Loading...
HomeMy WebLinkAbout3551; POINSETTIA LANE OVERHEAD WIDENING; SAND CONE DENSITY TESTS; 2002-03-25TESTING ENGINEERS - SAN DIEGO 7895 CONVOY COURT, SUITE 18 .' SAN DIEGO, CA 92111 ' R CIL EPORT OF SAND CONE DENSITY TESTS A.S.T.M. D1556 TEST RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS Wet Soil, Lbs 2 Moisture WET SOIL / OO Determinations DRY SOIL DIFFERENCE % MOISTURE 4 Unit Wt. of Sand, Lbs. / ft3 Sand in Apparatus Before Test, Lbs. c) / .) b 6 Sand in Apparatus After Test, Lbs. Sand in Hole + Cone, (5) - (6) Vol. of Hole + Cone, (7) - (4) o Vol. of Cone 10 Vol. of Hole (8) - (9) oel Wet Density (1) - (10) 12 Dry Density ((11) - (Moist. + 100)) x 100 ." I .)3 : 13 Standard Density 14 % of Standard Density ((12) + (13)) x 100 15 Optimum Moisture 16 % Density Required Cl ...ç' 17 mpIies DoesNot Comply Ve TEST RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS Test Numbers L~Tlst MD Curve No. TEST LOCATIONS , 'PAj til m'ft- /,cJ (ef)i.' 14t'e waf bkvt,4CJ E)( - CI.5 ,Jj.- h PROJECb ---t'i L, u\ L WORK REQUESTED BY PROJECT NUMBER 1-:)Uo'j- ti4 TEST DATE/TECHNICIAN, f3 ..- 1.. I NOT?I(SAURE) DATE o z AT P1 BYP HONE 5T SITE o THIS REPORT DOES NOT RELIEVE111E CONTRACTOR OF HIS RESPONSIBLITYTO BUILD PER THE PLANS, SPECIFICATIONS AND ALL APPLICABLE CODES WHITE -Office CANARY Field Technician PINK -Contractor Fomll01 TESTING ENGINEERS - SAN DIEGO 7895 CONVOY COURT, SUITE 18 SAN DIEGO, CA 92111 SAND CONE REPORT OF DENSITY TESTS A.S.T.M. D1556 TEST RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS Wet Soil, Lbs 2 Moisture WET SOIL - — Determinations. DRY SOIL DIFFERENCE %MOISTURE Unit Wt. of Sand, Lbs. / ft3 .' . Sand in Apparatus /... Before Test, Lbs. 6 Sand in Apparatus - After Test, Lbs. Sand in Hole + Cone, (5) - (6) Vol. of Hole + Cone, (7) .'- (4) Vol. of Cone . — 10 Vol. of Hole (8)-(9) ia 11 Wet Density (1) - (10) 12 Dry Density ((11) - (Moist. +100)) x 100 Standard Density .. - 14 % of Standard Density ((12) -- (13)) x 100 15 Optimum Moisture - - 16 %. Density Required - - 17 C~mp lies Does Not Comply ler~ TEST . RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS RESULTS Test Numbers Jar Test MD Curve No. TEST AOL LOCATIONS , c ,i,- ,, çj ~+ z / — 2vc' PROJECT WORK REQUESTED BY PROJECT NUMBER IM I7A'J?. AT PROJECT SITE BYPHONE THIS REP ORT REPORT DOES NOT RELIEVEr1E CONTRACTOR OF HIS RESPONSIBLITYTO BUILD PER THE PLANS, SPECIFICATIONS AND ALL APPLICABLE CODES WHITE Office CANARY -Field Technician PiNK . Conlractor Form#015