Loading...
HomeMy WebLinkAbout3479; PALOMAR AIRPORT 12" WATER PIPELINE; LABORATORY TEST REPORT NO.1; 2004-08-16347c1 I \ I ( ) 826 City of Carlsbad August 16, 2004 1635 Faraday Avenue Contract No. 77298 Carlsbad, CA 92008 Attention: William Lopez Subject: Laboratory Test Report No. 1 Project: Carlsbad-Palomar Airport Rd. New 12" Water Pipeline Lago Vista Road Carlsbad, CA Dear Mr. Lopez: RECEIVED LAUG 20 2004 CITY OF CARLSBAD DEPARTMENT - ('%t& I UIVISION Submitted herewith are the results of laboratory testing performed on an on-site material sample proposed for use as backfill for the new water line at the above referenced project site. The sample location and the respective classification is presented below: Sample I Date I Location Classification No. I Sampled I I (USCS) 1 8/9/2004 On-site: Stockpile CL Maximum density and optimum moisture values determined in accordance with the ASTM D- 1557-91 laboratory test standard for subsequent compaction monitoring purposes were as follows: Sample Classification Max Dry Optimum No. (USCS) Density Moisture (pcf) % 1 CL 115.0 15.0 It should be noted that test results contained herein are for geotechnical purposes and do not reflect compliance with United States Environmental Protection Agency and State of California regulations regarding environmental concerns. Testing Engineers - U.S. Laboratories 7895 Convoy Court, Suite 18 • San Diego, California 92111 • (858) 715-5800 • Fax: (858) 7 15-58 10 Offices Nationwide The laboratory test results indicate compliance with 'the project plans and specifications excluding any exceptions, as noted under individual tables These laboratory tests were performed in accordance with generally accepted standards and do not constitute engineering opinions or project control It is the responsibility of the contractor to schedule retests or reinspections of any areas that do not meet project specifications as a result of the attached information TE-USL neither controls nor supervises the work at the site We are not responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the work on schedule or carry it out m accordance with the project plans, specifications, and all applicable codes. •. • Respectfully submitted, • • • TESTING ENGINEERS U.S. Labs, Inc Victor H Robles Van W Olin, GE 2578 Staff Engineering Assistant Geotechmcal Department Manager cSo • • ••