Loading...
HomeMy WebLinkAbout3618; PARKING CARLSBAD BLVD AT PONTO BEACH; PRELIMINARY GEOTECHNICAL INVESTIGATION; 1999-04-151 it PETRA COSTA MESA • SAN DIEGO. TEMECULA • LOS ANGELES 110 RECEIVED LINTVEDT. McCOLL & ASSOC. APR 16 1999 April 15, 1999 J.N. 177-99 LINT VEDT, McCOLL & ASSOCIATES 3737 Camino Del Rio South, Suite 200 San Diego, California 92108-4008 Attention: Mr. Kent Madsen Subject: Preliminary Geotechnical Investigation, Proposed Ponto Beach Parking, West Carlsbad Boulevard, Carlsbad, California. Gentlemen: We are pleased to submit herewith our Preliminary Geotechnical Investigation report for the proposed Ponto Beach Parking on West Carlsbad Boulevard in Carlsbad, California. This report presents the results of our field and laboratory investigation, and conclusions and recommendations concerning the geotechnical design aspects of the proposed parking area. LOCATION AND SITE DESCRIPTION The proposed Ponto Beach parking area is located adjacent to, and west of the south- bound lane of West Carlsbad Boulevard from approximately station 159+00 to station 170+00. The project site extends basically from the north end of the bridge over the Batiquitos Lagoon outlet, north to the lifeguard station parking area and is bounded on the west by a narrow strip of beach and the Pacific Ocean. An asphalt-surfaced area comprising a traffic run-on lane extends from the lifeguard parking area at the north end of the site extends approximately 300 feet southerly onto the southbound lane of West Carlsbad Boulevard. The remainder of the site is presently being used as a foot/bicycle path. Painted ex-power poles lain on their sides separate the path area from the traffic and emergency parking lanes. PEIRA GEOTECHNICAL INC. 12225 World Trade Dr., Ste. 0 San Diego, CA 92128 Tel: (619) 485-5530 Fax: (619)485-8215 LINTVEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 Page 2 Topographically, the southern end of the site is at approximately the same elevation as the adjacent sandy beach area with a gradual increase in elevation towards the north such that at the northern end of the project there is an approximately twelve-foot high natural slope from the foot-path elevation to the sandy beach. The sandy beach is about 100 feet wide and about three to eight feet above mean sea level. It was observed that fill materials, which contain various asphaltic and portland cement concrete chunks (construction-type debris), had been end-dumped to extend the width of the foot/bike path along some portions of the slope that descends to the sandy beach. Vegetation consisting of grasses, weeds, and bushes, were observed along the edge of the path and across the slope. PROPOSED CONSTRUCTION AND GRADING It is our understanding that development will consist of the construction of an asphaltic concrete pavement parking lane along the west side of Carlsbad Boulevard in the area currently occupied by an existing emergency lane and foot/bicycle path. Based on existing elevations on the site, it is anticipated that only minor grading would be required to' generate the necessary pavement section. However, depending upon actual design,,the existing slope may be extended to the west to provide appropriate width. Recommendations for site grading and for the design of the asphaltic concrete pavement are presented in the "Conclusions and Recommendations" section of this report. FIELD INVESTIGATION A limited subsurface investigation of the site was conducted on March 19, 1999 by our personnel consisting of the excavation of 2 hand-dug test pits and the geologic logging of the natural slope adjacent to hand pit number 1. Logging and selective sampling Of LINTVEDT, McCOLL & ASSOCIATES April 15,1999.- J.N. 177-99 Page 3 the test pits were performed by our engineering geologist. Approximate locations of these hand pits are shown of the attached plot plan, Plate No. 1 in Appendix A. The exploratory pits were carefully logged when excavated and the logs are presented in Appendix A. The log of the natural slope is included as test pit number HP-1A. Soil materials were classified and logged in accordance with the Unified Soil Classification system. A written textural description, the wet color, the apparent moisture, and the density or consistency is provided on the log. The density of granular soils is given as either very loose, loose, medium dense, dense, or very dense. Disturbed and undisturbed samples of typical and representative soils were obtained and returned to the, laboratory for testing. LABORATORY TESTING In-place moisture content and unit dry density were determined for a sample of soil material from HP-2. R-Value testing was done on a bulk samples of different material types from the two hand-pits. Test data are summarized in Appendix B. An evaluation of the data is reflected throughout the "Conclusions and Recommendations" section of this report. FINDINGS In general the site was found to be underlain by a thin layer of artificial fill material over bedrock materials consisting of Terrace deposits. The fill material, which appears to have been placed during the construction of Carlsbad Boulevard, consists of silty sands, clayey sands, sands and gravely sands which vary in consistency from loose to dense. Bedrock materials encountered in, the exploratory pits and exposed in the face of the western slope leading to the beach, consist of silty sandstone and clayey sandstone deposits which are moderately hard to hard. ot LINTVEDT, McCOLL &ASSOCIATES April 15, 1999 J.N. 177-99 Page 4 CONCLUSIONS AND RECOMMENDATIONS General From a soils engineering and engineering geologic point of view, the site is considered suitable for the proposed development provided the following conclusions and recommendations are incorporated into the design criteria and project specifications. The major concern when developing the site is the presence, of the artificial fill material and the potential widening of the area in such a manner as in infringe upon the beach area. The artificial fill is anticipated to be removed in its entirety during excavation to the subgrade elevation of the pavement section. However, if existing fill material exists after this operation, complete removal and recompaction of the soils will be required. Grading Plan Review The following "Earthwork" recommendations are based on a review of the preliminary site plans prepared by Lintvedt, Mccoll & Associates which were supplied to our office and on an anticipated grading concept. Therefore, when the finalized grading plan has been prepared, it should be reviewed by the project geotèchnical consultant with respect to the geotechnical aspects of the planned site development. Depending on the results of the grading plan review, revised and/or additional recommendations should be prepared by the geotechnical consultant as deemed appropriate. General Earthwork and Grading Specifications All earthwork and grading should be performed in accordance with the applicable provisions of the Grading Code of the City of Carlsbad, in accordance with the following recommendations prepared by this firm, and our Standard Grading Specifications presented in Appendix C. LINT VEDT, McCOLL & ASSOCIATES April 15,1999 J.N. 177-99 Page 5 Site Preparation All weeds, grasses, brush, shrubs, and similar vegetation, trash and construction-type debris should be stripped and removed from the site in those areas to be graded, prior to any grading. Remaining roots from vegetation exposed during grading may require hand labor for proper removal. Grading should begin with the complete removal of the existing artificial fill material below the proposed subgrade elevations and the replacement of the soils as uniformly compacted fill material at slight above optimum moisture contents. In areas to receive fill after removal of existing fill and cuts of less that one foot, the near-surface soils should be scarified to a depth of approximately twelve inches, moisture conditioned to near-optimum moisture contents by addition of water Or drying back, and recompacting the soils to at least 90 percent of their maximum dry densities. If pockets of loose, dry weathered bedrock materials are encountered which extend to depths in excess of twelve inches,,the material should be removed in its entirety and replaced as properly compacted fill material. Geotechnical Observations Exposed bottom surfaces in any removal area should be observed and approved by the project geotechnical consultant ,prior to placing any fill to achieve proposed subgrade elevation. No fills should be placed without prior approval from the geotechnical consultant The project geotechnical consultant should also be present on-site during grading operations to verify proper placement and adequate compaction of fill, as well as to verify compliance with the other recommendations presented herein. I LINTVEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 Page-6 I Excavation Characteristics The on-site excavated materials are anticipated to consists of fill and bedrock material I of various compositions of silty sands, clayey sands, sands and gravelly sands. It is anticipated that the on-site soils will be relatively easy to excavate with normal I construction equipment.. I Ground Preparation Fill Areas Existing loose surficial soils or existing artificial fill in areas to receive fill material I should be removed to underlying natural ground materials. Exposed surfaces of the removals or areas of asphaltic concrete pavement removal which expose natural I ground materials, should be scarified to a depth of approximately six inches, watered or air dried as necessary to achieve near optimum moisture conditions, and then I recompacted in to 90 place a minimum relative compaction of percent. I Fill Placement - _Conventional I On-site excavated materials, maybe used as compacted material or backfill. All fill should be placed in lifts not exceeding eight inches in thickness, watered as necessary I to, achieve near-optimum moisture conditions, and then compacted in-place to a minimum relative compaction. of 90 percent. Each fill lift should be treated in a I similar manner. Subsequent hfts should not be placed until the preceding lift has been approved by the project geotechnical consultant The laboratory maximum dry density and optimum moisture content for each change I in soil type should be determined in accordance with Test Method ASTM D 1557-91. I I I. I LINT VEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 S Page I Fill Slope Constructiàfl Fill keys having a minimum width of 15 feet or 1.5 times the width of the excavation I and compaction equipment should be provided at the base of all fill slopes. The fill keys should extend through the loose surficial soils and excavated at least 2 feet into dense, competent ancient alluvium or bedrock, and tilted slightly into slope. I The finish surfaces of all fill slopes should be compacted to a minimum relative density of 90 percent. This surface compaction should be achieved by overfilling the I slopes during construction, backrolling to overfilled slope surfaces at vertical intervals not exceeding 3 to 4 feet, and then trimming the slopes back to the compacted inner I core. I Benching Compacted fills placed on natural slope surfaces inclining at 5:1 or greater (horizontal I to vertical), should be placed On a series of level benches excavated into competent native soils or bedrock. Benches should be at least 1.5 times the widths of the I excavation and compaction equipment, and provided at vertical elevations of 3 to 4 - feet. I PRELIMINARY PAVEMENT SECTION RECOMMENDATIONS Based on an assigned traffic index of.8.5 for a major arterial by the City of Carlsbad, I . and the Resistance Value (R-Value) results, preliminary pavement section recommendations are presented hereafter. 5.0 Inches of Asphaltic Concrete Pavement on. 6.0 Inches of Class II aggregate base on 12.0 Inches of compacted subgrade I LD1TVEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 Page 8 Subgrade soils shoàld be properly compacted, smooth, and non-yielding prior to pavement construction. The subgradc soils should be compacted to at least 95 percent of ASTM D1557-91. Any areas of sift or spongy soils should be removed and replaced with compacted fill. Class H aggregate base materials should conform to Section 200-2 of the Standard Specifications for Public Works Construction (Greenbook), or California Standard Specifications. The materials should be brought to a near optimum moisture then compacted to at least 95 percent of ASTM D1557-91. Asphaltic concrete materials and construction should conform to Section 203 of the "Greenbook". Near the completion of grading, soils being used at or within the upper three feet of the proposed subgrade elevation, should be reviewed to determine if additional R-value testing may be appropriate. INVESTIGATION LIMITATIONS This report is based on the proposed project and geotechnical data as described herein. The materials encountered on the project site, described in other literature, and utilized in our laboratory investigation are believed representative of the total project area,. and the conclusions and recommendations contained in this report are presented on that basis. However, soils can vary in characteristics between points of exploration, both laterally and vertically, and those variations could effect the conclusions and recommendations contained herein. As such, observation and testing by a geotechnical consultant during the construction phase of the project are essential to confirming the basis of this report. To provide the greatest degree of continuity between the design and construction phases, consideration should be given to retaining Petra Geotechnical, Inc. for construction services. LINTVEDT, McCOLL & ASSOCIATES S April 15, 1999 J.N. 177799 Page This report has been prepared consistent with that level of care being provided by other professionals providing similar services at the same locale and in the same time period. The contents of this report are professional Opinions and as such, are not to be considered a guaranty or warranty. This report should be reviewed and updated after a period of one year or project concept changes from that described herein. Respectfully submitted, S PETRA GEOTECHNlCAIG: (4 k. S. 042204 Ronald SHalbert xp Mar. ii000 j)2)Roy J. Rushing' OF c t Senior Associate En ]p Senior Associate Geologist R.C.E. 42204 or CA R.E.G 1.080 Distribution: (5) Submitted cc: c:\myfiles\I999\100\177-99.pgeoinv t Run-On Traffic j Approximate Stations CD LO Southbound Travel Lane CU North Carlsbad Blvd. CD -joot/bicyle Path Cr HP-1 HP-2 Emergency Parking Lane! CU DRAWING NOT TO SCALE TEST PIT LOG Project: Ponto Beach Parking Test Pit No.: HP-1 Location: Carlsbad Blvd. at Ave. Encinas Elevation: 24 Job No.: 177-99 Client: Lintvedt, McColl &Assoc. Date: 3/19/99 Method: Hand Dug Driving Weight: Logged By: RJR Depth (Feet) Lith- ology Material Description a e r Samples - Laboratory Tests Blows Per Foot C 0 e B k u Content Moisture (%) Dry Density (pcf) Other Lab Tests FTh.E ELL Silty Sand (SM): Dark brown; dry to slightly moist; medium • dense to dense; 1-2" layer of sand and gravel on surface; :...: trash and debris (glass, plastic bag, paper; occasional cobbles toO.65ft. - - @0.65 Feet:Moderate brown; dry; medium dense. Sand (SP): Gray; dry to slightly moist; loose to medium : R : dense with depth. - RIDROK Silty Sandstone (SM): Light to reddish brown; dry; hard. Total Depth = 1.8 Feet Slight Caving from 1.1 to 1.4 Feet No Ground Water PLATE A-i Petra Geotechnical, Inc. TEST PIT LOG Project: Ponto Beach Parking Test Pit No.: BF-1A Location: Carlsbad Blvd. at Ave. Encinas Elevation: Job No.: 177-99 Client: Lintvedt, McColl & Assoc. Date: 3/19/99 Method: Exposed Slope Driving Weight: Logged By: RJR Depth (Feet) Lith- ology Material Description a t r Samples - Laboratory Tests Blows Per Foot C e B k Moisture Content (%) Dry Density (pct) Other Lab Tests 2 __, ---.-'--, I-, - 7 - —8—:-''-- -9.-- H FILL See descriptions in HP-1 -- BEDROCK Silty Sandctone See description mflP4 Clayey Sandstone: White to light grey; dry; moderately hard. Silty Sandstone: Moderate brown; dry, moderately hard to hard; with gravel and cobbles. . - * - -- - - * - * -- -- -- Continued Next Page PLATE A-2 Petra Geotechnical, Inc. it TEST PIT LOG Project: Ponto Beach Parking Test Pit No.: HP-1A Location: Carlsbad Blvd. at Ave. Enemas Elevation: Job No.: 177-99 Client: Lintvedt, McColl & Assoc. Date: 3/19/99 Method: . Exposed Slope Driving Weight: Logged By: RJR Samples - Laboratory Tests Blows C B Moisture Dry Other Material Description a Depth Lith- Per Content Density Lab (Feet) ology r Foot e k (%) (pct) Tests Silty Sandstone (cont.) _11_.-•'-:-- ii 12 Exposed Slope Height = 12+/-Feet PLATE A-3 Pétra Geótechnical, Inc. - TEST PIT LOG Project: Ponto Beach Parking - Test Pit No.: HP-2 Location: Carlsbad Blvd. at Ave. Encinas Elevation: 16 Job No.: 177-99 Client: Lintvedt, McColl & Assoc. Date: 3/19/99 Method: Hand Dug - Driving Weight: Logged By: RJR Samples - Laboratory Tests Blows C B Moisture Dry Other Material Description a Depth Lith e Per 0 u Content Density Lab (Feet) ology r Foot e k (%) (pcf) Tests FIIJ :JJ4 Silty Sand (SM/SP): Light Brown to gray; dry; loose. @0.2 Feet: Dark brown; slightly moist; dense. -. Asphaltic Concrete: Dark brown to black; dense; petroleum 1 - 9.2 125.1 aroma. Clayey slightly moist; medium dense; trace to some gravel. :::: R Asphaltic Concrete- Dark brown to black; dense; petroleum - 2 - aroma. Silty Sand (SM): Dark reddish brown; moist; medium dense to dense. NATURAL GROUND Gravelly Sand (SP/GP): Light to moderate brown; slightly moist; loose to medium dense. Total Depth = 2.3 Feet Slight Caving from 1.4 Feet No Ground Water PLATE A-4 Petra Geotechnical, Inc. L I ......................................................000................. .uu..auuuuuuu.uuuu.uu.uuuu.u.u.uu.u..u..u.....flfl.........fl......fl..fl... ••UU••••••USUUUUU•••UU••U••U•UU•U••••U•••••NU.U.flM.OSMOOUN.NUU ........flu.u.e.u...u...............u.ueal........flfl...................... u......u.....usa...t.n.su.......uflfl.s........fl..................flfl... ...u...u.........fl.......u..u.........fl.N....l......................U..... u..u.uu.........u...uu......uuu..u....u....................fl............fl. ...u.uu...e.......e..fl..u...le..u.......................................... fl......fl. .....uuuu..uuuuuuu.......u...u.uau..u.u..................................fl. ...u.....eu........e..a.u.......su....................fl......fl........fl.. ...............................................fl.....fl........fl..fl....fl. ..............................................................a....n...... ..I..................................fl...flfl...fl............a............ uu.uu..u..uu...u..uu...uuu..uuu..u...u...aaesuu........................flfl. .................fl.....u.ufl..............................................I ..... .a.....u...N..uu....a....fl.u.....u.uu..uu.............flfl.fl....fl. ..........................................fl..............n....n... .........................................fl..fl. U...... ....... ......fl............................................................fl. .....................................l...l.......U..................... ................fl................................fl................... .............................fl............................fl..flfl.fl. ..............................................fl..fl......fl.....fl.... ..............................un.u..an..u•..•......................e .....................................................U.........fl...... ..........................fl...................................fl...... ..........................flflU.....................fl................. ...................................U...............fl.fl......-fl...fl. ...................fl.................................................. ..............U.............fl.................................flflfl.. ....................fl.fl...............U....fl....fl..e............... ....................U.................................................. ....- .................fl.......fl........U..............fl.... a UN UN fiN NU.UU flNflNNU.UU.fl su.... Uu•U Us.... Uu• ..................... S U............................fl....... ..............fl............... .fl......................... ...u.........................u...flNNfl... -_r-U.............. .................fl................................... -U.. .e............................•.fl•••.N .._......................u.._.u. ....................................................................... UUNUIUNIU•••UU•UUU••U•U•u••UUI•N•fl•••NuNlflU••u••••••••u•U••U••U•uUUUN .................fl.................................................... U.... ...................U.....UU...UU.....U..........U........U...U..U......U.....0 ...................................U........U......fl....................U... ........fl...fl..U....fl.........................................U............ .....UU.U.U...U...UU............................................U..........UU. .U...U....U..flUU.........U.U.U.......U......U.UU....U..UUU..U..U......U...... ........................U..........................U.......................... ............UUU..........................................................U...0 .........................................fl.fl............fl..fl.............. .............UUU..U.....UU.U..N.U.UUUUOU.UU.UUU.UUU..UUUUUU.U.UUUNU...U.UUUU ....U.......UUU...U..U........................................................ .......................U...................................fl................. ..U......U...........U...................U....UU.UU..U......U......U..UU.fl... ..................U......U....U.................UU..U.U...U..Ufl...U..U....... .........U......U.................U.....U......U.......................U....U. ..........U........................UU...U.....U.U...UU.U.U....U..U.U.......... .......U.U.UU.....U............................U.....U.................U.UUUU. .......UU..UU...U.U.U..UUUUUU...fl.U....fl......e........U.UUU..UU.U.......... .0 .........U••UUUUUU•••••UUU•UU•UUN•UUU••U•UUUUu•U•u•UaUUU•••U•UUSUuU••UUUN• ........U.............................................U....................... ......U..UUU...............U.............U............U....................... .UU.U.UU.....U.....UU.UU..U.........UU..UU....U..UU......U.U.U.U.U.UU...lfl.I .U...U....U.......UU................UU....U........UUU..U..U.U.U....UU........ ..UU.......U...U...........U...U...U.U...UUU....U.........U...UUUU..U..U..UU.. ...............U..................................U.............U............. .UU.U....U.U..U....UU..U...UUU.UUU...UU..UU..UU.U.UU..U.U.U...UUUUU...U.0 ..... 1 H S I I I ix c I I LINTVEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 STANDARD GRADING SPECIFICATIONS These specifications present the usual and minimum requirements for projects on which Petra Geotechnical; Inc. is the geotechnical. consultant No deviation from these specifications will be allowed, except where specifically superseded in the preliminary geology and soils report, or in other written communication signed by the Soils Engineer or Engineering Geologist of record. I. GENERAL A. The Soils Engineer and Engineering Geologist are the Owner's or Builders' representative on the Project. For the purpose of these specifications, participation by the Soils Engineer includes that observation performed by any person or persons employed by, and responsible to, the licensed Civil Engineer signing the soils report. B.. Alf clearing, site preparation, or earthwork performed on the project shall be conducted by the Contractor under the supervision of the Soils Engineer. C. It is the Contractor's responsibility to prepare the ground surface to receive the fills to the satisfaction of the Soils Engineer and to place, spread, mix, water, and compact the fill in accordance with the specifications of the Soils Engineer. The Contractor shall also LINTVEDT, McCOLL& ASSOCIATES April 15, 1999 J.N. 17799 remove all material considered unsatisfactory by the Soils Engineer. It is also the Contractor's responsibility to have suitable and sufficient compaction equipment on the job site to handle the amount of fill being placed. If necessary, excavation equipment will be shut down to permit completion of compaction. Sufficient watering apparatus will' also be provided by the Conttactor, with due consideration for the fill material, rate of placement, and time of year. A final report shall be issued by the Soils Engineer and Engineering Geologist attesting to the Contractor's conformance with these specifications. II. SITE PREPARATION A All vegetation and deletenous material shall be disposed of off site This removal shall be concluded prior to placmg fill B. Soil, alluvium, or bedrock materials determined by the Soils Engineer as being unsuitable for placement in compacted fills shall be removed from the site Any material incorporated as a part of a compacted fillmustbe approved by the Soils Engineer. C. After the ground surface to receive fill has been cleared, it shall be scarified, disced, or bladed by the Contractor until it is uniform and free from ruts, hollows, hummocks, or other uneven features LINTVEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 which may prevent uniform compaction. The scarified ground surface shall then be brought to optimum moisture, mixed as required, and compacted as specified.' If the scarified zone is. greater than 12 inches in depth, the excess shall be removed and placed in lifts restricted to 6 inches. 'Prior to placing fill, the ground surface to receive fill shall be inspected, tested, and approved by the Soils Engineer. D. Any underground structures such as cesspools, cisterns,, mining shafts, tunnels, septic tanks, wells, pipe lines, or others are to be removed or treated in a manner prescribed by the Soils Engineer. E In order to provide umform bearing conditions in cut-fill transition lots and where cut lots are partially in soil, colluvium, or unweathered bedrock materials, the bedrock portion of the lot extending a minimum of 3 feet outside of building lines shall be over excavated a minimum of 3 feet and replaced with compacted fill. (Typical details are given on Plates SG-1..) ilL COMPACTED FILLS A. Any material imported or excavated on the property may be utilized in the fill, provided each material has been determined to be suitable by the Soils Engineer. Roots, tree branches, and other matter missed during clearing shall be removed from the fill as directed by the Soils Engineer. LINTVEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 B. Rock fragments less than 6 inches in diameter may be utilized in the fill; provided: 1.' They are not placed in concentrated pockets. There is a sufficient percentage of fine grained material to surround the rocks. The distribution of rocks is supervised by the Soils Engineer. C. Rocks greater than 6 inches in diameter shall be taken off site, or placed in accordance with the recommendations of the Soils Engmeer in areas designated as suitable for rock disposal (A typical detail for Rock Disposal is given in Plate SG-2) D Material that is spongy, subject to decay, or otherwise considered unsuitable shall not be used in the compacted fill Representative samples of material to be utilized as compacted fill shall be analyzed by the laboratory of the Soils Engineer to determine their physical properties. If any material other than that previously tested is encountered during grading, ,the appropriate analysis of this material shall be conducted by the Soils Engineer as soon as possible. Material used in the compaction process shailbe evenly spread, t LINTVEDT, McCOLL & ASSOCIATES April 15, 1999 T'T l'•V? (C watered processed, processed, and compacted in thin lifts not to exceed 6 inches in thickness to obtain a uniformly dense layer The fill shall be placed and compacted on a.horizontal plane, unless otherwise approved by the Soils Engineer. G. If the moisture content or relative density varies from that required by the Soils Engineer, the Contractor shall rework the fill until it is approved by the Soils Engineer. H Each layer shall be compacted to 90 percent of the maximum density m compliance with the testing method specified by the controlling governmental agency. (In general, AS1'M D-1557-91, the five-layer method will be used.) If compaction to a lesser perôentage is authorized by the controlling governmental agency because of a specific land use or expansive soils condition, the area to receive fill compacted to less than 90 percent shall either be delineated on the grading plan or appropriate reference, made to the area in the soils report. All fills, shall be keyed and benched through all topsoil, colluvium, alluvium or creep material, into sound bedrock or firm material except where the slope receiving fill. exceeds a ratio of five horizontal to one ', vertical, in accordance with the recommendations of the Soils Engineer. J. The key for hillside fills should be a minimum of 15 feet in width and within bedrock or firm 'materials, unless otherwise specified It LINTVEDT, McCOLL & ASSOCIATES April 15, 1999 J.N. 177-99 in the soils report. (See detail on Plate SG-3). Subdrainage devices shall be constructed in compliance with the ordinances of the controlling governmental agency, or with the recommendations of the Soils Engineer or Engineering Geologist. (Typical Canyon Subdrain details are given in Plate SG-4.) The contractor will be required to obtain a minimum relative compaction of 90 percent out to the finish slope face of fill slopes, buttresses, and stabilization fills. This may be achieved by either overbuilding the slope and cutting back to the compacted core, or by direct compaction of the slope face with suitable equipment, or by any other procedure which produces the required compaction. All fill slopes should be planted or protected from erosion by other methods specified in the soils report. Fill-over-cut slopes shall be properly keyed through topsoil, colluvium or creep material into rock or firm materials, and the transition shall be stripped of all soil prior to placing fill. (See detail on Plate SG-7.) IV. CUT SLOPES The Engineering Geologist shall inspect all cut slopes at vertical intervals not exceeding 10 feet. If any conditions not anticipated in the preliminary report such as ato P I LINTVEDT, McCOLL& ASSOCIATES April 15, 1999 J.N. 177-99 I S perched water, seepage, .lenticular or confined strata of a I . potentially adverse nature, unfavorably inclined bedding, joints or fault planes are encountered during grading, these conditions shall I be analyzed by the Engineering Geologist and Soils Engineer, and recommendations shall be made totreat these problems. (Typical details for stabilization of a portion of a cut slopes are given in Plates SG-5 and SG-8). I. . . Cut slopes that face in the same direction as the prevailing I . . drainage shall be protected from. slope wash by a nonerodible interceptor swale placed at the top of the slope: I . Unless otherwise specified in the soils and geological report, no cut slopes shall be excavated higher or steeperthan that allowed. by the ordinances of controlling governmental agencies. I . E. Drainage terraces shall be constructed in compliance with the ordinances of controlling governmental agencies, or with the I . . . . recommendations of the Soils Engineer orEngineering Geologist. I V. GRADING CONTROL I A Observation of the fill placement shall be provided by the Soils Engineer during the progress of grading. I . B. In general, density tests should be made at intervals not exceeding I . S • • 2 feet of fill height or every 500 cubic yards of fill placement. This I . S criteria will vary depending on soil conditions and the size of the LINTVEDT, McCOLL'& ASSOCIATES April 15, 1999 J.N. 177-99 job. In any event, an adequate number of field density tests shall be made to verily that.the required compaction is being achieved. C. Density tests should also be made on the surface material to receive fill as required by the Soils Engineer. D. All cleanouts, processed ground to receive fill, key excavations, subdrains, and rock disposals must be inspected and approved by the Soils Engineer or Engineering Geologist prior to placing any fill. It shall be the Contractor's responsibility to notify the Soils Engineer when such areas are ready for inspection. VI. CONSTRUCTION CONSIDERATIONS Erosion control measures, when necessary, shall be provided by the Contractor during grading and prior to the completion and construction of permanent drainage controls. Upon completion of grading and termination of inspections by the Soils Engineer, no further filling or excavating, including that necessary for footings, foundations, large tree wells, retaining walls, or other features shall be performed without the approval of the Soils Engineer or Engineering. Geologist. Care shall be taken by the Contractor during final grading to preserve any berms, drainage terraces, interceptor swales, or other devices of permanent nature on or adjacent to the property. CUT LOT UNSUITABLE MATERIAL EXPOSED IN PORTION OF CUT PAD A LE EDR0 CK - - - 0pSOlLs COLLUVI 5' -..uu--- -- PROPOSED GRADE I COMPACTED APPR COMPETENT OVED BEDROCK TYPICAL BENCHING ORIGINAL GRADE - - - - (D) OR I 5' MIN. (D) OVEREXCAVATE AND RECOMPACT DEPTH OF FILL (F) DEPTH OF OVEREXCAVATION (D) FOOTING DEPTH TO 3 FEET EQUAL DEPTH 3TO6FEET 3FEET GREATER THAN 6 FEET ONE—HALF THE THICKNESS OF FILL PLACED ON THE 'FILL' PORTION (F) TO 15 FEET MAXIMUM. CUT-FILL TRANSITION LOT ORIGINAL \G ROUND - - — (D) OR 5'I N - --- PROPOSED GRAD. -_- () 130- \1 COMPACTED (F) COMPETENT BEDROCK OR FILL APPROVED FOUNDATION MATERIAL OVEREXCAVATE AND RECOMPACT ---I TYPICAL BENCHING PONTO BEACH PARKING PETRA GELITECHNICAL I INC,DWG. BY: RSH DATE: 04-15-99 JOB NO.: 177-99 PLATE SG-1 TYPICAL ROCK DISPOSAL DETAIL FINISHED GRADE CLEAR AREA FOR FOUNDATIONS, 4 13' / SLOPE FACE UTILITIES, AND SWIMMING POOLS -I- 15'--._, Y STREET 15' 5' OR BELOW DEPTH OF DEEPEST UTILITY TRENCH, '- WINDROW WHICHEVER IS GREATER. TYPICAL WINDROW DETAIL (END VIEW) HORIZONTAL PLACED COMPACTED FILL 6 TO 8 INCH LIFTS GRANDULAR SOIL FLOODED TO FILL VOIDS PROFILE VIEW PONTO BEACH PARKING PETRA GELITECHNICAL ) INC, DWG, BY: RSH DATE: 04-15-99 JOB NO.177-99 PLATE SG-2 FILL SLOPE ABOVE NATURAL SLOPE FINISHED GRADE TOE OF SLOPE AS SHOWN COMPACTED FILL ON GRADING PLANS NATURAL TOPOGRAPHY 7 - - TYPICAL BENCHING /•/ COMPETENT BEDROCK OR APPROVED PROJECTION FOUNDATION MATERIAL 2% MIN. H 15' MINIMUM - I BASE KEY WIDTH I 2' MIN. DOVNSLDPE KEY DEPTH NOTE: WHERE NATURAL SLOPE GRADIENT IS 5:1 OR LESS, BENCHING IS NOT NECESSARY HOWEVER, FILL IS NOT TO BE PLACED ON COMPRESSIBLE OR UNSUITABLE MATERIAL. PONTO BEACH PARKING PETRA GEUTECHNICAL, INC,DG, BY RSH IDATE: 04-15-99 JOB NO.: 177-99 PLATE SG-3 CANYON SUBDRAIN DETAIL - NATURAL GROUND TYPICAL BENCHING COMPETENT BEDROCK OR SEE DETAIL BELOW APPROVED FOUNDATION NOTE: FINAL 20 FEET OF PIPE AT OUTLET SHALL BE NON-PERFORATED FILTER MATERIAL- MINIMUM OF 9 CUBIC FEET PER LNEAL FOOT. 4 SEE PLATE SG-6 FOR FILTER MATERIAL SPECIFICATIONS. 4 4 4 4 44 4 CHARACTERISTICS 4 ALTERNATE IN LIEU OF FILTER MATERIAL 44 9 CUBIC FEET PER LINEAL FOOT OF 4 . OPEN-GRADED GRAVEL ENCASED IN 44 FILTER FABRIC. SEE PLATE SG-6 FOR GRAVEL SPECIFICATIONS. FILTER FABRIC SHALL BE MIRAFI 140N OR APPROVED EQUAL. MINIMUM 6-INCH DIAMETER PVC SCHEDULE 40 OR ABS SCR-35 WITH A MINIMUM OF 16 PERFORATIONS PER LINEAL FOOT IN BOTTOM HALF OF PIPE. PIPE TO BE LAID WITH PERFORATIONS DOWN. FOR CONTINUOUS RUNS IN EXCESS OF 500 FEET USE 8-INCH DIAMETER PIPE. PDNTD BEACH PARKING tPETRA GEUTECHNICALI INC DWG. BY: RSH DATE: 04-15-99 JIB NO.: 177-99 PLATE' SG-4 DEPTH AND BEDDING MAY VARY WITH PIPE AND LOAD BUTTRESS DR STABILIZATION FILL DETAIL TO TOP OF BACK CUT 15' MIN. FINISHED GRADE 4' SUBDRAIN FINISHED BDRA 30' MAXIMUM SPACING SEE DETAIL PLATE SG-6 _,'~<4' ~SU GRADE IN 2'M IN. 2 MIN. // -TYPICAL BENCHING WIDTH VARIES (15' MIN.) NOTES: 1. MAXIMUM VERTICAL SPACING OF PERFORATED PIPE OF 30 FEET. 2, MAXIMUM HORIZONTAL DISTANCE BETWEEN NON-PERFORATED PIPE OF 100 FEET. 3. MINIMUM GRADIENT OF TWO PERCENT OF ALL PERFORATED PIPE AND NON-PERFORATED OUTLET PIPE. 100' MAX. MIN OUTLET PIPE (TYPICAL) PERFORATED PIPE (TYPICAL) PDNTD BEACH PARKING PETRA GELITECHNICAL I INC DJG, BY: RSH DATE 04-15-99 JOB NO.: 177-99 PLATE SG-5 12 !1.112' MIN "u BUTTRESS DR STABILZATIDN FILL SUBDRAIN SLOPE FACE A / - 27 MIN, APPROVED FILTER MATERIAL. 5 CUBIC FEET PER LINEAL FOOT. WITHOUT FILTER FABRIC, 3 CUBIC FEET WITH FABRIC 4-INCH PERFORATED PIPE WITH PERFORATIONS DOWN. MINIMUM 2% GRADE TO OUTLET PIPE. 4-INCH NON-PERFORATED PIPE. MINIMUM 2% GRADE TO OUTLET. APPROVED ON SITE MATERIAL PER SOILS ENGINEER COMPACTED TO A MINIMUM OF 90% MAXIMUM DENSITY. 4-INCH NON-PERFORATED PIPE SECTION A-A PIPE SPECIFICATIONS 4-INCH MINIMUM DIAMETER, PVC SCHEDULE 40, OR ABS SDR-35. MINIMUM 16 PERFORATIONS PER FOOT ON BOTTOM ONE-THIRD OF PIPE. FILTER MATERIAL SPECIFICATIONS CLASS 2 PERMEABLE FILTER MATERIAL PER CALTRANS STANDARD SPECIFICATION 68-1.025 CLASS 2 SIEVE SIZE PERCENT PASSING 1-INCH 100 3/4-INCH 90-100 3/8-INCH 40-100 NO. 4 25-40 NO. 8 18-33 NO. 30 5-15 NO. 50 0-7 NO. 200 0-3 ALTERNATE: OPEN GRADED GRAVEL ENCASED IN FILTER FABRIC. (MIRAFI 140N OR EQUAL) OPEN -GRADED SIEVE SIZE PERCENT PASSING 1 1/2-INCH 88-100 1-INCH . 5-40 3/4-INCH 0-17 3/8-INCH 0-7 NO. 200 0-3 PDNTD BEACH PARKING tPETRA GEIIITECHNICAL, INC. DWG. BY: RSH DATE: 04-15-99 JOB NO.: 177-99 PLATE SG-6 - - - - - - - - - - - - - - - - - - - FILL SLOPE ABOVE CUT SLOPE COMPACTED FILL CUT/FILL CONTACT - SHOWN ON GRADING PLAN REMOVE ALL TOPSOIL, COLLUVIUM, OR CREEP MATERIAL FROM TRANSITION AS-BUILT SHOWN ON NATURAL TOPOGRAPHY - \ J ....- t-----1 - TIIJ!I. VARIES 10' TYPICAL CUT ' 15' MINIMUM - OR PER SOILS ENGINEER BEDROCK OR APPROVED FOUNDATION MATERIAL — — — — — — — — — — — - — — — —. — — — NATURAL TOPOGRAPHY STABILIZATION FILL DETAIL - JAPI S - z_- 2Z MIN V4' TYPICAL .0$ ARIES 10' TYPICAL NISH GRADE COMPACTED FILL BEDROCK OR APPROVED FOUNDATION MATERIAL NOTE: 1. SUBDRAINS NOT REQUIRED UNLESS SPECIFIED. 2. V' SHALL BE EQUIPMENT WIDTH (15') FOR SLOPE HEIGHTS LESS THAN 30 FEET FOR SLOPE HEIGHTS GREATER THAN 30 FEET, 'W SHALL BE DETERMINED BY THE PROJECT SOILS ENGINEER I .' COMPACTED FILL I NO \ INSTALL 6-INCH PIPE SUBDRAIN PER PLATES SG-4 AND SG-8 SHEAR KEY ON DAYLIGHT CUT LOTS EXISTING TOPOGRAPHY PROPOSED DAYLIGHT CUT PROPOSED CUT LOT RECONSTRUCT AT 1.5:1 OR FLATTER NOTE: V' SHALL BE 10 FEET DR AS DETERMINED BY THE PROJECT SOILS ENGINEER *PETRA GELITECHNICAL I INC PONTO BEACH PARKING 1E225 WORLD TRADE DRIVE, SUITE 0 DWG. BY: RSH DATE: 04-15-99 SAN DIEGO, CALIF. 9128 (619) 485-8502 FAX (619) 485-8215 JOB NO.: 177-99 PLATE SG-9 -