IN , EThS 0 L H ICU .451 35 9 )) ) • SA F. -. M(CCA Li 30 'WE TE SAN CL W.E 30 ..35 151 (1AN' I • • • 25 Escm 1. ms t~3O • • .•• EL MAR 7•Y/ ç'50 ç 5. ____ _____ _____ _____ 2 'S2,c7\ S'r -- - P d 20' rep: by U.S. DEPARTMEN F OF COMMERCE -ci C---'---- NATOAL OCWC AND AT osPttRiC ADt r4STRAT1ON .- V(( ,/ Y"U STUDIES BRANCH. OFFICE OF U UROLOGY NATIONAl. WEATHER SERVICE'.SA \5) / '. -' - 1 30 - - — 30'_ 1 20 ,j35 0 - Ic' 1160 I APPENDIX II SB Page 2of2 I 1U I SB&O, INC. LiJ Uj i f4' cz I ' i ij cm CO CIA Lzi r' . C:n . ' j '•f cm cm 0 ta 2<, LU S S . S .. £ — •.ti_i . S S 55 CDP C> UN UN cn • : •, S S • zc_) S S • • • S S • I S S • S •• S • S S S 1-14 I I SB&O. INC. . . •• Sidewalk Program Design Project No. 3391-6 U • Job No. 53172.10, July 28. 1998 •• 5 5 5 City of Carlsbad, Cl APPENDIX IV Page 1 of 1 I 0 .201_HH U ..... .•.. (8 : 14 10-----------..L.... - 0 .• -. - - •- . / . 3' • - U:.. . .- Lq 14 to 02 GAS . I I•.,i' . - 04— L : • . ... . .....,__ I '1 I I IJLIII I I II. . 2 . .4 5 6 7 8 9 10 20 30 .50 I ... . . .. DISCHARGE (C E S.) w : EXAMPLE: .. . . . . Given' Q= 10 Sra.5% . . Chart gives'. Depth 0.4, Velocity 4.4 tps. w. - I DEPARTMENT SAN DIEGO COUNTY OF SPECIAL DISTRICT SERVICES GUTTER AND ROADWAY DISCHARGE-VELOCITY CHART' 0 DESIGN MANUAL .. . . .. . . APPROVED ' DATE iz/3d;9 APPENDIX 'X-D .IV-A-13. . . . . . I. • VB&O INC .0 . Sidewalk Program Design Project No. 3391-6 I Job No 5317210 July. 28. 1998 City of Carlsbad CA • Directions for Application`.' • •-• 1) From precipitation naps determine 6 hr and 24hr. amounts for the selected frequency. - I These maps are printed in the County . Hydroloq' t4anua1(10, .50 And 100 yr. maps. included in U • . Design and Procedure Manual) 2) AdJuW6 ,hri precipitation (if, necessary) so that itiswlthln the range of 45% to 65%,of. the 24 hr.preciPtation. (Not applicable . -.. to Desert) - • 'S.. • . -• • •• • . . S. 3). Plot 6 hr..preclpitátionôn. the rigt side-' • •- . -. • • • of the chart..- ••. . •, - •1- -, • • S - •• .• S •• • . - +-- 4) Draw a line through the point parallel to the niotted - lines. . .. . ,• •• ' - • - . 5) This line is the •intensity-durationcurve for 6.0 the location, being analyzed. . . .5 •. . • e i 0'' •..... • .' .. ...... • 4S.,-%- 4.0 . Application Form:. •. . . . . . .. . ' 0) Selected Frequency 3Øin. -- . -- •• . 25 1) pSn2,(6in:p244,p,*pSE,5%* 24 2.0 2) Adjusted *6 2 in 15 3) tc ID mm ) i 41S In/hr - 1 0 *Not Applicable to Desert Region S. .. . -S • • ,. S * • S - • . . 'S • '• . . . .• ..- • .,. S , , - - •4 . _..s F II!AIUOfHU] _____________________________________ I I 'U ; II 111111' Ii'IiiI !IuhJIIh1IIIII011h!I !IIIOhi1IiIllhIllhIHhtIIBI1IIIIIiI1 I El Cno CIO ll 'H _111...jRRi NH NNW: I'IIRIIuIIIUhIlU 0 UIU1lUU1PIU1J fill liii ..u,e,,IutI,IIIu1 IIII N muh fPJ IIIlI!I!lIIi IIiIIIII1llhi J" IIII.i.iuI$HuI H"JIii iIIiU$IIIlUUuIlIIhuIIIlIIIIl 11111 lung • . - . • . # S A 'A ' AlAPPENDIX •. M • . . .' .. . . •••••• •• . . .5 . — '. '', '•.. • .5' -.5 • . •,. 'S ... . . -• '.5, . 0 -A717, __