Loading...
HomeMy WebLinkAbout3607; FARADAY AVENUE AND EL CAMINO REAL; LABORATORY TEST REPORT NO.1; 2006-10-043 9O1 0 U v4r City of Carlsbad - Inspection Division 5950 El Camino Real Carlsbad, CA 92008 Attention: Bill Lopez Subject: Laboratory Test Report No. 1 Project: Faraday Avenue Improvements Faraday Avenue and El Camino Real Carlsbad, CA Dear Mr. Lopez, October 4, 2006 Contract No.: 148015 Submitted herewith are the results of laboratory testing performed on an on-site material sample being used as fill at the above referenced project site. It should be noted that test results contained herein are for geotechnical purposes and do not reflect compliance with United States Environmental Protection Agency and State of California regulations regarding environmental concerns. These laboratory tests were performed in accordance with generally accepted standards and do not constitute engineering opinions or project control. It is the responsibility of the contractor to schedule retests or re-inspections of any areas that do not meet project specifications as a result of the attached information. TE-USL neither controls nor supervises the work at the site. We are not responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the work on schedule or carry it out in accordance with the project plans, specifications, and all applicable codes. Respectfully submitted, TESTING ENGINEERS U.S. Labs, inc. Nick Tracy, EIT Staff Engineer NI/V0 Distribution: (I) Addressee (I) Field File 0~ W. Olin, GE 2578 Geotechnical Department Manager Testing Engineers San Diego, Inc. A Bureau Veritas Company Main: (858) 715-5800 7895 Convoy Court, Suite 18 Fax (858 715-5810 San Diego, CA 92111 www.us.bureauveritas.com Particle Size Distribution Report ci IEL SAND . . % SILT % CLAY 68.6 100 z 50 - w 3C i: 500 % 90------- - I - -- 80 --H— 70----- - - 0 LIJ 4C------- - - —i----- I - - 2C----H— .. 100 COBBLES % 0.0. SIEVE SIZE PERCENT FINER SPEC.* PERCENT PASS? (X'=' NO). #4 ''100.0 #8 77.3 #16 . 64.2 #30 54.8 #50 45.8 #100 37.4 #200 31.4 Soil Description Tan Silty sand Atterbèrq Limits PL= • LL= -. P1= .. Coefficients 'D85= 3.07 D6b= 0.881 b50= 0.415 D30= • • 015= = . • D1= Cu- • C • Classification •" USCS=SM AASHTO= • Remarks 1829 - (no specification provided) SàmpleNo.: 1829 Source of Sample: Date: 9/28/06 Location.:: Faraday Ave@ El Camino Real, Sample #1........ ., Elev./Depth: .. : Client: City of Carlsbad Project El Camino Real & Faraday Improvements TESTING ENGINEERS - ProjectNo -148015 . Plate . • . COMPACTION TEST REPORT burveNo.: I Project No.: '148615 .. . - .. . Date: 9/28/0.6 Project: El Camino Real & Faraday Improvements : Location:. Faraday Ave @. El.:Camino Real; Sample #1. EIev./Deth: . Remarks: 1829 . . MATERIAL DESCRIPTION Description: Tan Silty sand . Classifications - USCS: SM AASHTO: Nat. Moist. = . . . ' Sp.G.= 2.50 Liquid Limit = . . . . Plasticity Index %'> No.4 = 0.0 % •''. . .', •' ' % < No.200 = 31.4% TESTRESULTS 140 = ii 126—" 90 Maximum [Optimum dry moisture density = 106 pcf = 18.5 %' Test specification ASTM D.155791 Procedure A Modified. f .. ... . 100% SATURATION CURVES FOR SPEC. GRAV. EQUAL TO: 2.7 IN. J\ 1IIIIiiIIr 28 = = = \jj — 1 13C--- III iic _.__.______., • 70' .80—-——--——-'—-- " .. 0 . 5. 10 15 • 20 . 25 30 . 35. 40 Water'cortent., % TFSTIW( FN(INFFR_• • Plate .•,, ..,.' , . .- . .. •.! Testing Engineers - San Diego, Inc. Established 1946 R-VALUE TEST RESULTS TESD PROJECT NO.3.81067-1490 15.60 CLIENT City, of Carlsbad PROJECT NAME El Camino teal & Faraday Improvements CLIENTS PROJECT OR WORK ORDER NUMBER N/A SAMPLE LOCATION Faraday Ave @ El Camino Real SAMPLE DESCRIPTION Olive Yellowish Brown Clayey Silt SAMPLED BY TESD DATE RECEIVED 9/28/2006 LAB NUMBER 1829 LABORATORY TEST DATA 1 2 3 Compactor Pressure (psi) Moisture at Compaction (%) Compacted Density (pcf) 90 130 200 24.8 23:8 22.8 98.5 99.9 101.5 Cover Thickness! by Expansion Pressure (feet) Cover Thickness by Stabilometer (feet) Exudation Pressure (psi) ; . R-Value (corrected) 0.27 0.50 0:97 1.22 1.15 1.04 i110 240 370 ,1.5 -. 20 28 EXPANSIONPRESSURE - 2.0 LU >-I- 15 S raw wO10 0.5 U) • 0:0 0.0 0.2 0.4 . 0.6 0.8 . fo 1.2 14 1.6 1.8. 2.0 COVER BY EXPANSION PRESSURE. (feet) EXUDATION PRESSURE Ui 100- 80 60 LU 40 LU 20 It C) 0 0 50 100 1150 . 200 250 300 350 400 EXUDATION PRESSURE (psi). ASSUMED TRAFFIC INDEX 45 ENGINEER VAN OLIN, CIVIL ENGINEER R VALUE BY EXUDATION 24 R VALUE BY EXPANSION N/A Reviewed By R-VALUE AT EQUILIBRIUM. ,. .. • 24 • • NICK TRACY. - . . . . . STAFF ENGINEER ...•. . ..-.-, . . .•. 0 •: . . . • S EXPANSION INDEX TEST Date: October 4, 2006 Job No: 38106-148015.00 Client: CITY OF CARLSBAD Address: 5950 El Camino Real Carlsbad, CA 92008 Report No: 9534 ENGINEER: VAN OLIN, GEOTECI-[NICAL ENGINEER REVIEWED BY:NICK TRACY. STAFF ENGINEER PROJECT: EL CAM[NO REAL & FARADY IMPROVEMENTS SAMPLED BY: TESD DATE: 9/28/06 SUBMITTED BY: TESD DATE: /28/06 PROCEDURE: ASTM D4829 Lab Number 1829 Sample Identification / Location Faraday Ave @ El Camino Real Initial Moisture Content, % 16.7 Final Moisture Content, % 27.5 Dry Density, pcf 94.8 Saturation, % 58.2 Expansion Index 67 Potential Expansion Medium COMMENTS: