Loading...
HomeMy WebLinkAbout3607; FARADAY AVENUE AND EL CAMINO REAL; LABORATORY TEST REPORT NO.3; 2007-01-31a. 3(eoi 1828 Cit.y..o::crlsbadJnspection. Diy.ision . 5950 El Carninó Real Carlsbad, .CA 920.0.8. Attention: Bill Lopez Subject: Laboratory Test Report No. 3 Project: Faraday Avenue Improvements Faraday Avenue and El Cam mo Real Carlsbad, CA Dear Mr. Lopez, .,. . :Januàty.73.1:20O Contract No.: 148015 Submitted herewith are the results of laboratory testing performed on an import material sample being used as fill at the above referenced project site. Note that the particle size distribution is marginally non-compliant with Caltrans Class II specifications. It should be noted that test results contained herein are for geotechnical purposes and do not reflect compliance with United States Environmental Protection Agency and State of California regulations regarding environmental concerns. . ........,r.;........ Testing and subsequent approval of any import source applies only to the sampleprovided It is the contractor's responsibility to import materials that are consistent with the sample tested. In any case, final approval is contingent upon the actual materials as hauled to the site. These laboratory tests were performed in accordance with generally accepted standards and do not constitute engineering opinions or project control. It is the responsibility of the contractor to schedule retests or re-inspections of any areas that do not meet project specifications as a result olthe attached information. TE-USL neither controls nor supervises the work at the site. We are not responsible for errors and omissions of the contractor, nor for the contractor's failure to keep the work on schedule or carry it out in accordance with the project plans, specifications, and all applicable codes. Respectfully submitted, TESTING ENG)RS U.S. Labs, Inc. l &J i a Nick Tracy, El Staff Engineer NT/VC) Distribution: (I) Addressee I) Field File W. Olin, GE 2578 Geotechnical Department Manager Testing Engineers San Diego, Inc. A Bureau Veriras Company Main: (858) 715-5800 7895 Convoy Court, Suite 18 Fac (858 715-5810 San Diego, CA 92111 www.us.bureauveritas.com 100 90 80 70 W 60 z IL I—z 50 W Ix W: 40 a- 30 20 10 0 % COBBLES % GRAVEL % SAND % SILT I % CLAY 00 403 475 122 SIEVE S!ZE, PERCENT FINER. SPEC.* PERCENT PASS? (X=NO) un. 100.0 100-100 3/4 in. 94.0 90 -100 1/2 in. 73.9 3/8 in. 67.6 #4 59.7 35-55 X #8 454. #16 32.9 #30 24.1 10-30 #50 18.2 #100 14.6 #200 12.2 2-9 X Material Description Gray Silty sand with gravel Atterberci Limits • PL=. LL= . P1= Coeffiëieflts D55= 15:8 D604:84- D50=. 2.91 D30= 0.968 D= 0.165 D1 O= CU cc= Classification USCS= SM AASHTO= Remarks 2502 - Caltrans Class 2 Base - - Sample No.: 2502 Source of Sample: - Date: 1/23/07 Lócätion: Easbound outside lane,-Faraday adj. curb&gutte, STA 13±07,;Saniple #4 Elev./Depth: Client City of Carlsbad Project El Camino Real & Faraday Improvements TESTING ENGINEERS - . Project No: 148015 Fjute- -- ••,i•• • COMPACTION.EST REPORT Curve No.:3 PàjctNó.: 148015 . bate: 1/23/07. Project: El Camino Real & Faraday Improvements _ Location: Easb6und outside lane, Faraday adj. ciirb&guer, STA 13+07, Sample #4 Retharks: 2502 MATERIAL DESCRIPTION Description: Gray Silty sand with gravel Classifications - . .. USCS: SM AASHTO: Nat. Moist. .= S'p.G. = 2.66 Liquid Limit = . PIasicity. lAdex = %>3/4jñ.= 6.0% . %<N0200= 12.2% TEST RESULTS Maximum dry density = 145 pcf Optimum moisture = 6 % . .. 150 = = = . .Test specification: - - ASTM D698-91 Procedure C Standard 140--. ---. -- S 'S "IJIiI.III\ . . 130- -. - \, . 100% SATURATION CURVES . FOR SPEC. GRAy. EQUAL TO: 2.8 2.7 11111 S -- 1001 -- 90 -- - 50 5 0 5 0 3540 Water content, % Figure - TESTING ENGINEERS